Bernie Burnettbernie.burnett@vancouver.caEngineering Webmasterengineering.webmaster@vancouver.caFME(R) 2021.1.0.0urn:uuid:1a538f5b-2025-4d94-a81b-cd3705083746http://vancouver.ca/engsvcs/streets/roadwork/images/roadahead.gifCopyright 2016, City of VancouverMedia releases about roadwork affecting major routes in Vancouver.City of Vancouver Road Ahead Information2024-03-28T04:25:02-07:00sidewalk demo and tree pit installation on south side of 1200 E Pender
Location:
Schedule: Nov 3, 2022 - Jan 31, 2023urn:uuid:b200b4f1-8cde-478d-8d9f-7871ec5b244c2022-12-08T08:00:00Z1200 E Pender Tree Pit Installation 2023-03-29T01:02:21.381426Z49.2804003625678 -123.07918464771382 49.280364621722356 -123.07713560756214Sewer Renewal Project
Local Streets: 1300-1400 Block Laburnum St
Location: 1300-1400 Block Laburnum St
Schedule: Apr 15, 2024 - Apr 26, 2024; Weekdays; 7:00 AM - 5:00 PMurn:uuid:1eb8dc38-e6e7-4de4-a721-2fe28722fa5f2024-03-13T07:00:00Z1400 Block Laburnum Sewer Main Replacement2024-03-22T17:24:50.1254574Z49.27255021626223 -123.15142689628027 49.273467227772386 -123.15140543860817Sewer Renewal Project
Curb lane closure on the north side of 2000 Block Cornwall Av
Location: North side of 2000 Block Cornwall Av
Schedule: Apr 8, 2024 - Apr 12, 2024; Weekdays; 7:00 AM - 5:00 PMurn:uuid:2673bdf5-6958-40bf-8423-45573fd5a6242024-03-22T07:00:00Z2000 Block Cornwall Sewer Main Replacement2024-03-22T17:25:22.5931382Z49.27255284260676 -123.15198732986097 49.27252834206675 -123.15086080207472New sidewalk, street lighting & paving along the frontages of 435 Boundary Rd.
Location: 435 Boundary Rd
Schedule: Feb 5, 2024 - Apr 5, 2024urn:uuid:b2d9110a-5025-4eb3-a384-47de5675ff6c2024-02-05T08:00:00Z435 Boudary Rd - Streetlighting, Sidewalk & Paving Construction2024-02-05T23:23:55.7835599Z49.2811265461867 -123.02447151041802 49.2811286734069 -123.02358093861905 49.2806160028951 -123.0236005116256New curb & paving along Kootenay St and E Hastings St fronting the development site.
Location:
Schedule: Mar 6, 2024 - Mar 29, 2024urn:uuid:63e241b5-f630-454f-8e84-cbc2332162a92024-03-05T08:00:00Z444 Kootenay St - Curb construction & Paving2024-03-06T00:00:15.0105676Z49.280764557558626 -123.02571168558909 49.281126298505455 -123.02571168558909 49.281126298505455 -123.02486245671696Crews will be on site to conduct Overhead Maintenance on behalf of BC Hydro
Traffic Impacts:
Parking Lane Closure, Both Sides, 1700-1800 Block of Blenheim St from W 1st Ave to Lane South of W 2nd Ave
WO# 2400223-01
Location: 1700-1800 Block of Blenheim Street
Schedule: Apr 4, 2024 8:00 AM - 5:00 PMurn:uuid:c1fd25a5-1719-4132-85f4-0d7200adb4622024-03-19T07:00:00ZBC Hydro - Overhead Maintenance on 1700-1800 Block of Blenheim Street2024-03-19T21:14:26.0120237Z49.271189638208654 -123.17758621657647 49.269833060862 -123.17765402717318Parking lane closure on both sides of 3500 Block of Mayfair avenue from West side of PL 3561 Mayfair avenue to Collingwood Street to facilitate overhead maintenance.
WO# 2386417-01
Location: Both sides of 3500 Block of Mayfair Avenue from West side of PL 3561 Mayfair Avenue to Collingwood St.
Schedule: Apr 4, 2024 8:00 AM - 5:00 PMurn:uuid:40c6040c-c259-4a66-b9be-0a46dcb29bdf2024-03-21T07:00:00ZBC Hydro - Overhead Maintenance on 3500 Block Mayfair Avenue2024-03-21T15:38:26.4854003Z49.23691104299144 -123.18408306527975 49.23690403778198 -123.18204458642845Crews will be on site to conduct Overhead Maintenance on behalf of BC Hydro
Traffic Impacts:
- Parking Lane Closure, Both Sides, 4400 Block of Quebec St from N PL 4458 Quebec St to S PL 4484 Quebec St
- Parking Lane Closure, South Side, 300 Block of E 32nd Ave from W PL 304 E 32nd Ave to E PL 392 E 32nd Ave
- Parking Lane Closure, Both Sides, 300 Block of Webber Ave from Sophia St to Lane East of Sophia St
WO# Mnt View VMA
Location: 4400 Block of Quebec St, 300 Block of E 32nd Ave and 300 Block of Webber Ave
Schedule: Apr 3, 2024 - Apr 8, 2024; M, W, Th, F; 7:00 AM - 3:00 PMurn:uuid:3312bc67-fa1f-40ae-9eab-19f395a9be9c2024-03-25T07:00:00ZBC Hydro - Overhead Maintenance on 4400 Block of Quebec St, 300 Block of E 32nd Ave and 300 Block of Webber Ave2024-03-25T18:20:32.118195Z49.24483113202916 -123.10259113708692 49.24534242762937 -123.10257504383284Crews will be on site to conduct Overhead Maintenance on behalf of BC Hydro
Traffic Impacts:
- Parking Lane Closure, Both Sides, 4400 Block of Quebec St from N PL 4458 Quebec St to S PL 4484 Quebec St
- Parking Lane Closure, South Side, 300 Block of E 32nd Ave from W PL 304 E 32nd Ave to E PL 392 E 32nd Ave
- Parking Lane Closure, Both Sides, 300 Block of Webber Ave from Sophia St to Lane East of Sophia St
WO# Mnt View VMA
Location: 4400 Block of Quebec St, 300 Block of E 32nd Ave and 300 Block of Webber Ave
Schedule: Apr 3, 2024 - Apr 8, 2024; M, W, Th, F; 7:00 AM - 3:00 PMurn:uuid:b022e73e-834d-4d37-8ed1-ecce9e212d132024-03-25T07:00:00ZBC Hydro - Overhead Maintenance on 4400 Block of Quebec St, 300 Block of E 32nd Ave and 300 Block of Webber Ave2024-03-25T18:20:32.118195Z49.24223797985155 -123.09875249553427 49.24220996203002 -123.09685349155176Crews will be on site to conduct Overhead Maintenance on behalf of BC Hydro
Traffic Impacts:
- Parking Lane Closure, Both Sides, 4400 Block of Quebec St from N PL 4458 Quebec St to S PL 4484 Quebec St
- Parking Lane Closure, South Side, 300 Block of E 32nd Ave from W PL 304 E 32nd Ave to E PL 392 E 32nd Ave
- Parking Lane Closure, Both Sides, 300 Block of Webber Ave from Sophia St to Lane East of Sophia St
WO# Mnt View VMA
Location: 4400 Block of Quebec St, 300 Block of E 32nd Ave and 300 Block of Webber Ave
Schedule: Apr 3, 2024 - Apr 8, 2024; M, W, Th, F; 7:00 AM - 3:00 PMurn:uuid:1896d0e6-2e57-4690-8dd9-c172e980cbdf2024-03-25T07:00:00ZBC Hydro - Overhead Maintenance on 4400 Block of Quebec St, 300 Block of E 32nd Ave and 300 Block of Webber Ave2024-03-25T18:20:32.118195Z49.24819560548184 -123.09903443810826 49.248178096457906 -123.09804202077277Parking lane closure on both sides of 5200-5300 Block of McKinnon Street from South side of PL 5336 McKinnon Street to Lane South of Euclid Avenue to facilitate overhead maintenance work.
WO# 2401766-01
Location: Both sides of 5200-5300 Block of McKinnon Street from South side of PL 5336 McKinnon Street to Lane South of Euclid Avenue.
Schedule: Apr 8, 2024 8:00 AM - 5:00 PMurn:uuid:3f46010e-674a-46c0-b350-9362949c3c4f2024-03-21T07:00:00ZBC Hydro - Overhead Maintenance on 5200-5300 McKinnon Street2024-03-21T19:00:14.800954Z49.23579992068724 -123.03709521993576 49.236903184460175 -123.0360138210244Parking Lane Closure on both sides of 1700 Block Ted Northe Lane from Denman Street to Bidwell Street to facilitate a pole installation/removal.
WO# 2355073-01
Location: Both sides of 1700 Block ted Northe Lane from Denman Street to Bidwell Street.
Schedule: Apr 8, 2024 8:00 AM - 5:00 PMurn:uuid:ba11aaba-1f09-4b1c-b308-f86539e62b2e2024-03-27T07:00:00ZBC Hydro - Pole Installatin/Removal on 1700 Block Ted Northe Lane2024-03-27T16:23:33.4723702Z49.28968789566133 -123.13805745174183 49.28871520288905 -123.13655005027547Crews will be on site to conduct a Pole Installation/Removal on behalf of BC Hydro
Traffic Impacts:
Parking Lane Closure, South Side, 1100 Block of Melville St from Thurlow St to Bute St
WO# 197071-264
Location: 1100 Block of Melville Street
Schedule: Apr 19, 2024 8:00 AM - 5:00 PMurn:uuid:665a1bd6-0a6d-4ba6-9a7f-c765faf1046a2024-03-25T07:00:00ZBC Hydro - Pole Installation/Removal on 1100 Block of Melville Street2024-03-25T22:36:49.8991181Z49.286491644758485 -123.12201700252558 49.28786676684496 -123.12417349857357Parking lane closure on both sides of 1600 Block of Ted Northe Lane from Bidwell Street to Cardero Street to facilitate a pole installation/removal.
WO# 2355073-01
Location: Both sides of 1600 Block Ted Northe Lane from Bidwell Street to Cardero Street
Schedule: Apr 9, 2024 8:00 AM - 5:00 PMurn:uuid:d3044d1a-5a38-40ae-b8a4-8a66d51b0d072024-03-27T07:00:00ZBC Hydro - Pole Installation/Removal on 1600 Block Ted Northe Lane2024-03-27T16:57:03.56065Z49.28868819495426 -123.13649651424095 49.28770148645481 -123.13498374835653Alleyway lane closure on both sides of 1800 Block of Stovold Lane from Gilford Street to Denman Street to facilitate a pole installation/removal.
WO# 2355073-0
Location: Both sides of 1800 Block Stovold Lane from Gilford Street to Denman Street.
Schedule: Apr 7, 2024 8:00 AM - 5:00 PMurn:uuid:ea7ab5ae-fbbd-49d8-9f88-fcc4651544462024-03-19T07:00:00ZBC Hydro - Pole Installation/Removal on 1800 Block Stovold Lane2024-03-19T16:39:30.4583644Z49.29143036381478 -123.13858851976637 49.29044720900339 -123.13707038946396Alleyway lane closure on both sides of 1800 Block Ted Northe Lane from Gilford Street to East side of PL 1855 Nelson Street to facilitate a pole installation/removal.
WO# 2355073-0
Location: Both sides of 1800 Block Ted Northe Lane from Gilford Street to East side of PL 1855 Nelson Street.
Schedule: Apr 2, 2024 8:00 AM - 5:00 PMurn:uuid:bcd5484c-2c77-43ef-b5f2-62ebc525b41d2024-03-19T07:00:00ZBC Hydro - Pole Installation/Removal on 1800 Block Ted Northe Lane2024-03-19T15:29:08.8218978Z49.29072636430698 -123.13964014635226 49.290194545868104 -123.13881939039368Alleyway lane closure on both sides of 1800 Block Ted Northe Lane from West side of PL 1826 Barclay Street to Denman Street to facilitate a pole installation/removal.
WO# 2355073-01
Location: Both sides of 1800 Block Ted Northe Lane from West side of PL 1826 Barclay Street to Denman Street.
Schedule: Apr 4, 2024 8:00 AM - 5:00 PMurn:uuid:80ef3e71-15f3-4196-aabb-d7a7b34225902024-03-21T07:00:00ZBC Hydro - Pole Installation/Removal on 1800 Block Ted Northe Lane2024-03-21T15:48:51.7272862Z49.28975019316792 -123.13814347372183 49.290117571671374 -123.1387013731969Crews will be on site to conduct a Pole Installation/Removal on behalf of BC Hydro
Traffic Impacts:
Parking Lane Closure, Both Sides, 200-300 Block of E 59th Ave from W PL 320 E 59th Ave to Prince Edward St
WO# 2283498-01
Location: 200-300 Block of E 59th Avenue
Schedule: Apr 9, 2024 8:00 AM - 5:00 PMurn:uuid:1d53dbdc-2dfd-4a5d-9f29-2dc28cd167622024-03-22T07:00:00ZBC Hydro - Pole Installation/Removal on 200-300 Block of E 59th Avenue2024-03-22T20:53:07.8485451Z49.21672767321161 -123.09960543308392 49.21669389432529 -123.09783724140635Alleyway Lane Closure on both sides of 2000 block of Ted Northe Lane from Chilco St to West side of PL 2088 on Ted Northe Lane to facilitate a pole installation/removal.
Parking Lane Closure on both sides of 900 Chilco St from 25 M North of Ted Northe Lane to 25 M South of Ted Northe Lane to facilitate a pole installation/removal.
WO#2355073-01
Location: Both sides of 2000 block of Ted Northe Lane from Chilco St to West side of PL 2088 of Ted Northe Lane and both sides of 900 Chilco St from 25 M North of Ted Northe Lane to 25 M South of Ted Northe Lane.
Schedule: Mar 14, 2024 - Mar 28, 2024; Th; 8:00 AM - 5:00 PMurn:uuid:d2e5cdf8-94bb-4c29-b7bc-dc87a6891b192024-02-22T08:00:00ZBC Hydro - Pole Installation/Removal on 2000 Block of Ted Northe Lane2024-03-07T16:42:20.8838656Z49.292508766628714 -123.14241261908366 49.29162359766488 -123.14103932806802Alleyway Lane Closure on both sides of 2000 block of Ted Northe Lane from Chilco St to West side of PL 2088 on Ted Northe Lane to facilitate a pole installation/removal.
Parking Lane Closure on both sides of 900 Chilco St from 25 M North of Ted Northe Lane to 25 M South of Ted Northe Lane to facilitate a pole installation/removal.
WO#2355073-01
Location: Both sides of 2000 block of Ted Northe Lane from Chilco St to West side of PL 2088 of Ted Northe Lane and both sides of 900 Chilco St from 25 M North of Ted Northe Lane to 25 M South of Ted Northe Lane.
Schedule: Mar 14, 2024 - Mar 28, 2024; Th; 8:00 AM - 5:00 PMurn:uuid:9897d395-a0bd-4ee4-b922-80ee5ffccf502024-02-22T08:00:00ZBC Hydro - Pole Installation/Removal on 2000 Block of Ted Northe Lane2024-03-07T16:42:20.8838656Z49.29181602705256 -123.14076574274851 49.29147315234769 -123.14129145571543Travel lane closure on the North side of 2200-2400 Block SE Marine Drive from Lane East of 8300 Block Elliot St to 40m West of West side of PL 2289 SE Marine Drive to facilitate a pole installation/removal.
WO#: 2400564-01
Location: North side of 2200-2400 Block SE Marine Drive from Lane East of 8300 Block Elliot St to 40m West of West side of PL 2289 SE Marine Drive
Schedule: Apr 6, 2024 8:00 AM - 5:00 PMurn:uuid:bc57d6e7-56a7-4c0e-8b45-d5eaef9ac2222024-03-22T07:00:00ZBC Hydro - Pole Installation/Removal on 2200-2400 Block SE Marine Drive2024-03-22T19:11:25.9799971Z49.2071596142153 -123.05579190665173 49.207096529326606 -123.05687551909375 49.20707550101244 -123.05721884184766 49.20706498685206 -123.05751924925733 49.207093024608184 -123.0579108517735 49.207163118928975 -123.05835609846999 49.20743298113635 -123.05939679556762 49.207979710444164 -123.06100612097649Crews will be on site to conduct a Pole Installation/Removal on behalf of BC Hydro
Traffic Impacts:
Total Road Closure, Both Sides, 5700-5900 Block of Highbury St from W 41st Ave to SW Marine Dr
WO# 2390482-01
Location: 5700-5900 Block of Highbury Street
Schedule: Apr 10, 2024 8:00 AM - 5:00 PMurn:uuid:2cf0cc42-f7c4-47a9-bcd3-6f52fd938f4e2024-03-21T07:00:00ZBC Hydro - Pole Installation/Removal on 5700-5900 Block of Highbury Street2024-03-21T21:38:09.8683378Z49.234794370682295 -123.18836917583798 49.23176269692536 -123.1884379583875Parking lane closure on both sides of 1400 Block Ted Northe Lane from Nicola Street to Broughton Street to facilitate a pole installation/removal.
WO# 2355073-01
Location: Both sides of 1400 Block Ted Northe Lane from Nicola Street to Broughton Street.
Schedule: Apr 11, 2024 8:00 AM - 5:00 PMurn:uuid:9ba2c524-6c0e-4335-a0db-69b032fd98a42024-03-27T07:00:00ZBC Hydro - Pole Intallation/Removal on 1400 Block Ted Northe Lane2024-03-27T17:03:21.1459394Z49.286909969793044 -123.13374132521952 49.286164664913485 -123.13260943301525Crews will be onsite to conduct Underground Utility construction at Lane North of 800 blk of E23rd Ave on behalf of BC Hydro
Traffic Impacts; Parking Lane closure at
- both sides of Lane North of 800 blk of E23rd Ave from Prince Albert St to 50m East of Prince Albert St
- East side of 3800 blk of Prince Albert St from Lane North of E23rd Ave to E22nd Ave, for parking
- Not including Easter Long Weekend from Friday, March 29 to Monday, April 1, 2024
WO: 461-U07-02594/W02384528-02
Location: B/B of Lane North of 800 blk of E23rd Ave
E/S of 3800 blk of Prince Albert St
Schedule: Recurring schedule as follows:
- Mar 21, 2024 - Apr 11, 2024; Weekdays; 7:00 AM - 8:00 PM
Except:
- Does not occur Mar 29, 2024 (Stat Holiday)
urn:uuid:e9924385-9847-4c07-85d4-da334cea48532024-03-20T07:00:00ZBC Hydro - Underground Utility Construction at Lane North of 800 blk of East 23rd Ave2024-03-20T16:25:19.3368109Z49.2505208795358 -123.0876641042767 49.250513876256804 -123.08728859501461Crews will be onsite to conduct Underground Utility construction at Lane North of 800 blk of E23rd Ave on behalf of BC Hydro
Traffic Impacts; Parking Lane closure at
- both sides of Lane North of 800 blk of E23rd Ave from Prince Albert St to 50m East of Prince Albert St
- East side of 3800 blk of Prince Albert St from Lane North of E23rd Ave to E22nd Ave, for parking
- Not including Easter Long Weekend from Friday, March 29 to Monday, April 1, 2024
WO: 461-U07-02594/W02384528-02
Location: B/B of Lane North of 800 blk of E23rd Ave
E/S of 3800 blk of Prince Albert St
Schedule: Recurring schedule as follows:
- Mar 21, 2024 - Apr 11, 2024; Weekdays; 7:00 AM - 8:00 PM
Except:
- Does not occur Mar 29, 2024 (Stat Holiday)
urn:uuid:623974a4-e2c8-45e9-9c37-0e3878b47be02024-03-20T07:00:00ZBC Hydro - Underground Utility Construction at Lane North of 800 blk of East 23rd Ave2024-03-20T16:25:19.3368109Z49.2505208795358 -123.08768556194877 49.250941074456335 -123.08769092636682Total road closure on both sides of 100 block East 5th Avenue from Quebec Street to Lane East of Quebec Street to facilitate an underground utility construction.
Hooded Parking Meters: A5-01-16 (11 spots), A5-01-19 (11 spots)
No weekend work and will not be working on Easter long weekend (Friday, March 29th to Monday, April 1st).
WO# W02341789-02
Location: Both sides of 100 Block East 5th Avenue from Quebec Street to Lane East of Quebec Street.
Schedule: Mar 28, 2024 - Apr 12, 2024; Weekdays; 7:00 AM - 8:00 PMurn:uuid:583b7c6b-0fb1-4393-b390-f7e7ad3741b22024-03-22T07:00:00ZBC Hydro - Underground Utility Construction on 100 Block East 5th Avenue2024-03-22T16:43:52.410846Z49.26645394580697 -123.10279821477266 49.26642944223798 -123.10162877164215Crews will be on site to conduct Utility Maintenance on behalf of BC Hydro
Traffic Impacts:
Travel Lane, Parking Lane and Sidewalk Closure, South Side, 100-300 Block of W Cordova St from Homer St to 20m East of Lane East of Cambie St
WO# 455-U07-02349
Location: 100-300 Block of W Cordova Street
Schedule: Recurring schedule as follows:
- Feb 24, 2024 - Apr 5, 2024; Weekdays; 7:00 AM - 8:00 PM
Except:
- Does not occur Mar 18, 2024 (Work stoppage for filming)
- Does not occur Mar 29, 2024 (Stat Holiday)
- Does not occur Apr 1, 2024 (Holiday)
urn:uuid:cdfd819c-573f-4eaf-95af-b7b34ad518fa2024-02-22T08:00:00ZBC Hydro - Underground Utility Construction on 100-300 Block of W Cordova Street2024-03-25T17:26:47.5331918Z49.28406015088066 -123.10992486625865 49.283257856198304 -123.10859256259997 49.28313970440169 -123.10801296156036Crews will be on site to conduct Underground Utility Construction on behalf of BC Hydro
Traffic Impacts:
- Travel Lane, Parking Lane and Sidewalk Closure, Both Sides, 1400 Block of W 71st Ave from Granville St to French St
- Alleyway Lane Closure, Both Sides, Lane West of 8700 Block of French St from W 71st Ave to 20m South of W 71st Ave
WO# W02381250-02
Location: 1400 Block of W 71st Ave and Lane West of 8700 Block of French St
Schedule: Apr 2, 2024 - Apr 15, 2024; Weekdays; 7:00 AM - 8:00 PMurn:uuid:a9d91121-bcf7-4fa8-b68b-78a1f974164f2024-03-19T07:00:00ZBC Hydro - Underground Utility Construction on 1400 Block of W 71st Ave and Lane West of 8700 Block of French St2024-03-19T22:48:57.3350494Z49.20708265436505 -123.1406083735675 49.20705111188164 -123.13924581138795Crews will be on site to conduct Underground Utility Construction on behalf of BC Hydro
Traffic Impacts:
- Travel Lane, Parking Lane and Sidewalk Closure, Both Sides, 1400 Block of W 71st Ave from Granville St to French St
- Alleyway Lane Closure, Both Sides, Lane West of 8700 Block of French St from W 71st Ave to 20m South of W 71st Ave
WO# W02381250-02
Location: 1400 Block of W 71st Ave and Lane West of 8700 Block of French St
Schedule: Apr 2, 2024 - Apr 15, 2024; Weekdays; 7:00 AM - 8:00 PMurn:uuid:792af5d8-38bb-4438-a7ac-a3590ce210cf2024-03-19T07:00:00ZBC Hydro - Underground Utility Construction on 1400 Block of W 71st Ave and Lane West of 8700 Block of French St2024-03-19T22:48:57.3350494Z49.207061626045004 -123.13991099922364 49.206697133743575 -123.1399217280597Alleyway lane closure on both sides of Lane North of 100 Block of W King Edward Avenue from Columbia Street to 40 meters East of Columbia Street to facilitate underground utility construction work.
Parking lane closure on East side of 4000 Block of Columbia Street from Lane North of W King Edward Avenue to W 23rd Avenue to facilitate underground utility construction work.
WO# W02313761-01
Drawing: 461-U07-02533
Location: Both sides of Lane North of 100 Block of W King Edward Avenue from Columbia Street to 40 meters East of Columbia Street. East side of 4000 Block of Columbia Street from Lane North of W King Edward Avenue to W 23rd Avenue.
Schedule: Mar 25, 2024 - Apr 9, 2024; Weekdays; 7:00 AM - 8:00 PMurn:uuid:952a3b4c-aa2d-4478-93e1-979bc88307292024-03-13T07:00:00ZBC Hydro - Underground Utility Construction on Lane North of 100 Block W King Edward Avenue2024-03-13T16:41:01.8282595Z49.24949233071786 -123.11004285464072 49.24948532729297 -123.10951177725578Alleyway lane closure on both sides of Lane North of 100 Block of W King Edward Avenue from Columbia Street to 40 meters East of Columbia Street to facilitate underground utility construction work.
Parking lane closure on East side of 4000 Block of Columbia Street from Lane North of W King Edward Avenue to W 23rd Avenue to facilitate underground utility construction work.
WO# W02313761-01
Drawing: 461-U07-02533
Location: Both sides of Lane North of 100 Block of W King Edward Avenue from Columbia Street to 40 meters East of Columbia Street. East side of 4000 Block of Columbia Street from Lane North of W King Edward Avenue to W 23rd Avenue.
Schedule: Mar 25, 2024 - Apr 9, 2024; Weekdays; 7:00 AM - 8:00 PMurn:uuid:940ddf86-e9a2-4e21-bed7-878ba614660c2024-03-13T07:00:00ZBC Hydro - Underground Utility Construction on Lane North of 100 Block W King Edward Avenue2024-03-13T16:41:01.8282595Z49.25000707972677 -123.11001603255059 49.24949233071786 -123.11003749022272Parking lane and alleyway lane closure on both sides of Lane South of 1800 Block of W 4th Avenue from Burrard Street to 50 meters West of Burrard Street and North side of 1800 Block of W 5th Avenue from Burrard Street to 50 meters West of Burrard Street to facilitate underground utility construction.
B5-18-01/03/05/07/09; Motorcycle Meter: B5-18-97
WO#457-U07-03310 / W02393009-02
Location: Both sides of Lane South of 1800 Block W 4th Avenue from Burrard Street to 50 meters West of Burrard Street. North side of 1800 Block W 5th Avenue from Burrard Street to 50 meters West of Burrard Street.
Schedule: Mar 18, 2024 - Mar 28, 2024; Weekdays; 7:00 AM - 8:00 PMurn:uuid:05d8c4f9-1891-49e3-a5da-bb50e6aef3072024-03-07T08:00:00ZBC Hydro - Underground Utility Construction on Lane South of 1800 Block W 4th Avenue and 1800 Block W 5th Avenue2024-03-07T22:27:46.0172302Z49.26759798828908 -123.14569767829367 49.2676154904251 -123.14653989192436Parking lane and alleyway lane closure on both sides of Lane South of 1800 Block of W 4th Avenue from Burrard Street to 50 meters West of Burrard Street and North side of 1800 Block of W 5th Avenue from Burrard Street to 50 meters West of Burrard Street to facilitate underground utility construction.
B5-18-01/03/05/07/09; Motorcycle Meter: B5-18-97
WO#457-U07-03310 / W02393009-02
Location: Both sides of Lane South of 1800 Block W 4th Avenue from Burrard Street to 50 meters West of Burrard Street. North side of 1800 Block W 5th Avenue from Burrard Street to 50 meters West of Burrard Street.
Schedule: Mar 18, 2024 - Mar 28, 2024; Weekdays; 7:00 AM - 8:00 PMurn:uuid:b034a690-8831-48ab-954e-2ad71be5c44f2024-03-07T08:00:00ZBC Hydro - Underground Utility Construction on Lane South of 1800 Block W 4th Avenue and 1800 Block W 5th Avenue2024-03-07T22:27:46.0172302Z49.26716393332964 -123.14568694945763 49.26718493607689 -123.14653989192436Crew will be on site to do BC Hydro Utility Maintenance - BC Hydro
Traffic Impacts: Lane Closure (Alleyway)
WO: 2376259-01
Location: Both sides of the Lane North of 1500-1600 Block of E Broadway, from W of PL 1699 E Broadway to E of PL 1669 E Broadway
Schedule: Apr 3, 2024 - Apr 3, 2024; W; 8:00 AM - 5:00 PMurn:uuid:7d89fb43-fb33-4ef5-931b-3dd9f9e6aa292024-03-18T07:00:00ZBC Hydro - Utility Maintenance 1600 Block of E Broadway2024-03-18T20:14:09.6238727Z49.26280728492438 -123.07086852041294 49.26280728492438 -123.06993904513283Travel lane closure on West side of 1100 Block Howe Street from Davie Street to North side of PL 1189 Howe Street to facilitate utility maintenance work.
WO# 195075-16
Location: West side of 1100 Block Howe Street from Davie Street to North side of PL 1189 Howe Street.
Schedule: Mar 27, 2024 - Mar 28, 2024; W - Th; 10:00 PM - 6:00 AMurn:uuid:dbd0ccd7-4032-487a-a091-d9d1561e6af02024-03-13T07:00:00ZBC Hydro - Utility Maintenance on 1100 Block Howe Street2024-03-12T21:43:18.4640682Z49.278399189164304 -123.12629966217843 49.27781824194258 -123.12718479115333Crews will be on site to conduct Utility Maintenance on behalf of BC Hydro
Traffic Impacts:
- Total Road Closure, Both Sides, 1400 Block of Penticton St from Kitchener St to 20m S of Kitchener St
WO# W02392425
Location: 1400 Block of Penticton Street
Schedule: Apr 8, 2024 - Apr 12, 2024; Weekdays; 8:00 AM - 4:00 PMurn:uuid:44da4c3f-b9b6-4854-b69d-2dd0dbeabb942024-03-27T07:00:00ZBC Hydro - Utility Maintenance on 1400 Block of Penticton Street2024-03-27T20:44:05.6021038Z49.272301649856786 -123.05204896361917 49.27198314026538 -123.05205432803723Crews will be on site to conduct Utility Maintenance on behalf of BC Hydro
Traffic Impacts:
- Parking Lane Closure, Both Sides, 2000 Block of Venables St from Semlin Dr to 40m East of Semlin Dr
- Parking Lane Closure, Both Sides, 2400 Block of Venables St from Kamloops St to 40m West of Kamloops St
WO# W02392425
Location: 2000 Block of Venables St and 2400 Block of Venables St
Schedule: Apr 8, 2024 - Apr 12, 2024; Weekdays; 8:00 AM - 4:00 PMurn:uuid:ef791288-bf30-4023-84aa-1c26cb5b01342024-03-27T07:00:00ZBC Hydro - Utility Maintenance on 2000 Block of Venables St and 2400 Block of Venables St2024-03-27T20:55:45.5511487Z49.27663403415622 -123.06371286084321 49.27662703458233 -123.06296720673707Crews will be on site to conduct Utility Maintenance on behalf of BC Hydro
Traffic Impacts:
- Parking Lane Closure, Both Sides, 2000 Block of Venables St from Semlin Dr to 40m East of Semlin Dr
- Parking Lane Closure, Both Sides, 2400 Block of Venables St from Kamloops St to 40m West of Kamloops St
WO# W02392425
Location: 2000 Block of Venables St and 2400 Block of Venables St
Schedule: Apr 8, 2024 - Apr 12, 2024; Weekdays; 8:00 AM - 4:00 PMurn:uuid:f623536a-37f8-4c4e-b58f-a253409c7bfc2024-03-27T07:00:00ZBC Hydro - Utility Maintenance on 2000 Block of Venables St and 2400 Block of Venables St2024-03-27T20:55:45.5511487Z49.276632092542854 -123.05466704131992 49.276632092542854 -123.05531077148349Crews will be on site to conduct Utility Maintenance on behalf of BC Hydro
Traffic Impacts:
- Travel Lane Closure, North Side, 3400-3500 Block of E 1st Ave from Trans Canada Hwy EB On Ramp to 115m West
- Travel Lane Closure, North Side, 3100-3200 Block of E 1st Ave from 50m West of Windermere St to 35m East of Windermere St
- Travel Lane Closure, North Side, 2800 Block of E 1st Ave from Kaslo St to 115m East of Kaslo St
WO# W02392425
Location: 2800-3500 Block of E 1st Avenue
Schedule: Apr 8, 2024 - Apr 12, 2024; Weekdays; 10:00 PM - 5:00 AMurn:uuid:9a8d56e0-9c2f-4145-9d09-03df23b09dff2024-03-27T07:00:00ZBC Hydro - Utility Maintenance on 2800-3500 Block of E 1st Avenue2024-03-27T21:19:42.5843373Z49.26947776584208 -123.02811036308584 49.26946026436667 -123.03001473148642Crews will be on site to conduct Utility Maintenance on behalf of BC Hydro
Traffic Impacts:
- Travel Lane Closure, North Side, 3400-3500 Block of E 1st Ave from Trans Canada Hwy EB On Ramp to 115m West
- Travel Lane Closure, North Side, 3100-3200 Block of E 1st Ave from 50m West of Windermere St to 35m East of Windermere St
- Travel Lane Closure, North Side, 2800 Block of E 1st Ave from Kaslo St to 115m East of Kaslo St
WO# W02392425
Location: 2800-3500 Block of E 1st Avenue
Schedule: Apr 8, 2024 - Apr 12, 2024; Weekdays; 10:00 PM - 5:00 AMurn:uuid:623dab98-0ec9-425c-9faa-437f0de393382024-03-27T07:00:00ZBC Hydro - Utility Maintenance on 2800-3500 Block of E 1st Avenue2024-03-27T21:19:42.5843373Z49.26946219308388 -123.03720710894193 49.269473872736626 -123.03596605699693Crews will be on site to conduct Utility Maintenance on behalf of BC Hydro
Traffic Impacts:
- Travel Lane Closure, North Side, 3400-3500 Block of E 1st Ave from Trans Canada Hwy EB On Ramp to 115m West
- Travel Lane Closure, North Side, 3100-3200 Block of E 1st Ave from 50m West of Windermere St to 35m East of Windermere St
- Travel Lane Closure, North Side, 2800 Block of E 1st Ave from Kaslo St to 115m East of Kaslo St
WO# W02392425
Location: 2800-3500 Block of E 1st Avenue
Schedule: Apr 8, 2024 - Apr 12, 2024; Weekdays; 10:00 PM - 5:00 AMurn:uuid:7ed5df46-330b-4a69-9188-3cd7c8a5a1c32024-03-27T07:00:00ZBC Hydro - Utility Maintenance on 2800-3500 Block of E 1st Avenue2024-03-27T21:19:42.5843373Z49.26949376184379 -123.04696728700314 49.269489868628085 -123.04567850229103Both sides of Lane North of 400 Block W Hastings Street from West of PL 401 W Hastings Street to Homer Street to facilitate utility maintenance work.
WO# 197071-22
Location: Both sides of Lane North of 400 Block W Hastings Street from West of PL 401 W Hastings Street to Homer Street.
Schedule: Mar 31, 2024 8:00 AM - 5:00 PMurn:uuid:c1609d69-7e63-458b-a967-7d741553165e2024-03-22T07:00:00ZBC Hydro - Utility Maintenance on 400 W Hastings St 2024-03-22T15:54:29.4926875Z49.28377704007781 -123.11048890496345 49.283920510342 -123.1107088461027Crews will be on site to conduct Utility Maintenance on behalf of BC Hydro
Traffic Impacts:
- Travel Lane Closure, East Side, 800-900 Block of Burrard St from 100m N of Smithe St to 80m S of Smithe St
- Total Road Closure, Both Sides, 1000 Block of Barclay St from Burrard St to 80m West
WO# 2226208
Location: 800-900 Block of Burrard St and 1000 Block of Barclay St
Schedule: Apr 2, 2024 - Apr 10, 2024; Weekdays; 9:00 AM - 3:00 PMurn:uuid:22facd93-c440-41d6-b441-dc45bd521d132024-03-26T07:00:00ZBC Hydro - Utility Maintenance on 800-900 Block of Burrard St and 1000 Block of Barclay St2024-03-26T16:00:49.2121793Z49.28280631783687 -123.12355308889578 49.28177639350727 -123.12509832962617Crews will be on site to conduct Utility Maintenance on behalf of BC Hydro
Traffic Impacts:
- Travel Lane Closure, East Side, 800-900 Block of Burrard St from 100m N of Smithe St to 80m S of Smithe St
- Total Road Closure, Both Sides, 1000 Block of Barclay St from Burrard St to 80m West
WO# 2226208
Location: 800-900 Block of Burrard St and 1000 Block of Barclay St
Schedule: Apr 2, 2024 - Apr 10, 2024; Weekdays; 9:00 AM - 3:00 PMurn:uuid:38a40d6b-22fa-471e-87be-750154086a952024-03-26T07:00:00ZBC Hydro - Utility Maintenance on 800-900 Block of Burrard St and 1000 Block of Barclay St2024-03-26T16:00:49.2121793Z49.2818815782548 -123.12491021336336 49.28239873333368 -123.12570298904242Travel lane closure and sidewalk closure on South side of 900 Block Smithe Street from Burrard Street to Hornby Street to facilitate utility maintenance work.
Not working on the weekend of March 30th and 31st.
WO# 2226202-01
Location: South side of 900 Block Smithe Street from Burrard Street to Hornby Street.
Schedule: Mar 23, 2024 - Apr 5, 2024; All days; 9:00 PM - 5:00 AMurn:uuid:80a3fd46-1411-4611-beed-9737af6023d32024-03-15T07:00:00ZBC Hydro - Utility Maintenance on 900 Block Smithe Street2024-03-18T15:52:31.7070821Z49.282216761917084 -123.12437865563116 49.281611363635875 -123.12343451805793Alleyway lane closure on both sides of Lane East of 2900 Block Arbutus Street from W 13th Ave to Lane North of PL 2065 W 14th Ave to facilitate utility maintenance work.
WO# 1896143-03
Location: Both sides of Lane East of 2900 Block Arbutus Street from W 13th Ave to Lane North of PL 2065 W 14th Ave.
Schedule: Apr 5, 2024 8:00 AM - 5:00 PMurn:uuid:64b30320-80b4-4c64-8161-ceefc32274112024-03-21T07:00:00ZBC Hydro - Utility Maintenance on Lane East of 2900 Block Arbutus Street2024-03-21T20:21:03.338686Z49.260023945061334 -123.15237649613866 49.259596825464826 -123.15237649613866Alleyway Lane Closure on North side of Lane West of 400 Block of Homer Street from Homer Street to West side of PL 420 to facilitate utility maintenance work.
WO# 195075-05
Location: North side of Lane West of 400 Block of Homer St from Homer St to West side of PL 420.
Schedule: Mar 31, 2024 9:00 AM - 3:00 PMurn:uuid:9ebe5abf-5338-460b-894a-1fe548e7972a2024-03-26T07:00:00ZBC Hydro - Utility Maintenance on Lane West of 400 Block of Homer Street2024-03-26T17:06:27.733673Z49.28339567038478 -123.11192873814002 49.283096478737974 -123.11146203377145Parking lane closure on Both Sides of 1700 Block of Fir Street to facilitate a pole installation/removal.
WO# 2400754-01
Location: Both Sides of 1700 Block of Fir Street From 20m South of W 1st Avenue to 20m North of W 2nd Avenue.
Schedule: Apr 4, 2024 8:00 AM - 5:00 PMurn:uuid:4137ccfd-528f-425a-91fb-28f8880a43a42024-03-26T07:00:00ZBC Hydro Pole Installation/Removal on 1700 Block of Fir Street2024-03-26T19:01:45.306028Z49.270710807920636 -123.14128921153463 49.27026275925479 -123.1408058596667 49.26999771481579 -123.14080102585301Crew will be on site to do a pole replacement - BC Hydro
Traffic Impacts: Parking Lane Closure
WO: 2355073-01
Location: East Side of the street of 900 Block of Denman St, from Nelson St to 1700 Ted Northe Lane
Schedule: Apr 5, 2024 - Apr 5, 2024; F; 8:00 AM - 5:00 PMurn:uuid:f006f9dc-2fba-455f-8df3-835c0b5778a52024-03-20T07:00:00ZBC Hydro Pole Replacement - 900 Block of Denman St2024-03-20T17:32:17.9412449Z49.28936974262413 -123.13865246642338 49.289710299421785 -123.13810193075803Parking lane closure on Both Sides of 1200 Block of East 28th Avenue to facilitate tree trimming.
WO# Mnt View VMA
Location: Both Sides of 1200 Block of E 28th Avenue From W PL of 1238 to East PL of 1258.
Schedule: Apr 2, 2024 7:00 AM - Apr 3, 2024 3:00 PMurn:uuid:20b6dd0b-3c0a-4198-ab34-a522179907ea2024-03-20T07:00:00ZBC Hydro Tree Trimming on 1200 Block of East 28th Avenue2024-03-20T15:40:45.5433654Z49.245445939044686 -123.07949731048011 49.245438935045826 -123.07883748706247Crew will be on site to do an underground utility construction - BC Hydro
Parking Impacts: Alleyway Closure, Parking Lane
WO: W02352257-01/460-U07-01312
Location: Both sides of the Street of 100 Block of E Georgia St, from Main St to Lane W of Main St; West Side of the Street of 600-700 Block of Main St, from 30m N of E Georgia St to 30m S of E Georgia St
Schedule: Mar 20, 2024 - Apr 4, 2024; Weekdays; 7:00 AM - 8:00 PMurn:uuid:2e68994f-4473-4a35-aaa8-c29e6437201f2024-03-14T07:00:00ZBC Hydro Underground Utility Construction 100 Block E Georgia St, 600-700 Block of Main St2024-03-14T17:07:15.1389566Z49.27865826810441 -123.10051238688635 49.27863493707392 -123.0998474547267Crew will be on site to do an underground utility construction - BC Hydro
Parking Impacts: Alleyway Closure, Parking Lane
WO: W02352257-01/460-U07-01312
Location: Both sides of the Street of 100 Block of E Georgia St, from Main St to Lane W of Main St; West Side of the Street of 600-700 Block of Main St, from 30m N of E Georgia St to 30m S of E Georgia St
Schedule: Mar 20, 2024 - Apr 4, 2024; Weekdays; 7:00 AM - 8:00 PMurn:uuid:2b0ac4be-f5e7-409b-9c54-fe213e5478ce2024-03-14T07:00:00ZBC Hydro Underground Utility Construction 100 Block E Georgia St, 600-700 Block of Main St2024-03-14T17:07:15.1389566Z49.27898490030418 -123.09980013648979 49.27824297530785 -123.09982873594065Travel lane closure on 0-700 Block of Expo Boulevard, 600-700 Block of Carrall Street and Both Sides of 600-700 Block of Abbott Street/Pat Quinn Way to facilitate underground utility construction.
WO# 60L034-V07-00001/W02378001-0
Location: Both Sides of 0-700 Block of Expo Boulevard From Carrall Street to 100m West of W Georgia Street. Both Sides of 600-700 Block of Carrall Street From 40m North of Expo Boulevard to 40m South of Expo Boulevard. Both Sides of 600-700 Block of Abbott Street/Pat Quinn Way From 40m North of Expo Boulevard to 40m South of Expo Boulevard (9:30am to 3pm).
Schedule: Mar 25, 2024 - Apr 9, 2024; All days; 7:00 AM - 8:00 PMurn:uuid:306a5cd5-4a00-4b39-a624-7f8edc82d61f2024-03-15T07:00:00ZBC Hydro Underground Utility Construction on 0-700 Block of Expo Boulevard2024-03-18T17:20:22.7227607Z49.27864826697228 -123.10763239310842 49.27870706090991 -123.10789834554554 49.27873505801875 -123.1081299817186 49.278704261240875 -123.10858038526119 49.27859227264011 -123.1089278393572 49.27840749082887 -123.10930532055237Travel lane closure on 0-700 Block of Expo Boulevard, 600-700 Block of Carrall Street and Both Sides of 600-700 Block of Abbott Street/Pat Quinn Way to facilitate underground utility construction.
WO# 60L034-V07-00001/W02378001-0
Location: Both Sides of 0-700 Block of Expo Boulevard From Carrall Street to 100m West of W Georgia Street. Both Sides of 600-700 Block of Carrall Street From 40m North of Expo Boulevard to 40m South of Expo Boulevard. Both Sides of 600-700 Block of Abbott Street/Pat Quinn Way From 40m North of Expo Boulevard to 40m South of Expo Boulevard (9:30am to 3pm).
Schedule: Mar 25, 2024 - Apr 9, 2024; All days; 7:00 AM - 8:00 PMurn:uuid:d9a55796-df8b-415b-83e6-9855aa7a7ffa2024-03-15T07:00:00ZBC Hydro Underground Utility Construction on 0-700 Block of Expo Boulevard2024-03-18T17:20:22.7227607Z49.278351496223365 -123.10574069829492 49.27818071221981 -123.10604096732334 49.278051923982645 -123.10617823303399 49.277746750368806 -123.10632407805608 49.27762076072912 -123.10632407805608Travel lane closure on 0-700 Block of Expo Boulevard, 600-700 Block of Carrall Street and Both Sides of 600-700 Block of Abbott Street/Pat Quinn Way to facilitate underground utility construction.
WO# 60L034-V07-00001/W02378001-0
Location: Both Sides of 0-700 Block of Expo Boulevard From Carrall Street to 100m West of W Georgia Street. Both Sides of 600-700 Block of Carrall Street From 40m North of Expo Boulevard to 40m South of Expo Boulevard. Both Sides of 600-700 Block of Abbott Street/Pat Quinn Way From 40m North of Expo Boulevard to 40m South of Expo Boulevard (9:30am to 3pm).
Schedule: Mar 25, 2024 - Apr 9, 2024; All days; 7:00 AM - 8:00 PMurn:uuid:74898d72-2f08-47c2-81b8-d151d701d0e82024-03-15T07:00:00ZBC Hydro Underground Utility Construction on 0-700 Block of Expo Boulevard2024-03-18T17:20:22.7227607Z49.27903162307493 -123.10763553208614 49.27823090434629 -123.10765697987388Parking lane closure on the East Side of 300 Block of Cambie Street and the South Side of 100 Block of W Cordova Street to facilitate underground utility construction.
Pay Station and Parking meters to be hood: Pay Station: 56-03-10 (4 parking spots); 04-01-34
WO# 455-U07-02349
Location: East Side of 300 Block of Cambie Street From W Cordova to 15m South of Lane South of W Cordova. South Side of 100 Block of W Cordova Street From Cambie Street to 20m East of Lane East of Cambie Street.
Schedule: Mar 22, 2024 - Apr 5, 2024; Weekdays; 7:00 AM - 8:00 PMurn:uuid:92430d27-c2fc-4d30-a6dd-81af0e467fb72024-03-14T07:00:00ZBC Hydro Underground Utility Construction on 300 Cambie Street2024-03-14T21:37:04.8332883Z49.28336129126359 -123.10916836333489 49.28270466311807 -123.10947691152622Parking lane closure on the East Side of 300 Block of Cambie Street and the South Side of 100 Block of W Cordova Street to facilitate underground utility construction.
Pay Station and Parking meters to be hood: Pay Station: 56-03-10 (4 parking spots); 04-01-34
WO# 455-U07-02349
Location: East Side of 300 Block of Cambie Street From W Cordova to 15m South of Lane South of W Cordova. South Side of 100 Block of W Cordova Street From Cambie Street to 20m East of Lane East of Cambie Street.
Schedule: Mar 22, 2024 - Apr 5, 2024; Weekdays; 7:00 AM - 8:00 PMurn:uuid:fec3736d-f744-40bf-afa2-c28a02b1d7e22024-03-14T07:00:00ZBC Hydro Underground Utility Construction on 300 Cambie Street2024-03-14T21:37:04.8332883Z49.28335253618937 -123.1091549480478 49.28318619132054 -123.1082606046731Alleyway lane closure on Both Sides of Lane South of 1300 Block of W 10th Avenue and Parking lane closure on the South Side of 1300 Block of W 10th Avenue to facilitate underground utility construction.
WO# 457-U07-03236 / W02359547-02
Location: Both Sides of Lane South of 1300 Block of W 10th Avenue From Hemlock Street to 60m East of Hemlock Street. South Side of 1300 Block of West 10th Avenue From Hemlock Street to 40m East of Hemlock Street.
Schedule: Apr 4, 2024 - Apr 17, 2024; Weekdays; 7:00 AM - 8:00 PMurn:uuid:25d33054-f673-451f-961a-21dbe72b6a4f2024-03-20T07:00:00ZBC Hydro Underground Utility Construction on Lane South of 1300 Block of West 10th Avenue2024-03-20T15:24:10.6846807Z49.262141337620704 -123.13617221833915 49.26212383354289 -123.13497058870048Alleyway lane closure on Both Sides of Lane South of 1300 Block of W 10th Avenue and Parking lane closure on the South Side of 1300 Block of W 10th Avenue to facilitate underground utility construction.
WO# 457-U07-03236 / W02359547-02
Location: Both Sides of Lane South of 1300 Block of W 10th Avenue From Hemlock Street to 60m East of Hemlock Street. South Side of 1300 Block of West 10th Avenue From Hemlock Street to 40m East of Hemlock Street.
Schedule: Apr 4, 2024 - Apr 17, 2024; Weekdays; 7:00 AM - 8:00 PMurn:uuid:dc1631a4-f383-4188-995f-4acc605dfe7a2024-03-20T07:00:00ZBC Hydro Underground Utility Construction on Lane South of 1300 Block of West 10th Avenue2024-03-20T15:24:10.6846807Z49.26258243833192 -123.13615076066715 49.262568435195334 -123.13522808076601Alleyway lane closure on Both Sides of Lane West of 700 Block of Main Street to facilitate underground utility construction.
24 HOUR CLOSURE.
WO# 133 Union St
Location: Both Sides of Lane West of 700 Block of Main Street From Union Street to E Georgia Street.
Schedule: Feb 28, 2024 - Apr 30, 2024urn:uuid:9482748c-dafe-4f09-b2ed-d28ca29c389d2024-02-28T08:00:00ZBC Hydro Underground Utility Construction on Lane West of 700 Block of Main Street2024-02-28T18:43:35.2872861Z49.27865466512853 -123.10054098709078 49.27768595438715 -123.10058388266629Crew will be on site to do a Utility Maintenance - BC Hydro
Traffic Impacts: Parking Lane Closure
WO: W02392332
Location: East Side of the street of 1100 Block of Richards St, from 35m N of Davie St to 60m N of Davie St
Parking Meters: 59-11-24 (7 spots)
Schedule: Apr 2, 2024 - Apr 5, 2024; Tu - F; 8:00 AM - 4:00 PMurn:uuid:5f31bc20-cbcb-4632-96db-a26178c1cf822024-03-14T07:00:00ZBC Hydro Utility Maintenance 1100 Block of Richards St2024-03-14T18:39:03.5948589Z49.27605803268571 -123.12397662434344 49.27628668748571 -123.12361198412687Crew will be on site to do a Utility Maintenance - BC Hydro
Traffic Impacts: Parking Lane Closure, Travel Lane Closure
WO: W02392332
Location: 1. East Side of the Street of 600 Block of Richards St, from Dunsmuir St to 50m S of Dunsmuir St
Parking Meters: 59-06-10 (4 spots)
2. East Side of the Street of 700 Block of Richards St, from W Georgia St to 25m S of W Georgia St
Parking Meters: 59-07-04, 59-07-08 (1 Spot)
3. East Side of the Street of 800 Block of Richards St, from 30m N of Smithe St to 55m N of Smithe St
Parking Meter: 59-08-24 ( 5 spots)
Schedule: Apr 2, 2024 - Apr 5, 2024; Tu - F; 8:00 AM - 4:00 PMurn:uuid:9482d9d5-f95a-4400-aeff-1fae01202ca02024-03-14T07:00:00ZBC Hydro Utility Maintenance 600 to 800 Richards Block2024-03-14T18:47:28.6865641Z49.281215625037504 -123.1161773785526 49.28103365269891 -123.11646337109755Crew will be on site to do a Utility Maintenance - BC Hydro
Traffic Impacts: Parking Lane Closure, Travel Lane Closure
WO: W02392332
Location: 1. East Side of the Street of 600 Block of Richards St, from Dunsmuir St to 50m S of Dunsmuir St
Parking Meters: 59-06-10 (4 spots)
2. East Side of the Street of 700 Block of Richards St, from W Georgia St to 25m S of W Georgia St
Parking Meters: 59-07-04, 59-07-08 (1 Spot)
3. East Side of the Street of 800 Block of Richards St, from 30m N of Smithe St to 55m N of Smithe St
Parking Meter: 59-08-24 ( 5 spots)
Schedule: Apr 2, 2024 - Apr 5, 2024; Tu - F; 8:00 AM - 4:00 PMurn:uuid:9d874b03-b4a8-4c12-9dde-71c8d6d60f0b2024-03-14T07:00:00ZBC Hydro Utility Maintenance 600 to 800 Richards Block2024-03-14T18:47:28.6865641Z49.279218558555414 -123.119194596727 49.279433200353225 -123.11888000538576Crew will be on site to do a Utility Maintenance - BC Hydro
Traffic Impacts: Parking Lane Closure, Travel Lane Closure
WO: W02392332
Location: 1. East Side of the Street of 600 Block of Richards St, from Dunsmuir St to 50m S of Dunsmuir St
Parking Meters: 59-06-10 (4 spots)
2. East Side of the Street of 700 Block of Richards St, from W Georgia St to 25m S of W Georgia St
Parking Meters: 59-07-04, 59-07-08 (1 Spot)
3. East Side of the Street of 800 Block of Richards St, from 30m N of Smithe St to 55m N of Smithe St
Parking Meter: 59-08-24 ( 5 spots)
Schedule: Apr 2, 2024 - Apr 5, 2024; Tu - F; 8:00 AM - 4:00 PMurn:uuid:66e7c7a2-dc9c-4059-bf7e-88dfde1c06c42024-03-14T07:00:00ZBC Hydro Utility Maintenance 600 to 800 Richards Block2024-03-14T18:47:28.6865641Z49.28236416206218 -123.11445365014728 49.28197689584715 -123.11501848455622Crew will be on site to do a utility maintenance - BC Hydro
Traffic Impacts: Parking Lane Closure
WO: 197071-131
Location: North side of the street of 0 Block of Keefer Pl, from Taylor St to E Side of PL 550 Taylor St
Parking meters: 40-00-23 (5 spots)
Schedule: Apr 5, 2024 - Apr 5, 2024; F; 8:00 AM - 5:00 PMurn:uuid:6ae8fb49-5177-4389-87b2-188daf687c122024-03-15T07:00:00ZBC Hydro Utility Maintenance - 0 Block of Keefer Pl2024-03-15T16:19:40.3915448Z49.27946907182334 -123.10611136303886 49.2793524189056 -123.10533203373029Crew will be on site to do a utility maintenance - BC Hydro
Traffic Impacts: Travel Lane Closure
WO: W02280461
Location: South side of the street of 0 Block of W Pender St, from 35m W of Taylor St to Carrall St
Parking Meter: 08-00-36 (2 spots), 08-00-04, 08-00-06, 08-00-02
Schedule: Mar 25, 2024 - Mar 29, 2024; Weekdays; 9:30 AM - 3:00 PMurn:uuid:b5c3d9fd-7065-43dc-998e-89333f903cdf2024-03-07T08:00:00ZBC Hydro Utility Maintenance - 0 Block of W Pender St2024-03-07T21:15:56.416084Z49.280762341709476 -123.10582431130298 49.28049637946668 -123.10439434988747Crew will be on site for utility maintenance - BC Hydro
Traffic Impacts: Lane Closure (Alleyway), Total Road Closure
WO: W0228046
Location: Location1: Both sides of the lane North of 100 Block of Keefer st, from Columbia St to Lane W of Main St.
Location 2: Both sides of the street of 100 Block of Keefer St, from Lane W of Main St to 45m W of the Lane W of Main st
Schedule: Mar 25, 2024 - Mar 29, 2024; Weekdays; 9:30 AM - 3:00 PMurn:uuid:83f19503-863b-41cb-85d5-445506c1bc2c2024-03-07T08:00:00ZBC Hydro Utility Maintenance - 100 Block of Keefer St2024-03-07T23:09:34.5598189Z49.27999801321636 -123.10226561328173 49.27995135251874 -123.10052820956952Crew will be on site for utility maintenance - BC Hydro
Traffic Impacts: Lane Closure (Alleyway), Total Road Closure
WO: W0228046
Location: Location1: Both sides of the lane North of 100 Block of Keefer st, from Columbia St to Lane W of Main St.
Location 2: Both sides of the street of 100 Block of Keefer St, from Lane W of Main St to 45m W of the Lane W of Main st
Schedule: Mar 25, 2024 - Mar 29, 2024; Weekdays; 9:30 AM - 3:00 PMurn:uuid:48c27900-33ac-4ebb-ac72-cc005b02f07b2024-03-07T08:00:00ZBC Hydro Utility Maintenance - 100 Block of Keefer St2024-03-07T23:09:34.5598189Z49.27951274020907 -123.10056395839217 49.279540736860525 -123.10123604057821Crew will be on site to do a utility maintenance - BC Hydro
Traffic Impacts: Travel Lane Closure
WO: W02392332
Location: South Side of the Street of 1300 Block of Pacific Blvd, from Homer St to Drake St
Parking Meters: 32-13-38, 312-13-40, 31-13-36/34/32/30/28/26/24/22/20/18/16/12/10/08/06/04/02
Schedule: Apr 2, 2024 - Apr 5, 2024; Tu - F; 9:30 AM - 3:00 PMurn:uuid:ee2ef3f2-d464-4383-a97b-66b31de94c142024-03-14T07:00:00ZBC Hydro Utility Maintenance - 1300 Block of Pacific Blvd2024-03-14T18:46:50.9416774Z49.27308608349031 -123.12590374497033 49.27305574979667 -123.12568210086258 49.27305808317482 -123.12528528634556 49.273111750414415 -123.12488489730632 49.273205084653824 -123.12451668207655 49.27334735025144 -123.12402691999881 49.27344301740507 -123.1237087536444Crew will be on site to do a utility maintenance - BC Hydro
Traffic Impacts: Sidewalk closure, Travel Lane Closure
WO: W02280461
Location: North side of the street of 200 Block of Robson St, from Hamilton St to 20m East of Hamilton St
Parking Meter: 12-02-09 (4 spots)
Schedule: Mar 25, 2024 - Mar 29, 2024; Weekdays; 9:30 AM - 3:00 PMurn:uuid:f8b5ef11-0189-42c5-ab01-289853c3a9a42024-03-08T08:00:00ZBC Hydro Utility Maintenance - 200 Block of Robson St2024-03-08T17:33:32.7658356Z49.278856597384646 -123.11593272085162 49.2787400106441 -123.11574882541758Crew will be on site to do a utility maintenacen - BC Hydro
Traffic Impacts: Alleyway Closure
WO: W02349580-1
Location: Both sides of the Lane North of 2700-2800 Block of E 49th Ave, from Vivian St to Killarney St
Schedule: Apr 6, 2024 - Apr 6, 2024; Sa; 8:00 AM - 5:00 PMurn:uuid:61f420f9-2ae7-41e9-8564-bebc0f4eeca52024-03-19T07:00:00ZBC Hydro Utility Maintenance - 2700- 2800 Block of E 49th Ave2024-03-15T16:53:33.1260491Z49.22540633625857 -123.05030851753185 49.22538641568383 -123.04569689126319Crew will be on site to do a utility maintenance - BC Hydro
Traffic Impacts: Travel Lane Closure
WO: 195075-20
Location: West Side of the street of 400 Block of Howe St, from 20m N of W Hastings St to Lane S of W Hastings
Schedule: Mar 29, 2024 - Mar 29, 2024; F; 9:30 AM - 3:00 PMurn:uuid:7e3f437a-e753-46c1-be4c-0cf60c1a20722024-03-18T07:00:00ZBC Hydro Utility Maintenance - 400 Block of Howe St2024-03-15T19:46:31.8095265Z49.28563941488707 -123.11538055596323 49.2860988344253 -123.11469058506283Crew will be on site to do Utility Maintenance - BC Hydro
Traffic Impacts:
Parking Lane Closure, Travel Lane Closure, Total Road Closure
One Travel Lane to remain open on W 7th Ave WB & EB
WO: W02382332
Location: Both sides of the street of 600 Block of W 7th Ave, from Ash St to 20m W of Ash St, Both sides of the street of 400 Block of W 7th Ave, from Yukon St to Cambie st, from East side of the street of 2200 Block of Laurel St, from W 7th Ave to 35m N of W 7th Ave
Schedule: Apr 2, 2024 - Apr 5, 2024; Tu - F; 8:00 AM - 4:00 PMurn:uuid:e59be6fe-d20d-40a2-87d1-8265f55cde4a2024-03-14T07:00:00ZBC Hydro Utility Maintenance - 600 Block of W 7th Ave, 400 Block of W 7th Ave, 2200 Block of Laruel St2024-03-14T19:56:52.6792768Z49.26513422693449 -123.12416846012154 49.26537693482132 -123.12414701069706Crew will be on site to do Utility Maintenance - BC Hydro
Traffic Impacts:
Parking Lane Closure, Travel Lane Closure, Total Road Closure
One Travel Lane to remain open on W 7th Ave WB & EB
WO: W02382332
Location: Both sides of the street of 600 Block of W 7th Ave, from Ash St to 20m W of Ash St, Both sides of the street of 400 Block of W 7th Ave, from Yukon St to Cambie st, from East side of the street of 2200 Block of Laurel St, from W 7th Ave to 35m N of W 7th Ave
Schedule: Apr 2, 2024 - Apr 5, 2024; Tu - F; 8:00 AM - 4:00 PMurn:uuid:c396abbd-8ced-4d41-a13a-1e1f954efea02024-03-14T07:00:00ZBC Hydro Utility Maintenance - 600 Block of W 7th Ave, 400 Block of W 7th Ave, 2200 Block of Laruel St2024-03-14T19:56:52.6792768Z49.26487276760423 -123.11474653889533 49.264830760132355 -123.11284469014069Crew will be on site to do Utility Maintenance - BC Hydro
Traffic Impacts:
Parking Lane Closure, Travel Lane Closure, Total Road Closure
One Travel Lane to remain open on W 7th Ave WB & EB
WO: W02382332
Location: Both sides of the street of 600 Block of W 7th Ave, from Ash St to 20m W of Ash St, Both sides of the street of 400 Block of W 7th Ave, from Yukon St to Cambie st, from East side of the street of 2200 Block of Laurel St, from W 7th Ave to 35m N of W 7th Ave
Schedule: Apr 2, 2024 - Apr 5, 2024; Tu - F; 8:00 AM - 4:00 PMurn:uuid:d716b747-4c35-4112-9770-ed3b7a834cf62024-03-14T07:00:00ZBC Hydro Utility Maintenance - 600 Block of W 7th Ave, 400 Block of W 7th Ave, 2200 Block of Laruel St2024-03-14T19:56:52.6792768Z49.26501557441401 -123.11747760434882 49.265020241930785 -123.11782079514089Crew will be on site to do a Utility Maintenance - BC Hydro
Traffic Impacts: Travel Lane Closure
WO: W02280461
Location: Both sides of the street of 700 Block of Beatty St, from Robson St to 60m North of Robson st
Schedule: Mar 25, 2024 - Mar 29, 2024; Weekdays; 9:30 AM - 3:00 PMurn:uuid:9308bd61-6618-49e1-a140-b5296fc93ce92024-03-08T08:00:00ZBC Hydro Utility Maintenance - 700 Block of Beatty St2024-03-08T17:45:23.960756Z49.27759751660872 -123.11396046292782 49.27792182279245 -123.11347070085012Crew will be on site to do a Utility Maintenance - BC Hydro
Traffic Impacts: Single Lane Alternating Traffic
WO: W02280461
Location: Both sides of the street of 600 Block of Beatty St, from Dunsmuir St to 50m South of Dunsmuir St
Schedule: Mar 25, 2024 - Mar 29, 2024; Weekdays; 9:30 AM - 3:00 PMurn:uuid:1d327ea8-1590-4388-996f-a67bdf1d5da12024-03-08T08:00:00ZBC Hydro Utility Maintenance - 700 Block of Beatty St2024-03-08T17:53:17.0048503Z49.27984311744734 -123.11055703837147 49.2795538197048 -123.11099317656065Crew will be on site to do a utility maintenance - BC Hydro
Traffic Impacts: Travel Lane Closure
WO: W02280461
Location: South side of the street of 100 Block of W Pender St, from Cambie St to Beatty St
Schedule: Mar 25, 2024 - Mar 29, 2024; Weekdays; 9:30 AM - 3:00 PMurn:uuid:c481ce1a-70a9-482c-a9bc-8604f7ea54e72024-03-07T08:00:00ZBC Hydro Utility Maintenance - 900 Block of Hornby St2024-03-07T21:21:05.260938Z49.28124405096432 -123.1084862619096 49.2815053432181 -123.10997342222686Crew will be on site to do a utility maintenance - BC Hydro
Traffic Impacts: Travel Lane Closure
WO: W02280461
Location: Both sides of the street of 900 Block of Hornby St, from 35m South of Nelson St to Smithe St
Parking Meter: 63-09-15 (10 spots)
Schedule: Mar 25, 2024 - Mar 29, 2024; Weekdays; 9:00 PM - 5:00 AMurn:uuid:cbed0ddd-4c37-449a-92a7-eab4c40dafdd2024-03-07T08:00:00ZBC Hydro Utility Maintenance - 900 Block of Hornby St2024-03-07T17:30:37.683973Z49.28160029785957 -123.12338614102492 49.28049198342032 -123.12504139788946Crew will be on site to do a utility maintenance - BC Hydro
Traffic Impacts: Travel Lane Closure
WO: W02280461
Location: Both sides of the street of 900 Block of Hornby St, from 35m South of Nelson St to Smithe St
Parking Meter: 63-09-15 (10 spots)
Schedule: Mar 25, 2024 - Mar 29, 2024; Weekdays; 9:00 PM - 5:00 AMurn:uuid:5e369dd9-2597-4e96-b4b7-27c2fa648d262024-03-07T08:00:00ZBC Hydro Utility Maintenance - 900 Block of Hornby St2024-03-07T17:30:37.683973Z49.28050131541835 -123.1250127984386 49.28044532319004 -123.12510574616299Crew will be on site to do a utility maintenance - BC Hydro
Traffic Impacts: Travel Lane Closure
WO: W02280461
Location: West side of the street of 900 Block of Mainland St, from Smithe to 25m South of Smithe St
Parking Meters: 29-09-07, 29-09-09
Schedule: Mar 25, 2024 - Mar 29, 2024; Weekdays; 9:30 AM - 3:00 PMurn:uuid:4ec6e121-ae3f-47bd-952e-d8aac365934f2024-03-07T08:00:00ZBC Hydro Utility Maintenance - 900 Block of Mainland St2024-03-07T22:34:26.7356221Z49.27770637144366 -123.11738463219336 49.2775803817008 -123.11757052698754Alleway lane closure on Both Sides of 100 Block of W Cordova Street to facilitate utility maintenance.
Parking meters and Pay Stations to be hood: 04-01-34; Pay Station: 04-01-28 (6 parking spots); Pay Station: 04-01-06 (8 parking spots); Pay Station: 04-01-13 (9 parking spots)
WO# 2396045-031
Location: Both Sides of 100 Block of W Cordova Street From Cambie Street to Abbott Street.
Schedule: Mar 18, 2024 - Mar 29, 2024; Weekdays; 9:00 AM - 3:00 PMurn:uuid:98840897-3e74-4569-9ba1-e7448c1985102024-03-08T08:00:00ZBC Hydro Utility Maintenance on 100 Block of W Cordova Street 2024-03-14T16:09:59.7397872Z49.28337763062953 -123.10919431993213 49.28292131875412 -123.10678787804922Parking lane closure on the East Side of 200 Block of Cambie Street to facilitate utility maintenance.
WO# 2396045-03
Location: East Side of 200 Block of Cambie Street From Cordova Street to Water Street.
Schedule: Apr 9, 2024 9:00 AM - Apr 10, 2024 3:00 PMurn:uuid:7898a66f-0d93-4bd1-b318-fe257729f3a72024-03-27T07:00:00ZBC Hydro Utility Maintenance on 200 Block of Cambie Street2024-03-27T19:33:31.1055594Z49.283352888168565 -123.10916196078684 49.284313089442236 -123.108767321296Travel lane closure on Both Sides of 400-700 Block of Cambie Street, Both Sides of 500 Block of Hamilton Street and Both Sides of Lane South of W Pender Street to facilitate utility maintenance.
Parking meters to be hood: Pay Station: 56-04-13 (7 parking spots); 56-04-06/08/10/12/14; 56-07-14/16/18/20/22/24/26/28/30/32/34/36; 57-05-01/03/05/07; Pay Station: 57-05-19 (12 parking spots); Pay Station: 57-05-18 (15 parking spots)
WO# 60862 - Objective 4
Location: Both Sides of 400-700 Block of Cambie Street From W Hastings Street to Robson Street. Both Sides of 500 Block of Hamilton Street From Dunsmuir Street to W Pender Street. Both Sides of Lane South of 300-400 Block of W Pender Street From Hamilton Street to Richards Street.
Schedule: Apr 2, 2024 - Apr 22, 2024; Weekdays; 9:00 PM - 5:00 AMurn:uuid:cac92c96-2a95-4822-964f-3a81bb7ae4a02024-03-20T07:00:00ZBC Hydro Utility Maintenance on 400-700 Block of Cambie Street/500 Hamilton/300-400 W Pender2024-03-20T16:18:24.4169626Z49.28251607042799 -123.10954751331099 49.28151174120876 -123.10998203117138 49.280468896889715 -123.11153234798196 49.27934204032056 -123.11327041942357 49.278222157352104 -123.11496021110295Travel lane closure on Both Sides of 400-700 Block of Cambie Street, Both Sides of 500 Block of Hamilton Street and Both Sides of Lane South of W Pender Street to facilitate utility maintenance.
Parking meters to be hood: Pay Station: 56-04-13 (7 parking spots); 56-04-06/08/10/12/14; 56-07-14/16/18/20/22/24/26/28/30/32/34/36; 57-05-01/03/05/07; Pay Station: 57-05-19 (12 parking spots); Pay Station: 57-05-18 (15 parking spots)
WO# 60862 - Objective 4
Location: Both Sides of 400-700 Block of Cambie Street From W Hastings Street to Robson Street. Both Sides of 500 Block of Hamilton Street From Dunsmuir Street to W Pender Street. Both Sides of Lane South of 300-400 Block of W Pender Street From Hamilton Street to Richards Street.
Schedule: Apr 2, 2024 - Apr 22, 2024; Weekdays; 9:00 PM - 5:00 AMurn:uuid:44a96b37-f3b0-46e5-ad0b-38a5801fc89a2024-03-20T07:00:00ZBC Hydro Utility Maintenance on 400-700 Block of Cambie Street/500 Hamilton/300-400 W Pender2024-03-20T16:18:24.4169626Z49.28214850177679 -123.11096212675318 49.28110217145371 -123.11253390123592Travel lane closure on Both Sides of 400-700 Block of Cambie Street, Both Sides of 500 Block of Hamilton Street and Both Sides of Lane South of W Pender Street to facilitate utility maintenance.
Parking meters to be hood: Pay Station: 56-04-13 (7 parking spots); 56-04-06/08/10/12/14; 56-07-14/16/18/20/22/24/26/28/30/32/34/36; 57-05-01/03/05/07; Pay Station: 57-05-19 (12 parking spots); Pay Station: 57-05-18 (15 parking spots)
WO# 60862 - Objective 4
Location: Both Sides of 400-700 Block of Cambie Street From W Hastings Street to Robson Street. Both Sides of 500 Block of Hamilton Street From Dunsmuir Street to W Pender Street. Both Sides of Lane South of 300-400 Block of W Pender Street From Hamilton Street to Richards Street.
Schedule: Apr 2, 2024 - Apr 22, 2024; Weekdays; 9:00 PM - 5:00 AMurn:uuid:6e2f7d85-5a12-47cb-86b3-10679f5121982024-03-20T07:00:00ZBC Hydro Utility Maintenance on 400-700 Block of Cambie Street/500 Hamilton/300-400 W Pender2024-03-20T16:18:24.4169626Z49.28338780161485 -123.11289207063196 49.28215603000854 -123.11097160897731Parking lane closure on 600 Block of Seymour Street to facilitate utility maintenance.
Motorcycle Meter to be hood: Motorcycle Meter: 60-06-98
Parking Meter to be hooded: Pay Station: 60-06-28 (3 spots)
WO# W02280459
Location: East Side of 600 Block of Seymour Street From W Georgia Street to 25m North of W Georgia Street.
Schedule: Apr 2, 2024 9:30 AM - Apr 5, 2024 3:00 PMurn:uuid:b2915372-5076-4ac2-963f-f84af2fc8bdc2024-03-04T08:00:00ZBC Hydro Utility Maintenance on 600 Block of Seymour Street 2024-03-19T22:43:41.2738829Z49.28185215454559 -123.11709581820095 49.28215170370302 -123.11662396703424Crews will be on site to conduct Underground Utility Construction on behalf of BC Hydro/Telus
Traffic Impacts:
Total Road and Sidewalk Closure, Both Sides, 1500 Block of Grant St from Cotton Dr to 90m W of Cotton Drive
WO# W02393308-01
Location: 1500 Block of Grant Street
Schedule: Mar 26, 2024 - Apr 10, 2024; Weekdays; 7:00 AM - 8:00 PMurn:uuid:975c3499-913f-4864-bd35-5e0b6ace7f2e2024-03-18T07:00:00ZBC Hydro/Telus - Underground Utility Construction on 1500 Block of Grant Street2024-03-18T16:57:23.6837841Z49.27142335954147 -123.07154772779563 49.27143035985381 -123.07274399301627Crews will be on site to conduct Underground Utility Construction on behalf of BC Hydro/Telus
Traffic Impacts:
Parking Lane and Sidewalk Closure, East Side, 1500 Block of Maple St from York Ave to Cornwall Ave
WO# W02393538-03
Location: 1500 Block of Maple Street
Schedule: Apr 8, 2024 - Apr 19, 2024; Weekdays; 7:00 AM - 8:00 PMurn:uuid:aa4861b4-6e13-4745-be79-7d20fb8f256f2024-03-27T07:00:00ZBC Hydro/Telus - Underground Utility Construction on 1500 Block of Maple Street2024-03-27T16:09:19.4119802Z49.27250869545938 -123.15021225694635 49.27163716798756 -123.1502390790365Alleyway lane closure on Both Sides of Lane West of 6300 Block of Oak Street, Both Sides of Lane South of 1000 Block of W 47th Avenue and the South Side of 1000 Block of W 47th Avenue to facilitate underground utility construction.
WO# 458-U07-01097/W02380702-01/2849383U
Location: Both Sides of Lane West of 6300 Block of Oak Street From West 47th Avenue to Lane South of West 47th Avenue.
Schedule: Recurring schedule as follows:
- Feb 21, 2024 - Apr 3, 2024; Weekdays; 7:00 AM - 8:00 PM
Except:
- Does not occur Mar 29, 2024 (Good Friday - Stat)
- Does not occur Apr 1, 2024 (Easter Monday - Stat)
urn:uuid:40744ef1-d79e-409c-99cf-9dee7737d07d2024-02-12T08:00:00ZBC Hydro/Telus Underground Utility Contruction on Lane West of 6300 Block of Oak Street2024-03-14T22:14:46.8798671Z49.228428426349524 -123.12907587335602 49.227974408908295 -123.1290887418323Alleyway lane closure on Both Sides of Lane West of 6300 Block of Oak Street, Both Sides of Lane South of 1000 Block of W 47th Avenue and the South Side of 1000 Block of W 47th Avenue to facilitate underground utility construction.
WO# 458-U07-01097/W02380702-01/2849383U
Location: Both Sides of Lane West of 6300 Block of Oak Street From West 47th Avenue to Lane South of West 47th Avenue.
Schedule: Recurring schedule as follows:
- Feb 21, 2024 - Apr 3, 2024; Weekdays; 7:00 AM - 8:00 PM
Except:
- Does not occur Mar 29, 2024 (Good Friday - Stat)
- Does not occur Apr 1, 2024 (Easter Monday - Stat)
urn:uuid:300574ea-da17-4176-aaa5-9b52f4c0e5c42024-02-12T08:00:00ZBC Hydro/Telus Underground Utility Contruction on Lane West of 6300 Block of Oak Street2024-03-14T22:14:46.8798671Z49.2279744088014 -123.12908016284811 49.22799963215252 -123.12982654559974Alleyway lane closure on Both Sides of Lane West of 6300 Block of Oak Street, Both Sides of Lane South of 1000 Block of W 47th Avenue and the South Side of 1000 Block of W 47th Avenue to facilitate underground utility construction.
WO# 458-U07-01097/W02380702-01/2849383U
Location: Both Sides of Lane West of 6300 Block of Oak Street From West 47th Avenue to Lane South of West 47th Avenue.
Schedule: Recurring schedule as follows:
- Feb 21, 2024 - Apr 3, 2024; Weekdays; 7:00 AM - 8:00 PM
Except:
- Does not occur Mar 29, 2024 (Good Friday - Stat)
- Does not occur Apr 1, 2024 (Easter Monday - Stat)
urn:uuid:2e83ff18-8c14-4479-be12-0221c6b2713e2024-02-12T08:00:00ZBC Hydro/Telus Underground Utility Contruction on Lane West of 6300 Block of Oak Street2024-03-14T22:14:46.8798671Z49.22838919043767 -123.12826085742181 49.22842001872925 -123.12904155676473Crews will be on site to conduct Underground Utility Construction on behalf of BC Hydro/Telus/Shaw
Traffic Impacts:
- Total Road and Sidewalk Closure, Both Sides, 500 Block of W 13th Ave from Cambie St to Ash St
- Alleyway Lane Closure, Both Sides, Lane West of 2900 Block of Cambie St from W 13th Ave to 20m South of W 13th Ave
WO# 461-U07-02624 / W02397619-03 / 2903515U / PER-4216078
Location: 500 Block of W 13th Ave and Lane West of 2900 Block of Cambie St
Schedule: Mar 21, 2024 - Apr 5, 2024; Weekdays; 7:00 AM - 8:00 PMurn:uuid:e61f3950-05d7-4c02-954a-ad962a4aeff92024-03-13T07:00:00ZBC Hydro/Telus/Shaw - Underground Utility Construction on 500 Block of W 13th Ave and Lane West of 2900 Block of Cambie St2024-03-13T21:04:37.8261427Z49.25944603524147 -123.1149874004877 49.25948454629403 -123.1176696095026Crews will be on site to conduct Underground Utility Construction on behalf of BC Hydro/Telus/Shaw
Traffic Impacts:
- Total Road and Sidewalk Closure, Both Sides, 500 Block of W 13th Ave from Cambie St to Ash St
- Alleyway Lane Closure, Both Sides, Lane West of 2900 Block of Cambie St from W 13th Ave to 20m South of W 13th Ave
WO# 461-U07-02624 / W02397619-03 / 2903515U / PER-4216078
Location: 500 Block of W 13th Ave and Lane West of 2900 Block of Cambie St
Schedule: Mar 21, 2024 - Apr 5, 2024; Weekdays; 7:00 AM - 8:00 PMurn:uuid:b4c3c7b2-4143-46c0-8fd4-0c7bdd2db1c72024-03-13T07:00:00ZBC Hydro/Telus/Shaw - Underground Utility Construction on 500 Block of W 13th Ave and Lane West of 2900 Block of Cambie St2024-03-13T21:04:37.8261427Z49.25946231630303 -123.11560514542796 49.25921222821415 -123.11560514542796Crews will be on site to conduct Underground Utility Construction on behalf of BC Hydro/Telus/Shaw
Traffic Impacts:
- Single Lane Alternating Traffic, Both Sides, 8000-8200 Block of Manitoba St from SW Marine Dr to 180m S of SW Marine Dr
- Travel Lane, Parking Lane and Sidewalk Closure, South Side, 100-200 Block of SW Marine Dr from 50m W of SW Marine Dr to 50m E of SW Marine Dr
WO# W02311970-03
Location: 8000-8200 Block of Manitoba St and 100-200 Block of SW Marine Dr
Schedule: Recurring schedule as follows:
- Mar 4, 2024 - Apr 16, 2024; M - Sa; 7:00 AM - 8:00 PM
Except:
- Does not occur Mar 29, 2024
- Does not occur Mar 30, 2024
- Does not occur Apr 1, 2024
- Does not occur Apr 13, 2024
urn:uuid:29f230bc-2662-4664-ae92-d15b0409973e2024-02-26T08:00:00ZBC Hydro/Telus/Shaw - Underground Utility Construction on 8000-8200 Block of Manitoba St and 100-200 Block of SW Marine Dr2024-03-26T20:31:24.0416569Z49.21222045308673 -123.10995862129107 49.21056412972342 -123.11006332131946Crews will be on site to conduct Underground Utility Construction on behalf of BC Hydro/Telus/Shaw
Traffic Impacts:
- Single Lane Alternating Traffic, Both Sides, 8000-8200 Block of Manitoba St from SW Marine Dr to 180m S of SW Marine Dr
- Travel Lane, Parking Lane and Sidewalk Closure, South Side, 100-200 Block of SW Marine Dr from 50m W of SW Marine Dr to 50m E of SW Marine Dr
WO# W02311970-03
Location: 8000-8200 Block of Manitoba St and 100-200 Block of SW Marine Dr
Schedule: Recurring schedule as follows:
- Mar 4, 2024 - Apr 16, 2024; M - Sa; 7:00 AM - 8:00 PM
Except:
- Does not occur Mar 29, 2024
- Does not occur Mar 30, 2024
- Does not occur Apr 1, 2024
- Does not occur Apr 13, 2024
urn:uuid:a7962c38-1a8e-4c4d-85cd-cca632e1322f2024-02-26T08:00:00ZBC Hydro/Telus/Shaw - Underground Utility Construction on 8000-8200 Block of Manitoba St and 100-200 Block of SW Marine Dr2024-03-26T20:31:24.0416569Z49.21204450747072 -123.11056926512975 49.21230552452761 -123.1093674075578May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:4b193f85-38fc-4a6c-bb3d-b0a26d5363ed2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.2792698738281 -123.102175759035 49.27897590658014 -123.102122114855 49.27772614670519 -123.10209642022 49.27755816037717 -123.10209642022 49.27734817666243 -123.102074962548 49.277187188542484 -123.102085691384 49.27708919551651 -123.102074962548 49.276872210266106 -123.10209642022 49.2767112205926 -123.10220370857999May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:472456be-0003-4bb4-b812-b158d5ccfa3c2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.280533285853096 -123.104383684387 49.281081928204514 -123.10755405544302May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:7883e18b-8893-4c36-88b9-e767a783853f2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.280529927781515 -123.104367760121 49.280460061878216 -123.104080573138 49.280446063815305 -123.10340197425698 49.280384886216666 -123.099730271204 49.28026765213889 -123.097281414374 49.280258903315996 -123.09533413062901May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:d13cf86b-3edf-4306-8798-823eb3313e4f2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.280420966181794 -123.102273566565 49.279752553717 -123.102316481909 49.2795600772435 -123.10233793958102 49.2793011077122 -123.102203829131May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:5f79a8fb-4e27-4472-83d8-60e1541e91212024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.28170814090882 -123.11349264975401 49.28277195513431 -123.111888688764May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:ae58c051-e871-4121-93f6-96f87763e1bd2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.2776940218738 -123.099829982862 49.277701021296366 -123.100267182931 49.27768002302591 -123.10130519782 49.277641526173625 -123.102092978385May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:9b7ec361-f7fa-4671-947e-8ac8d93c06652024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.26670731786302 -123.11460126482416 49.2695916381482 -123.11481584154534 49.274379797537904 -123.1145583494799 49.275583764491756 -123.11138261400627May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:86ad9f00-e585-41bc-842e-535ecdf515b22024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.2771418725917 -123.107002854541 49.27714187259181 -123.10762512703302 49.27705787850411 -123.10820448418 49.27694588616498 -123.10867118854898 49.27674639918092 -123.109073519901 49.2755844589569 -123.11147677917799May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:9490d27a-3886-4a52-9edb-645df36e20412024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.27632974296381 -123.102710646084 49.276084755775 -123.102493387154 49.275775020230185 -123.10226808159702 49.27545303319519 -123.102160793236 49.27406530733029 -123.101823155153 49.2732456097618 -123.101801781614 49.272732853122704 -123.101820557077 49.27209474010081 -123.101937246799 49.27202648793221 -123.10197211551602 49.27182523098821 -123.101964068889May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:e3fda2ba-5b22-421b-a64e-09517c9b86af2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.27181737345251 -123.101950017417 49.27146910944114 -123.10215386530199 49.27064189963917 -123.102505234683 49.27019562060801 -123.102633980715May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:fca1c8a8-eb28-4e12-ae3a-e786dd8a0ddb2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.27610105464353 -123.10211067306501 49.276067806299295 -123.100823212738 49.276067806299295 -123.100723971004May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:dd82eb6e-ea8d-48f5-87b8-c7794da1af1b2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.27633070192269 -123.10270640993798 49.2767296784468 -123.10313556338001 49.27695016408856 -123.103537894733 49.27708340367141 -123.104155184043 49.277111401702 -123.10573768736198 49.27713583795202 -123.10701873767May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:58d8ce85-69a4-459f-9223-cd76c5a5e2d82024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.276704221029604 -123.102225166253 49.276585228307596 -123.102310996941 49.2764574858011 -123.102404874256 49.2763367425799 -123.10269455283May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:e9e7ef31-c95b-4bb0-9b17-019c2141418d2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.245110430655615 -123.112337024348 49.245026382032705 -123.11195078625 49.24501937797419 -123.111848862308 49.24485128027487 -123.111376793521May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:085e4b76-817b-4676-84de-1f399f5d641e2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.24484027897478 -123.111364033849 49.244686188880195 -123.11108776632 49.24356551918018 -123.109786894948 49.243005174792586 -123.109116342694May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:dd0b4a86-0268-4f89-a04e-dc56788795692024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.24511743470117 -123.11233165993 49.245169965010604 -123.115346462865May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:0e1a57b0-2962-4a20-b4d9-b944275ac6a82024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.240585528503686 -123.10523663203499 49.240525988621584 -123.102699262306May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:526062a9-6f97-4643-8696-a2478eeb4e392024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.240593006761 -123.10525961956 49.24062102549999 -123.106064282265 49.240831165535496 -123.106654368248 49.24299555586481 -123.10911127170499May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:9fa6168b-8670-4093-9110-23f0ce6b2d9e2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.2491270728726 -123.115364848404 49.248990504897705 -123.115515052109May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:808ebe92-a8ee-4ca6-b4b2-a96f62593bc12024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.26668499666022 -123.114642428731 49.26555082402268 -123.114631699895 49.2653162850699 -123.114717530583 49.24913057461049 -123.115359483986May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:1a1cf358-d2e7-4359-968e-41259e9d53312024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.27945573291419 -123.11685412948 49.27885729999559 -123.115950225042May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:9551ba28-f6a4-4591-afc6-68881842306b2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.2871432144257 -123.11706520033599 49.2879122288943 -123.119736653689May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:a5659f4b-2577-4bbe-94c9-b3abe0f716362024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.2876577794417 -123.116212405732 49.28658007429999 -123.11782977776801May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:1e24dbb7-d50e-47ba-a794-4c6e4aa3a8512024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.288357881939305 -123.11908477119198 49.287531130197266 -123.12037374435099May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:2ae75b56-482c-471b-b696-97ff3e494eff2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.293046680728395 -123.133043890088 49.29220000694076 -123.134374265759May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:da79449d-39e3-4afd-8a36-056cdcd9faa62024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.30439251074429 -123.13227779069598 49.307638377670116 -123.13553935685901 49.304280580484686 -123.132449452073 49.30271353015419 -123.128501240403 49.30215385724449 -123.125754658371 49.30025092180529 -123.121806446701 49.30069867793131 -123.11579829850801 49.297116515014096 -123.118201557785 49.2953190971171 -123.123260785225May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:b622fb53-1e25-4e32-9be3-1735bb4ae5bf2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.2953394921785 -123.123578160605 49.29746650949801 -123.12392148335898May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:f7982fb0-11c0-43a0-8798-93d54d7918512024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.276633298609 -123.11896737379298 49.27457538106799 -123.122137744849May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:2cad8918-9aed-410c-83d7-b2c470af9ca92024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.274881611444556 -123.12263226650902 49.2759420730917 -123.12112486504299May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:cb08d059-93bb-4cda-82df-38fea807403b2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.276641039235955 -123.118982510562 49.27776095810617 -123.11743755816998May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:36d4ea80-fc26-4f00-bbef-87006d8c4b842024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.276294498297716 -123.12165321445698 49.27594801581239 -123.121116772654 49.27557353200518 -123.120542779925May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:5323b1cf-1795-403b-ae9e-d56890380f252024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.27700230868291 -123.132372279421 49.281556386717 -123.139446184985May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:97e644b8-3b32-48fb-81b6-c2efc499c6d82024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.277744545214205 -123.11743570367801 49.27838148793964 -123.11658276121202 49.278713954776094 -123.116116056843 49.27884694088317 -123.115955124302May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:1e2e2559-55a5-4725-9b61-eb287ba1f5472024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.29732743558034 -123.12361736774 49.298111052613024 -123.12421818256 49.29771924565412 -123.126363949771 49.29626393539348 -123.127994732852 49.29783119081728 -123.130054669376 49.297047569334865 -123.131771283145 49.297047569334865 -123.133917050357 49.29564821427047 -123.136406140324 49.29492053393591 -123.13683529376601 49.29178578814387 -123.132200436588 49.28725124955639 -123.12567730426399 49.28182045084381 -123.117866711612 49.27930080503191 -123.11340351580999 49.27711700786301 -123.108511166567May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:a9fd6127-eca8-49cf-858c-6b4b1418c8e62024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.273405165724796 -123.123593139371 49.27318291422051 -123.124416577538 49.27311116352121 -123.124687480649 49.2730324126332 -123.125087129792 49.27301316239701 -123.125408100804 49.273004412287406 -123.125587808808 49.273037662696396 -123.12589358063599May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:533d076d-9cf9-4f6c-86b1-99d9fe81f15a2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.24517346702919 -123.11535182728302 49.245439619718894 -123.115716607709May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:d41c848f-1950-4278-b7d7-c47ecb7b0b302024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.2730438303422 -123.125920413316 49.273134831335796 -123.126384435475 49.27328008257393 -123.126778720201 49.27335533304719 -123.126939652741 49.27373333368769 -123.127513645471May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:56f43f5d-c3df-43d4-b449-8d115ccf1cc92024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.27399941419759 -123.12129784226099 49.273411415121444 -123.123580878812May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:6c2c1660-b278-428b-82bd-0840c3002a222024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.27384113080652 -123.127393918033 49.27473711879611 -123.12911053180301 49.27546509705391 -123.129968838687 49.276865025044515 -123.132543759342May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:736dc4e7-5210-463e-8c48-a606f3a3e69a2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.27497323825452 -123.129575073953 49.27411575418779 -123.130851805444 49.27397925534888 -123.131050288911 49.27386375603629 -123.131211221452 49.273685256566836 -123.13174229883698May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:ee7738ee-14a2-4fc1-aef9-221897948e8d2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.274094124427165 -123.12145932242399 49.27527314667989 -123.123292720106May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:f9b868e3-de2b-4627-93e2-792a489249ad2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.27366162926842 -123.208733568007 49.27360912927628 -123.205756316001May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:28a34301-3241-466c-876d-dfcaefc80dfa2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.28310489087562 -123.141778031165 49.281607155949075 -123.13953570442901 49.28054046514359 -123.138473549659 49.2800190354707 -123.137910285766 49.2764122555769 -123.134176650816 49.27605877426427 -123.133785048299 49.27541480179687 -123.13279799538202 49.274760321163996 -123.131821671301 49.274133831567895 -123.13090972023599May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:30915fca-bb47-4f49-a6a8-46545e3053dd2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.287663171445786 -123.14240366656202 49.2872747804671 -123.14185113150499May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:4c0c76a9-91c3-4448-925d-8cf02e67a3052024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.28310839020298 -123.14174048023898 49.2831433834634 -123.141879955108 49.28397621573188 -123.14248076992699 49.28452909661212 -123.14281336384498 49.28477404185588 -123.14281336384498 49.2855578584595 -123.14265243130401 49.2864606317855 -123.142437854583 49.286856027300814 -123.142330566222 49.2882533389278 -123.14250384833102 49.2886207285857 -123.142927637356 49.29035060823719 -123.14562174098099May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:f2ad821e-5f79-4885-8d69-d7585caf13d82024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.290641872188814 -123.146010700853 49.29159209922821 -123.14789897599898 49.29568466033061 -123.15030223527701 49.298035552407384 -123.153563801439 49.2990430432572 -123.157340351733May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:ab4494cc-d51f-4a4a-89f3-8244e7c569612024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.31379374486531 -123.143092457445 49.31256273295401 -123.140345875413 49.30998869954749 -123.13828593888998 49.30730260824873 -123.13553935685901May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:907f8c5c-8791-4cd3-b5cf-2086bce536e62024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.299154985413594 -123.157340351733 49.301314335961706 -123.15802699724098 49.30360899358797 -123.15648204484799 49.30819798828708 -123.155623737963 49.309764864199536 -123.15442210832401 49.311891258944996 -123.151332203538 49.3136818359628 -123.14326411882202May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:5bf21142-8ead-445e-9414-2d0743fb0f7b2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.26885843854251 -123.197742039117 49.268883773375364 -123.198718332841 49.268883773375364 -123.198678099706May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:fbefb54c-8a4e-4471-a5b7-6559cd8caf5b2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.27036357163428 -123.18359023412802 49.27046655497631 -123.189478781787May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:19a12112-83c8-4efd-961b-3987951647ec2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.2727366343436 -123.16430351452098 49.27271388392711 -123.16485336737 49.2726613829266 -123.16506794409102 49.27140675059388 -123.168266025772 49.271182739998864 -123.168885616055 49.271109236301015 -123.169247714272 49.2710917354043 -123.169438151112 49.27109698567389 -123.170906852134 49.27114059921752 -123.17331991390299 49.27114584948191 -123.1737356563 49.2713418589546 -123.17561856702902 49.27225124773702 -123.18425666635201 49.27229324889129 -123.184964769531 49.272286248701505 -123.18552266900701May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:ae4eb949-fe8a-4ce3-a038-5b0400865b4f2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.27269495033448 -123.161956830716 49.272470945589504 -123.155433698391 49.275382927935624 -123.153030439113 49.2781827488476 -123.151485486721 49.277958769023314 -123.145992322658 49.272694950334596 -123.145477338527May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:67830bac-239e-46e6-acbc-b2f46b8578c62024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.27275095136187 -123.16444592068198 49.27269495033448 -123.161871000027May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:f4ea8935-d92e-4409-bcc2-a8f9d0a73bfa2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.27226407189934 -123.187499642162 49.27138553978739 -123.187526464252May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:e007117c-18a9-43f3-a3e2-ed9f00276edf2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.2727047213518 -123.145324055345 49.27628865822669 -123.133908573777May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:dad3bf92-e985-4d8b-a476-1a75e993bd402024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.268663669501706 -123.18571209846002 49.2686286659673 -123.18571478066899 49.268859645010195 -123.197731675226May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:95a79084-d819-4142-b25d-03d2f264e6fb2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.26888902388009 -123.19874515493099 49.2688872737119 -123.19910993535699 49.26885752084388 -123.199533724381 49.26882076727637 -123.19970538575798 49.26882951812834 -123.19978585202898May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:a8b11d3d-b321-48a9-a7fe-20a9d9f4e32a2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.246214247456805 -123.196714783196 49.24524134575449 -123.196752334122 49.244789583920664 -123.19670941877801 49.24433431587582 -123.196687961106 49.243397713509125 -123.196675097613 49.24239609003729 -123.196750199466 49.240819715916984 -123.19673801496101 49.2400928564833 -123.196722476509 49.239588511356374 -123.19661518814799 49.23862358670792 -123.196593730476 49.2376212671079 -123.196657841931 49.237060855271096 -123.196663206349 49.23569890387981 -123.196658105556May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:837f866b-1b1c-4bd2-959d-9950aadf2abf2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.27225552657251 -123.185565171944 49.26866897548027 -123.185711959338May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:9534490d-8c37-4d0a-a3be-9bf03573cae02024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.250028626842294 -123.20566536890502 49.249804519187705 -123.20463540064299 49.2536142109623 -123.20120217310401 49.257871753854204 -123.203605432381 49.25876803187862 -123.226951379648 49.256303228146294 -123.235877771249 49.251821451456124 -123.24583413111401 49.260560539098606 -123.25750710474699 49.26571363470529 -123.261626977794 49.26907405931931 -123.25956704127 49.27163091873561 -123.253280683259 49.2754389259114 -123.250534101228 49.27924663912199 -123.244697614411 49.27924663912199 -123.238174482086 49.27745481069991 -123.22650150845301 49.2767828582582 -123.21860508511298 49.27476694600611 -123.21070866177202 49.273422958731345 -123.20693211148May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:f92b9b46-e7c1-45c4-87d8-538309bc1c1d2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.246224326090726 -123.196731293993 49.246238333864795 -123.19769152481999 49.24621382025771 -123.19820650895198 49.246238333864795 -123.198630297976 49.24629786685958 -123.198973620731 49.2467040900855 -123.199815834362 49.249033435019385 -123.204556513328May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:920fe51f-7bf9-454c-8c71-9bf81aaae9612024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.2688358306427 -123.199780590105 49.26886383335477 -123.20022047238301 49.26888308521009 -123.200421638059 49.26887783470491 -123.200866884756 49.26890758756056 -123.201215571928 49.268939090564686 -123.201387233305 49.269009097168464 -123.201596445608 49.26920861544468 -123.20196659045202 49.26931187458649 -123.202111429739 49.2694833892935 -123.202237493562 49.26959714871941 -123.202312595415 49.26988406606429 -123.202344781923 49.27004332789349 -123.20233405308699 49.2705541891971 -123.202243983948 49.27080970445559 -123.202225208485 49.27108271929697 -123.202278852665 49.27115622303461 -123.202316403591 49.271372650070305 -123.20246392508699 49.27163261000271 -123.202672830366 49.2717376141382 -123.202865949415 49.271947621738406 -123.20325218751302 49.27218562927138 -123.203842273497 49.272395634964624 -123.204475274824 49.272732139697496 -123.205355801856 49.27284414160431 -123.205613293922 49.272935142966304 -123.205709853446 49.273061144574996 -123.20575276879 49.273264146489794 -123.205742039954 49.273425147414315 -123.20573131111802 49.2735721477996 -123.205742039954 49.2747236356615 -123.205629387176 49.27484963270189 -123.205822506225May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:681235e4-0312-41db-a2c5-3918ae362c852024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.249069822998905 -123.2045922385384 49.249408712656304 -123.20521120617809 49.2497921003004 -123.20465518483938May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:b1a3e4a7-35e8-4865-81fb-dbea8a22fb6a2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.228392389557 -123.1282627778 49.227483833911975 -123.12829348514May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:671fb697-81ff-491e-9147-5af6187b92022024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.229302411319026 -123.12823203195 49.228392389557 -123.1282627778May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:79e97e0c-eac0-43e3-a851-08d36265e3402024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.23021968337804 -123.12820104279999 49.229302411319026 -123.12823203195May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:2661a19a-d6b6-4fba-84b3-50d9d901a5592024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.232095660743 -123.12813765737002 49.23021968337804 -123.12820104279999May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:d2817c7b-1dec-4ffe-8cd3-be1d33620e9f2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.23395165002199 -123.12807425681 49.23300098656202 -123.12810673008May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:47b6a21a-e290-4fd7-95cf-bd677e3647872024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.23300098656202 -123.12810673008 49.232095660743 -123.12813765737002May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:7d171fbe-7339-423e-b300-2e6e90e2ae1a2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.224799101704974 -123.12837915561002 49.223914093608016 -123.12841118322001May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:bd3a74d8-4573-4126-aae1-8f6bff7e69b32024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.227483833911975 -123.12829348514 49.22655267346897 -123.12831568622998May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:2f9c2679-64b1-49a2-a84a-b60bfd37044d2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.22655267346897 -123.12831568622998 49.22598203585298 -123.12833634808May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:d87fd9bc-cfea-4999-84ed-399d350ce0f42024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.22568411865396 -123.1283471269 49.224799101704974 -123.12837915561002May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:82b316fb-7d7e-4e53-8497-51ced6245e322024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.22598203585298 -123.12833634808 49.22568411865396 -123.1283471269May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:ffa2e30a-6ca4-40a8-85b4-f8bcfdb5e8862024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.227041642108446 -123.1166246261273 49.22613077459391 -123.1166568126355May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:7d058c54-e5a9-4694-bee2-557cf88937262024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.248997611537305 -123.115524943495 49.24711597014078 -123.11572879137998 49.24550858071609 -123.115777071143 49.24522491832681 -123.115819986487 49.244630645107776 -123.116199216713 49.24378314003806 -123.117395481934 49.243569315264494 -123.117787233924 49.24319787791191 -123.118147614636 49.242823145516866 -123.118410471119 49.2421577258452 -123.118528488315 49.24108603110409 -123.11857140366 49.24077782700317 -123.11861431900401 49.240329526695945 -123.118367555774 49.2386472824671 -123.11647438952 49.238367083164405 -123.116232990709 49.23816043516018 -123.116190075365 49.23728830100771 -123.11620080420099 49.22702053857094 -123.116630066409May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:6a748df4-0a01-4ce2-a603-239fdb0517ab2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.21820184696401 -123.12881158561 49.21818116855499 -123.12881809578 49.218049634365 -123.12886311069 49.217918644940994 -123.12891164215 49.217788218317 -123.128963649 49.217659902376 -123.12901850357May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:faf8d79e-918c-428c-9287-001415ebde712024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.221541796143015 -123.12849354542 49.220508632535996 -123.12852809613May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:5e92a0b8-4fa7-43f6-b48e-7583bfefd8e02024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.220508632535996 -123.12852809613 49.21965173773299 -123.12855674455 49.21951699992496 -123.12856264330999 49.21938233909802 -123.12857211265998 49.21924781818501 -123.12858518018 49.21920403214099 -123.12859060071May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:f198557c-9789-408e-8e5d-f1bbea114ab12024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.21864679187999 -123.12868828744 49.218578563064995 -123.12870410823 49.218445664407966 -123.12873857399998 49.218313193575966 -123.12877656985 49.21820184696401 -123.12881158561May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:bd68476d-ce2d-41a4-83e6-9cf108b2a4782024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.21920403214099 -123.12859060071 49.21911346420299 -123.12860181846 49.21897932209501 -123.12862205504999 49.218845427887004 -123.12864584882001 49.21871182653703 -123.12867321358 49.21864679187999 -123.12868828744May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:c485a5d2-eb93-43b7-9499-daa0a6af3c4a2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.222809690888994 -123.12845114203 49.221541796143015 -123.12849354542May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:c61af3b1-27ab-4409-ba50-b8d2e11dbf682024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.223914093608016 -123.12841118322001 49.222809690888994 -123.12845114203May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:38b22f90-2b6e-4011-9b6b-84d14d85d26a2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.22745611145601 -123.13982637884 49.226965831125 -123.13984324843001May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:55472d0a-757a-42e9-b492-0eb92b67009e2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.227888522867005 -123.13981144704998 49.22745611145601 -123.13982637884May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:3af0248f-63e1-4da7-b901-755f1498d7272024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.232474209916006 -123.13965322377 49.23061392213296 -123.13971728923998May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:299b8b23-b1fd-464e-8294-f9a60749180c2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.23061392213296 -123.13971728923998 49.229702960647984 -123.13974911336May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:47ec2de0-2263-49d2-9c5a-deda3f6cd03c2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.229702960647984 -123.13974911336 49.22875454133799 -123.13978209429May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:f1647691-11ee-45f2-8fe6-674c3933e1ec2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.22875454133799 -123.13978209429 49.227888522867005 -123.13981144704998May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:4154a4b2-44fc-40d5-81a3-15a311f033cf2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.23433036962001 -123.13958801561 49.232474209916006 -123.13965322377May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:85962d5c-cd25-48f2-ba04-c9e583aa94df2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.22261047117897 -123.14001727727 49.221706411437 -123.14005345018May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:c6176eed-3c0e-471a-86db-29b00c0ffacf2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.223514530736 -123.13998113054 49.22261047117897 -123.14001727727May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:7676ec25-79f6-449e-85b9-d7f8d5651e6e2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.22471009603197 -123.13993325301001 49.224079155352996 -123.13995843058May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:404d6f28-42bd-4deb-9f0a-e1ca1c6ffcfb2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.224079155352996 -123.13995843058 49.223514530736 -123.13998113054May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:1dc52e26-8099-49a9-98dc-4dafffab76472024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.226965831125 -123.13984324843001 49.22471009603197 -123.13993325301001May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:357cca42-0adb-4a33-9baa-2082668719262024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.22613223653471 -123.116663585184 49.2261742769422 -123.11798591422802 49.226204055542496 -123.11907667922802 49.226309156341415 -123.121579180239 49.2263179147312 -123.12202710914399 49.226360898851794 -123.12329229156101 49.2264492339373 -123.125610870636 49.2268894315452 -123.137410018847May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:c1f9c4a7-daab-4dd1-9fc0-70e386ddbeba2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.2268929348601 -123.137423429893 49.226936902066086 -123.138634078491 49.226964954022606 -123.13984406677099May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:ff60a15f-5288-4252-82cf-0eb8bd01196c2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.21072925422601 -123.13017074044 49.20847130656301 -123.13024569212May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:1590fb66-6820-46f3-96ea-36a312836de92024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.212988127486 -123.13009577084 49.21072925422601 -123.13017074044May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:17094aa0-af8b-457e-bc63-c4b1556ba5a42024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.214458686694 -123.13004695791999 49.21341269386198 -123.1300816851May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:0bfa6172-0f59-42ca-9e99-5c4feea000df2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.217659902376 -123.12901850357 49.217658417454004 -123.12901913138 49.217529260383 -123.12907804808998 49.217400810067005 -123.1291403993 49.21727308450599 -123.12920617128 49.21714612870102 -123.12927533666999 49.217120584311004 -123.12928944119999May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:31a8584f-1d2c-4924-be36-ae06a3b642412024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.21514826794001 -123.12998851452 49.21509742676801 -123.12999635902 49.214961407594984 -123.13001367428998 49.21482521259199 -123.130027364 49.21468887774 -123.13003742826999 49.214552448049005 -123.13004383979 49.214458686694 -123.13004695791999May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:4e96c986-a9fc-433a-aec4-412b16680c932024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.217120584311004 -123.12928944119999 49.217088531754 -123.12930763451 49.216960072231984 -123.12937808624 49.216830833892004 -123.12944513011999 49.21670085277 -123.12950872508 49.216570164912014 -123.1295688163 49.216438815255 -123.12962544513002 49.21630683085101 -123.12967855673 49.21617425669601 -123.12972813752 49.21604113778699 -123.12977417391 49.215907519088006 -123.12981667978 49.215773418656 -123.12985560028 49.215638908439985 -123.12989094933998 49.215504006466006 -123.12992269959999 49.215368766691995 -123.12995086494 49.215233225134 -123.12997541803 49.21514826794001 -123.12998851452May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:14ac9cd5-2483-4d92-9c01-8986ac19bffe2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.21341269386198 -123.1300816851 49.212988127486 -123.13009577084May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:eb416177-c242-4b0a-92f2-1c484bc4d5132024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.221706411437 -123.14005345018 49.22080248705501 -123.14008914153999May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:076939e2-fd7e-459c-9600-3d863c2248a62024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.2271042571347 -123.150870168139 49.2271468171208 -123.15448809924898 49.2271608303063 -123.155078185232 49.22725197536266 -123.16050819367999 49.22725372700728 -123.160828408171May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:55366008-7a15-45f6-9194-0f4dca2248092024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.22695969905769 -123.139833337935 49.22702846479268 -123.14430193949698 49.2270354714027 -123.145794836202 49.227044701001205 -123.146417701174 49.22706747247247 -123.14792510264 49.22710600878469 -123.150862121512May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:a1a21bea-4b51-42c8-976c-39625ac9b13c2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.22724847207331 -123.16083377258899 49.227342569189204 -123.17023125723001May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:97c30520-c34b-4899-8c76-542336984dbb2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.2273408175476 -123.17023304536902 49.227349630412306 -123.17082349403098 49.227389022489234 -123.17152038882801May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:bb19f2ef-3b49-4f15-84b3-417ad53d04672024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.23496357010919 -123.19691874668929 49.23266571753544 -123.19091059849593 49.23025565975237 -123.18455912754867 49.23019961049803 -123.1789801327977 49.227284961645125 -123.17116954014634May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:948c3c01-72d5-4f6b-b451-67010d0a133e2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.23572779917376 -123.1965881041833 49.235027256529946 -123.19706017296994 49.234733025656794 -123.19633061211788May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:ddeec159-827f-4f4d-b730-e844a88b9f322024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.21588570502598 -123.14027345855001 49.215040140428016 -123.14030226304May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:27ab4f8f-90fb-44e1-b2a4-2f65ee8d27b02024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.216793773875 -123.14024039463001 49.21588570502598 -123.14027345855001May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:ab13d636-2275-42c1-aea2-ecb502a2ee232024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.21989781543101 -123.14012522777001 49.21935074073201 -123.14014745181001May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:bc31daaa-29cb-48c1-8b70-1bb20aa747832024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.21935074073201 -123.14014745181001 49.218482434685995 -123.14017784388May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:6eae8df6-015b-4d38-bb5d-0311c190969d2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.217371910379 -123.14021747786 49.216793773875 -123.14024039463001May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:25652dff-906f-4995-95c8-e63640835ed92024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.22071865602999 -123.14009248883 49.21989781543101 -123.14012522777001May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:8a1fe3ed-f821-4de7-9f24-9cb9bc7d14bc2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.21837049292799 -123.14018156452998 49.217413360319995 -123.14021773243May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:0df0f725-c001-4ccd-98f1-46a65afedd242024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.21051312831901 -123.14045679204 49.208624220107 -123.14051989586May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:a3db5875-1fb2-48be-a89c-bba636b777df2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.21399898174499 -123.14033886125999 49.21314370036097 -123.14036896797May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:73a23185-c598-4bea-9f32-fe0b6bd9bdf42024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.21314370036097 -123.14036896797 49.21225446289802 -123.14039803011002May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:f929a23b-1919-4b0c-a717-6e7d885360c42024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.21225446289802 -123.14039803011002 49.21136665378597 -123.14042853695May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:77756900-9c47-4e8b-a58c-904e52fd56922024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.21136665378597 -123.14042853695 49.21088466645199 -123.14044474617002May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:157f7719-6496-479c-8513-2ae0469ea2a42024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.21088466645199 -123.14044474617002 49.21051312831901 -123.14045679204May 5th - event day
BMO Vancouver Marathon, Half Marathon, relay and 8KM Race will experience three separate courses showcasing the City of Vancouver. These routes will impact traffic in Vancouver’s Riley Park, Coal Harbour and Downtown on Saturday, May 4th, 2024 and Riley Park, South Cambie, Oakridge, Fairview, Kerrisdale, Dunbar, UBC, Point Grey, Kitsilano, West End, Coal Harbour, Chinatown, Yaletown, Cambie, False Creek and Downtown neighbourhoods on Sunday, May 5th, 2024.
Location: Note: Both the Marathon and Half Marathon start on Midlothian Ave. between Queen Elizabeth Park & Hillcrest Community Centre and finish on Pender St. between Bute St. & Thurlow St.
Schedule: May 4, 2024 5:00 AM - May 5, 2024 7:00 PMurn:uuid:fee0fd15-aa05-4630-af70-b1635ae90afe2024-02-08T08:00:00ZBMO Vancouver Marathon 2024-03-07T18:40:16.8186358Z49.214935809049024 -123.14030562022998 49.21399898174499 -123.14033886125999The Arbutus Greenway will experience a detour to its cycling route due to Broadway Subway work on W 10th Av and W 7th Av, Yew St to Cypress St impacted.
Traffic Impact:
-Full closure of Arbutus Greenway Cycling Route from W 10th Av to W 7th Av
-Full closure of Cypress St, cycling will be diverted to Maple St up to 7th Av
For further inquiries, please contact:
Broadwaysubway@gov.bc.ca
--------------------------
Internal Staff Only, please contact:
ENRTODL@vancouver.ca (Rapid Transit Office)
Location: W 10th Ave (Yew St to Cypress St)
W 7th Ave (Yew St to Cypress St)
Schedule: Mar 1, 2023 - Dec 31, 2024urn:uuid:42ad4238-65d5-4870-b5ad-d6a0c198916d2024-03-01T08:00:00ZBroadway Subway - Arbutus Greenway Cycling Route Detour2024-02-20T17:05:17.4513774Z49.262791540936604 -123.14817942044908 49.26283022879312 -123.15058020367758The Arbutus Greenway will experience a detour to its cycling route due to Broadway Subway work on W 10th Av and W 7th Av, Yew St to Cypress St impacted.
Traffic Impact:
-Full closure of Arbutus Greenway Cycling Route from W 10th Av to W 7th Av
-Full closure of Cypress St, cycling will be diverted to Maple St up to 7th Av
For further inquiries, please contact:
Broadwaysubway@gov.bc.ca
--------------------------
Internal Staff Only, please contact:
ENRTODL@vancouver.ca (Rapid Transit Office)
Location: W 10th Ave (Yew St to Cypress St)
W 7th Ave (Yew St to Cypress St)
Schedule: Mar 1, 2023 - Dec 31, 2024urn:uuid:f0cbbbdf-7337-4466-b042-0a6604244bae2024-03-01T08:00:00ZBroadway Subway - Arbutus Greenway Cycling Route Detour2024-02-20T17:05:17.4513774Z49.262791540936604 -123.14817942044908 49.26283022879312 -123.15058020367758The Arbutus Greenway will experience a detour to its cycling route due to Broadway Subway work on W 10th Av and W 7th Av, Yew St to Cypress St impacted.
Traffic Impact:
-Full closure of Arbutus Greenway Cycling Route from W 10th Av to W 7th Av
-Full closure of Cypress St, cycling will be diverted to Maple St up to 7th Av
For further inquiries, please contact:
Broadwaysubway@gov.bc.ca
--------------------------
Internal Staff Only, please contact:
ENRTODL@vancouver.ca (Rapid Transit Office)
Location: W 10th Ave (Yew St to Cypress St)
W 7th Ave (Yew St to Cypress St)
Schedule: Mar 1, 2023 - Dec 31, 2024urn:uuid:f84aeba9-d64e-4839-a68c-36ea98de6f402024-03-01T08:00:00ZBroadway Subway - Arbutus Greenway Cycling Route Detour2024-02-20T17:05:17.4513774Z49.26325189042859 -123.14816409923601 49.262791540936604 -123.14817942044908The Arbutus Greenway will experience a detour to its cycling route due to Broadway Subway work on W 10th Av and W 7th Av, Yew St to Cypress St impacted.
Traffic Impact:
-Full closure of Arbutus Greenway Cycling Route from W 10th Av to W 7th Av
-Full closure of Cypress St, cycling will be diverted to Maple St up to 7th Av
For further inquiries, please contact:
Broadwaysubway@gov.bc.ca
--------------------------
Internal Staff Only, please contact:
ENRTODL@vancouver.ca (Rapid Transit Office)
Location: W 10th Ave (Yew St to Cypress St)
W 7th Ave (Yew St to Cypress St)
Schedule: Mar 1, 2023 - Dec 31, 2024urn:uuid:54d13481-0e39-483b-b7f6-c55edf90ea4a2024-03-01T08:00:00ZBroadway Subway - Arbutus Greenway Cycling Route Detour2024-02-20T17:05:17.4513774Z49.26375735519022 -123.14814539417256 49.26325189042859 -123.14816409923601The Arbutus Greenway will experience a detour to its cycling route due to Broadway Subway work on W 10th Av and W 7th Av, Yew St to Cypress St impacted.
Traffic Impact:
-Full closure of Arbutus Greenway Cycling Route from W 10th Av to W 7th Av
-Full closure of Cypress St, cycling will be diverted to Maple St up to 7th Av
For further inquiries, please contact:
Broadwaysubway@gov.bc.ca
--------------------------
Internal Staff Only, please contact:
ENRTODL@vancouver.ca (Rapid Transit Office)
Location: W 10th Ave (Yew St to Cypress St)
W 7th Ave (Yew St to Cypress St)
Schedule: Mar 1, 2023 - Dec 31, 2024urn:uuid:e62132fc-e8dc-48cd-9a57-49ccd5d355512024-03-01T08:00:00ZBroadway Subway - Arbutus Greenway Cycling Route Detour2024-02-20T17:05:17.4513774Z49.26423539325219 -123.14812689528398 49.26375735519022 -123.14814539417256The Arbutus Greenway will experience a detour to its cycling route due to Broadway Subway work on W 10th Av and W 7th Av, Yew St to Cypress St impacted.
Traffic Impact:
-Full closure of Arbutus Greenway Cycling Route from W 10th Av to W 7th Av
-Full closure of Cypress St, cycling will be diverted to Maple St up to 7th Av
For further inquiries, please contact:
Broadwaysubway@gov.bc.ca
--------------------------
Internal Staff Only, please contact:
ENRTODL@vancouver.ca (Rapid Transit Office)
Location: W 10th Ave (Yew St to Cypress St)
W 7th Ave (Yew St to Cypress St)
Schedule: Mar 1, 2023 - Dec 31, 2024urn:uuid:f373e0ba-875f-4a15-889a-b30f68c2a3812024-03-01T08:00:00ZBroadway Subway - Arbutus Greenway Cycling Route Detour2024-02-20T17:05:17.4513774Z49.264668290607545 -123.14811051511163 49.26423539325219 -123.14812689528398The Arbutus Greenway will experience a detour to its cycling route due to Broadway Subway work on W 10th Av and W 7th Av, Yew St to Cypress St impacted.
Traffic Impact:
-Full closure of Arbutus Greenway Cycling Route from W 10th Av to W 7th Av
-Full closure of Cypress St, cycling will be diverted to Maple St up to 7th Av
For further inquiries, please contact:
Broadwaysubway@gov.bc.ca
--------------------------
Internal Staff Only, please contact:
ENRTODL@vancouver.ca (Rapid Transit Office)
Location: W 10th Ave (Yew St to Cypress St)
W 7th Ave (Yew St to Cypress St)
Schedule: Mar 1, 2023 - Dec 31, 2024urn:uuid:0c4b0300-1db4-4d64-884c-6cd8515e341a2024-03-01T08:00:00ZBroadway Subway - Arbutus Greenway Cycling Route Detour2024-02-20T17:05:17.4513774Z49.265506710248786 -123.14807974753339 49.264668290607545 -123.14811051511163The Arbutus Greenway will experience a detour to its cycling route due to Broadway Subway work on W 10th Av and W 7th Av, Yew St to Cypress St impacted.
Traffic Impact:
-Full closure of Arbutus Greenway Cycling Route from W 10th Av to W 7th Av
-Full closure of Cypress St, cycling will be diverted to Maple St up to 7th Av
For further inquiries, please contact:
Broadwaysubway@gov.bc.ca
--------------------------
Internal Staff Only, please contact:
ENRTODL@vancouver.ca (Rapid Transit Office)
Location: W 10th Ave (Yew St to Cypress St)
W 7th Ave (Yew St to Cypress St)
Schedule: Mar 1, 2023 - Dec 31, 2024urn:uuid:2c1a9ee0-5e8d-4057-9f62-6ab9608cde272024-03-01T08:00:00ZBroadway Subway - Arbutus Greenway Cycling Route Detour2024-02-20T17:05:17.4513774Z49.265583595433384 -123.1528775934756 49.26562181341876 -123.155247491559The Arbutus Greenway will experience a detour to its cycling route due to Broadway Subway work on W 10th Av and W 7th Av, Yew St to Cypress St impacted.
Traffic Impact:
-Full closure of Arbutus Greenway Cycling Route from W 10th Av to W 7th Av
-Full closure of Cypress St, cycling will be diverted to Maple St up to 7th Av
For further inquiries, please contact:
Broadwaysubway@gov.bc.ca
--------------------------
Internal Staff Only, please contact:
ENRTODL@vancouver.ca (Rapid Transit Office)
Location: W 10th Ave (Yew St to Cypress St)
W 7th Ave (Yew St to Cypress St)
Schedule: Mar 1, 2023 - Dec 31, 2024urn:uuid:840a5edf-1457-4ac9-9334-d28f37c941a52024-03-01T08:00:00ZBroadway Subway - Arbutus Greenway Cycling Route Detour2024-02-20T17:05:17.4513774Z49.2655450695182 -123.15047888829062 49.265583595433384 -123.1528775934756The Arbutus Greenway will experience a detour to its cycling route due to Broadway Subway work on W 10th Av and W 7th Av, Yew St to Cypress St impacted.
Traffic Impact:
-Full closure of Arbutus Greenway Cycling Route from W 10th Av to W 7th Av
-Full closure of Cypress St, cycling will be diverted to Maple St up to 7th Av
For further inquiries, please contact:
Broadwaysubway@gov.bc.ca
--------------------------
Internal Staff Only, please contact:
ENRTODL@vancouver.ca (Rapid Transit Office)
Location: W 10th Ave (Yew St to Cypress St)
W 7th Ave (Yew St to Cypress St)
Schedule: Mar 1, 2023 - Dec 31, 2024urn:uuid:eaa9ab3a-22c0-4327-ad99-1584abb16cb72024-03-01T08:00:00ZBroadway Subway - Arbutus Greenway Cycling Route Detour2024-02-20T17:05:17.4513774Z49.265506710248786 -123.14807974753339 49.2655450695182 -123.15047888829062The Arbutus Greenway will experience a detour to its cycling route due to Broadway Subway work on W 10th Av and W 7th Av, Yew St to Cypress St impacted.
Traffic Impact:
-Full closure of Arbutus Greenway Cycling Route from W 10th Av to W 7th Av
-Full closure of Cypress St, cycling will be diverted to Maple St up to 7th Av
For further inquiries, please contact:
Broadwaysubway@gov.bc.ca
--------------------------
Internal Staff Only, please contact:
ENRTODL@vancouver.ca (Rapid Transit Office)
Location: W 10th Ave (Yew St to Cypress St)
W 7th Ave (Yew St to Cypress St)
Schedule: Mar 1, 2023 - Dec 31, 2024urn:uuid:8d04b773-07b4-4584-94a7-93504c5195ad2024-03-01T08:00:00ZBroadway Subway - Arbutus Greenway Cycling Route Detour2024-02-20T17:05:17.4513774Z49.26288333673111 -123.15382360977375 49.26290658986835 -123.15534939644594The Arbutus Greenway will experience a detour to its cycling route due to Broadway Subway work on W 10th Av and W 7th Av, Yew St to Cypress St impacted.
Traffic Impact:
-Full closure of Arbutus Greenway Cycling Route from W 10th Av to W 7th Av
-Full closure of Cypress St, cycling will be diverted to Maple St up to 7th Av
For further inquiries, please contact:
Broadwaysubway@gov.bc.ca
--------------------------
Internal Staff Only, please contact:
ENRTODL@vancouver.ca (Rapid Transit Office)
Location: W 10th Ave (Yew St to Cypress St)
W 7th Ave (Yew St to Cypress St)
Schedule: Mar 1, 2023 - Dec 31, 2024urn:uuid:e8fb60a9-d320-46e2-9ff1-f88deeec4a132024-03-01T08:00:00ZBroadway Subway - Arbutus Greenway Cycling Route Detour2024-02-20T17:05:17.4513774Z49.26286825656257 -123.15297987536017 49.26288333673111 -123.15382360977375The Arbutus Greenway will experience a detour to its cycling route due to Broadway Subway work on W 10th Av and W 7th Av, Yew St to Cypress St impacted.
Traffic Impact:
-Full closure of Arbutus Greenway Cycling Route from W 10th Av to W 7th Av
-Full closure of Cypress St, cycling will be diverted to Maple St up to 7th Av
For further inquiries, please contact:
Broadwaysubway@gov.bc.ca
--------------------------
Internal Staff Only, please contact:
ENRTODL@vancouver.ca (Rapid Transit Office)
Location: W 10th Ave (Yew St to Cypress St)
W 7th Ave (Yew St to Cypress St)
Schedule: Mar 1, 2023 - Dec 31, 2024urn:uuid:f4483cd3-842c-46d3-a9c5-6653f1613e822024-03-01T08:00:00ZBroadway Subway - Arbutus Greenway Cycling Route Detour2024-02-20T17:05:17.4513774Z49.262856728088195 -123.15227593311229 49.26286825656257 -123.15297987536017The Arbutus Greenway will experience a detour to its cycling route due to Broadway Subway work on W 10th Av and W 7th Av, Yew St to Cypress St impacted.
Traffic Impact:
-Full closure of Arbutus Greenway Cycling Route from W 10th Av to W 7th Av
-Full closure of Cypress St, cycling will be diverted to Maple St up to 7th Av
For further inquiries, please contact:
Broadwaysubway@gov.bc.ca
--------------------------
Internal Staff Only, please contact:
ENRTODL@vancouver.ca (Rapid Transit Office)
Location: W 10th Ave (Yew St to Cypress St)
W 7th Ave (Yew St to Cypress St)
Schedule: Mar 1, 2023 - Dec 31, 2024urn:uuid:acf83459-413b-492c-b377-aa6a275355932024-03-01T08:00:00ZBroadway Subway - Arbutus Greenway Cycling Route Detour2024-02-20T17:05:17.4513774Z49.26283022879312 -123.15058020367758 49.262856728088195 -123.15227593311229The Arbutus Greenway will experience a detour to its cycling route due to Broadway Subway work on W 10th Av and W 7th Av, Yew St to Cypress St impacted.
Traffic Impact:
-Full closure of Arbutus Greenway Cycling Route from W 10th Av to W 7th Av
-Full closure of Cypress St, cycling will be diverted to Maple St up to 7th Av
For further inquiries, please contact:
Broadwaysubway@gov.bc.ca
--------------------------
Internal Staff Only, please contact:
ENRTODL@vancouver.ca (Rapid Transit Office)
Location: W 10th Ave (Yew St to Cypress St)
W 7th Ave (Yew St to Cypress St)
Schedule: Mar 1, 2023 - Dec 31, 2024urn:uuid:042fe0ea-eb24-4857-a26a-4768c9c04f2c2024-03-01T08:00:00ZBroadway Subway - Arbutus Greenway Cycling Route Detour2024-02-20T17:05:17.4513774Z49.26283022879312 -123.15058020367758 49.262856728088195 -123.15227593311229Street lane use is currently publicly accessible.
Traffic Impacts:
-Open
-----------------------------------
Access can be closed by Broadway Subway when required.
Laneway retained for continuity with intent to return street to dead-end for Arbutus Greenway pathway to connect to Broadway.
Location: Unnamed lane between Broadway and 10th Avenue - from Arbutus St to Maple St
Schedule: Mar 1, 2021 - Mar 1, 2025urn:uuid:27434ffe-8d88-4fed-b94b-28471cd329682024-03-01T08:00:00ZBroadway Subway Construction-Required Lands - Unnamed lane South of West Broadway - 2080 W Broadway - 2096 W Broadway2024-02-20T18:48:40.5393005Z49.26329014919253 -123.15056307545694 49.26332838449093 -123.15296253641276Starting in mid February 2022, the City of Vancouver will be upgrading its existing Burrard Sanitary Pump Station, located below the Cordova Street Viaduct at the intersection of Burrard Street and West Cordova Street. During construction, construction traffic will access the underground space from the vehicle ramp at Granville and W Cordova, which will occasionally result in disruptions to street-level traffic and parking. There shall be no activities that impact access to the vehicle ramp by anybody without notifying the Burrard project team, as this will have significant impacts to the project.
Location: Burrard Street and W Cordova St (from Burrard to Granville St)
Schedule: Feb 14, 2022 - Apr 30, 2023; Weekdays; 7:00 AM - 5:00 PMurn:uuid:0913241a-a6ac-4c31-8226-51b7316d546a2022-08-31T07:00:00ZBurrard Pump Station Upgrades2023-03-29T01:02:21.381426Z49.28775986947025 -123.11699330806728 49.287605913353985 -123.11646759510039 49.28741696655422 -123.11678946018216 49.287605913353985 -123.11724007129666 49.28775986947025 -123.11699330806728CMBC Installation and upgrades to transit and bus stops.
Traffic Impact:
Parking Lane Closures
Areas Impacted:
-3100 E 22 Av - (WB E 22 Av FS Windermere St)
-2900 E 22 A - (WB E 22 Av NS Renfrew St)
-2600 E 22 Av - (WB E 22 Av FS Slocan St)
-3800 Nanaimo St - (SB Nanaimo St FS E 22 Av)
-1300 E King Edward Av - (WB E King Edward Av FS Knight St)
-1100 E King Edward Av - (WB E King Edward Av FS Inverness St)
-900 E King Edward Av - (WB E King Edward Av FS Windsor St)
-500 E King Edward Av - (WB E King Edward Av NS St George St)
-300 E King Edward Av - (WB E King Edward Av FS Prince Edward St)
-0 W King Edward Av - (WB W King Edward Av FS Ontario St)
-200 W King Edward Av - (WB W King Edward Av FS Columbia St)
-1200 W King Edward Av - (WB W King Edward Av FS Selkirk St)
-4000 Dunbar St - (NB Dunbar St FS W King Edward Av)
-3900 W 16 Av - (WB W 16 Av FS Wallace St)
-4100 W 16 Av - (WB W 16 Av FS Camosun St)
-4300 W 16 Av - (WB W 16 Av FS Discovery St)
-4500 W 16 Av - (WB W 16 Av FS Sasamat St)
-4600 W 16 Av - (WB W 16 Av FS Blanca St)
-4500 W 16 Av - (EB W 16av FS Tolmie St)
-4300 W 16 Av - (EB W 16 Av FS Trimble St)
-4100 W 16 Av - (EB W 16 Av FS Camosun St)
-3900 W 16 Av - (EB W 16 Av FS Crown St)
-1400 W King Edward Av - (EB W King Edward Av FS Granville St)
-1200 W King Edward Av - (EB W King Edward Av FS Hudson St)
-700 W King Edward Av - (EB W King Edward Av FS Willow St)
-0 E King Edward Av - (EB E King Edward Av FS Ontario St)
-500 E King Edward Av - (EB E King Edward Av FS St George St)
-900 E King Edward Av - EB E King Edward Av FS St Catherines St)
-1100 E King Edward Av - (EB E King Edward Av FS Glen Dr)
-1400 E King Edward Av - (EB E King Edward Av FS Knight St)
-4500 Nanaimo St - (NB Nanaimo St FS Brock St)
-2400 E 22 Av - (EB E 22 Av FS Nanaimo St)
-2700 E 22 Av - (EB E 22 Av FS Slocan St)
-2900 E 22 Av - (EB E 22 Av FS Boyd Diversion)
-3100 E 22 Av - (EB E 22 Av FS Lillooet St)
Location: Various
Schedule: Nov 22, 2023 - Feb 15, 2024urn:uuid:d494d07f-3da0-4dbb-84f1-74b1f3c5b6852023-11-22T08:00:00ZCMBC Transit Bus Stop Upgrades - Route 252023-12-15T20:17:32.5085767Z49.250661644987815 -123.04902453008579 49.250662791161176 -123.04893073497814CMBC Installation and upgrades to transit and bus stops.
Traffic Impact:
Parking Lane Closures
Areas Impacted:
-3100 E 22 Av - (WB E 22 Av FS Windermere St)
-2900 E 22 A - (WB E 22 Av NS Renfrew St)
-2600 E 22 Av - (WB E 22 Av FS Slocan St)
-3800 Nanaimo St - (SB Nanaimo St FS E 22 Av)
-1300 E King Edward Av - (WB E King Edward Av FS Knight St)
-1100 E King Edward Av - (WB E King Edward Av FS Inverness St)
-900 E King Edward Av - (WB E King Edward Av FS Windsor St)
-500 E King Edward Av - (WB E King Edward Av NS St George St)
-300 E King Edward Av - (WB E King Edward Av FS Prince Edward St)
-0 W King Edward Av - (WB W King Edward Av FS Ontario St)
-200 W King Edward Av - (WB W King Edward Av FS Columbia St)
-1200 W King Edward Av - (WB W King Edward Av FS Selkirk St)
-4000 Dunbar St - (NB Dunbar St FS W King Edward Av)
-3900 W 16 Av - (WB W 16 Av FS Wallace St)
-4100 W 16 Av - (WB W 16 Av FS Camosun St)
-4300 W 16 Av - (WB W 16 Av FS Discovery St)
-4500 W 16 Av - (WB W 16 Av FS Sasamat St)
-4600 W 16 Av - (WB W 16 Av FS Blanca St)
-4500 W 16 Av - (EB W 16av FS Tolmie St)
-4300 W 16 Av - (EB W 16 Av FS Trimble St)
-4100 W 16 Av - (EB W 16 Av FS Camosun St)
-3900 W 16 Av - (EB W 16 Av FS Crown St)
-1400 W King Edward Av - (EB W King Edward Av FS Granville St)
-1200 W King Edward Av - (EB W King Edward Av FS Hudson St)
-700 W King Edward Av - (EB W King Edward Av FS Willow St)
-0 E King Edward Av - (EB E King Edward Av FS Ontario St)
-500 E King Edward Av - (EB E King Edward Av FS St George St)
-900 E King Edward Av - EB E King Edward Av FS St Catherines St)
-1100 E King Edward Av - (EB E King Edward Av FS Glen Dr)
-1400 E King Edward Av - (EB E King Edward Av FS Knight St)
-4500 Nanaimo St - (NB Nanaimo St FS Brock St)
-2400 E 22 Av - (EB E 22 Av FS Nanaimo St)
-2700 E 22 Av - (EB E 22 Av FS Slocan St)
-2900 E 22 Av - (EB E 22 Av FS Boyd Diversion)
-3100 E 22 Av - (EB E 22 Av FS Lillooet St)
Location: Various
Schedule: Nov 22, 2023 - Feb 15, 2024urn:uuid:d8e5fcb5-ff13-4840-ac57-fe755acbde292023-11-22T08:00:00ZCMBC Transit Bus Stop Upgrades - Route 252023-12-15T20:17:32.5085767Z49.250662791161176 -123.04893073497814 49.250646692934026 -123.04710489459642CMBC Installation and upgrades to transit and bus stops.
Traffic Impact:
Parking Lane Closures
Areas Impacted:
-3100 E 22 Av - (WB E 22 Av FS Windermere St)
-2900 E 22 A - (WB E 22 Av NS Renfrew St)
-2600 E 22 Av - (WB E 22 Av FS Slocan St)
-3800 Nanaimo St - (SB Nanaimo St FS E 22 Av)
-1300 E King Edward Av - (WB E King Edward Av FS Knight St)
-1100 E King Edward Av - (WB E King Edward Av FS Inverness St)
-900 E King Edward Av - (WB E King Edward Av FS Windsor St)
-500 E King Edward Av - (WB E King Edward Av NS St George St)
-300 E King Edward Av - (WB E King Edward Av FS Prince Edward St)
-0 W King Edward Av - (WB W King Edward Av FS Ontario St)
-200 W King Edward Av - (WB W King Edward Av FS Columbia St)
-1200 W King Edward Av - (WB W King Edward Av FS Selkirk St)
-4000 Dunbar St - (NB Dunbar St FS W King Edward Av)
-3900 W 16 Av - (WB W 16 Av FS Wallace St)
-4100 W 16 Av - (WB W 16 Av FS Camosun St)
-4300 W 16 Av - (WB W 16 Av FS Discovery St)
-4500 W 16 Av - (WB W 16 Av FS Sasamat St)
-4600 W 16 Av - (WB W 16 Av FS Blanca St)
-4500 W 16 Av - (EB W 16av FS Tolmie St)
-4300 W 16 Av - (EB W 16 Av FS Trimble St)
-4100 W 16 Av - (EB W 16 Av FS Camosun St)
-3900 W 16 Av - (EB W 16 Av FS Crown St)
-1400 W King Edward Av - (EB W King Edward Av FS Granville St)
-1200 W King Edward Av - (EB W King Edward Av FS Hudson St)
-700 W King Edward Av - (EB W King Edward Av FS Willow St)
-0 E King Edward Av - (EB E King Edward Av FS Ontario St)
-500 E King Edward Av - (EB E King Edward Av FS St George St)
-900 E King Edward Av - EB E King Edward Av FS St Catherines St)
-1100 E King Edward Av - (EB E King Edward Av FS Glen Dr)
-1400 E King Edward Av - (EB E King Edward Av FS Knight St)
-4500 Nanaimo St - (NB Nanaimo St FS Brock St)
-2400 E 22 Av - (EB E 22 Av FS Nanaimo St)
-2700 E 22 Av - (EB E 22 Av FS Slocan St)
-2900 E 22 Av - (EB E 22 Av FS Boyd Diversion)
-3100 E 22 Av - (EB E 22 Av FS Lillooet St)
Location: Various
Schedule: Nov 22, 2023 - Feb 15, 2024urn:uuid:3d9a2ea0-089d-4566-98bc-86ca7ec36a682023-11-22T08:00:00ZCMBC Transit Bus Stop Upgrades - Route 252023-12-15T20:17:32.5085767Z49.2506296745521 -123.04421262801444 49.250615536586025 -123.04161446473246CMBC Installation and upgrades to transit and bus stops.
Traffic Impact:
Parking Lane Closures
Areas Impacted:
-3100 E 22 Av - (WB E 22 Av FS Windermere St)
-2900 E 22 A - (WB E 22 Av NS Renfrew St)
-2600 E 22 Av - (WB E 22 Av FS Slocan St)
-3800 Nanaimo St - (SB Nanaimo St FS E 22 Av)
-1300 E King Edward Av - (WB E King Edward Av FS Knight St)
-1100 E King Edward Av - (WB E King Edward Av FS Inverness St)
-900 E King Edward Av - (WB E King Edward Av FS Windsor St)
-500 E King Edward Av - (WB E King Edward Av NS St George St)
-300 E King Edward Av - (WB E King Edward Av FS Prince Edward St)
-0 W King Edward Av - (WB W King Edward Av FS Ontario St)
-200 W King Edward Av - (WB W King Edward Av FS Columbia St)
-1200 W King Edward Av - (WB W King Edward Av FS Selkirk St)
-4000 Dunbar St - (NB Dunbar St FS W King Edward Av)
-3900 W 16 Av - (WB W 16 Av FS Wallace St)
-4100 W 16 Av - (WB W 16 Av FS Camosun St)
-4300 W 16 Av - (WB W 16 Av FS Discovery St)
-4500 W 16 Av - (WB W 16 Av FS Sasamat St)
-4600 W 16 Av - (WB W 16 Av FS Blanca St)
-4500 W 16 Av - (EB W 16av FS Tolmie St)
-4300 W 16 Av - (EB W 16 Av FS Trimble St)
-4100 W 16 Av - (EB W 16 Av FS Camosun St)
-3900 W 16 Av - (EB W 16 Av FS Crown St)
-1400 W King Edward Av - (EB W King Edward Av FS Granville St)
-1200 W King Edward Av - (EB W King Edward Av FS Hudson St)
-700 W King Edward Av - (EB W King Edward Av FS Willow St)
-0 E King Edward Av - (EB E King Edward Av FS Ontario St)
-500 E King Edward Av - (EB E King Edward Av FS St George St)
-900 E King Edward Av - EB E King Edward Av FS St Catherines St)
-1100 E King Edward Av - (EB E King Edward Av FS Glen Dr)
-1400 E King Edward Av - (EB E King Edward Av FS Knight St)
-4500 Nanaimo St - (NB Nanaimo St FS Brock St)
-2400 E 22 Av - (EB E 22 Av FS Nanaimo St)
-2700 E 22 Av - (EB E 22 Av FS Slocan St)
-2900 E 22 Av - (EB E 22 Av FS Boyd Diversion)
-3100 E 22 Av - (EB E 22 Av FS Lillooet St)
Location: Various
Schedule: Nov 22, 2023 - Feb 15, 2024urn:uuid:50899f90-0509-4b1f-959e-45f29b37abbd2023-11-22T08:00:00ZCMBC Transit Bus Stop Upgrades - Route 252023-12-15T20:17:32.5085767Z49.25061168953437 -123.03908184193963 49.25061019137854 -123.03848020433212CMBC Installation and upgrades to transit and bus stops.
Traffic Impact:
Parking Lane Closures
Areas Impacted:
-3100 E 22 Av - (WB E 22 Av FS Windermere St)
-2900 E 22 A - (WB E 22 Av NS Renfrew St)
-2600 E 22 Av - (WB E 22 Av FS Slocan St)
-3800 Nanaimo St - (SB Nanaimo St FS E 22 Av)
-1300 E King Edward Av - (WB E King Edward Av FS Knight St)
-1100 E King Edward Av - (WB E King Edward Av FS Inverness St)
-900 E King Edward Av - (WB E King Edward Av FS Windsor St)
-500 E King Edward Av - (WB E King Edward Av NS St George St)
-300 E King Edward Av - (WB E King Edward Av FS Prince Edward St)
-0 W King Edward Av - (WB W King Edward Av FS Ontario St)
-200 W King Edward Av - (WB W King Edward Av FS Columbia St)
-1200 W King Edward Av - (WB W King Edward Av FS Selkirk St)
-4000 Dunbar St - (NB Dunbar St FS W King Edward Av)
-3900 W 16 Av - (WB W 16 Av FS Wallace St)
-4100 W 16 Av - (WB W 16 Av FS Camosun St)
-4300 W 16 Av - (WB W 16 Av FS Discovery St)
-4500 W 16 Av - (WB W 16 Av FS Sasamat St)
-4600 W 16 Av - (WB W 16 Av FS Blanca St)
-4500 W 16 Av - (EB W 16av FS Tolmie St)
-4300 W 16 Av - (EB W 16 Av FS Trimble St)
-4100 W 16 Av - (EB W 16 Av FS Camosun St)
-3900 W 16 Av - (EB W 16 Av FS Crown St)
-1400 W King Edward Av - (EB W King Edward Av FS Granville St)
-1200 W King Edward Av - (EB W King Edward Av FS Hudson St)
-700 W King Edward Av - (EB W King Edward Av FS Willow St)
-0 E King Edward Av - (EB E King Edward Av FS Ontario St)
-500 E King Edward Av - (EB E King Edward Av FS St George St)
-900 E King Edward Av - EB E King Edward Av FS St Catherines St)
-1100 E King Edward Av - (EB E King Edward Av FS Glen Dr)
-1400 E King Edward Av - (EB E King Edward Av FS Knight St)
-4500 Nanaimo St - (NB Nanaimo St FS Brock St)
-2400 E 22 Av - (EB E 22 Av FS Nanaimo St)
-2700 E 22 Av - (EB E 22 Av FS Slocan St)
-2900 E 22 Av - (EB E 22 Av FS Boyd Diversion)
-3100 E 22 Av - (EB E 22 Av FS Lillooet St)
Location: Various
Schedule: Nov 22, 2023 - Feb 15, 2024urn:uuid:a305b308-86b5-4702-b15d-72af259215a92023-11-22T08:00:00ZCMBC Transit Bus Stop Upgrades - Route 252023-12-15T20:17:32.5085767Z49.25061019137854 -123.03848020433212 49.25060637966334 -123.03715415269089CMBC Installation and upgrades to transit and bus stops.
Traffic Impact:
Parking Lane Closures
Areas Impacted:
-3100 E 22 Av - (WB E 22 Av FS Windermere St)
-2900 E 22 A - (WB E 22 Av NS Renfrew St)
-2600 E 22 Av - (WB E 22 Av FS Slocan St)
-3800 Nanaimo St - (SB Nanaimo St FS E 22 Av)
-1300 E King Edward Av - (WB E King Edward Av FS Knight St)
-1100 E King Edward Av - (WB E King Edward Av FS Inverness St)
-900 E King Edward Av - (WB E King Edward Av FS Windsor St)
-500 E King Edward Av - (WB E King Edward Av NS St George St)
-300 E King Edward Av - (WB E King Edward Av FS Prince Edward St)
-0 W King Edward Av - (WB W King Edward Av FS Ontario St)
-200 W King Edward Av - (WB W King Edward Av FS Columbia St)
-1200 W King Edward Av - (WB W King Edward Av FS Selkirk St)
-4000 Dunbar St - (NB Dunbar St FS W King Edward Av)
-3900 W 16 Av - (WB W 16 Av FS Wallace St)
-4100 W 16 Av - (WB W 16 Av FS Camosun St)
-4300 W 16 Av - (WB W 16 Av FS Discovery St)
-4500 W 16 Av - (WB W 16 Av FS Sasamat St)
-4600 W 16 Av - (WB W 16 Av FS Blanca St)
-4500 W 16 Av - (EB W 16av FS Tolmie St)
-4300 W 16 Av - (EB W 16 Av FS Trimble St)
-4100 W 16 Av - (EB W 16 Av FS Camosun St)
-3900 W 16 Av - (EB W 16 Av FS Crown St)
-1400 W King Edward Av - (EB W King Edward Av FS Granville St)
-1200 W King Edward Av - (EB W King Edward Av FS Hudson St)
-700 W King Edward Av - (EB W King Edward Av FS Willow St)
-0 E King Edward Av - (EB E King Edward Av FS Ontario St)
-500 E King Edward Av - (EB E King Edward Av FS St George St)
-900 E King Edward Av - EB E King Edward Av FS St Catherines St)
-1100 E King Edward Av - (EB E King Edward Av FS Glen Dr)
-1400 E King Edward Av - (EB E King Edward Av FS Knight St)
-4500 Nanaimo St - (NB Nanaimo St FS Brock St)
-2400 E 22 Av - (EB E 22 Av FS Nanaimo St)
-2700 E 22 Av - (EB E 22 Av FS Slocan St)
-2900 E 22 Av - (EB E 22 Av FS Boyd Diversion)
-3100 E 22 Av - (EB E 22 Av FS Lillooet St)
Location: Various
Schedule: Nov 22, 2023 - Feb 15, 2024urn:uuid:67f52a8d-502d-4d68-9cc4-7452d25212b32023-11-22T08:00:00ZCMBC Transit Bus Stop Upgrades - Route 252023-12-15T20:17:32.5085767Z49.25060637966334 -123.03715415269089 49.25060513256523 -123.03655177337897CMBC Installation and upgrades to transit and bus stops.
Traffic Impact:
Parking Lane Closures
Areas Impacted:
-3100 E 22 Av - (WB E 22 Av FS Windermere St)
-2900 E 22 A - (WB E 22 Av NS Renfrew St)
-2600 E 22 Av - (WB E 22 Av FS Slocan St)
-3800 Nanaimo St - (SB Nanaimo St FS E 22 Av)
-1300 E King Edward Av - (WB E King Edward Av FS Knight St)
-1100 E King Edward Av - (WB E King Edward Av FS Inverness St)
-900 E King Edward Av - (WB E King Edward Av FS Windsor St)
-500 E King Edward Av - (WB E King Edward Av NS St George St)
-300 E King Edward Av - (WB E King Edward Av FS Prince Edward St)
-0 W King Edward Av - (WB W King Edward Av FS Ontario St)
-200 W King Edward Av - (WB W King Edward Av FS Columbia St)
-1200 W King Edward Av - (WB W King Edward Av FS Selkirk St)
-4000 Dunbar St - (NB Dunbar St FS W King Edward Av)
-3900 W 16 Av - (WB W 16 Av FS Wallace St)
-4100 W 16 Av - (WB W 16 Av FS Camosun St)
-4300 W 16 Av - (WB W 16 Av FS Discovery St)
-4500 W 16 Av - (WB W 16 Av FS Sasamat St)
-4600 W 16 Av - (WB W 16 Av FS Blanca St)
-4500 W 16 Av - (EB W 16av FS Tolmie St)
-4300 W 16 Av - (EB W 16 Av FS Trimble St)
-4100 W 16 Av - (EB W 16 Av FS Camosun St)
-3900 W 16 Av - (EB W 16 Av FS Crown St)
-1400 W King Edward Av - (EB W King Edward Av FS Granville St)
-1200 W King Edward Av - (EB W King Edward Av FS Hudson St)
-700 W King Edward Av - (EB W King Edward Av FS Willow St)
-0 E King Edward Av - (EB E King Edward Av FS Ontario St)
-500 E King Edward Av - (EB E King Edward Av FS St George St)
-900 E King Edward Av - EB E King Edward Av FS St Catherines St)
-1100 E King Edward Av - (EB E King Edward Av FS Glen Dr)
-1400 E King Edward Av - (EB E King Edward Av FS Knight St)
-4500 Nanaimo St - (NB Nanaimo St FS Brock St)
-2400 E 22 Av - (EB E 22 Av FS Nanaimo St)
-2700 E 22 Av - (EB E 22 Av FS Slocan St)
-2900 E 22 Av - (EB E 22 Av FS Boyd Diversion)
-3100 E 22 Av - (EB E 22 Av FS Lillooet St)
Location: Various
Schedule: Nov 22, 2023 - Feb 15, 2024urn:uuid:a4a200e1-fe63-4319-98ae-0dca3990de092023-11-22T08:00:00ZCMBC Transit Bus Stop Upgrades - Route 252023-12-15T20:17:32.5085767Z49.248590555258886 -123.08525008659056 49.24858202973169 -123.08451281433396CMBC Installation and upgrades to transit and bus stops.
Traffic Impact:
Parking Lane Closures
Areas Impacted:
-3100 E 22 Av - (WB E 22 Av FS Windermere St)
-2900 E 22 A - (WB E 22 Av NS Renfrew St)
-2600 E 22 Av - (WB E 22 Av FS Slocan St)
-3800 Nanaimo St - (SB Nanaimo St FS E 22 Av)
-1300 E King Edward Av - (WB E King Edward Av FS Knight St)
-1100 E King Edward Av - (WB E King Edward Av FS Inverness St)
-900 E King Edward Av - (WB E King Edward Av FS Windsor St)
-500 E King Edward Av - (WB E King Edward Av NS St George St)
-300 E King Edward Av - (WB E King Edward Av FS Prince Edward St)
-0 W King Edward Av - (WB W King Edward Av FS Ontario St)
-200 W King Edward Av - (WB W King Edward Av FS Columbia St)
-1200 W King Edward Av - (WB W King Edward Av FS Selkirk St)
-4000 Dunbar St - (NB Dunbar St FS W King Edward Av)
-3900 W 16 Av - (WB W 16 Av FS Wallace St)
-4100 W 16 Av - (WB W 16 Av FS Camosun St)
-4300 W 16 Av - (WB W 16 Av FS Discovery St)
-4500 W 16 Av - (WB W 16 Av FS Sasamat St)
-4600 W 16 Av - (WB W 16 Av FS Blanca St)
-4500 W 16 Av - (EB W 16av FS Tolmie St)
-4300 W 16 Av - (EB W 16 Av FS Trimble St)
-4100 W 16 Av - (EB W 16 Av FS Camosun St)
-3900 W 16 Av - (EB W 16 Av FS Crown St)
-1400 W King Edward Av - (EB W King Edward Av FS Granville St)
-1200 W King Edward Av - (EB W King Edward Av FS Hudson St)
-700 W King Edward Av - (EB W King Edward Av FS Willow St)
-0 E King Edward Av - (EB E King Edward Av FS Ontario St)
-500 E King Edward Av - (EB E King Edward Av FS St George St)
-900 E King Edward Av - EB E King Edward Av FS St Catherines St)
-1100 E King Edward Av - (EB E King Edward Av FS Glen Dr)
-1400 E King Edward Av - (EB E King Edward Av FS Knight St)
-4500 Nanaimo St - (NB Nanaimo St FS Brock St)
-2400 E 22 Av - (EB E 22 Av FS Nanaimo St)
-2700 E 22 Av - (EB E 22 Av FS Slocan St)
-2900 E 22 Av - (EB E 22 Av FS Boyd Diversion)
-3100 E 22 Av - (EB E 22 Av FS Lillooet St)
Location: Various
Schedule: Nov 22, 2023 - Feb 15, 2024urn:uuid:997ca025-29df-4e40-98f7-f275217c6d8e2023-11-22T08:00:00ZCMBC Transit Bus Stop Upgrades - Route 252023-12-15T20:17:32.5085767Z49.248690489192626 -123.09407461489624 49.248669604660506 -123.0921406446355CMBC Installation and upgrades to transit and bus stops.
Traffic Impact:
Parking Lane Closures
Areas Impacted:
-3100 E 22 Av - (WB E 22 Av FS Windermere St)
-2900 E 22 A - (WB E 22 Av NS Renfrew St)
-2600 E 22 Av - (WB E 22 Av FS Slocan St)
-3800 Nanaimo St - (SB Nanaimo St FS E 22 Av)
-1300 E King Edward Av - (WB E King Edward Av FS Knight St)
-1100 E King Edward Av - (WB E King Edward Av FS Inverness St)
-900 E King Edward Av - (WB E King Edward Av FS Windsor St)
-500 E King Edward Av - (WB E King Edward Av NS St George St)
-300 E King Edward Av - (WB E King Edward Av FS Prince Edward St)
-0 W King Edward Av - (WB W King Edward Av FS Ontario St)
-200 W King Edward Av - (WB W King Edward Av FS Columbia St)
-1200 W King Edward Av - (WB W King Edward Av FS Selkirk St)
-4000 Dunbar St - (NB Dunbar St FS W King Edward Av)
-3900 W 16 Av - (WB W 16 Av FS Wallace St)
-4100 W 16 Av - (WB W 16 Av FS Camosun St)
-4300 W 16 Av - (WB W 16 Av FS Discovery St)
-4500 W 16 Av - (WB W 16 Av FS Sasamat St)
-4600 W 16 Av - (WB W 16 Av FS Blanca St)
-4500 W 16 Av - (EB W 16av FS Tolmie St)
-4300 W 16 Av - (EB W 16 Av FS Trimble St)
-4100 W 16 Av - (EB W 16 Av FS Camosun St)
-3900 W 16 Av - (EB W 16 Av FS Crown St)
-1400 W King Edward Av - (EB W King Edward Av FS Granville St)
-1200 W King Edward Av - (EB W King Edward Av FS Hudson St)
-700 W King Edward Av - (EB W King Edward Av FS Willow St)
-0 E King Edward Av - (EB E King Edward Av FS Ontario St)
-500 E King Edward Av - (EB E King Edward Av FS St George St)
-900 E King Edward Av - EB E King Edward Av FS St Catherines St)
-1100 E King Edward Av - (EB E King Edward Av FS Glen Dr)
-1400 E King Edward Av - (EB E King Edward Av FS Knight St)
-4500 Nanaimo St - (NB Nanaimo St FS Brock St)
-2400 E 22 Av - (EB E 22 Av FS Nanaimo St)
-2700 E 22 Av - (EB E 22 Av FS Slocan St)
-2900 E 22 Av - (EB E 22 Av FS Boyd Diversion)
-3100 E 22 Av - (EB E 22 Av FS Lillooet St)
Location: Various
Schedule: Nov 22, 2023 - Feb 15, 2024urn:uuid:71194ed5-587d-4b13-bf24-bf41ec14572e2023-11-22T08:00:00ZCMBC Transit Bus Stop Upgrades - Route 252023-12-15T20:17:32.5085767Z49.24874560856546 -123.09873567445706 49.248719664363705 -123.09719980706788CMBC Installation and upgrades to transit and bus stops.
Traffic Impact:
Parking Lane Closures
Areas Impacted:
-3100 E 22 Av - (WB E 22 Av FS Windermere St)
-2900 E 22 A - (WB E 22 Av NS Renfrew St)
-2600 E 22 Av - (WB E 22 Av FS Slocan St)
-3800 Nanaimo St - (SB Nanaimo St FS E 22 Av)
-1300 E King Edward Av - (WB E King Edward Av FS Knight St)
-1100 E King Edward Av - (WB E King Edward Av FS Inverness St)
-900 E King Edward Av - (WB E King Edward Av FS Windsor St)
-500 E King Edward Av - (WB E King Edward Av NS St George St)
-300 E King Edward Av - (WB E King Edward Av FS Prince Edward St)
-0 W King Edward Av - (WB W King Edward Av FS Ontario St)
-200 W King Edward Av - (WB W King Edward Av FS Columbia St)
-1200 W King Edward Av - (WB W King Edward Av FS Selkirk St)
-4000 Dunbar St - (NB Dunbar St FS W King Edward Av)
-3900 W 16 Av - (WB W 16 Av FS Wallace St)
-4100 W 16 Av - (WB W 16 Av FS Camosun St)
-4300 W 16 Av - (WB W 16 Av FS Discovery St)
-4500 W 16 Av - (WB W 16 Av FS Sasamat St)
-4600 W 16 Av - (WB W 16 Av FS Blanca St)
-4500 W 16 Av - (EB W 16av FS Tolmie St)
-4300 W 16 Av - (EB W 16 Av FS Trimble St)
-4100 W 16 Av - (EB W 16 Av FS Camosun St)
-3900 W 16 Av - (EB W 16 Av FS Crown St)
-1400 W King Edward Av - (EB W King Edward Av FS Granville St)
-1200 W King Edward Av - (EB W King Edward Av FS Hudson St)
-700 W King Edward Av - (EB W King Edward Av FS Willow St)
-0 E King Edward Av - (EB E King Edward Av FS Ontario St)
-500 E King Edward Av - (EB E King Edward Av FS St George St)
-900 E King Edward Av - EB E King Edward Av FS St Catherines St)
-1100 E King Edward Av - (EB E King Edward Av FS Glen Dr)
-1400 E King Edward Av - (EB E King Edward Av FS Knight St)
-4500 Nanaimo St - (NB Nanaimo St FS Brock St)
-2400 E 22 Av - (EB E 22 Av FS Nanaimo St)
-2700 E 22 Av - (EB E 22 Av FS Slocan St)
-2900 E 22 Av - (EB E 22 Av FS Boyd Diversion)
-3100 E 22 Av - (EB E 22 Av FS Lillooet St)
Location: Various
Schedule: Nov 22, 2023 - Feb 15, 2024urn:uuid:98c9dc6f-6042-4ad9-b5de-7b5bd54297652023-11-22T08:00:00ZCMBC Transit Bus Stop Upgrades - Route 252023-12-15T20:17:32.5085767Z49.248751264441665 -123.09908488674196 49.24874560856546 -123.09873567445706CMBC Installation and upgrades to transit and bus stops.
Traffic Impact:
Parking Lane Closures
Areas Impacted:
-3100 E 22 Av - (WB E 22 Av FS Windermere St)
-2900 E 22 A - (WB E 22 Av NS Renfrew St)
-2600 E 22 Av - (WB E 22 Av FS Slocan St)
-3800 Nanaimo St - (SB Nanaimo St FS E 22 Av)
-1300 E King Edward Av - (WB E King Edward Av FS Knight St)
-1100 E King Edward Av - (WB E King Edward Av FS Inverness St)
-900 E King Edward Av - (WB E King Edward Av FS Windsor St)
-500 E King Edward Av - (WB E King Edward Av NS St George St)
-300 E King Edward Av - (WB E King Edward Av FS Prince Edward St)
-0 W King Edward Av - (WB W King Edward Av FS Ontario St)
-200 W King Edward Av - (WB W King Edward Av FS Columbia St)
-1200 W King Edward Av - (WB W King Edward Av FS Selkirk St)
-4000 Dunbar St - (NB Dunbar St FS W King Edward Av)
-3900 W 16 Av - (WB W 16 Av FS Wallace St)
-4100 W 16 Av - (WB W 16 Av FS Camosun St)
-4300 W 16 Av - (WB W 16 Av FS Discovery St)
-4500 W 16 Av - (WB W 16 Av FS Sasamat St)
-4600 W 16 Av - (WB W 16 Av FS Blanca St)
-4500 W 16 Av - (EB W 16av FS Tolmie St)
-4300 W 16 Av - (EB W 16 Av FS Trimble St)
-4100 W 16 Av - (EB W 16 Av FS Camosun St)
-3900 W 16 Av - (EB W 16 Av FS Crown St)
-1400 W King Edward Av - (EB W King Edward Av FS Granville St)
-1200 W King Edward Av - (EB W King Edward Av FS Hudson St)
-700 W King Edward Av - (EB W King Edward Av FS Willow St)
-0 E King Edward Av - (EB E King Edward Av FS Ontario St)
-500 E King Edward Av - (EB E King Edward Av FS St George St)
-900 E King Edward Av - EB E King Edward Av FS St Catherines St)
-1100 E King Edward Av - (EB E King Edward Av FS Glen Dr)
-1400 E King Edward Av - (EB E King Edward Av FS Knight St)
-4500 Nanaimo St - (NB Nanaimo St FS Brock St)
-2400 E 22 Av - (EB E 22 Av FS Nanaimo St)
-2700 E 22 Av - (EB E 22 Av FS Slocan St)
-2900 E 22 Av - (EB E 22 Av FS Boyd Diversion)
-3100 E 22 Av - (EB E 22 Av FS Lillooet St)
Location: Various
Schedule: Nov 22, 2023 - Feb 15, 2024urn:uuid:6365d297-02d0-41bd-b05c-75928720c5582023-11-22T08:00:00ZCMBC Transit Bus Stop Upgrades - Route 252023-12-15T20:17:32.5085767Z49.258024215139415 -123.19107267157887 49.25806261984076 -123.19356147366257CMBC Installation and upgrades to transit and bus stops.
Traffic Impact:
Parking Lane Closures
Areas Impacted:
-3100 E 22 Av - (WB E 22 Av FS Windermere St)
-2900 E 22 A - (WB E 22 Av NS Renfrew St)
-2600 E 22 Av - (WB E 22 Av FS Slocan St)
-3800 Nanaimo St - (SB Nanaimo St FS E 22 Av)
-1300 E King Edward Av - (WB E King Edward Av FS Knight St)
-1100 E King Edward Av - (WB E King Edward Av FS Inverness St)
-900 E King Edward Av - (WB E King Edward Av FS Windsor St)
-500 E King Edward Av - (WB E King Edward Av NS St George St)
-300 E King Edward Av - (WB E King Edward Av FS Prince Edward St)
-0 W King Edward Av - (WB W King Edward Av FS Ontario St)
-200 W King Edward Av - (WB W King Edward Av FS Columbia St)
-1200 W King Edward Av - (WB W King Edward Av FS Selkirk St)
-4000 Dunbar St - (NB Dunbar St FS W King Edward Av)
-3900 W 16 Av - (WB W 16 Av FS Wallace St)
-4100 W 16 Av - (WB W 16 Av FS Camosun St)
-4300 W 16 Av - (WB W 16 Av FS Discovery St)
-4500 W 16 Av - (WB W 16 Av FS Sasamat St)
-4600 W 16 Av - (WB W 16 Av FS Blanca St)
-4500 W 16 Av - (EB W 16av FS Tolmie St)
-4300 W 16 Av - (EB W 16 Av FS Trimble St)
-4100 W 16 Av - (EB W 16 Av FS Camosun St)
-3900 W 16 Av - (EB W 16 Av FS Crown St)
-1400 W King Edward Av - (EB W King Edward Av FS Granville St)
-1200 W King Edward Av - (EB W King Edward Av FS Hudson St)
-700 W King Edward Av - (EB W King Edward Av FS Willow St)
-0 E King Edward Av - (EB E King Edward Av FS Ontario St)
-500 E King Edward Av - (EB E King Edward Av FS St George St)
-900 E King Edward Av - EB E King Edward Av FS St Catherines St)
-1100 E King Edward Av - (EB E King Edward Av FS Glen Dr)
-1400 E King Edward Av - (EB E King Edward Av FS Knight St)
-4500 Nanaimo St - (NB Nanaimo St FS Brock St)
-2400 E 22 Av - (EB E 22 Av FS Nanaimo St)
-2700 E 22 Av - (EB E 22 Av FS Slocan St)
-2900 E 22 Av - (EB E 22 Av FS Boyd Diversion)
-3100 E 22 Av - (EB E 22 Av FS Lillooet St)
Location: Various
Schedule: Nov 22, 2023 - Feb 15, 2024urn:uuid:7b4d3314-c583-43ed-bb47-0d0bacf288ec2023-11-22T08:00:00ZCMBC Transit Bus Stop Upgrades - Route 252023-12-15T20:17:32.5085767Z49.25806261984076 -123.19356147366257 49.25807108173214 -123.19410992488744CMBC Installation and upgrades to transit and bus stops.
Traffic Impact:
Parking Lane Closures
Areas Impacted:
-3100 E 22 Av - (WB E 22 Av FS Windermere St)
-2900 E 22 A - (WB E 22 Av NS Renfrew St)
-2600 E 22 Av - (WB E 22 Av FS Slocan St)
-3800 Nanaimo St - (SB Nanaimo St FS E 22 Av)
-1300 E King Edward Av - (WB E King Edward Av FS Knight St)
-1100 E King Edward Av - (WB E King Edward Av FS Inverness St)
-900 E King Edward Av - (WB E King Edward Av FS Windsor St)
-500 E King Edward Av - (WB E King Edward Av NS St George St)
-300 E King Edward Av - (WB E King Edward Av FS Prince Edward St)
-0 W King Edward Av - (WB W King Edward Av FS Ontario St)
-200 W King Edward Av - (WB W King Edward Av FS Columbia St)
-1200 W King Edward Av - (WB W King Edward Av FS Selkirk St)
-4000 Dunbar St - (NB Dunbar St FS W King Edward Av)
-3900 W 16 Av - (WB W 16 Av FS Wallace St)
-4100 W 16 Av - (WB W 16 Av FS Camosun St)
-4300 W 16 Av - (WB W 16 Av FS Discovery St)
-4500 W 16 Av - (WB W 16 Av FS Sasamat St)
-4600 W 16 Av - (WB W 16 Av FS Blanca St)
-4500 W 16 Av - (EB W 16av FS Tolmie St)
-4300 W 16 Av - (EB W 16 Av FS Trimble St)
-4100 W 16 Av - (EB W 16 Av FS Camosun St)
-3900 W 16 Av - (EB W 16 Av FS Crown St)
-1400 W King Edward Av - (EB W King Edward Av FS Granville St)
-1200 W King Edward Av - (EB W King Edward Av FS Hudson St)
-700 W King Edward Av - (EB W King Edward Av FS Willow St)
-0 E King Edward Av - (EB E King Edward Av FS Ontario St)
-500 E King Edward Av - (EB E King Edward Av FS St George St)
-900 E King Edward Av - EB E King Edward Av FS St Catherines St)
-1100 E King Edward Av - (EB E King Edward Av FS Glen Dr)
-1400 E King Edward Av - (EB E King Edward Av FS Knight St)
-4500 Nanaimo St - (NB Nanaimo St FS Brock St)
-2400 E 22 Av - (EB E 22 Av FS Nanaimo St)
-2700 E 22 Av - (EB E 22 Av FS Slocan St)
-2900 E 22 Av - (EB E 22 Av FS Boyd Diversion)
-3100 E 22 Av - (EB E 22 Av FS Lillooet St)
Location: Various
Schedule: Nov 22, 2023 - Feb 15, 2024urn:uuid:6e4fbc0c-e427-48a9-be33-2ded5e93ebac2023-11-22T08:00:00ZCMBC Transit Bus Stop Upgrades - Route 252023-12-15T20:17:32.5085767Z49.258114766564034 -123.19715161037816 49.25816030772313 -123.20019189328644CMBC Installation and upgrades to transit and bus stops.
Traffic Impact:
Parking Lane Closures
Areas Impacted:
-3100 E 22 Av - (WB E 22 Av FS Windermere St)
-2900 E 22 A - (WB E 22 Av NS Renfrew St)
-2600 E 22 Av - (WB E 22 Av FS Slocan St)
-3800 Nanaimo St - (SB Nanaimo St FS E 22 Av)
-1300 E King Edward Av - (WB E King Edward Av FS Knight St)
-1100 E King Edward Av - (WB E King Edward Av FS Inverness St)
-900 E King Edward Av - (WB E King Edward Av FS Windsor St)
-500 E King Edward Av - (WB E King Edward Av NS St George St)
-300 E King Edward Av - (WB E King Edward Av FS Prince Edward St)
-0 W King Edward Av - (WB W King Edward Av FS Ontario St)
-200 W King Edward Av - (WB W King Edward Av FS Columbia St)
-1200 W King Edward Av - (WB W King Edward Av FS Selkirk St)
-4000 Dunbar St - (NB Dunbar St FS W King Edward Av)
-3900 W 16 Av - (WB W 16 Av FS Wallace St)
-4100 W 16 Av - (WB W 16 Av FS Camosun St)
-4300 W 16 Av - (WB W 16 Av FS Discovery St)
-4500 W 16 Av - (WB W 16 Av FS Sasamat St)
-4600 W 16 Av - (WB W 16 Av FS Blanca St)
-4500 W 16 Av - (EB W 16av FS Tolmie St)
-4300 W 16 Av - (EB W 16 Av FS Trimble St)
-4100 W 16 Av - (EB W 16 Av FS Camosun St)
-3900 W 16 Av - (EB W 16 Av FS Crown St)
-1400 W King Edward Av - (EB W King Edward Av FS Granville St)
-1200 W King Edward Av - (EB W King Edward Av FS Hudson St)
-700 W King Edward Av - (EB W King Edward Av FS Willow St)
-0 E King Edward Av - (EB E King Edward Av FS Ontario St)
-500 E King Edward Av - (EB E King Edward Av FS St George St)
-900 E King Edward Av - EB E King Edward Av FS St Catherines St)
-1100 E King Edward Av - (EB E King Edward Av FS Glen Dr)
-1400 E King Edward Av - (EB E King Edward Av FS Knight St)
-4500 Nanaimo St - (NB Nanaimo St FS Brock St)
-2400 E 22 Av - (EB E 22 Av FS Nanaimo St)
-2700 E 22 Av - (EB E 22 Av FS Slocan St)
-2900 E 22 Av - (EB E 22 Av FS Boyd Diversion)
-3100 E 22 Av - (EB E 22 Av FS Lillooet St)
Location: Various
Schedule: Nov 22, 2023 - Feb 15, 2024urn:uuid:1968b868-a6d9-471c-97b2-d79376af66022023-11-22T08:00:00ZCMBC Transit Bus Stop Upgrades - Route 252023-12-15T20:17:32.5085767Z49.25820652508466 -123.20321648999217 49.25825362355306 -123.2062725541609CMBC Installation and upgrades to transit and bus stops.
Traffic Impact:
Parking Lane Closures
Areas Impacted:
-3100 E 22 Av - (WB E 22 Av FS Windermere St)
-2900 E 22 A - (WB E 22 Av NS Renfrew St)
-2600 E 22 Av - (WB E 22 Av FS Slocan St)
-3800 Nanaimo St - (SB Nanaimo St FS E 22 Av)
-1300 E King Edward Av - (WB E King Edward Av FS Knight St)
-1100 E King Edward Av - (WB E King Edward Av FS Inverness St)
-900 E King Edward Av - (WB E King Edward Av FS Windsor St)
-500 E King Edward Av - (WB E King Edward Av NS St George St)
-300 E King Edward Av - (WB E King Edward Av FS Prince Edward St)
-0 W King Edward Av - (WB W King Edward Av FS Ontario St)
-200 W King Edward Av - (WB W King Edward Av FS Columbia St)
-1200 W King Edward Av - (WB W King Edward Av FS Selkirk St)
-4000 Dunbar St - (NB Dunbar St FS W King Edward Av)
-3900 W 16 Av - (WB W 16 Av FS Wallace St)
-4100 W 16 Av - (WB W 16 Av FS Camosun St)
-4300 W 16 Av - (WB W 16 Av FS Discovery St)
-4500 W 16 Av - (WB W 16 Av FS Sasamat St)
-4600 W 16 Av - (WB W 16 Av FS Blanca St)
-4500 W 16 Av - (EB W 16av FS Tolmie St)
-4300 W 16 Av - (EB W 16 Av FS Trimble St)
-4100 W 16 Av - (EB W 16 Av FS Camosun St)
-3900 W 16 Av - (EB W 16 Av FS Crown St)
-1400 W King Edward Av - (EB W King Edward Av FS Granville St)
-1200 W King Edward Av - (EB W King Edward Av FS Hudson St)
-700 W King Edward Av - (EB W King Edward Av FS Willow St)
-0 E King Edward Av - (EB E King Edward Av FS Ontario St)
-500 E King Edward Av - (EB E King Edward Av FS St George St)
-900 E King Edward Av - EB E King Edward Av FS St Catherines St)
-1100 E King Edward Av - (EB E King Edward Av FS Glen Dr)
-1400 E King Edward Av - (EB E King Edward Av FS Knight St)
-4500 Nanaimo St - (NB Nanaimo St FS Brock St)
-2400 E 22 Av - (EB E 22 Av FS Nanaimo St)
-2700 E 22 Av - (EB E 22 Av FS Slocan St)
-2900 E 22 Av - (EB E 22 Av FS Boyd Diversion)
-3100 E 22 Av - (EB E 22 Av FS Lillooet St)
Location: Various
Schedule: Nov 22, 2023 - Feb 15, 2024urn:uuid:d66363d8-cb26-4098-beb8-9d479dd765302023-11-22T08:00:00ZCMBC Transit Bus Stop Upgrades - Route 252023-12-15T20:17:32.5085767Z49.25829993268093 -123.20931255514124 49.258318798154306 -123.21022775097849 49.258346317662756 -123.21235586058351CMBC Installation and upgrades to transit and bus stops.
Traffic Impact:
Parking Lane Closures
Areas Impacted:
-3100 E 22 Av - (WB E 22 Av FS Windermere St)
-2900 E 22 A - (WB E 22 Av NS Renfrew St)
-2600 E 22 Av - (WB E 22 Av FS Slocan St)
-3800 Nanaimo St - (SB Nanaimo St FS E 22 Av)
-1300 E King Edward Av - (WB E King Edward Av FS Knight St)
-1100 E King Edward Av - (WB E King Edward Av FS Inverness St)
-900 E King Edward Av - (WB E King Edward Av FS Windsor St)
-500 E King Edward Av - (WB E King Edward Av NS St George St)
-300 E King Edward Av - (WB E King Edward Av FS Prince Edward St)
-0 W King Edward Av - (WB W King Edward Av FS Ontario St)
-200 W King Edward Av - (WB W King Edward Av FS Columbia St)
-1200 W King Edward Av - (WB W King Edward Av FS Selkirk St)
-4000 Dunbar St - (NB Dunbar St FS W King Edward Av)
-3900 W 16 Av - (WB W 16 Av FS Wallace St)
-4100 W 16 Av - (WB W 16 Av FS Camosun St)
-4300 W 16 Av - (WB W 16 Av FS Discovery St)
-4500 W 16 Av - (WB W 16 Av FS Sasamat St)
-4600 W 16 Av - (WB W 16 Av FS Blanca St)
-4500 W 16 Av - (EB W 16av FS Tolmie St)
-4300 W 16 Av - (EB W 16 Av FS Trimble St)
-4100 W 16 Av - (EB W 16 Av FS Camosun St)
-3900 W 16 Av - (EB W 16 Av FS Crown St)
-1400 W King Edward Av - (EB W King Edward Av FS Granville St)
-1200 W King Edward Av - (EB W King Edward Av FS Hudson St)
-700 W King Edward Av - (EB W King Edward Av FS Willow St)
-0 E King Edward Av - (EB E King Edward Av FS Ontario St)
-500 E King Edward Av - (EB E King Edward Av FS St George St)
-900 E King Edward Av - EB E King Edward Av FS St Catherines St)
-1100 E King Edward Av - (EB E King Edward Av FS Glen Dr)
-1400 E King Edward Av - (EB E King Edward Av FS Knight St)
-4500 Nanaimo St - (NB Nanaimo St FS Brock St)
-2400 E 22 Av - (EB E 22 Av FS Nanaimo St)
-2700 E 22 Av - (EB E 22 Av FS Slocan St)
-2900 E 22 Av - (EB E 22 Av FS Boyd Diversion)
-3100 E 22 Av - (EB E 22 Av FS Lillooet St)
Location: Various
Schedule: Nov 22, 2023 - Feb 15, 2024urn:uuid:5fce752b-6c6a-4f1a-a2b4-c8894794a25f2023-11-22T08:00:00ZCMBC Transit Bus Stop Upgrades - Route 252023-12-15T20:17:32.5085767Z49.258346317662756 -123.21235586058351 49.25839328966103 -123.21542729292993CMBC Installation and upgrades to transit and bus stops.
Traffic Impact:
Parking Lane Closures
Areas Impacted:
-3100 E 22 Av - (WB E 22 Av FS Windermere St)
-2900 E 22 A - (WB E 22 Av NS Renfrew St)
-2600 E 22 Av - (WB E 22 Av FS Slocan St)
-3800 Nanaimo St - (SB Nanaimo St FS E 22 Av)
-1300 E King Edward Av - (WB E King Edward Av FS Knight St)
-1100 E King Edward Av - (WB E King Edward Av FS Inverness St)
-900 E King Edward Av - (WB E King Edward Av FS Windsor St)
-500 E King Edward Av - (WB E King Edward Av NS St George St)
-300 E King Edward Av - (WB E King Edward Av FS Prince Edward St)
-0 W King Edward Av - (WB W King Edward Av FS Ontario St)
-200 W King Edward Av - (WB W King Edward Av FS Columbia St)
-1200 W King Edward Av - (WB W King Edward Av FS Selkirk St)
-4000 Dunbar St - (NB Dunbar St FS W King Edward Av)
-3900 W 16 Av - (WB W 16 Av FS Wallace St)
-4100 W 16 Av - (WB W 16 Av FS Camosun St)
-4300 W 16 Av - (WB W 16 Av FS Discovery St)
-4500 W 16 Av - (WB W 16 Av FS Sasamat St)
-4600 W 16 Av - (WB W 16 Av FS Blanca St)
-4500 W 16 Av - (EB W 16av FS Tolmie St)
-4300 W 16 Av - (EB W 16 Av FS Trimble St)
-4100 W 16 Av - (EB W 16 Av FS Camosun St)
-3900 W 16 Av - (EB W 16 Av FS Crown St)
-1400 W King Edward Av - (EB W King Edward Av FS Granville St)
-1200 W King Edward Av - (EB W King Edward Av FS Hudson St)
-700 W King Edward Av - (EB W King Edward Av FS Willow St)
-0 E King Edward Av - (EB E King Edward Av FS Ontario St)
-500 E King Edward Av - (EB E King Edward Av FS St George St)
-900 E King Edward Av - EB E King Edward Av FS St Catherines St)
-1100 E King Edward Av - (EB E King Edward Av FS Glen Dr)
-1400 E King Edward Av - (EB E King Edward Av FS Knight St)
-4500 Nanaimo St - (NB Nanaimo St FS Brock St)
-2400 E 22 Av - (EB E 22 Av FS Nanaimo St)
-2700 E 22 Av - (EB E 22 Av FS Slocan St)
-2900 E 22 Av - (EB E 22 Av FS Boyd Diversion)
-3100 E 22 Av - (EB E 22 Av FS Lillooet St)
Location: Various
Schedule: Nov 22, 2023 - Feb 15, 2024urn:uuid:88c2bb29-dcbe-46a0-9df5-51b29c78d61c2023-11-22T08:00:00ZCMBC Transit Bus Stop Upgrades - Route 252023-12-15T20:17:32.5085767Z49.248851478025415 -123.10500453320526 49.24889426418744 -123.10746448249448CMBC Installation and upgrades to transit and bus stops.
Traffic Impact:
Parking Lane Closures
Areas Impacted:
-3100 E 22 Av - (WB E 22 Av FS Windermere St)
-2900 E 22 A - (WB E 22 Av NS Renfrew St)
-2600 E 22 Av - (WB E 22 Av FS Slocan St)
-3800 Nanaimo St - (SB Nanaimo St FS E 22 Av)
-1300 E King Edward Av - (WB E King Edward Av FS Knight St)
-1100 E King Edward Av - (WB E King Edward Av FS Inverness St)
-900 E King Edward Av - (WB E King Edward Av FS Windsor St)
-500 E King Edward Av - (WB E King Edward Av NS St George St)
-300 E King Edward Av - (WB E King Edward Av FS Prince Edward St)
-0 W King Edward Av - (WB W King Edward Av FS Ontario St)
-200 W King Edward Av - (WB W King Edward Av FS Columbia St)
-1200 W King Edward Av - (WB W King Edward Av FS Selkirk St)
-4000 Dunbar St - (NB Dunbar St FS W King Edward Av)
-3900 W 16 Av - (WB W 16 Av FS Wallace St)
-4100 W 16 Av - (WB W 16 Av FS Camosun St)
-4300 W 16 Av - (WB W 16 Av FS Discovery St)
-4500 W 16 Av - (WB W 16 Av FS Sasamat St)
-4600 W 16 Av - (WB W 16 Av FS Blanca St)
-4500 W 16 Av - (EB W 16av FS Tolmie St)
-4300 W 16 Av - (EB W 16 Av FS Trimble St)
-4100 W 16 Av - (EB W 16 Av FS Camosun St)
-3900 W 16 Av - (EB W 16 Av FS Crown St)
-1400 W King Edward Av - (EB W King Edward Av FS Granville St)
-1200 W King Edward Av - (EB W King Edward Av FS Hudson St)
-700 W King Edward Av - (EB W King Edward Av FS Willow St)
-0 E King Edward Av - (EB E King Edward Av FS Ontario St)
-500 E King Edward Av - (EB E King Edward Av FS St George St)
-900 E King Edward Av - EB E King Edward Av FS St Catherines St)
-1100 E King Edward Av - (EB E King Edward Av FS Glen Dr)
-1400 E King Edward Av - (EB E King Edward Av FS Knight St)
-4500 Nanaimo St - (NB Nanaimo St FS Brock St)
-2400 E 22 Av - (EB E 22 Av FS Nanaimo St)
-2700 E 22 Av - (EB E 22 Av FS Slocan St)
-2900 E 22 Av - (EB E 22 Av FS Boyd Diversion)
-3100 E 22 Av - (EB E 22 Av FS Lillooet St)
Location: Various
Schedule: Nov 22, 2023 - Feb 15, 2024urn:uuid:cd18d3f1-3ebc-4e9d-9b9f-e1f0ff513df12023-11-22T08:00:00ZCMBC Transit Bus Stop Upgrades - Route 252023-12-15T20:17:32.5085767Z49.24890222479024 -123.11006366034565 49.24894011008064 -123.11220780636948CMBC Installation and upgrades to transit and bus stops.
Traffic Impact:
Parking Lane Closures
Areas Impacted:
-3100 E 22 Av - (WB E 22 Av FS Windermere St)
-2900 E 22 A - (WB E 22 Av NS Renfrew St)
-2600 E 22 Av - (WB E 22 Av FS Slocan St)
-3800 Nanaimo St - (SB Nanaimo St FS E 22 Av)
-1300 E King Edward Av - (WB E King Edward Av FS Knight St)
-1100 E King Edward Av - (WB E King Edward Av FS Inverness St)
-900 E King Edward Av - (WB E King Edward Av FS Windsor St)
-500 E King Edward Av - (WB E King Edward Av NS St George St)
-300 E King Edward Av - (WB E King Edward Av FS Prince Edward St)
-0 W King Edward Av - (WB W King Edward Av FS Ontario St)
-200 W King Edward Av - (WB W King Edward Av FS Columbia St)
-1200 W King Edward Av - (WB W King Edward Av FS Selkirk St)
-4000 Dunbar St - (NB Dunbar St FS W King Edward Av)
-3900 W 16 Av - (WB W 16 Av FS Wallace St)
-4100 W 16 Av - (WB W 16 Av FS Camosun St)
-4300 W 16 Av - (WB W 16 Av FS Discovery St)
-4500 W 16 Av - (WB W 16 Av FS Sasamat St)
-4600 W 16 Av - (WB W 16 Av FS Blanca St)
-4500 W 16 Av - (EB W 16av FS Tolmie St)
-4300 W 16 Av - (EB W 16 Av FS Trimble St)
-4100 W 16 Av - (EB W 16 Av FS Camosun St)
-3900 W 16 Av - (EB W 16 Av FS Crown St)
-1400 W King Edward Av - (EB W King Edward Av FS Granville St)
-1200 W King Edward Av - (EB W King Edward Av FS Hudson St)
-700 W King Edward Av - (EB W King Edward Av FS Willow St)
-0 E King Edward Av - (EB E King Edward Av FS Ontario St)
-500 E King Edward Av - (EB E King Edward Av FS St George St)
-900 E King Edward Av - EB E King Edward Av FS St Catherines St)
-1100 E King Edward Av - (EB E King Edward Av FS Glen Dr)
-1400 E King Edward Av - (EB E King Edward Av FS Knight St)
-4500 Nanaimo St - (NB Nanaimo St FS Brock St)
-2400 E 22 Av - (EB E 22 Av FS Nanaimo St)
-2700 E 22 Av - (EB E 22 Av FS Slocan St)
-2900 E 22 Av - (EB E 22 Av FS Boyd Diversion)
-3100 E 22 Av - (EB E 22 Av FS Lillooet St)
Location: Various
Schedule: Nov 22, 2023 - Feb 15, 2024urn:uuid:7e495bd9-e389-4929-866e-4d712361d8a72023-11-22T08:00:00ZCMBC Transit Bus Stop Upgrades - Route 252023-12-15T20:17:32.5085767Z49.24930788762478 -123.13201363482727 49.24934523542231 -123.13437038210212CMBC Installation and upgrades to transit and bus stops.
Traffic Impact:
Parking Lane Closures
Areas Impacted:
-3100 E 22 Av - (WB E 22 Av FS Windermere St)
-2900 E 22 A - (WB E 22 Av NS Renfrew St)
-2600 E 22 Av - (WB E 22 Av FS Slocan St)
-3800 Nanaimo St - (SB Nanaimo St FS E 22 Av)
-1300 E King Edward Av - (WB E King Edward Av FS Knight St)
-1100 E King Edward Av - (WB E King Edward Av FS Inverness St)
-900 E King Edward Av - (WB E King Edward Av FS Windsor St)
-500 E King Edward Av - (WB E King Edward Av NS St George St)
-300 E King Edward Av - (WB E King Edward Av FS Prince Edward St)
-0 W King Edward Av - (WB W King Edward Av FS Ontario St)
-200 W King Edward Av - (WB W King Edward Av FS Columbia St)
-1200 W King Edward Av - (WB W King Edward Av FS Selkirk St)
-4000 Dunbar St - (NB Dunbar St FS W King Edward Av)
-3900 W 16 Av - (WB W 16 Av FS Wallace St)
-4100 W 16 Av - (WB W 16 Av FS Camosun St)
-4300 W 16 Av - (WB W 16 Av FS Discovery St)
-4500 W 16 Av - (WB W 16 Av FS Sasamat St)
-4600 W 16 Av - (WB W 16 Av FS Blanca St)
-4500 W 16 Av - (EB W 16av FS Tolmie St)
-4300 W 16 Av - (EB W 16 Av FS Trimble St)
-4100 W 16 Av - (EB W 16 Av FS Camosun St)
-3900 W 16 Av - (EB W 16 Av FS Crown St)
-1400 W King Edward Av - (EB W King Edward Av FS Granville St)
-1200 W King Edward Av - (EB W King Edward Av FS Hudson St)
-700 W King Edward Av - (EB W King Edward Av FS Willow St)
-0 E King Edward Av - (EB E King Edward Av FS Ontario St)
-500 E King Edward Av - (EB E King Edward Av FS St George St)
-900 E King Edward Av - EB E King Edward Av FS St Catherines St)
-1100 E King Edward Av - (EB E King Edward Av FS Glen Dr)
-1400 E King Edward Av - (EB E King Edward Av FS Knight St)
-4500 Nanaimo St - (NB Nanaimo St FS Brock St)
-2400 E 22 Av - (EB E 22 Av FS Nanaimo St)
-2700 E 22 Av - (EB E 22 Av FS Slocan St)
-2900 E 22 Av - (EB E 22 Av FS Boyd Diversion)
-3100 E 22 Av - (EB E 22 Av FS Lillooet St)
Location: Various
Schedule: Nov 22, 2023 - Feb 15, 2024urn:uuid:97ba3b81-8865-4b2b-b4be-6f479f4a4c7f2023-11-22T08:00:00ZCMBC Transit Bus Stop Upgrades - Route 252023-12-15T20:17:32.5085767Z49.2493818815048 -123.13670177948195 49.24940813528178 -123.1383894688778CMBC Installation and upgrades to transit and bus stops.
Traffic Impact:
Parking Lane Closures
Areas Impacted:
-3100 E 22 Av - (WB E 22 Av FS Windermere St)
-2900 E 22 A - (WB E 22 Av NS Renfrew St)
-2600 E 22 Av - (WB E 22 Av FS Slocan St)
-3800 Nanaimo St - (SB Nanaimo St FS E 22 Av)
-1300 E King Edward Av - (WB E King Edward Av FS Knight St)
-1100 E King Edward Av - (WB E King Edward Av FS Inverness St)
-900 E King Edward Av - (WB E King Edward Av FS Windsor St)
-500 E King Edward Av - (WB E King Edward Av NS St George St)
-300 E King Edward Av - (WB E King Edward Av FS Prince Edward St)
-0 W King Edward Av - (WB W King Edward Av FS Ontario St)
-200 W King Edward Av - (WB W King Edward Av FS Columbia St)
-1200 W King Edward Av - (WB W King Edward Av FS Selkirk St)
-4000 Dunbar St - (NB Dunbar St FS W King Edward Av)
-3900 W 16 Av - (WB W 16 Av FS Wallace St)
-4100 W 16 Av - (WB W 16 Av FS Camosun St)
-4300 W 16 Av - (WB W 16 Av FS Discovery St)
-4500 W 16 Av - (WB W 16 Av FS Sasamat St)
-4600 W 16 Av - (WB W 16 Av FS Blanca St)
-4500 W 16 Av - (EB W 16av FS Tolmie St)
-4300 W 16 Av - (EB W 16 Av FS Trimble St)
-4100 W 16 Av - (EB W 16 Av FS Camosun St)
-3900 W 16 Av - (EB W 16 Av FS Crown St)
-1400 W King Edward Av - (EB W King Edward Av FS Granville St)
-1200 W King Edward Av - (EB W King Edward Av FS Hudson St)
-700 W King Edward Av - (EB W King Edward Av FS Willow St)
-0 E King Edward Av - (EB E King Edward Av FS Ontario St)
-500 E King Edward Av - (EB E King Edward Av FS St George St)
-900 E King Edward Av - EB E King Edward Av FS St Catherines St)
-1100 E King Edward Av - (EB E King Edward Av FS Glen Dr)
-1400 E King Edward Av - (EB E King Edward Av FS Knight St)
-4500 Nanaimo St - (NB Nanaimo St FS Brock St)
-2400 E 22 Av - (EB E 22 Av FS Nanaimo St)
-2700 E 22 Av - (EB E 22 Av FS Slocan St)
-2900 E 22 Av - (EB E 22 Av FS Boyd Diversion)
-3100 E 22 Av - (EB E 22 Av FS Lillooet St)
Location: Various
Schedule: Nov 22, 2023 - Feb 15, 2024urn:uuid:789b4db7-73ca-496f-ae44-787a94faf21d2023-11-22T08:00:00ZCMBC Transit Bus Stop Upgrades - Route 252023-12-15T20:17:32.5085767Z49.249082800680895 -123.12038518278872 49.24912493056115 -123.12234117759225CMBC Installation and upgrades to transit and bus stops.
Traffic Impact:
Parking Lane Closures
Areas Impacted:
-3100 E 22 Av - (WB E 22 Av FS Windermere St)
-2900 E 22 A - (WB E 22 Av NS Renfrew St)
-2600 E 22 Av - (WB E 22 Av FS Slocan St)
-3800 Nanaimo St - (SB Nanaimo St FS E 22 Av)
-1300 E King Edward Av - (WB E King Edward Av FS Knight St)
-1100 E King Edward Av - (WB E King Edward Av FS Inverness St)
-900 E King Edward Av - (WB E King Edward Av FS Windsor St)
-500 E King Edward Av - (WB E King Edward Av NS St George St)
-300 E King Edward Av - (WB E King Edward Av FS Prince Edward St)
-0 W King Edward Av - (WB W King Edward Av FS Ontario St)
-200 W King Edward Av - (WB W King Edward Av FS Columbia St)
-1200 W King Edward Av - (WB W King Edward Av FS Selkirk St)
-4000 Dunbar St - (NB Dunbar St FS W King Edward Av)
-3900 W 16 Av - (WB W 16 Av FS Wallace St)
-4100 W 16 Av - (WB W 16 Av FS Camosun St)
-4300 W 16 Av - (WB W 16 Av FS Discovery St)
-4500 W 16 Av - (WB W 16 Av FS Sasamat St)
-4600 W 16 Av - (WB W 16 Av FS Blanca St)
-4500 W 16 Av - (EB W 16av FS Tolmie St)
-4300 W 16 Av - (EB W 16 Av FS Trimble St)
-4100 W 16 Av - (EB W 16 Av FS Camosun St)
-3900 W 16 Av - (EB W 16 Av FS Crown St)
-1400 W King Edward Av - (EB W King Edward Av FS Granville St)
-1200 W King Edward Av - (EB W King Edward Av FS Hudson St)
-700 W King Edward Av - (EB W King Edward Av FS Willow St)
-0 E King Edward Av - (EB E King Edward Av FS Ontario St)
-500 E King Edward Av - (EB E King Edward Av FS St George St)
-900 E King Edward Av - EB E King Edward Av FS St Catherines St)
-1100 E King Edward Av - (EB E King Edward Av FS Glen Dr)
-1400 E King Edward Av - (EB E King Edward Av FS Knight St)
-4500 Nanaimo St - (NB Nanaimo St FS Brock St)
-2400 E 22 Av - (EB E 22 Av FS Nanaimo St)
-2700 E 22 Av - (EB E 22 Av FS Slocan St)
-2900 E 22 Av - (EB E 22 Av FS Boyd Diversion)
-3100 E 22 Av - (EB E 22 Av FS Lillooet St)
Location: Various
Schedule: Nov 22, 2023 - Feb 15, 2024urn:uuid:e1ff7ae4-4736-4efc-809a-f54173ba12022023-11-22T08:00:00ZCMBC Transit Bus Stop Upgrades - Route 252023-12-15T20:17:32.5085767Z49.251061961384266 -123.18519142626246 49.25006638924876 -123.18520134708868CMBC Installation and upgrades to transit and bus stops.
Traffic Impact:
Parking Lane Closures
Areas Impacted:
-3100 E 22 Av - (WB E 22 Av FS Windermere St)
-2900 E 22 A - (WB E 22 Av NS Renfrew St)
-2600 E 22 Av - (WB E 22 Av FS Slocan St)
-3800 Nanaimo St - (SB Nanaimo St FS E 22 Av)
-1300 E King Edward Av - (WB E King Edward Av FS Knight St)
-1100 E King Edward Av - (WB E King Edward Av FS Inverness St)
-900 E King Edward Av - (WB E King Edward Av FS Windsor St)
-500 E King Edward Av - (WB E King Edward Av NS St George St)
-300 E King Edward Av - (WB E King Edward Av FS Prince Edward St)
-0 W King Edward Av - (WB W King Edward Av FS Ontario St)
-200 W King Edward Av - (WB W King Edward Av FS Columbia St)
-1200 W King Edward Av - (WB W King Edward Av FS Selkirk St)
-4000 Dunbar St - (NB Dunbar St FS W King Edward Av)
-3900 W 16 Av - (WB W 16 Av FS Wallace St)
-4100 W 16 Av - (WB W 16 Av FS Camosun St)
-4300 W 16 Av - (WB W 16 Av FS Discovery St)
-4500 W 16 Av - (WB W 16 Av FS Sasamat St)
-4600 W 16 Av - (WB W 16 Av FS Blanca St)
-4500 W 16 Av - (EB W 16av FS Tolmie St)
-4300 W 16 Av - (EB W 16 Av FS Trimble St)
-4100 W 16 Av - (EB W 16 Av FS Camosun St)
-3900 W 16 Av - (EB W 16 Av FS Crown St)
-1400 W King Edward Av - (EB W King Edward Av FS Granville St)
-1200 W King Edward Av - (EB W King Edward Av FS Hudson St)
-700 W King Edward Av - (EB W King Edward Av FS Willow St)
-0 E King Edward Av - (EB E King Edward Av FS Ontario St)
-500 E King Edward Av - (EB E King Edward Av FS St George St)
-900 E King Edward Av - EB E King Edward Av FS St Catherines St)
-1100 E King Edward Av - (EB E King Edward Av FS Glen Dr)
-1400 E King Edward Av - (EB E King Edward Av FS Knight St)
-4500 Nanaimo St - (NB Nanaimo St FS Brock St)
-2400 E 22 Av - (EB E 22 Av FS Nanaimo St)
-2700 E 22 Av - (EB E 22 Av FS Slocan St)
-2900 E 22 Av - (EB E 22 Av FS Boyd Diversion)
-3100 E 22 Av - (EB E 22 Av FS Lillooet St)
Location: Various
Schedule: Nov 22, 2023 - Feb 15, 2024urn:uuid:304c56c3-d2bb-4275-b286-503951e0eab72023-11-22T08:00:00ZCMBC Transit Bus Stop Upgrades - Route 252023-12-15T20:17:32.5085767Z49.25064017624774 -123.05665004649 49.24970210790704 -123.05665253205899CMBC Installation and upgrades to transit and bus stops.
Traffic Impact:
Parking Lane Closures
Areas Impacted:
-3100 E 22 Av - (WB E 22 Av FS Windermere St)
-2900 E 22 A - (WB E 22 Av NS Renfrew St)
-2600 E 22 Av - (WB E 22 Av FS Slocan St)
-3800 Nanaimo St - (SB Nanaimo St FS E 22 Av)
-1300 E King Edward Av - (WB E King Edward Av FS Knight St)
-1100 E King Edward Av - (WB E King Edward Av FS Inverness St)
-900 E King Edward Av - (WB E King Edward Av FS Windsor St)
-500 E King Edward Av - (WB E King Edward Av NS St George St)
-300 E King Edward Av - (WB E King Edward Av FS Prince Edward St)
-0 W King Edward Av - (WB W King Edward Av FS Ontario St)
-200 W King Edward Av - (WB W King Edward Av FS Columbia St)
-1200 W King Edward Av - (WB W King Edward Av FS Selkirk St)
-4000 Dunbar St - (NB Dunbar St FS W King Edward Av)
-3900 W 16 Av - (WB W 16 Av FS Wallace St)
-4100 W 16 Av - (WB W 16 Av FS Camosun St)
-4300 W 16 Av - (WB W 16 Av FS Discovery St)
-4500 W 16 Av - (WB W 16 Av FS Sasamat St)
-4600 W 16 Av - (WB W 16 Av FS Blanca St)
-4500 W 16 Av - (EB W 16av FS Tolmie St)
-4300 W 16 Av - (EB W 16 Av FS Trimble St)
-4100 W 16 Av - (EB W 16 Av FS Camosun St)
-3900 W 16 Av - (EB W 16 Av FS Crown St)
-1400 W King Edward Av - (EB W King Edward Av FS Granville St)
-1200 W King Edward Av - (EB W King Edward Av FS Hudson St)
-700 W King Edward Av - (EB W King Edward Av FS Willow St)
-0 E King Edward Av - (EB E King Edward Av FS Ontario St)
-500 E King Edward Av - (EB E King Edward Av FS St George St)
-900 E King Edward Av - EB E King Edward Av FS St Catherines St)
-1100 E King Edward Av - (EB E King Edward Av FS Glen Dr)
-1400 E King Edward Av - (EB E King Edward Av FS Knight St)
-4500 Nanaimo St - (NB Nanaimo St FS Brock St)
-2400 E 22 Av - (EB E 22 Av FS Nanaimo St)
-2700 E 22 Av - (EB E 22 Av FS Slocan St)
-2900 E 22 Av - (EB E 22 Av FS Boyd Diversion)
-3100 E 22 Av - (EB E 22 Av FS Lillooet St)
Location: Various
Schedule: Nov 22, 2023 - Feb 15, 2024urn:uuid:94d13601-cd1a-42a8-9be4-8b0e639b82ed2023-11-22T08:00:00ZCMBC Transit Bus Stop Upgrades - Route 252023-12-15T20:17:32.5085767Z49.2506459658095 -123.05589976586249 49.250656451279696 -123.054589090098CMBC Installation and upgrades to transit and bus stops.
Traffic Impact:
Parking Lane Closures
Areas Impacted:
-3100 E 22 Av - (WB E 22 Av FS Windermere St)
-2900 E 22 A - (WB E 22 Av NS Renfrew St)
-2600 E 22 Av - (WB E 22 Av FS Slocan St)
-3800 Nanaimo St - (SB Nanaimo St FS E 22 Av)
-1300 E King Edward Av - (WB E King Edward Av FS Knight St)
-1100 E King Edward Av - (WB E King Edward Av FS Inverness St)
-900 E King Edward Av - (WB E King Edward Av FS Windsor St)
-500 E King Edward Av - (WB E King Edward Av NS St George St)
-300 E King Edward Av - (WB E King Edward Av FS Prince Edward St)
-0 W King Edward Av - (WB W King Edward Av FS Ontario St)
-200 W King Edward Av - (WB W King Edward Av FS Columbia St)
-1200 W King Edward Av - (WB W King Edward Av FS Selkirk St)
-4000 Dunbar St - (NB Dunbar St FS W King Edward Av)
-3900 W 16 Av - (WB W 16 Av FS Wallace St)
-4100 W 16 Av - (WB W 16 Av FS Camosun St)
-4300 W 16 Av - (WB W 16 Av FS Discovery St)
-4500 W 16 Av - (WB W 16 Av FS Sasamat St)
-4600 W 16 Av - (WB W 16 Av FS Blanca St)
-4500 W 16 Av - (EB W 16av FS Tolmie St)
-4300 W 16 Av - (EB W 16 Av FS Trimble St)
-4100 W 16 Av - (EB W 16 Av FS Camosun St)
-3900 W 16 Av - (EB W 16 Av FS Crown St)
-1400 W King Edward Av - (EB W King Edward Av FS Granville St)
-1200 W King Edward Av - (EB W King Edward Av FS Hudson St)
-700 W King Edward Av - (EB W King Edward Av FS Willow St)
-0 E King Edward Av - (EB E King Edward Av FS Ontario St)
-500 E King Edward Av - (EB E King Edward Av FS St George St)
-900 E King Edward Av - EB E King Edward Av FS St Catherines St)
-1100 E King Edward Av - (EB E King Edward Av FS Glen Dr)
-1400 E King Edward Av - (EB E King Edward Av FS Knight St)
-4500 Nanaimo St - (NB Nanaimo St FS Brock St)
-2400 E 22 Av - (EB E 22 Av FS Nanaimo St)
-2700 E 22 Av - (EB E 22 Av FS Slocan St)
-2900 E 22 Av - (EB E 22 Av FS Boyd Diversion)
-3100 E 22 Av - (EB E 22 Av FS Lillooet St)
Location: Various
Schedule: Nov 22, 2023 - Feb 15, 2024urn:uuid:fd01ac54-f7bc-4dd2-89d4-e59e28ebfb922023-11-22T08:00:00ZCMBC Transit Bus Stop Upgrades - Route 252023-12-15T20:17:32.5085767Z49.250668055544395 -123.05225363664223 49.250666511893286 -123.05023792254515CMBC Installation and upgrades to transit and bus stops.
Traffic Impact:
Parking Lane Closures
Areas Impacted:
-3100 E 22 Av - (WB E 22 Av FS Windermere St)
-2900 E 22 A - (WB E 22 Av NS Renfrew St)
-2600 E 22 Av - (WB E 22 Av FS Slocan St)
-3800 Nanaimo St - (SB Nanaimo St FS E 22 Av)
-1300 E King Edward Av - (WB E King Edward Av FS Knight St)
-1100 E King Edward Av - (WB E King Edward Av FS Inverness St)
-900 E King Edward Av - (WB E King Edward Av FS Windsor St)
-500 E King Edward Av - (WB E King Edward Av NS St George St)
-300 E King Edward Av - (WB E King Edward Av FS Prince Edward St)
-0 W King Edward Av - (WB W King Edward Av FS Ontario St)
-200 W King Edward Av - (WB W King Edward Av FS Columbia St)
-1200 W King Edward Av - (WB W King Edward Av FS Selkirk St)
-4000 Dunbar St - (NB Dunbar St FS W King Edward Av)
-3900 W 16 Av - (WB W 16 Av FS Wallace St)
-4100 W 16 Av - (WB W 16 Av FS Camosun St)
-4300 W 16 Av - (WB W 16 Av FS Discovery St)
-4500 W 16 Av - (WB W 16 Av FS Sasamat St)
-4600 W 16 Av - (WB W 16 Av FS Blanca St)
-4500 W 16 Av - (EB W 16av FS Tolmie St)
-4300 W 16 Av - (EB W 16 Av FS Trimble St)
-4100 W 16 Av - (EB W 16 Av FS Camosun St)
-3900 W 16 Av - (EB W 16 Av FS Crown St)
-1400 W King Edward Av - (EB W King Edward Av FS Granville St)
-1200 W King Edward Av - (EB W King Edward Av FS Hudson St)
-700 W King Edward Av - (EB W King Edward Av FS Willow St)
-0 E King Edward Av - (EB E King Edward Av FS Ontario St)
-500 E King Edward Av - (EB E King Edward Av FS St George St)
-900 E King Edward Av - EB E King Edward Av FS St Catherines St)
-1100 E King Edward Av - (EB E King Edward Av FS Glen Dr)
-1400 E King Edward Av - (EB E King Edward Av FS Knight St)
-4500 Nanaimo St - (NB Nanaimo St FS Brock St)
-2400 E 22 Av - (EB E 22 Av FS Nanaimo St)
-2700 E 22 Av - (EB E 22 Av FS Slocan St)
-2900 E 22 Av - (EB E 22 Av FS Boyd Diversion)
-3100 E 22 Av - (EB E 22 Av FS Lillooet St)
Location: Various
Schedule: Nov 22, 2023 - Feb 15, 2024urn:uuid:979acfc1-944f-4e4f-902f-c5b9c29531082023-11-22T08:00:00ZCMBC Transit Bus Stop Upgrades - Route 252023-12-15T20:17:32.5085767Z49.24847163452313 -123.07337057515542 49.24844233011038 -123.07222525477579CMBC Installation and upgrades to transit and bus stops.
Traffic Impact:
Parking Lane Closures
Areas Impacted:
-3100 E 22 Av - (WB E 22 Av FS Windermere St)
-2900 E 22 A - (WB E 22 Av NS Renfrew St)
-2600 E 22 Av - (WB E 22 Av FS Slocan St)
-3800 Nanaimo St - (SB Nanaimo St FS E 22 Av)
-1300 E King Edward Av - (WB E King Edward Av FS Knight St)
-1100 E King Edward Av - (WB E King Edward Av FS Inverness St)
-900 E King Edward Av - (WB E King Edward Av FS Windsor St)
-500 E King Edward Av - (WB E King Edward Av NS St George St)
-300 E King Edward Av - (WB E King Edward Av FS Prince Edward St)
-0 W King Edward Av - (WB W King Edward Av FS Ontario St)
-200 W King Edward Av - (WB W King Edward Av FS Columbia St)
-1200 W King Edward Av - (WB W King Edward Av FS Selkirk St)
-4000 Dunbar St - (NB Dunbar St FS W King Edward Av)
-3900 W 16 Av - (WB W 16 Av FS Wallace St)
-4100 W 16 Av - (WB W 16 Av FS Camosun St)
-4300 W 16 Av - (WB W 16 Av FS Discovery St)
-4500 W 16 Av - (WB W 16 Av FS Sasamat St)
-4600 W 16 Av - (WB W 16 Av FS Blanca St)
-4500 W 16 Av - (EB W 16av FS Tolmie St)
-4300 W 16 Av - (EB W 16 Av FS Trimble St)
-4100 W 16 Av - (EB W 16 Av FS Camosun St)
-3900 W 16 Av - (EB W 16 Av FS Crown St)
-1400 W King Edward Av - (EB W King Edward Av FS Granville St)
-1200 W King Edward Av - (EB W King Edward Av FS Hudson St)
-700 W King Edward Av - (EB W King Edward Av FS Willow St)
-0 E King Edward Av - (EB E King Edward Av FS Ontario St)
-500 E King Edward Av - (EB E King Edward Av FS St George St)
-900 E King Edward Av - EB E King Edward Av FS St Catherines St)
-1100 E King Edward Av - (EB E King Edward Av FS Glen Dr)
-1400 E King Edward Av - (EB E King Edward Av FS Knight St)
-4500 Nanaimo St - (NB Nanaimo St FS Brock St)
-2400 E 22 Av - (EB E 22 Av FS Nanaimo St)
-2700 E 22 Av - (EB E 22 Av FS Slocan St)
-2900 E 22 Av - (EB E 22 Av FS Boyd Diversion)
-3100 E 22 Av - (EB E 22 Av FS Lillooet St)
Location: Various
Schedule: Nov 22, 2023 - Feb 15, 2024urn:uuid:2975e793-6084-4504-919e-5c3d02bafb202023-11-22T08:00:00ZCMBC Transit Bus Stop Upgrades - Route 252023-12-15T20:17:32.5085767Z49.248472042186364 -123.07353583177631 49.24847163452313 -123.07337057515542CMBC Installation and upgrades to transit and bus stops.
Traffic Impact:
Parking Lane Closures
Areas Impacted:
-3100 E 22 Av - (WB E 22 Av FS Windermere St)
-2900 E 22 A - (WB E 22 Av NS Renfrew St)
-2600 E 22 Av - (WB E 22 Av FS Slocan St)
-3800 Nanaimo St - (SB Nanaimo St FS E 22 Av)
-1300 E King Edward Av - (WB E King Edward Av FS Knight St)
-1100 E King Edward Av - (WB E King Edward Av FS Inverness St)
-900 E King Edward Av - (WB E King Edward Av FS Windsor St)
-500 E King Edward Av - (WB E King Edward Av NS St George St)
-300 E King Edward Av - (WB E King Edward Av FS Prince Edward St)
-0 W King Edward Av - (WB W King Edward Av FS Ontario St)
-200 W King Edward Av - (WB W King Edward Av FS Columbia St)
-1200 W King Edward Av - (WB W King Edward Av FS Selkirk St)
-4000 Dunbar St - (NB Dunbar St FS W King Edward Av)
-3900 W 16 Av - (WB W 16 Av FS Wallace St)
-4100 W 16 Av - (WB W 16 Av FS Camosun St)
-4300 W 16 Av - (WB W 16 Av FS Discovery St)
-4500 W 16 Av - (WB W 16 Av FS Sasamat St)
-4600 W 16 Av - (WB W 16 Av FS Blanca St)
-4500 W 16 Av - (EB W 16av FS Tolmie St)
-4300 W 16 Av - (EB W 16 Av FS Trimble St)
-4100 W 16 Av - (EB W 16 Av FS Camosun St)
-3900 W 16 Av - (EB W 16 Av FS Crown St)
-1400 W King Edward Av - (EB W King Edward Av FS Granville St)
-1200 W King Edward Av - (EB W King Edward Av FS Hudson St)
-700 W King Edward Av - (EB W King Edward Av FS Willow St)
-0 E King Edward Av - (EB E King Edward Av FS Ontario St)
-500 E King Edward Av - (EB E King Edward Av FS St George St)
-900 E King Edward Av - EB E King Edward Av FS St Catherines St)
-1100 E King Edward Av - (EB E King Edward Av FS Glen Dr)
-1400 E King Edward Av - (EB E King Edward Av FS Knight St)
-4500 Nanaimo St - (NB Nanaimo St FS Brock St)
-2400 E 22 Av - (EB E 22 Av FS Nanaimo St)
-2700 E 22 Av - (EB E 22 Av FS Slocan St)
-2900 E 22 Av - (EB E 22 Av FS Boyd Diversion)
-3100 E 22 Av - (EB E 22 Av FS Lillooet St)
Location: Various
Schedule: Nov 22, 2023 - Feb 15, 2024urn:uuid:8e72ce53-2b61-4af6-b116-6361853e2f1d2023-11-22T08:00:00ZCMBC Transit Bus Stop Upgrades - Route 252023-12-15T20:17:32.5085767Z49.248488250942614 -123.0746728071757 49.248472042186364 -123.07353583177631CMBC Installation and upgrades to transit and bus stops.
Traffic Impact:
Parking Lane Closures
Areas Impacted:
-3100 E 22 Av - (WB E 22 Av FS Windermere St)
-2900 E 22 A - (WB E 22 Av NS Renfrew St)
-2600 E 22 Av - (WB E 22 Av FS Slocan St)
-3800 Nanaimo St - (SB Nanaimo St FS E 22 Av)
-1300 E King Edward Av - (WB E King Edward Av FS Knight St)
-1100 E King Edward Av - (WB E King Edward Av FS Inverness St)
-900 E King Edward Av - (WB E King Edward Av FS Windsor St)
-500 E King Edward Av - (WB E King Edward Av NS St George St)
-300 E King Edward Av - (WB E King Edward Av FS Prince Edward St)
-0 W King Edward Av - (WB W King Edward Av FS Ontario St)
-200 W King Edward Av - (WB W King Edward Av FS Columbia St)
-1200 W King Edward Av - (WB W King Edward Av FS Selkirk St)
-4000 Dunbar St - (NB Dunbar St FS W King Edward Av)
-3900 W 16 Av - (WB W 16 Av FS Wallace St)
-4100 W 16 Av - (WB W 16 Av FS Camosun St)
-4300 W 16 Av - (WB W 16 Av FS Discovery St)
-4500 W 16 Av - (WB W 16 Av FS Sasamat St)
-4600 W 16 Av - (WB W 16 Av FS Blanca St)
-4500 W 16 Av - (EB W 16av FS Tolmie St)
-4300 W 16 Av - (EB W 16 Av FS Trimble St)
-4100 W 16 Av - (EB W 16 Av FS Camosun St)
-3900 W 16 Av - (EB W 16 Av FS Crown St)
-1400 W King Edward Av - (EB W King Edward Av FS Granville St)
-1200 W King Edward Av - (EB W King Edward Av FS Hudson St)
-700 W King Edward Av - (EB W King Edward Av FS Willow St)
-0 E King Edward Av - (EB E King Edward Av FS Ontario St)
-500 E King Edward Av - (EB E King Edward Av FS St George St)
-900 E King Edward Av - EB E King Edward Av FS St Catherines St)
-1100 E King Edward Av - (EB E King Edward Av FS Glen Dr)
-1400 E King Edward Av - (EB E King Edward Av FS Knight St)
-4500 Nanaimo St - (NB Nanaimo St FS Brock St)
-2400 E 22 Av - (EB E 22 Av FS Nanaimo St)
-2700 E 22 Av - (EB E 22 Av FS Slocan St)
-2900 E 22 Av - (EB E 22 Av FS Boyd Diversion)
-3100 E 22 Av - (EB E 22 Av FS Lillooet St)
Location: Various
Schedule: Nov 22, 2023 - Feb 15, 2024urn:uuid:7e79f72b-97cd-4208-9f76-90acb6d902a72023-11-22T08:00:00ZCMBC Transit Bus Stop Upgrades - Route 252023-12-15T20:17:32.5085767Z49.248501293310596 -123.07560062169594 49.248488250942614 -123.0746728071757CMBC Installation and upgrades to transit and bus stops.
Traffic Impact:
Parking Lane Closures
Areas Impacted:
-3100 E 22 Av - (WB E 22 Av FS Windermere St)
-2900 E 22 A - (WB E 22 Av NS Renfrew St)
-2600 E 22 Av - (WB E 22 Av FS Slocan St)
-3800 Nanaimo St - (SB Nanaimo St FS E 22 Av)
-1300 E King Edward Av - (WB E King Edward Av FS Knight St)
-1100 E King Edward Av - (WB E King Edward Av FS Inverness St)
-900 E King Edward Av - (WB E King Edward Av FS Windsor St)
-500 E King Edward Av - (WB E King Edward Av NS St George St)
-300 E King Edward Av - (WB E King Edward Av FS Prince Edward St)
-0 W King Edward Av - (WB W King Edward Av FS Ontario St)
-200 W King Edward Av - (WB W King Edward Av FS Columbia St)
-1200 W King Edward Av - (WB W King Edward Av FS Selkirk St)
-4000 Dunbar St - (NB Dunbar St FS W King Edward Av)
-3900 W 16 Av - (WB W 16 Av FS Wallace St)
-4100 W 16 Av - (WB W 16 Av FS Camosun St)
-4300 W 16 Av - (WB W 16 Av FS Discovery St)
-4500 W 16 Av - (WB W 16 Av FS Sasamat St)
-4600 W 16 Av - (WB W 16 Av FS Blanca St)
-4500 W 16 Av - (EB W 16av FS Tolmie St)
-4300 W 16 Av - (EB W 16 Av FS Trimble St)
-4100 W 16 Av - (EB W 16 Av FS Camosun St)
-3900 W 16 Av - (EB W 16 Av FS Crown St)
-1400 W King Edward Av - (EB W King Edward Av FS Granville St)
-1200 W King Edward Av - (EB W King Edward Av FS Hudson St)
-700 W King Edward Av - (EB W King Edward Av FS Willow St)
-0 E King Edward Av - (EB E King Edward Av FS Ontario St)
-500 E King Edward Av - (EB E King Edward Av FS St George St)
-900 E King Edward Av - EB E King Edward Av FS St Catherines St)
-1100 E King Edward Av - (EB E King Edward Av FS Glen Dr)
-1400 E King Edward Av - (EB E King Edward Av FS Knight St)
-4500 Nanaimo St - (NB Nanaimo St FS Brock St)
-2400 E 22 Av - (EB E 22 Av FS Nanaimo St)
-2700 E 22 Av - (EB E 22 Av FS Slocan St)
-2900 E 22 Av - (EB E 22 Av FS Boyd Diversion)
-3100 E 22 Av - (EB E 22 Av FS Lillooet St)
Location: Various
Schedule: Nov 22, 2023 - Feb 15, 2024urn:uuid:c3df9243-27c2-4d5c-9869-afe109a8f21c2023-11-22T08:00:00ZCMBC Transit Bus Stop Upgrades - Route 252023-12-15T20:17:32.5085767Z49.24850888045532 -123.07810951198279 49.248494534671096 -123.07684623587905CMBC Installation and upgrades to transit and bus stops.
Traffic Impact:
Parking Lane Closures
Areas Impacted:
-3100 E 22 Av - (WB E 22 Av FS Windermere St)
-2900 E 22 A - (WB E 22 Av NS Renfrew St)
-2600 E 22 Av - (WB E 22 Av FS Slocan St)
-3800 Nanaimo St - (SB Nanaimo St FS E 22 Av)
-1300 E King Edward Av - (WB E King Edward Av FS Knight St)
-1100 E King Edward Av - (WB E King Edward Av FS Inverness St)
-900 E King Edward Av - (WB E King Edward Av FS Windsor St)
-500 E King Edward Av - (WB E King Edward Av NS St George St)
-300 E King Edward Av - (WB E King Edward Av FS Prince Edward St)
-0 W King Edward Av - (WB W King Edward Av FS Ontario St)
-200 W King Edward Av - (WB W King Edward Av FS Columbia St)
-1200 W King Edward Av - (WB W King Edward Av FS Selkirk St)
-4000 Dunbar St - (NB Dunbar St FS W King Edward Av)
-3900 W 16 Av - (WB W 16 Av FS Wallace St)
-4100 W 16 Av - (WB W 16 Av FS Camosun St)
-4300 W 16 Av - (WB W 16 Av FS Discovery St)
-4500 W 16 Av - (WB W 16 Av FS Sasamat St)
-4600 W 16 Av - (WB W 16 Av FS Blanca St)
-4500 W 16 Av - (EB W 16av FS Tolmie St)
-4300 W 16 Av - (EB W 16 Av FS Trimble St)
-4100 W 16 Av - (EB W 16 Av FS Camosun St)
-3900 W 16 Av - (EB W 16 Av FS Crown St)
-1400 W King Edward Av - (EB W King Edward Av FS Granville St)
-1200 W King Edward Av - (EB W King Edward Av FS Hudson St)
-700 W King Edward Av - (EB W King Edward Av FS Willow St)
-0 E King Edward Av - (EB E King Edward Av FS Ontario St)
-500 E King Edward Av - (EB E King Edward Av FS St George St)
-900 E King Edward Av - EB E King Edward Av FS St Catherines St)
-1100 E King Edward Av - (EB E King Edward Av FS Glen Dr)
-1400 E King Edward Av - (EB E King Edward Av FS Knight St)
-4500 Nanaimo St - (NB Nanaimo St FS Brock St)
-2400 E 22 Av - (EB E 22 Av FS Nanaimo St)
-2700 E 22 Av - (EB E 22 Av FS Slocan St)
-2900 E 22 Av - (EB E 22 Av FS Boyd Diversion)
-3100 E 22 Av - (EB E 22 Av FS Lillooet St)
Location: Various
Schedule: Nov 22, 2023 - Feb 15, 2024urn:uuid:fd371cf5-e912-4a71-b078-6ed6dc8d11e42023-11-22T08:00:00ZCMBC Transit Bus Stop Upgrades - Route 252023-12-15T20:17:32.5085767Z49.24854689280565 -123.08144654769043 49.248536669841855 -123.08056758259544CMBC Installation and upgrades to transit and bus stops.
Traffic Impact:
Parking Lane Closures
Areas Impacted:
-3100 E 22 Av - (WB E 22 Av FS Windermere St)
-2900 E 22 A - (WB E 22 Av NS Renfrew St)
-2600 E 22 Av - (WB E 22 Av FS Slocan St)
-3800 Nanaimo St - (SB Nanaimo St FS E 22 Av)
-1300 E King Edward Av - (WB E King Edward Av FS Knight St)
-1100 E King Edward Av - (WB E King Edward Av FS Inverness St)
-900 E King Edward Av - (WB E King Edward Av FS Windsor St)
-500 E King Edward Av - (WB E King Edward Av NS St George St)
-300 E King Edward Av - (WB E King Edward Av FS Prince Edward St)
-0 W King Edward Av - (WB W King Edward Av FS Ontario St)
-200 W King Edward Av - (WB W King Edward Av FS Columbia St)
-1200 W King Edward Av - (WB W King Edward Av FS Selkirk St)
-4000 Dunbar St - (NB Dunbar St FS W King Edward Av)
-3900 W 16 Av - (WB W 16 Av FS Wallace St)
-4100 W 16 Av - (WB W 16 Av FS Camosun St)
-4300 W 16 Av - (WB W 16 Av FS Discovery St)
-4500 W 16 Av - (WB W 16 Av FS Sasamat St)
-4600 W 16 Av - (WB W 16 Av FS Blanca St)
-4500 W 16 Av - (EB W 16av FS Tolmie St)
-4300 W 16 Av - (EB W 16 Av FS Trimble St)
-4100 W 16 Av - (EB W 16 Av FS Camosun St)
-3900 W 16 Av - (EB W 16 Av FS Crown St)
-1400 W King Edward Av - (EB W King Edward Av FS Granville St)
-1200 W King Edward Av - (EB W King Edward Av FS Hudson St)
-700 W King Edward Av - (EB W King Edward Av FS Willow St)
-0 E King Edward Av - (EB E King Edward Av FS Ontario St)
-500 E King Edward Av - (EB E King Edward Av FS St George St)
-900 E King Edward Av - EB E King Edward Av FS St Catherines St)
-1100 E King Edward Av - (EB E King Edward Av FS Glen Dr)
-1400 E King Edward Av - (EB E King Edward Av FS Knight St)
-4500 Nanaimo St - (NB Nanaimo St FS Brock St)
-2400 E 22 Av - (EB E 22 Av FS Nanaimo St)
-2700 E 22 Av - (EB E 22 Av FS Slocan St)
-2900 E 22 Av - (EB E 22 Av FS Boyd Diversion)
-3100 E 22 Av - (EB E 22 Av FS Lillooet St)
Location: Various
Schedule: Nov 22, 2023 - Feb 15, 2024urn:uuid:00ffad94-b40b-4803-9b83-e189996da46e2023-11-22T08:00:00ZCMBC Transit Bus Stop Upgrades - Route 252023-12-15T20:17:32.5085767Z49.243722429417744 -123.0566700507407 49.24342286979447 -123.05667060099354CMBC Installation and upgrades to transit and bus stops.
Traffic Impact:
Parking Lane Closures
Areas Impacted:
-3100 E 22 Av - (WB E 22 Av FS Windermere St)
-2900 E 22 A - (WB E 22 Av NS Renfrew St)
-2600 E 22 Av - (WB E 22 Av FS Slocan St)
-3800 Nanaimo St - (SB Nanaimo St FS E 22 Av)
-1300 E King Edward Av - (WB E King Edward Av FS Knight St)
-1100 E King Edward Av - (WB E King Edward Av FS Inverness St)
-900 E King Edward Av - (WB E King Edward Av FS Windsor St)
-500 E King Edward Av - (WB E King Edward Av NS St George St)
-300 E King Edward Av - (WB E King Edward Av FS Prince Edward St)
-0 W King Edward Av - (WB W King Edward Av FS Ontario St)
-200 W King Edward Av - (WB W King Edward Av FS Columbia St)
-1200 W King Edward Av - (WB W King Edward Av FS Selkirk St)
-4000 Dunbar St - (NB Dunbar St FS W King Edward Av)
-3900 W 16 Av - (WB W 16 Av FS Wallace St)
-4100 W 16 Av - (WB W 16 Av FS Camosun St)
-4300 W 16 Av - (WB W 16 Av FS Discovery St)
-4500 W 16 Av - (WB W 16 Av FS Sasamat St)
-4600 W 16 Av - (WB W 16 Av FS Blanca St)
-4500 W 16 Av - (EB W 16av FS Tolmie St)
-4300 W 16 Av - (EB W 16 Av FS Trimble St)
-4100 W 16 Av - (EB W 16 Av FS Camosun St)
-3900 W 16 Av - (EB W 16 Av FS Crown St)
-1400 W King Edward Av - (EB W King Edward Av FS Granville St)
-1200 W King Edward Av - (EB W King Edward Av FS Hudson St)
-700 W King Edward Av - (EB W King Edward Av FS Willow St)
-0 E King Edward Av - (EB E King Edward Av FS Ontario St)
-500 E King Edward Av - (EB E King Edward Av FS St George St)
-900 E King Edward Av - EB E King Edward Av FS St Catherines St)
-1100 E King Edward Av - (EB E King Edward Av FS Glen Dr)
-1400 E King Edward Av - (EB E King Edward Av FS Knight St)
-4500 Nanaimo St - (NB Nanaimo St FS Brock St)
-2400 E 22 Av - (EB E 22 Av FS Nanaimo St)
-2700 E 22 Av - (EB E 22 Av FS Slocan St)
-2900 E 22 Av - (EB E 22 Av FS Boyd Diversion)
-3100 E 22 Av - (EB E 22 Av FS Lillooet St)
Location: Various
Schedule: Nov 22, 2023 - Feb 15, 2024urn:uuid:c51488c2-f95b-45ea-860d-0165a525af342023-11-22T08:00:00ZCMBC Transit Bus Stop Upgrades - Route 252023-12-15T20:17:32.5085767Z49.243996154696674 -123.05666952587723 49.243722429417744 -123.0566700507407Further detour to the existing Cambie Seawall Detour
Please see the original detour and closure here:
https://www.facebook.com/photo?fbid=881997823931486&set=a.500575942073678
Location:
Schedule: Apr 2, 2024 - Apr 12, 2024urn:uuid:45559177-da6f-492b-a064-b4e7d17825372024-03-21T07:00:00ZCambie Seawall Further detour2024-03-21T20:35:33.6758978Z49.271933166564224 -123.11055387209372 49.271663307513876 -123.11016702769369 49.271610508831344 -123.10934835698669 49.27064252297029 -123.10934835698669 49.270295972260016 -123.10943805885377 49.27026576900846 -123.1098722693534 49.27015250665042 -123.11016753249318Resurfacing and renewal of the sidewalk along Howe Street Viaduct by removing existing tiles, exposed aggregate topping, and non-structural overlay, and installing a new unreinforced cast-in-place concrete overlay. Schedule to be fine tuned.
Location:
Schedule: Feb 26, 2024 - Jul 31, 2024urn:uuid:cacbcb57-5cc2-476d-8c17-f001b18300082024-02-21T08:00:00ZCanada Place/Howe St Sidewalk Renewal2024-03-01T21:59:07.3608449Z49.28763126573111 -123.11365364537055 49.28747162764256 -123.11318798597966 49.287398810149654 -123.1130849829008 49.28726997885093 -123.1130763992836 49.28716461809199 -123.11314158053423 49.2866424758121 -123.113844041482Celebrating our 16th year anniversary, a series of activities will be presented to engage and connect our local multicultural communities for their enjoyment to promote and celebrate our Latin American Arts, Food and Culture. Carnaval del Sol, recreates the atmosphere of a vibrant city plaza in Latin America. The arts showcased during this event include live musical bands, Native Canadian and Latin American visual art, traditional folk dances, arts and crafts, dancing and culinary shows
Location: Jonathon Roger's Park, 100 W 8th ave, 2300 Columbia, 100 W 7th and 2300 Manitoba - *full closure along 100 W 8th, 2300 Columbia and Manitoba*.
parking restrictions along B/S 2200 & 2400 Columbia & 2200 & 2400 Manitoba from Broadway to W 6th Ave and B/S 200 to 00 unit block W 7th Ave from Alberta to Ontario and B/S 200 W 8th Ave and 00 unit Block W 8th from Ontario to Alberta
Schedule: Jul 4, 2024 - Jul 8, 2024urn:uuid:957e50a1-c0a0-42a3-afcf-61fb2a6bdae02024-03-04T08:00:00ZCarnaval Del Sol2024-03-04T20:39:18.1549374Z49.26387344717958 -123.10668239812658 49.263840600817616 -123.10497205060685Celebrating our 16th year anniversary, a series of activities will be presented to engage and connect our local multicultural communities for their enjoyment to promote and celebrate our Latin American Arts, Food and Culture. Carnaval del Sol, recreates the atmosphere of a vibrant city plaza in Latin America. The arts showcased during this event include live musical bands, Native Canadian and Latin American visual art, traditional folk dances, arts and crafts, dancing and culinary shows
Location: Jonathon Roger's Park, 100 W 8th ave, 2300 Columbia, 100 W 7th and 2300 Manitoba - *full closure along 100 W 8th, 2300 Columbia and Manitoba*.
parking restrictions along B/S 2200 & 2400 Columbia & 2200 & 2400 Manitoba from Broadway to W 6th Ave and B/S 200 to 00 unit block W 7th Ave from Alberta to Ontario and B/S 200 W 8th Ave and 00 unit Block W 8th from Ontario to Alberta
Schedule: Jul 4, 2024 - Jul 8, 2024urn:uuid:af0957d0-cbc2-4ffa-97a1-32e849801eca2024-03-04T08:00:00ZCarnaval Del Sol2024-03-04T20:39:18.1549374Z49.263961037371246 -123.1108241220224 49.263928191067606 -123.10963358436625Celebrating our 16th year anniversary, a series of activities will be presented to engage and connect our local multicultural communities for their enjoyment to promote and celebrate our Latin American Arts, Food and Culture. Carnaval del Sol, recreates the atmosphere of a vibrant city plaza in Latin America. The arts showcased during this event include live musical bands, Native Canadian and Latin American visual art, traditional folk dances, arts and crafts, dancing and culinary shows
Location: Jonathon Roger's Park, 100 W 8th ave, 2300 Columbia, 100 W 7th and 2300 Manitoba - *full closure along 100 W 8th, 2300 Columbia and Manitoba*.
parking restrictions along B/S 2200 & 2400 Columbia & 2200 & 2400 Manitoba from Broadway to W 6th Ave and B/S 200 to 00 unit block W 7th Ave from Alberta to Ontario and B/S 200 W 8th Ave and 00 unit Block W 8th from Ontario to Alberta
Schedule: Jul 4, 2024 - Jul 8, 2024urn:uuid:0afd4b3a-1c35-4f68-a29d-41b7ed1c413c2024-03-04T08:00:00ZCarnaval Del Sol2024-03-04T20:39:18.1549374Z49.264264389735644 -123.10830174468063 49.264264389735644 -123.10795523177302 49.26426159660372 -123.10795950971014 49.264264389735644 -123.10830174468063Celebrating our 16th year anniversary, a series of activities will be presented to engage and connect our local multicultural communities for their enjoyment to promote and celebrate our Latin American Arts, Food and Culture. Carnaval del Sol, recreates the atmosphere of a vibrant city plaza in Latin America. The arts showcased during this event include live musical bands, Native Canadian and Latin American visual art, traditional folk dances, arts and crafts, dancing and culinary shows
Location: Jonathon Roger's Park, 100 W 8th ave, 2300 Columbia, 100 W 7th and 2300 Manitoba - *full closure along 100 W 8th, 2300 Columbia and Manitoba*.
parking restrictions along B/S 2200 & 2400 Columbia & 2200 & 2400 Manitoba from Broadway to W 6th Ave and B/S 200 to 00 unit block W 7th Ave from Alberta to Ontario and B/S 200 W 8th Ave and 00 unit Block W 8th from Ontario to Alberta
Schedule: Jul 4, 2024 - Jul 8, 2024urn:uuid:67b62535-a7f2-49e9-af90-69076e937dbe2024-03-04T08:00:00ZCarnaval Del Sol2024-03-04T20:39:18.1549374Z49.26459606161126 -123.10490497815512 49.26463985555057 -123.10668239812658Celebrating our 16th year anniversary, a series of activities will be presented to engage and connect our local multicultural communities for their enjoyment to promote and celebrate our Latin American Arts, Food and Culture. Carnaval del Sol, recreates the atmosphere of a vibrant city plaza in Latin America. The arts showcased during this event include live musical bands, Native Canadian and Latin American visual art, traditional folk dances, arts and crafts, dancing and culinary shows
Location: Jonathon Roger's Park, 100 W 8th ave, 2300 Columbia, 100 W 7th and 2300 Manitoba - *full closure along 100 W 8th, 2300 Columbia and Manitoba*.
parking restrictions along B/S 2200 & 2400 Columbia & 2200 & 2400 Manitoba from Broadway to W 6th Ave and B/S 200 to 00 unit block W 7th Ave from Alberta to Ontario and B/S 200 W 8th Ave and 00 unit Block W 8th from Ontario to Alberta
Schedule: Jul 4, 2024 - Jul 8, 2024urn:uuid:4710dc3d-f6e4-48c5-a97d-662debe804ec2024-03-04T08:00:00ZCarnaval Del Sol2024-03-04T20:39:18.1549374Z49.265592375875826 -123.10934852808381 49.264880724462444 -123.10936529619674Celebrating our 16th year anniversary, a series of activities will be presented to engage and connect our local multicultural communities for their enjoyment to promote and celebrate our Latin American Arts, Food and Culture. Carnaval del Sol, recreates the atmosphere of a vibrant city plaza in Latin America. The arts showcased during this event include live musical bands, Native Canadian and Latin American visual art, traditional folk dances, arts and crafts, dancing and culinary shows
Location: Jonathon Roger's Park, 100 W 8th ave, 2300 Columbia, 100 W 7th and 2300 Manitoba - *full closure along 100 W 8th, 2300 Columbia and Manitoba*.
parking restrictions along B/S 2200 & 2400 Columbia & 2200 & 2400 Manitoba from Broadway to W 6th Ave and B/S 200 to 00 unit block W 7th Ave from Alberta to Ontario and B/S 200 W 8th Ave and 00 unit Block W 8th from Ontario to Alberta
Schedule: Jul 4, 2024 - Jul 8, 2024urn:uuid:7dc1c21a-d921-4248-948d-0069a2c010762024-03-04T08:00:00ZCarnaval Del Sol2024-03-04T20:39:18.1549374Z49.26484787877098 -123.1108241220224 49.26474934156536 -123.10490497815512Celebrating our 16th year anniversary, a series of activities will be presented to engage and connect our local multicultural communities for their enjoyment to promote and celebrate our Latin American Arts, Food and Culture. Carnaval del Sol, recreates the atmosphere of a vibrant city plaza in Latin America. The arts showcased during this event include live musical bands, Native Canadian and Latin American visual art, traditional folk dances, arts and crafts, dancing and culinary shows
Location: Jonathon Roger's Park, 100 W 8th ave, 2300 Columbia, 100 W 7th and 2300 Manitoba - *full closure along 100 W 8th, 2300 Columbia and Manitoba*.
parking restrictions along B/S 2200 & 2400 Columbia & 2200 & 2400 Manitoba from Broadway to W 6th Ave and B/S 200 to 00 unit block W 7th Ave from Alberta to Ontario and B/S 200 W 8th Ave and 00 unit Block W 8th from Ontario to Alberta
Schedule: Jul 4, 2024 - Jul 8, 2024urn:uuid:a559f5ef-9cc8-4a00-99fb-704ab9d010042024-03-04T08:00:00ZCarnaval Del Sol2024-03-04T20:39:18.1549374Z49.26319461765502 -123.10934852808381 49.263720163702686 -123.10934852808381Celebrating our 16th year anniversary, a series of activities will be presented to engage and connect our local multicultural communities for their enjoyment to promote and celebrate our Latin American Arts, Food and Culture. Carnaval del Sol, recreates the atmosphere of a vibrant city plaza in Latin America. The arts showcased during this event include live musical bands, Native Canadian and Latin American visual art, traditional folk dances, arts and crafts, dancing and culinary shows
Location: Jonathon Roger's Park, 100 W 8th ave, 2300 Columbia, 100 W 7th and 2300 Manitoba - *full closure along 100 W 8th, 2300 Columbia and Manitoba*.
parking restrictions along B/S 2200 & 2400 Columbia & 2200 & 2400 Manitoba from Broadway to W 6th Ave and B/S 200 to 00 unit block W 7th Ave from Alberta to Ontario and B/S 200 W 8th Ave and 00 unit Block W 8th from Ontario to Alberta
Schedule: Jul 4, 2024 - Jul 8, 2024urn:uuid:473b80fe-0cf5-44fd-ae1f-27ad37c4dd8b2024-03-04T08:00:00ZCarnaval Del Sol2024-03-04T20:39:18.1549374Z49.26553763396774 -123.10679977491715 49.26313987268583 -123.1069171500702Celebrating our 16th year anniversary, a series of activities will be presented to engage and connect our local multicultural communities for their enjoyment to promote and celebrate our Latin American Arts, Food and Culture. Carnaval del Sol, recreates the atmosphere of a vibrant city plaza in Latin America. The arts showcased during this event include live musical bands, Native Canadian and Latin American visual art, traditional folk dances, arts and crafts, dancing and culinary shows
Location: Jonathon Roger's Park, 100 W 8th ave, 2300 Columbia, 100 W 7th and 2300 Manitoba - *full closure along 100 W 8th, 2300 Columbia and Manitoba*.
parking restrictions along B/S 2200 & 2400 Columbia & 2200 & 2400 Manitoba from Broadway to W 6th Ave and B/S 200 to 00 unit block W 7th Ave from Alberta to Ontario and B/S 200 W 8th Ave and 00 unit Block W 8th from Ontario to Alberta
Schedule: Jul 4, 2024 - Jul 8, 2024urn:uuid:445f9490-de20-4974-9c6e-235612ab7f532024-03-04T08:00:00ZCarnaval Del Sol2024-03-04T20:39:18.1549374Z49.2631179753227 -123.10674947057834 49.26553763396774 -123.10666563001364Celebrating our 16th year anniversary, a series of activities will be presented to engage and connect our local multicultural communities for their enjoyment to promote and celebrate our Latin American Arts, Food and Culture. Carnaval del Sol, recreates the atmosphere of a vibrant city plaza in Latin America. The arts showcased during this event include live musical bands, Native Canadian and Latin American visual art, traditional folk dances, arts and crafts, dancing and culinary shows
Location: Jonathon Roger's Park, 100 W 8th ave, 2300 Columbia, 100 W 7th and 2300 Manitoba - *full closure along 100 W 8th, 2300 Columbia and Manitoba*.
parking restrictions along B/S 2200 & 2400 Columbia & 2200 & 2400 Manitoba from Broadway to W 6th Ave and B/S 200 to 00 unit block W 7th Ave from Alberta to Ontario and B/S 200 W 8th Ave and 00 unit Block W 8th from Ontario to Alberta
Schedule: Jul 4, 2024 - Jul 8, 2024urn:uuid:892a6b09-be3c-49f6-a1cf-a1247a04ac032024-03-04T08:00:00ZCarnaval Del Sol2024-03-04T20:39:18.1549374Z49.26320556632078 -123.10953297568861 49.26561427280919 -123.10951620921318Celebrating our 16th year anniversary, a series of activities will be presented to engage and connect our local multicultural communities for their enjoyment to promote and celebrate our Latin American Arts, Food and Culture. Carnaval del Sol, recreates the atmosphere of a vibrant city plaza in Latin America. The arts showcased during this event include live musical bands, Native Canadian and Latin American visual art, traditional folk dances, arts and crafts, dancing and culinary shows
Location: Jonathon Roger's Park, 100 W 8th ave, 2300 Columbia, 100 W 7th and 2300 Manitoba - *full closure along 100 W 8th, 2300 Columbia and Manitoba*.
parking restrictions along B/S 2200 & 2400 Columbia & 2200 & 2400 Manitoba from Broadway to W 6th Ave and B/S 200 to 00 unit block W 7th Ave from Alberta to Ontario and B/S 200 W 8th Ave and 00 unit Block W 8th from Ontario to Alberta
Schedule: Jul 4, 2024 - Jul 8, 2024urn:uuid:8e465217-9ee1-42f5-8510-7972a804fdf92024-03-04T08:00:00ZCarnaval Del Sol2024-03-04T20:39:18.1549374Z49.263698266329754 -123.10498881871979 49.26380775443377 -123.11089119201787Celebrating our 16th year anniversary, a series of activities will be presented to engage and connect our local multicultural communities for their enjoyment to promote and celebrate our Latin American Arts, Food and Culture. Carnaval del Sol, recreates the atmosphere of a vibrant city plaza in Latin America. The arts showcased during this event include live musical bands, Native Canadian and Latin American visual art, traditional folk dances, arts and crafts, dancing and culinary shows
Location: Jonathon Roger's Park, 100 W 8th ave, 2300 Columbia, 100 W 7th and 2300 Manitoba - *full closure along 100 W 8th, 2300 Columbia and Manitoba*.
parking restrictions along B/S 2200 & 2400 Columbia & 2200 & 2400 Manitoba from Broadway to W 6th Ave and B/S 200 to 00 unit block W 7th Ave from Alberta to Ontario and B/S 200 W 8th Ave and 00 unit Block W 8th from Ontario to Alberta
Schedule: Jul 4, 2024 - Jul 8, 2024urn:uuid:691803a3-f0fc-4231-b163-65b06ce85e252024-03-04T08:00:00ZCarnaval Del Sol2024-03-04T20:39:18.1549374Z49.26383245834265 -123.10692068507723 49.263888324160405 -123.10938762654591 49.26471699302954 -123.10940188842409 49.264689060597675 -123.10682086515922 49.26382314736691 -123.10684938613048Celebrating our 16th year anniversary, a series of activities will be presented to engage and connect our local multicultural communities for their enjoyment to promote and celebrate our Latin American Arts, Food and Culture. Carnaval del Sol, recreates the atmosphere of a vibrant city plaza in Latin America. The arts showcased during this event include live musical bands, Native Canadian and Latin American visual art, traditional folk dances, arts and crafts, dancing and culinary shows
Location: Jonathon Roger's Park, 100 W 8th ave, 2300 Columbia, 100 W 7th and 2300 Manitoba - *full closure along 100 W 8th, 2300 Columbia and Manitoba*.
parking restrictions along B/S 2200 & 2400 Columbia & 2200 & 2400 Manitoba from Broadway to W 6th Ave and B/S 200 to 00 unit block W 7th Ave from Alberta to Ontario and B/S 200 W 8th Ave and 00 unit Block W 8th from Ontario to Alberta
Schedule: Jul 4, 2024 - Jul 8, 2024urn:uuid:909a3bb0-49c4-4f52-84ae-d7c86ad0b4d72024-03-04T08:00:00ZCarnaval Del Sol2024-03-04T20:39:18.1549374Z49.264654505080586 -123.10948109999158 49.263882211456405 -123.10944525815127 49.26381980317254 -123.10925410050291 49.26379640011717 -123.10697217117037 49.2638900122721 -123.10678101468874 49.26466230558373 -123.10676906740865Sidewalk and Travel Lane closure on North side of 300-400 Block W Georgia St from Hamilton St to Richards St to facilitate utility maintenance work.
WO #: CEE295998
Location: North side of 300-400 Block W Georgia St from Hamilton St to Richards St.
Schedule: Apr 2, 2024 9:30 AM - Apr 5, 2024 3:00 PMurn:uuid:29a11c88-5267-4b4f-845a-d1589e8000222024-03-22T07:00:00ZCity of Vancouver - Utility Maintenance on 300-400 Block W Georiga St 2024-03-22T20:21:16.7379163Z49.28119910381713 -123.11614299779478 49.280016271217534 -123.1142869091564813 Tree pit installation on the sidewalk on the south side
Location: 1600 Block of Franklin St South side
Schedule: Mar 27, 2023 - May 12, 2023urn:uuid:b8140284-d7af-4bf3-a842-db98c1ad2c1f2023-04-13T07:00:00ZClimate Adaptation 20232023-04-13T17:57:58.4634776Z49.28217561795893 -123.07254794703782 49.2821592873822 -123.07044071053225Laneway reconstruction and new CB installation.
Location:
Schedule: Sep 25, 2023 7:00 AM - Nov 3, 2023 5:00 PMurn:uuid:077342ec-b63c-4fff-a522-58638d8561db2023-09-20T07:00:00ZCommercial Lane Renewal - 1100 block Pantages2023-09-20T22:08:36.0437978Z49.280037572269975 -123.13174463479388 49.28143723814375 -123.13390642843055City of Vancouver will be undertaking sewer trenchless project at Cypress Street and Arbutus Greenway as part of the Balaclava South Sewers Upgrades. The anticipated start of construction is on April 26th for about 3 months with substantial performance on July 5th. Please note this schedule is subject to change.
The pre-construction works for the project are at Cypress Street between Linden Road and Quilchena Crescent and they are as follow:
- Planting, landscape encroachments and tree removals - early December (approximately 1-2 days work)
- Fortis BC gas relocation work at Cypress St between Linden Road and Quilchena Crescent - Q1 2024 (approximately 1 to 2 weeks work)
Location: 5000 Block Cypress Street
Schedule: Mar 25, 2024 - Mar 31, 2024; All days; 7:00 AM - 5:00 PMurn:uuid:1f0cd940-a132-44bd-9d13-042bc57211882024-03-27T07:00:00ZCypress & Arbutus Trenchless Sewers Project - Pre Construction Works2024-03-27T17:25:20.6070856Z49.2406046877889 -123.14873534506503 49.240625701839605 -123.14872461622899 49.24090588832817 -123.14870315855688 49.24113704098451 -123.14876753157324 49.241459251973 -123.14900356596654impact:
- 1 lane WB retained
Location: 2150 Keith Dr
Schedule: Mar 2, 2024 - Apr 27, 2024; Sa; 7:00 AM - 5:00 PMurn:uuid:3ee285bb-ecec-43ce-8aa7-1efcefcbfa8b2024-02-29T08:00:00ZDevelopment Concrete Pour on E 6th Av from Clark Dr to Glen Dr2024-02-29T16:17:33.5525664Z49.26520337739885 -123.07939427533339 49.265199647426044 -123.07874574977438impact:
- 1 lane WB retained
Location: 2150 Keith Dr
Schedule: Mar 2, 2024 - Apr 27, 2024; Sa; 7:00 AM - 5:00 PMurn:uuid:bb634844-db52-423e-a2b7-8137a286789e2024-02-29T08:00:00ZDevelopment Concrete Pour on E 6th Av from Clark Dr to Glen Dr2024-02-29T16:17:33.5525664Z49.26519555442488 -123.07810991043402 49.265190693304476 -123.07746069605368impact:
- 1 lane WB retained
Location: 2150 Keith Dr
Schedule: Mar 2, 2024 - Apr 27, 2024; Sa; 7:00 AM - 5:00 PMurn:uuid:e89a893c-c229-4882-b577-52a86680397e2024-02-29T08:00:00ZDevelopment Concrete Pour on E 6th Av from Clark Dr to Glen Dr2024-02-29T16:17:33.5525664Z49.265199647426044 -123.07874574977438 49.26519555442488 -123.07810991043402impact:
- 1 lane WB retained
Location: 2150 Keith Dr
Schedule: Mar 2, 2024 - Apr 27, 2024; Sa; 7:00 AM - 5:00 PMurn:uuid:b3382199-de70-4e81-8b99-a8459f4e30112024-02-29T08:00:00ZDevelopment Concrete Pour on E 6th Av from Clark Dr to Glen Dr2024-02-29T16:17:33.5525664Z49.265236747026705 -123.08132509936372 49.26523303410218 -123.08129655849105 49.265227912964235 -123.0812238936314 49.265223619434806 -123.08115109269333 49.265220153484734 -123.0810781969083 49.26521752409943 -123.08100522003258 49.26521573126902 -123.08093217580736 49.265214765969404 -123.08085910544956 49.26520337739885 -123.07939427533339Impact:
- 1 lane SB retained
Location:
Schedule: Mar 16, 2024 - Apr 13, 2024 (Saturdays only 7:00AM - 5:00PM)urn:uuid:86cc4673-7a6f-44fe-a2b4-9436e46e40c92024-03-13T07:00:00ZDevelopment Construction works on Macdonald St from W 3rd to W 4th Av2024-03-13T18:18:57.6600806Z49.26882063694961 -123.16831253328411 49.26837362491568 -123.1683279476996Impact:
- 1 lane SB retained
Location:
Schedule: Mar 16, 2024 - Apr 13, 2024 (Saturdays only 7:00AM - 5:00PM)urn:uuid:e08316f8-60bd-427d-938c-fbf7838beedf2024-03-13T07:00:00ZDevelopment Construction works on Macdonald St from W 3rd to W 4th Av2024-03-13T18:18:57.6600806Z49.26926673138104 -123.1682971567179 49.26882063694961 -123.16831253328411Traffic Impact:
-Full Closure
-Sidewalk Closure
Location: 768 Seymour St
Schedule: Mar 29, 2024 - Apr 1, 2024urn:uuid:3835e1e9-50e4-4fa4-99aa-2d28fffb7da22024-03-26T07:00:00ZDevelopment Crane Demobilization on Seymour St from Robson St to W Georgia St2024-02-08T20:07:36.4127542Z49.281858520766576 -123.11714425642927 49.28072834079299 -123.11885186498577Impact:
-EB/WB lane reductions
Location:
Schedule: Mar 23, 2024 - Mar 31, 2024urn:uuid:e3bdb650-fdc4-4611-b122-ea878ea551f62024-03-21T07:00:00ZDevelopment Hydro Conduit work on Prior St from Georgia Viaduct to Jackson Av2024-03-21T20:27:12.8371802Z49.27675813894081 -123.09903321718957 49.27671768785473 -123.09684669468456Impact:
-EB/WB lane reductions
Location:
Schedule: Mar 23, 2024 - Mar 31, 2024urn:uuid:cde64973-29ce-4a14-84a6-91e548ffde6c2024-03-21T07:00:00ZDevelopment Hydro Conduit work on Prior St from Georgia Viaduct to Jackson Av2024-03-21T20:27:12.8371802Z49.27669303715942 -123.09559831837205 49.276658359930764 -123.09364396540379Impact:
-EB/WB lane reductions
Location:
Schedule: Mar 23, 2024 - Mar 31, 2024urn:uuid:cf37c6d6-8516-4859-a49e-e1d9286c2bca2024-03-21T07:00:00ZDevelopment Hydro Conduit work on Prior St from Georgia Viaduct to Jackson Av2024-03-21T20:27:12.8371802Z49.27671768785473 -123.09684669468456 49.27669303715942 -123.09559831837205Expansion of the NEU by adding new heat pumps and accompanying electrical and mechanical works. The majority of the project construction is within the FCEC building, however there are some works occurring outside of the building within the property lines. The City's contractor will be utilizing the site to the east of the new extension of Wyllie Street as a laydown area for the duration of the project. The project site shown on the map is for the laydown area.
Location: 1890 Spyglass Place and the laydown area to the east of Wyllie Street.
Schedule: Apr 1, 2022 - Nov 30, 2024urn:uuid:23ac0b61-4cec-493b-80a5-215d618860452023-06-02T07:00:00ZFalse Creek Energy Centre - Low Carbon Expansion - Contractor Laydown Area2024-02-20T23:02:00.8503759Z49.268516816046144 -123.11421672215279 49.26830329346333 -123.11394313683326 49.26851156550191 -123.11350593676386 49.268621826813444 -123.11373124232108 49.268516816046144 -123.11421672215279Crew will be on site to do a Gas Service Connection - Fortis BC
Traffic Impacts: Total road closure, sidewalk closure
WO: 31359013
Location: Both sides of the street of 1900 Block of E 6th Ave, from W PL 1937 E 6th Ave to E PL 1949 E 6th Ave
Schedule: Apr 10, 2024 - Apr 11, 2024; W - Th; 7:00 AM - 5:00 PMurn:uuid:ea50afbb-3719-4e29-ac80-fdc3e71e374c2024-03-25T07:00:00ZForitsBC Gas Service Connection 1900 Block of E 6th Ave2024-03-25T20:25:38.701693Z49.265049422759944 -123.06494034238507 49.265040087838315 -123.06446845504595Crew will be on site to conduct daylighting on behalf of Fortis BC
Traffic Impact:
• Sidewalk and Travel lane closure, East side of 700 blk Beatty St from South PL 720 Beatty St to W Georgia St
• Sidewalk, Travel and Parking lane closure, South side of 100 blk W Georgia St from Cambie St to Citadel Parade
• Bike lane closure
WO: 37-G1015
Location: 700 Block Beatty Street & 100 Block W Georgia Street
Schedule: Apr 3, 2024 - Apr 5, 2024; W - F; 9:30 AM - 3:00 PMurn:uuid:98ffdb77-7f8e-4ea0-833e-5326924a159b2024-03-26T07:00:00ZFortis BC - Daylighting at 700 Block Beatty Street & 100 Block W Georgia Street2024-03-26T19:52:19.6582004Z49.27799077896756 -123.11338407785041 49.27871870920461 -123.11227764106648Crew will be on site to conduct daylighting on behalf of Fortis BC
Traffic Impact:
• Sidewalk and Travel lane closure, East side of 700 blk Beatty St from South PL 720 Beatty St to W Georgia St
• Sidewalk, Travel and Parking lane closure, South side of 100 blk W Georgia St from Cambie St to Citadel Parade
• Bike lane closure
WO: 37-G1015
Location: 700 Block Beatty Street & 100 Block W Georgia Street
Schedule: Apr 3, 2024 - Apr 5, 2024; W - F; 9:30 AM - 3:00 PMurn:uuid:29fe9315-b2a7-45ba-a5cd-694b773f693f2024-03-26T07:00:00ZFortis BC - Daylighting at 700 Block Beatty Street & 100 Block W Georgia Street2024-03-26T19:52:19.6582004Z49.27934864021444 -123.11327257638425 49.2783771433094 -123.11172442267465Crews will be on site to conduct a Gas Service Connection on behalf of FortisBC
Traffic Impacts:
Parking Lane Closure, Both Sides, 1300 Block of Cotton Dr from 15m North of Lane South of Charles St to Kitchener St
WO# 31361097
Location: 1300 Block of Cotton Drive
Schedule: Apr 5, 2024 - Apr 9, 2024; M, Tu, F; 8:00 AM - 4:00 PMurn:uuid:01025932-d584-4950-8a54-a8eba32517ec2024-03-27T07:00:00ZFortisBC - Gas Service Connection on 1300 Block of Cotton Drive2024-03-27T17:09:05.0122471Z49.27277543707976 -123.07150918092532 49.27215560924475 -123.07151263828996Crews will be on site to conduct a Gas Service Connection on behalf of FortisBC
Traffic Impacts:
Total Road and Sidewalk Closure, Both Sides, 1300 Block of E 17th Ave from Clark Dr to Knight St
WO# 31355913
Location: 1300 Block of E 167th Avenue
Schedule: Apr 2, 2024 - Apr 4, 2024; Tu - Th; 7:00 AM - 5:00 PMurn:uuid:56bacac0-0915-4db6-9ff5-177f312250d02024-03-22T07:00:00ZFortisBC - Gas Service Connection on 1300 Block of E 167th Avenue2024-03-22T16:55:27.4070135Z49.255345284385584 -123.07787528654588 49.25532077530028 -123.0759333672191Sidewalk closure on both sides of 1700 Block E 34th Avenue from Argyle Street to Commercial Street to facilitate a gas service connection.
WO# 31361293
Location: Both sides of 1700 Block E 34th Avenue from Argyle Street to Commercial Street.
Schedule: Apr 9, 2024 - Apr 11, 2024; Tu - Th; 7:00 AM - 5:00 PMurn:uuid:6a30cb81-b024-4d01-8bf8-9c556fa23dc42024-03-27T07:00:00ZFortisBC - Gas Service Connection on 1700 E 34th Avenue2024-03-27T22:09:44.5238113Z49.23931779312997 -123.07128992909361 49.239265256595075 -123.06857553357052Alleyway lane closure on both sides of Lane North of 1800 Block W 58th Avenue from West of PL 1861 W 58th Ave to East of PL 7357 W 58th Avenue to facilitate a gas service connection.
WO# 31357569
Location: Both sides of Lane North of 1800 Block W 58th Avenue from West of PL 1861 W 58th Avenue to East of PL 7357 W 58th Avenue.
Schedule: Mar 27, 2024 - Mar 28, 2024; W - Th; 7:00 AM - 5:00 PMurn:uuid:8c2dd732-faf9-456b-8d35-e7747a37bdf12024-03-12T07:00:00ZFortisBC - Gas Service Connection on 1800 Block W 58th Avenue2024-03-12T21:03:14.2675641Z49.21901588572493 -123.14832095818196 49.21902639734381 -123.14940993504202Crews will be on site to conduct a Gas Service Connection on behalf of FortisBC
Traffic Impacts:
Parking Lane Closure, South Side, 200 Block of E 16th Ave from W PL 248 E 16th Ave to E PL 256 E 16th Ave
WO# 31358411
Location: 200 Block of E 16th Avenue
Schedule: Mar 28, 2024 - Mar 29, 2024; Th - F; 7:00 AM - 5:00 PMurn:uuid:9cede6b1-1912-4e88-9990-71e387194b9f2024-03-06T08:00:00ZFortisBC - Gas Service Connection on 200 Block of E 16th Avenue2024-03-06T16:50:26.3805837Z49.25659690667035 -123.09992275340154 49.256568896996384 -123.0992682944019Crews will be on site to conduct a Gas Service Connection on behalf of FortisBC
Traffic Impacts:
Total Road and Sidewalk Closure, Both Sides, 2300 Block of E 5th Ave from W PL 2306 E 5th Ave to E PL 2388 E 5th Ave
WO# 31359801
Location: 2300 Block of E 5th Avenue
Schedule: Apr 4, 2024 - Apr 8, 2024; M, Th, F; 7:00 AM - 5:00 PMurn:uuid:e3999098-e14f-4996-9d1f-ae3995b5b9332024-03-18T07:00:00ZFortisBC - Gas Service Connection on 2300 Block of E 5th Avenue2024-03-21T20:49:26.9430472Z49.265903480595455 -123.0580308391566 49.265889478401306 -123.05668973464915Crews will be on site to conduct a Gas Service Connection on behalf of FortisBC
Traffic Impacts:
Total Road Closure, Both Sides, 2300 Block of Rosedale Dr from W PL 2300 Rosedale Dr to E PL 2320 Rosedale Dr
WO# 31360331
Location: 2300 Block of Rosedale Drive
Schedule: Apr 9, 2024 - Apr 11, 2024; Tu - Th; 7:00 AM - 5:00 PMurn:uuid:2c93abbc-226f-4037-89fc-1015d119e8f42024-03-22T07:00:00ZFortisBC - Gas Service Connection on 2300 Block of Rosedale Drive2024-03-22T19:22:05.8279391Z49.2085009445866 -123.06015533411701 49.20846589838695 -123.05989247763353 49.20830819018093 -123.05972618067462 49.20812244431539 -123.05939895117478 49.2078806231807 -123.0585191866179Total road closure on both sides 3800 Block W 39th Avenue from East of PL 3803 W 39th Avenue to West of PL 3849 W 39th Avenue to facilitate a gas service connection.
WO# 31334006
Location: Both sides of 3800 Block W 39th Avenue from East of PL 3803 W 39th Avenue to West of PL 3849 W 39th Avenue.
Schedule: Apr 4, 2024 - Apr 8, 2024; M, Th, F; 7:00 AM - 5:00 PMurn:uuid:469574b8-eb86-4626-a281-583ad3a6a7512024-03-27T07:00:00ZFortisBC - Gas Service Connection on 3800 Block W 39th Avenue2024-03-27T16:33:42.6002148Z49.23644840149768 -123.1882727445685 49.23646241204483 -123.18963530674804Total road closure and sidewalk closure on both sides of 400 Block E 57th Avenue from Prince Edward Street to St. George Street to facilitate a gas service connection.
WO# 31359806
Location: Both sides of 400 Block E 57th Avenue from Prince Edward Street to St. George Street.
Schedule: Apr 6, 2024 - Apr 7, 2024; All days; 7:00 AM - 5:00 PMurn:uuid:75e410bb-bfb4-41cd-9e84-77724c8f25052024-03-27T07:00:00ZFortisBC - Gas Service Connection on 400 Block E 57th Avenue2024-03-27T15:39:36.3620701Z49.218385188537894 -123.09774155021917 49.21832956727482 -123.09488886347323Crews will be on site to conduct a Gas Service Connection on behalf of FortisBC
Traffic Impacts:
Single Lane Alternating Traffic, Parking Lane and Sidewalk Closure, Both Sides, 400 Block of W 22nd Ave from W PL 481 W 22nd Ave to E PL 3773 Yukon Ave
WO# 31359890
Location: 400 Block of W 22nd Avenue
Schedule: Apr 5, 2024 - Apr 9, 2024; M, Tu, F; 7:00 AM - 5:00 PMurn:uuid:b78ec0b2-13f4-4414-9d15-aa111522a89e2024-03-21T07:00:00ZFortisBC - Gas Service Connection on 400 Block of W 22nd Avenue2024-03-21T21:10:22.6818107Z49.25115685684224 -123.11463742544373 49.25111133609755 -123.11282961656768Crews will be on site to conduct a Gas Service Connection on behalf of FortisBC
Traffic Impacts:
Total Road and Sidewalk Closure, Both Sides, 500 Block of W 21st Ave from W PL 580 W 21st Ave to E PL 572 W 21st Ave
WO# 31357827
Location: 500 Block of W 21st Avenue
Schedule: Mar 27, 2024 - Mar 28, 2024; W - Th; 9:30 AM - 2:30 PMurn:uuid:0d2dda81-ca42-4452-8d29-4a90570d1b2f2024-03-15T07:00:00ZFortisBC - Gas Service Connection on 500 Block of W 21st Avenue2024-03-15T18:32:47.6779783Z49.25243496607439 -123.11741947580698 49.252431464570776 -123.1168991272581Crews will be on site to conduct a Gas Service Connection on behalf of FortisBC
Traffic Impacts:
Total Road and Sidewalk Closure, Both Sides, 6300-6400 Block of St. Catherine's St from S PL 6485 St. Catherines St to N PL 6305 St. Catherines St
WO# 31359106
Location: 6300-6400 Block of St. Catherines Street
Schedule: Apr 5, 2024 - Apr 9, 2024; M, Tu, F; 7:00 AM - 5:00 PMurn:uuid:40004ad1-7563-4c74-a575-5517e12875682024-03-25T07:00:00ZFortisBC - Gas Service Connection on 6300-6400 Block of St. Catherines Street2024-03-25T19:01:00.3647008Z49.22724741278827 -123.08657436657433 49.2255650324594 -123.08663612248584Crews will be on site to conduct a Gas Service Connection on behalf of FortisBC
Traffic Impacts:
Single Lane Alternating Traffic and Sidewalk Closure, Both Sides, 8600-8700 Block of Barnard St from S PL 8726 Barnard St to N PL 8628 Barnard St
WO# 31360852
Location: 8600-8700 Block of Barnard Street
Schedule: Apr 9, 2024 - Apr 11, 2024; Tu - Th; 7:00 AM - 5:00 PMurn:uuid:61320dc2-ca78-4d9a-b6be-4540c3df43652024-03-25T07:00:00ZFortisBC - Gas Service Connection on 8600-8700 Block of Barnard Street2024-03-25T17:20:40.0096066Z49.20825380920036 -123.145177549619 49.20640705166724 -123.14523856711243 49.205870600039844 -123.14581860184842Crews will be on site to conduct a Gas Service Connection on behalf of FortisBC
Traffic Impacts:
Alleyway Lane Closure, Both Sides, 6100 Block of Fremlin St from N PL 892 W 45th Ave to S PL 6162 Fremlin St
WO# 31357347
Location: Lane East of 6100 Block of Fremlin Street
Schedule: Apr 2, 2024 - Apr 5, 2024; Tu - F; 7:00 AM - 5:00 PMurn:uuid:ce845bae-e8c5-4c1e-94f8-3c203ffa47f82024-03-15T07:00:00ZFortisBC - Gas Service Connection on Lane East of 6100 Block of Fremlin Street2024-03-15T23:09:50.3104305Z49.230166461916326 -123.12610942647521 49.22950087171307 -123.12612015531127Crews will be on site to conduct a Gas Service Connection on behalf of FortisBC
Traffic Impacts:
Alleyway Lane Closure, Both Sides, Lane North of 2000 Block of W 36th Ave from E PL 5189 Maple St to W PL 5190 East Blvd
WO# 31358701
Location: Lane North of 2000 Block of W 36th Avenue
Schedule: Apr 2, 2024 - Apr 4, 2024; All days; 7:00 AM - 5:00 PMurn:uuid:67db05f8-6049-4cbd-b619-dcb8f79ad9da2024-03-22T07:00:00ZFortisBC - Gas Service Connection on Lane North of 2000 Block of W 36th Avenue2024-03-22T19:07:13.3558219Z49.2395820677113 -123.15195407665104 49.23963110149771 -123.15466847217411Crews will be on site to conduct a Gas Service Connection on behalf of FortisBC
Traffic Impacts:
Alleyway Lane Closure, Both Sides, Lane south of 1300 Block of E 35th Ave from W PL 1304 Culloden St to E PL 5125 Knight St
WO# 31360593
Location: Lane South of 1300 Block of E 35th Avenue
Schedule: Apr 11, 2024 - Apr 15, 2024; Weekdays; 7:00 AM - 5:00 PMurn:uuid:73cd5ecc-83b4-4ff2-9163-03e510290d192024-03-21T07:00:00ZFortisBC - Gas Service Connection on Lane South of 1300 Block of E 35th Avenue2024-03-21T21:24:51.8184397Z49.238150499883346 -123.0789171330425 49.2381188113834 -123.07688753935656Crews will be on site to conduct a Gas Service Connection on behalf of FortisBC
Traffic Impacts:
Alleyway Lane Closure, Both Sides, Lane South of 2500 Block of E 15th Ave from W PL 2508 E 15th Ave to E PL 2536 E 15th Ave
WO# 31358781
Location: Lane South of 2500 Block of E 15th Avenue
Schedule: Mar 28, 2024 - Mar 29, 2024; Th - F; 7:00 AM - 5:00 PMurn:uuid:5269df57-b6b7-4484-b3e1-4b93ba7aafa22024-03-06T08:00:00ZFortisBC - Gas Service Connection on Lane South of 2500 Block of E 15th Avenue2024-03-06T16:38:35.9587385Z49.25617768101702 -123.05503464050993 49.25618118225492 -123.05433726616607Crews will be on site to conduct a Gas Service Connection on behalf of FortisBC
Traffic Impacts:
Alleyway Lane Closure, Both Sides, Lane South of 400 Block of E 10th Ave from Guelph St to E PL 448 E 10th Ave
WO# 31153772
Location: Lane South of 400 Block of E 10th Avenue
Schedule: Mar 27, 2024 - Apr 2, 2024; Weekdays; 7:00 AM - 5:00 PMurn:uuid:9fd4cd08-2e82-407d-bd6b-b26d964457a22024-03-08T08:00:00ZFortisBC - Gas Service Connection on Lane South of 400 Block of E 10th Avenue2024-03-15T21:01:42.8452304Z49.2611222035344 -123.09496381533945 49.261118702646996 -123.0941967035612Crew will be on site to do a gas service connection - FortisBC
Traffic Impacts: Parking Lane Closure
WO: 31358760
Location: West side of the street of 5600 Block of Earles St, from S pl 5605 Earles St to N PL 5577 Earles St
Schedule: Mar 27, 2024 - Mar 28, 2024; W - Th; 7:00 AM - 5:00 PMurn:uuid:36969b04-9b81-4c54-8445-00a04bca63fd2024-03-08T08:00:00ZFortisBC Gas Service Connection 5600 Block of Earles St2024-03-08T20:10:20.4144668Z49.233695657037686 -123.0487853241333 49.233985223638626 -123.0487853241333Crew will be on site to do a Gas Service Connection - Fortis BC
Traffic Impacts: Sidewalk Closure, Total Road Closure
WO: 31359013
Location: Both sides of the street of 1900 Block of E 6th Ave, from W PL 1937 E 6th Ave to E PL 1949 E 6th Ave
Schedule: Mar 28, 2024 - Mar 29, 2024; Th - F; 7:00 AM - 5:00 PMurn:uuid:c40e8011-2b02-4776-9f46-924448fde92f2024-03-12T07:00:00ZFortisBC Gas Service Connection - 1900 Block of E 6th Ave2024-03-12T17:51:20.5720812Z49.26505453014161 -123.06481658147739 49.265044240211125 -123.06451048470757Crew will be on site to do a gas service connection
Traffic Impacts: Alleyway closure
WO: 31357308
Location: Both Sides of the Lane North of 3300 Block of Kingsway, from W PL 3325 Kingsway to E PL 3331 Kingsway
Schedule: Apr 2, 2024 - Apr 2, 2024; Tu; 7:00 AM - 5:00 PMurn:uuid:1d2073f5-0ae4-491d-9c1b-8923837c677b2024-03-26T07:00:00ZFortisBC Gas Service Connection - 3300 Block of Kingsway2024-03-26T22:40:50.8090158Z49.23411273283503 -123.03466261291804 49.23385586002513 -123.03423362442794Crew will be on site to do a Gas Main Relocation and Service Reconnections - Fortis BC
Traffic Impacts: Total Road Closure
WO: 31332882
Location: Both sides of the street of 500 Block of Cypress St, from Quilchena Cres to Linden Rd, Both sides of the street of 1900 Block of Linden Rd, from 50m W of Cypress St to Cypress St
Schedule: Mar 25, 2024 - Mar 28, 2024urn:uuid:a3591eb9-d545-4abf-8c94-41e9d703d4732024-03-11T07:00:00ZFortisBC Gas Service Connection - 5000 Block of Cypress St, 1900 Block of Linden Rd2024-03-27T18:31:00.3318412Z49.241486878588745 -123.1490140201916 49.24113664935004 -123.14877092715028 49.24087981296074 -123.14868512945225 49.2405996263243 -123.1487423276994Crew will be on site to do a Gas Main Relocation and Service Reconnections - Fortis BC
Traffic Impacts: Total Road Closure
WO: 31332882
Location: Both sides of the street of 500 Block of Cypress St, from Quilchena Cres to Linden Rd, Both sides of the street of 1900 Block of Linden Rd, from 50m W of Cypress St to Cypress St
Schedule: Mar 25, 2024 - Mar 28, 2024urn:uuid:2a7eb871-f244-4168-822c-8ed936c786c42024-03-11T07:00:00ZFortisBC Gas Service Connection - 5000 Block of Cypress St, 1900 Block of Linden Rd2024-03-27T18:31:00.3318412Z49.240604296150195 -123.14872802830125 49.24052490969066 -123.1493572109837Crew will be on site to do a gas service connection - FortisBC
Traffic Impacts: Total Road Closure
WO: MCO 2800572460
Location: Both sides of the street of 6500 Block of Price Albert Street, from E 50th Ave to E 49th Ave
Schedule: Mar 20, 2024 - Mar 28, 2024; Weekdays; 8:00 AM - 4:00 PMurn:uuid:335481fd-a21e-4c48-8d70-0b260c3278522024-03-19T07:00:00ZFortisBC Gas Service Connection - 6500 Block of Price Albert Street2024-03-19T22:38:24.1634166Z49.224501448568844 -123.08804679311143 49.22541234622608 -123.08803249371329Crew will be on site to do a Gas Service connection - Fortis BC
Traffic Impacts: Travel Lane Closure, Parking Lane Closure
WO: MCO 2800572460
Location: Both sides of the 700 Block of E 49th Ave, Chester St to St Catherines St
Schedule: Mar 25, 2024 - Mar 28, 2024; M - Th; 8:00 AM - 4:00 PMurn:uuid:522613bc-9622-43d9-8852-ae53555021c22024-03-19T07:00:00ZFortisBC Gas Service Connection 700 E 49th Ave2024-03-19T22:49:45.7795835Z49.225465042022364 -123.08942916348397 49.22543666717877 -123.0866713111431Parking lane closure on the South Side of 2000 Block of W 20th Avenue to facilitate a gas service connection.
WO# 31358571
Location: South Side of 2000 Block of W 20th Avenue From W PL of 3637 to Maple Street.
Schedule: Mar 28, 2024 7:00 AM - Mar 29, 2024 5:00 PMurn:uuid:043a1a80-3bdd-4cbb-9e40-4286ea7c9ff02024-03-06T08:00:00ZFortisBC Gas Service Connection on 2000 Block of W 20th Avenue2024-03-06T21:01:04.3097288Z49.25346067947194 -123.1514188688561 49.253458928756544 -123.15123111422506 49.2534501751787 -123.15108091052021 49.25342741586891 -123.15094411786046Parking lane closure on the East Side of 600 Block of Beatty Street to facilitate a gas service connection.
WO# 31359880
Location: East Side of 600 Block of Beatty Street From South PL of 161 to North PL of 620.
Schedule: Apr 5, 2024 7:00 AM - Apr 9, 2024 5:00 PMurn:uuid:ecdb8c11-e70c-4534-ad2b-4a40ade99e092024-03-18T07:00:00ZFortisBC Gas Service Connection on 600 Block of Beatty Street2024-03-18T22:50:21.7823509Z49.278794524121565 -123.11212851076498 49.27922007756757 -123.11147649798485Travel lane closure on Both Sides of 700 Block of E 49th Avenue to facilitate a gas service connection.
Traffic Impacts: Parking Lane Closure, Travel Lane Closure
WO# MCO 2800572460
Location: Both Sides of 700 Block of E 49th Avenue From Fraser Street to Prince Albert Street.
Schedule: Mar 25, 2024 - Mar 28, 2024; M - Th; 9:30 AM - 3:00 PMurn:uuid:1929bb17-a385-438a-bd55-5c26e3132d072024-03-19T07:00:00ZFortisBC Gas Service Connection on 700 Block of E 49th Avenue2024-03-19T22:54:18.359941Z49.22545627998207 -123.09077084393466 49.22545627998207 -123.0880181675716Alleyway lane closure on Both Sides of Lane West of 6900 Block of Fremlin Street to facilitate a gas service connection.
WO# 31358727
Location: Both Sides of Lane West of 6900 Block of Fremlin Street From South PL of 6949 to North PL of 6877.
Schedule: Mar 27, 2024 7:00 AM - Mar 29, 2024 5:00 PMurn:uuid:287524d4-7809-4aea-ac82-db5d59a295592024-03-18T07:00:00ZFortisBC Gas Service Connection on Lane West of 6900 Fremlin Street2024-03-18T17:56:17.7096533Z49.22223372100021 -123.1276719024533 49.22290361340944 -123.12764616484623Total road closure on the North Side of 3600 Block of Fellowes Street and Both Sides of 3600/500 Fellowes Street to facilitate utility maintenance.
WO# 31176291/4206-M-000-1007
Location: North Side of 3600 Block of Fellowes Street From North Boundary Road to Kootenay Street. Both Sides of 3600/500 Block of Fellowes Street From 100m West of North Boundary Road to Trinity Street (24 Hours).
Schedule: Apr 2, 2024 - Aug 20, 2024urn:uuid:4f6481e3-ead1-470c-8531-47d51f1bb3512024-03-21T07:00:00ZFortisBC Utility Maintenance on 3600 Block of Fellowes Street 2024-03-21T18:55:11.1303755Z49.29197088370205 -123.02342782665868 49.29195129107296 -123.02366804181592 49.29189811076597 -123.02406697079887 49.29185892522864 -123.02433292323596 49.29179454901265 -123.02459029668887 49.29170218298145 -123.02495490908049 49.29159022389777 -123.02528520488083 49.29146147067996 -123.02549968292189 49.29129912904759 -123.02570987130723 49.291159179062475 -123.02570129232302Total road closure on the North Side of 3600 Block of Fellowes Street and Both Sides of 3600/500 Fellowes Street to facilitate utility maintenance.
WO# 31176291/4206-M-000-1007
Location: North Side of 3600 Block of Fellowes Street From North Boundary Road to Kootenay Street. Both Sides of 3600/500 Block of Fellowes Street From 100m West of North Boundary Road to Trinity Street (24 Hours).
Schedule: Apr 2, 2024 - Aug 20, 2024urn:uuid:93084034-1a86-411f-b2fd-174550cfaf202024-03-21T07:00:00ZFortisBC Utility Maintenance on 3600 Block of Fellowes Street 2024-03-21T18:55:11.1303755Z49.29123121859544 -123.02571453603186 49.28969174419933 -123.02674831949919Crews will complete street repairs along Fraser St. Concrete repairs underway. Bus slabs installation and road repairs continue between 41st and 49th, with the last pave anticipated for mid-October and completion of concrete work end of February 2024.
Location:
Schedule: Apr 13, 2023 - Feb 29, 2024urn:uuid:448da3d0-5d09-478d-a0a2-6df85d9614a22023-04-13T07:00:00ZFraser St Street Renewal2024-01-29T19:58:30.137338Z49.217137969301206 -123.09100118089128 49.21656279970682 -123.09101572406506Crews will complete street repairs along Fraser St. Concrete repairs underway. Bus slabs installation and road repairs continue between 41st and 49th, with the last pave anticipated for mid-October and completion of concrete work end of February 2024.
Location:
Schedule: Apr 13, 2023 - Feb 29, 2024urn:uuid:1aafc65c-7ef2-4dac-9d4c-eaaa9bf2634b2023-04-13T07:00:00ZFraser St Street Renewal2024-01-29T19:58:30.137338Z49.217401311371844 -123.09099445514664 49.217137969301206 -123.09100118089128Crews will complete street repairs along Fraser St. Concrete repairs underway. Bus slabs installation and road repairs continue between 41st and 49th, with the last pave anticipated for mid-October and completion of concrete work end of February 2024.
Location:
Schedule: Apr 13, 2023 - Feb 29, 2024urn:uuid:a8588fa9-57c8-4813-aa9e-7eb1d90232c62023-04-13T07:00:00ZFraser St Street Renewal2024-01-29T19:58:30.137338Z49.21826109140213 -123.09096854193616 49.217401311371844 -123.09099445514664Crews will complete street repairs along Fraser St. Concrete repairs underway. Bus slabs installation and road repairs continue between 41st and 49th, with the last pave anticipated for mid-October and completion of concrete work end of February 2024.
Location:
Schedule: Apr 13, 2023 - Feb 29, 2024urn:uuid:2cfcc51c-9def-42b3-bc3f-0651f285177f2023-04-13T07:00:00ZFraser St Street Renewal2024-01-29T19:58:30.137338Z49.21913089829175 -123.09094610677987 49.21826109140213 -123.09096854193616Crews will complete street repairs along Fraser St. Concrete repairs underway. Bus slabs installation and road repairs continue between 41st and 49th, with the last pave anticipated for mid-October and completion of concrete work end of February 2024.
Location:
Schedule: Apr 13, 2023 - Feb 29, 2024urn:uuid:5cd6cd7d-1211-4bab-a5b3-c0f13f5a8d332023-04-13T07:00:00ZFraser St Street Renewal2024-01-29T19:58:30.137338Z49.21995844714672 -123.09092125881011 49.21913089829175 -123.09094610677987Crews will complete street repairs along Fraser St. Concrete repairs underway. Bus slabs installation and road repairs continue between 41st and 49th, with the last pave anticipated for mid-October and completion of concrete work end of February 2024.
Location:
Schedule: Apr 13, 2023 - Feb 29, 2024urn:uuid:d3230a01-d5f7-4baf-8c4f-0ef839c1169a2023-04-13T07:00:00ZFraser St Street Renewal2024-01-29T19:58:30.137338Z49.22064884379233 -123.09090931443181 49.21995844714672 -123.09092125881011Crews will complete street repairs along Fraser St. Concrete repairs underway. Bus slabs installation and road repairs continue between 41st and 49th, with the last pave anticipated for mid-October and completion of concrete work end of February 2024.
Location:
Schedule: Apr 13, 2023 - Feb 29, 2024urn:uuid:f65512a7-5728-46d8-869e-455a1b1b1fcd2023-04-13T07:00:00ZFraser St Street Renewal2024-01-29T19:58:30.137338Z49.22086404418056 -123.09090108497828 49.22064884379233 -123.09090931443181Crews will complete street repairs along Fraser St. Concrete repairs underway. Bus slabs installation and road repairs continue between 41st and 49th, with the last pave anticipated for mid-October and completion of concrete work end of February 2024.
Location:
Schedule: Apr 13, 2023 - Feb 29, 2024urn:uuid:856b361d-474e-4d5f-8dd6-15fe023705d22023-04-13T07:00:00ZFraser St Street Renewal2024-01-29T19:58:30.137338Z49.2217713860407 -123.09088105096176 49.22086404418056 -123.09090108497828Crews will complete street repairs along Fraser St. Concrete repairs underway. Bus slabs installation and road repairs continue between 41st and 49th, with the last pave anticipated for mid-October and completion of concrete work end of February 2024.
Location:
Schedule: Apr 13, 2023 - Feb 29, 2024urn:uuid:c6da9c45-9970-4361-acdc-4e900c18ba982023-04-13T07:00:00ZFraser St Street Renewal2024-01-29T19:58:30.137338Z49.2217713860407 -123.09088105096176 49.22086404418056 -123.09090108497828Crews will complete street repairs along Fraser St. Concrete repairs underway. Bus slabs installation and road repairs continue between 41st and 49th, with the last pave anticipated for mid-October and completion of concrete work end of February 2024.
Location:
Schedule: Apr 13, 2023 - Feb 29, 2024urn:uuid:338e9951-d41e-404e-ae67-62acabbb9bfe2023-04-13T07:00:00ZFraser St Street Renewal2024-01-29T19:58:30.137338Z49.22200108476386 -123.09087536094279 49.2217713860407 -123.09088105096176Crews will complete street repairs along Fraser St. Concrete repairs underway. Bus slabs installation and road repairs continue between 41st and 49th, with the last pave anticipated for mid-October and completion of concrete work end of February 2024.
Location:
Schedule: Apr 13, 2023 - Feb 29, 2024urn:uuid:ba2b1e67-c6a8-4dda-917a-35167b2bf6342023-04-13T07:00:00ZFraser St Street Renewal2024-01-29T19:58:30.137338Z49.2226752389991 -123.09085922451371 49.22200108476386 -123.09087536094279Crews will complete street repairs along Fraser St. Concrete repairs underway. Bus slabs installation and road repairs continue between 41st and 49th, with the last pave anticipated for mid-October and completion of concrete work end of February 2024.
Location:
Schedule: Apr 13, 2023 - Feb 29, 2024urn:uuid:1c9205e1-a83c-4482-9f68-29e493cb56e02023-04-13T07:00:00ZFraser St Street Renewal2024-01-29T19:58:30.137338Z49.223579937797666 -123.09083684950205 49.22273247748166 -123.09085721452486Crews will complete street repairs along Fraser St. Concrete repairs underway. Bus slabs installation and road repairs continue between 41st and 49th, with the last pave anticipated for mid-October and completion of concrete work end of February 2024.
Location:
Schedule: Apr 13, 2023 - Feb 29, 2024urn:uuid:8b5ed161-ff58-4525-ab98-ce457f6cc1932023-04-13T07:00:00ZFraser St Street Renewal2024-01-29T19:58:30.137338Z49.22451517547768 -123.09081435112071 49.223579937797666 -123.09083684950205Crews will complete street repairs along Fraser St. Concrete repairs underway. Bus slabs installation and road repairs continue between 41st and 49th, with the last pave anticipated for mid-October and completion of concrete work end of February 2024.
Location:
Schedule: Apr 13, 2023 - Feb 29, 2024urn:uuid:88abd249-6eba-4dae-9eca-ac6fef31ec3f2023-04-13T07:00:00ZFraser St Street Renewal2024-01-29T19:58:30.137338Z49.225477436780295 -123.09078930569157 49.22451517547768 -123.09081435112071Crews will complete street repairs along Fraser St. Concrete repairs underway. Bus slabs installation and road repairs continue between 41st and 49th, with the last pave anticipated for mid-October and completion of concrete work end of February 2024.
Location:
Schedule: Apr 13, 2023 - Feb 29, 2024urn:uuid:fcf6f027-8b98-4e4b-a18d-ba121c94ecbb2023-04-13T07:00:00ZFraser St Street Renewal2024-01-29T19:58:30.137338Z49.22652027473512 -123.09075631738253 49.225477436780295 -123.09078930569157Crews will complete street repairs along Fraser St. Concrete repairs underway. Bus slabs installation and road repairs continue between 41st and 49th, with the last pave anticipated for mid-October and completion of concrete work end of February 2024.
Location:
Schedule: Apr 13, 2023 - Feb 29, 2024urn:uuid:0a0dfd69-86a9-4d80-9b04-c11e0f6cbd7c2023-04-13T07:00:00ZFraser St Street Renewal2024-01-29T19:58:30.137338Z49.227378306301375 -123.0907214510845 49.22652027473512 -123.09075631738253Crews will complete street repairs along Fraser St. Concrete repairs underway. Bus slabs installation and road repairs continue between 41st and 49th, with the last pave anticipated for mid-October and completion of concrete work end of February 2024.
Location:
Schedule: Apr 13, 2023 - Feb 29, 2024urn:uuid:50d6200e-2c48-44e3-a28c-ffd0e1dd82072023-04-13T07:00:00ZFraser St Street Renewal2024-01-29T19:58:30.137338Z49.22828339113127 -123.09069907225901 49.227378306301375 -123.0907214510845Crews will complete street repairs along Fraser St. Concrete repairs underway. Bus slabs installation and road repairs continue between 41st and 49th, with the last pave anticipated for mid-October and completion of concrete work end of February 2024.
Location:
Schedule: Apr 13, 2023 - Feb 29, 2024urn:uuid:5c8034f8-cf3d-4b5e-baec-fd598156531f2023-04-13T07:00:00ZFraser St Street Renewal2024-01-29T19:58:30.137338Z49.229188232953845 -123.09067667845892 49.22828339113127 -123.09069907225901Crews will complete street repairs along Fraser St. Concrete repairs underway. Bus slabs installation and road repairs continue between 41st and 49th, with the last pave anticipated for mid-October and completion of concrete work end of February 2024.
Location:
Schedule: Apr 13, 2023 - Feb 29, 2024urn:uuid:170852b2-08a4-4947-bff1-25ca17e43daf2023-04-13T07:00:00ZFraser St Street Renewal2024-01-29T19:58:30.137338Z49.23009405994051 -123.09064813224195 49.229188232953845 -123.09067667845892Crews will complete street repairs along Fraser St. Concrete repairs underway. Bus slabs installation and road repairs continue between 41st and 49th, with the last pave anticipated for mid-October and completion of concrete work end of February 2024.
Location:
Schedule: Apr 13, 2023 - Feb 29, 2024urn:uuid:3f8f16e8-1986-4d12-aa54-6c19774bc2462023-04-13T07:00:00ZFraser St Street Renewal2024-01-29T19:58:30.137338Z49.230995352905694 -123.09061992010048 49.23009405994051 -123.09064813224195Crews will complete street repairs along Fraser St. Concrete repairs underway. Bus slabs installation and road repairs continue between 41st and 49th, with the last pave anticipated for mid-October and completion of concrete work end of February 2024.
Location:
Schedule: Apr 13, 2023 - Feb 29, 2024urn:uuid:03ba8adc-a426-4a2d-9f09-32a0c241f0922023-04-13T07:00:00ZFraser St Street Renewal2024-01-29T19:58:30.137338Z49.23289712150685 -123.09057312454922 49.230995352905694 -123.09061992010048Crews will complete street repairs along Fraser St. Concrete repairs underway. Bus slabs installation and road repairs continue between 41st and 49th, with the last pave anticipated for mid-October and completion of concrete work end of February 2024.
Location:
Schedule: Apr 13, 2023 - Feb 29, 2024urn:uuid:4b55c817-ec01-4620-b81a-13a0404a4a5c2023-04-13T07:00:00ZFraser St Street Renewal2024-01-29T19:58:30.137338Z49.214850566329034 -123.09104955826679 49.21416598807997 -123.09105115698915Crews will complete street repairs along Fraser St. Concrete repairs underway. Bus slabs installation and road repairs continue between 41st and 49th, with the last pave anticipated for mid-October and completion of concrete work end of February 2024.
Location:
Schedule: Apr 13, 2023 - Feb 29, 2024urn:uuid:608c4cf3-ac63-4e46-9ff4-102f280c20222023-04-13T07:00:00ZFraser St Street Renewal2024-01-29T19:58:30.137338Z49.215640537579304 -123.09104241339483 49.214850566329034 -123.09104955826679Crews will complete street repairs along Fraser St. Concrete repairs underway. Bus slabs installation and road repairs continue between 41st and 49th, with the last pave anticipated for mid-October and completion of concrete work end of February 2024.
Location:
Schedule: Apr 13, 2023 - Feb 29, 2024urn:uuid:673afd33-e784-4512-acf9-f8ba24b137402023-04-13T07:00:00ZFraser St Street Renewal2024-01-29T19:58:30.137338Z49.21652994776042 -123.09101722914458 49.215640537579304 -123.09104241339483Crews will complete street repairs along Fraser St. Concrete repairs underway. Bus slabs installation and road repairs continue between 41st and 49th, with the last pave anticipated for mid-October and completion of concrete work end of February 2024.
Location:
Schedule: Apr 13, 2023 - Feb 29, 2024urn:uuid:cc3c1e7f-c42e-4fbd-8ce0-1282ed1919a02023-04-13T07:00:00ZFraser St Street Renewal2024-01-29T19:58:30.137338Z49.21416598807997 -123.09105115698915 49.21396028161951 -123.09105410204916Crews will complete street repairs along Fraser St. Concrete repairs underway. Bus slabs installation and road repairs continue between 41st and 49th, with the last pave anticipated for mid-October and completion of concrete work end of February 2024.
Location:
Schedule: Apr 13, 2023 - Feb 29, 2024urn:uuid:01e29b72-bb07-4075-abce-c607436ca94d2023-04-13T07:00:00ZFraser St Street Renewal2024-01-29T19:58:30.137338Z49.21396028161951 -123.09105410204916 49.21300473449406 -123.0910605304878Crews will complete street repairs along Fraser St. Concrete repairs underway. Bus slabs installation and road repairs continue between 41st and 49th, with the last pave anticipated for mid-October and completion of concrete work end of February 2024.
Location:
Schedule: Apr 13, 2023 - Feb 29, 2024urn:uuid:10091947-319e-4216-bc6e-98ffad11f0e32023-04-13T07:00:00ZFraser St Street Renewal2024-01-29T19:58:30.137338Z49.21300473449406 -123.0910605304878 49.212615580506 -123.0910718848076Crews will complete street repairs along Fraser St. Concrete repairs underway. Bus slabs installation and road repairs continue between 41st and 49th, with the last pave anticipated for mid-October and completion of concrete work end of February 2024.
Location:
Schedule: Apr 13, 2023 - Feb 29, 2024urn:uuid:a1849e78-db02-4895-ab0f-f9006a99dac62023-04-13T07:00:00ZFraser St Street Renewal2024-01-29T19:58:30.137338Z49.212615580506 -123.0910718848076 49.21181875360449 -123.09109148332143Sewer Renewal Project
Local Streets: L/E Garden Dr
Location: L/E Garden Dr (E 5th Ave to L/N)
Schedule: Mar 18, 2024 - Apr 2, 2024urn:uuid:80b45814-8b24-4b5c-af00-b255c00bd1c52024-03-08T08:00:00ZGarden Dr Sewer Renewal Project2024-03-11T16:13:34.5576952Z49.26589399658238 -123.05735573390818 49.266352566333126 -123.05735573390818Sidewalk repair in various locations around Gastown. Will include removal and installation of new pavers.
Location:
Schedule: Feb 9, 2023 - Jun 9, 2023urn:uuid:fd7a8162-5bc9-48dd-9ae7-675cd58bc63a2022-10-19T07:00:00ZGastown - Utility Cut Repair - Sidewalks2024-03-02T02:00:25.2193695Z49.28387729591 -123.10694775556976 49.28385629993929 -123.10683183084647Sidewalk repair in various locations around Gastown. Will include removal and installation of new pavers.
Location:
Schedule: Feb 9, 2023 - Jun 9, 2023urn:uuid:cf886f02-6433-454e-99fd-1e4e6d8607a22022-10-19T07:00:00ZGastown - Utility Cut Repair - Sidewalks2024-03-02T02:00:25.2193695Z49.283961810177686 -123.10689552266682 49.283891060593845 -123.1064935830873Sidewalk repair in various locations around Gastown. Will include removal and installation of new pavers.
Location:
Schedule: Feb 9, 2023 - Jun 9, 2023urn:uuid:03a2c38f-7695-4db9-b79c-3e61bf12b02a2022-10-19T07:00:00ZGastown - Utility Cut Repair - Sidewalks2024-03-02T02:00:25.2193695Z49.284043163796525 -123.10687691253771 49.284017968725976 -123.10674810714406Sidewalk repair in various locations around Gastown. Will include removal and installation of new pavers.
Location:
Schedule: Feb 9, 2023 - Jun 9, 2023urn:uuid:4f432653-e3bc-41c3-ac8c-9bea61c646c92022-10-19T07:00:00ZGastown - Utility Cut Repair - Sidewalks2024-03-02T02:00:25.2193695Z49.28400113726363 -123.10645203687206 49.28422728958557 -123.10635449140291Sidewalk repair in various locations around Gastown. Will include removal and installation of new pavers.
Location:
Schedule: Feb 9, 2023 - Jun 9, 2023urn:uuid:b6fcd4a5-a634-46c8-9e1f-3bfa2daba7472022-10-19T07:00:00ZGastown - Utility Cut Repair - Sidewalks2024-03-02T02:00:25.2193695Z49.28422022234119 -123.10635810397757 49.28421786662881 -123.10636532978837Sidewalk repair in various locations around Gastown. Will include removal and installation of new pavers.
Location:
Schedule: Feb 9, 2023 - Jun 9, 2023urn:uuid:40d35c18-6b26-450d-826c-347124020e592022-10-19T07:00:00ZGastown - Utility Cut Repair - Sidewalks2024-03-02T02:00:25.2193695Z49.28374435903447 -123.10615578755915Sidewalk repair in various locations around Gastown. Will include removal and installation of new pavers.
Location:
Schedule: Feb 9, 2023 - Jun 9, 2023urn:uuid:2e8cecae-5141-4014-b6ce-56f1d7baf09b2022-10-19T07:00:00ZGastown - Utility Cut Repair - Sidewalks2024-03-02T02:00:25.2193695Z49.284398790651636 -123.10918594027078 49.284348850222045 -123.10889246057779Sidewalk repair in various locations around Gastown. Will include removal and installation of new pavers.
Location:
Schedule: Feb 9, 2023 - Jun 9, 2023urn:uuid:c8deec3e-b1b7-49eb-8a5d-da7ac2f14e5f2022-10-19T07:00:00ZGastown - Utility Cut Repair - Sidewalks2024-03-02T02:00:25.2193695Z49.284848252242 -123.11119563816837 49.28472756388396 -123.11101061836193Sidewalk repair in various locations around Gastown. Will include removal and installation of new pavers.
Location:
Schedule: Feb 9, 2023 - Jun 9, 2023urn:uuid:58d8e93b-856b-4614-9a53-cf6cf52c24882022-10-19T07:00:00ZGastown - Utility Cut Repair - Sidewalks2024-03-02T02:00:25.2193695Z49.2848784603805 -123.11104152263778 49.28479447814914 -123.1109352584173Sidewalk repair in various locations around Gastown. Will include removal and installation of new pavers.
Location:
Schedule: Feb 9, 2023 - Jun 9, 2023urn:uuid:66927554-4533-4bc4-9c2c-8c466ad62b242022-10-19T07:00:00ZGastown - Utility Cut Repair - Sidewalks2024-03-02T02:00:25.2193695Z49.28460271354757 -123.11028967911615 49.28456109669855 -123.11007913933642Sidewalk repair in various locations around Gastown. Will include removal and installation of new pavers.
Location:
Schedule: Feb 9, 2023 - Jun 9, 2023urn:uuid:c3aa60b7-1a77-49e1-adbf-c8d0a19321e42022-10-19T07:00:00ZGastown - Utility Cut Repair - Sidewalks2024-03-02T02:00:25.2193695Z49.28463184532103 -123.11087025850875 49.28451531812405 -123.11068523870232Sidewalk repair in various locations around Gastown. Will include removal and installation of new pavers.
Location:
Schedule: Feb 9, 2023 - Jun 9, 2023urn:uuid:f5fc93ff-20e9-49d1-aaff-5e08f7ef97cf2022-10-19T07:00:00ZGastown - Utility Cut Repair - Sidewalks2024-03-02T02:00:25.2193695Z49.28466029991969 -123.11076024139987 49.284641594829225 -123.11060457423808Sidewalk repair in various locations around Gastown. Will include removal and installation of new pavers.
Location:
Schedule: Feb 9, 2023 - Jun 9, 2023urn:uuid:4960b828-9033-4308-988f-07a93b3d2d0f2022-10-19T07:00:00ZGastown - Utility Cut Repair - Sidewalks2024-03-02T02:00:25.2193695Z49.284531964883314 -123.10992601949658 49.284494509666985 -123.10972185971016Sidewalk repair in various locations around Gastown. Will include removal and installation of new pavers.
Location:
Schedule: Feb 9, 2023 - Jun 9, 2023urn:uuid:49979fcc-41b9-4242-9ae2-46888ae4a2802022-10-19T07:00:00ZGastown - Utility Cut Repair - Sidewalks2024-03-02T02:00:25.2193695Z49.284303071450495 -123.11034071906272 49.28418654347655 -123.11016845924293Sidewalk repair in various locations around Gastown. Will include removal and installation of new pavers.
Location:
Schedule: Feb 9, 2023 - Jun 9, 2023urn:uuid:f0f75974-521e-47cb-869d-cab1dc3c97ba2022-10-19T07:00:00ZGastown - Utility Cut Repair - Sidewalks2024-03-02T02:00:25.2193695Z49.28416987236656 -123.11002148777011 49.2841368238733 -123.10994100089873Sidewalk repair in various locations around Gastown. Will include removal and installation of new pavers.
Location:
Schedule: Feb 9, 2023 - Jun 9, 2023urn:uuid:df010aeb-c352-448f-a967-8dd6564a08922022-10-19T07:00:00ZGastown - Utility Cut Repair - Sidewalks2024-03-02T02:00:25.2193695Z49.28429474803289 -123.10862450085811 49.28422399892679 -123.10827360122519Sidewalk repair in various locations around Gastown. Will include removal and installation of new pavers.
Location:
Schedule: Feb 9, 2023 - Jun 9, 2023urn:uuid:01a8da56-85ac-495d-93f5-b732545041752022-10-19T07:00:00ZGastown - Utility Cut Repair - Sidewalks2024-03-02T02:00:25.2193695Z49.28415741144002 -123.10784614167238 49.28408666213684 -123.10745696207948Utility cut repair occurring in the square, limited to the sidewalk. Work involves removal and re-installation of red tile bricks.
Location:
Schedule: Oct 24, 2022 - Nov 18, 2022urn:uuid:534be00a-2e0f-4e1f-b037-699cafb114442022-10-19T07:00:00ZGastown Maple Tree Square - Utility Cut Repair - Sidewalks2024-03-02T02:00:25.2193695Z49.283507707962514 -123.10386887047572 49.28356602954142 -123.10423007467764 49.283512373676416 -123.10423007467764 49.28347154849129 -123.10399404028435 49.283507707962514 -123.10386887047572Continuing the Gastown sidewalk repair program in various locations around the neighbourhood. Construction will be sequenced closer to the date.
Location: 228-238 Abbott Major cut - Abbott from Trounce Alley (laneway) to Cordova (East Sidewalk)
210-214 Abbott Brick restoration - Abbott from Water to Trounce Alley (East Sidewalk)
53 Water Cut near Old Spaghetti Factor
8 Water Cut - middle of sidewalk
18 Water Cut - including curb
38 Water Cut - to curb
46 Water Cut - to curb
45 Powell Cut - to curb
300 Water St. Cut - near curb
328 Water St. Cut - near curb
387 Water St. Cut - adjacent to pole
12 Alexander Major cut, including curb
42 Alexander Cut adjacent to parking spots
41 Alexander Cut adjacent to building
27 Alexander Loose bricks: Replace and/or regrout
27 Alexander Loose bricks: Replace and/or regrout
41 Alexander Asphalting patching/loose bricks
24 Alexander Asphalt patch - raised
Schedule: Aug 1, 2023 - Nov 30, 2023urn:uuid:fbff2ec0-70e7-4b1e-944f-4c7d3c65a50c2023-06-13T07:00:00ZGastown Sidewalk Repair - Summer 20232023-10-10T18:15:05.7821859Z49.28345202770495 -123.10365346939606Continuing the Gastown sidewalk repair program in various locations around the neighbourhood. Construction will be sequenced closer to the date.
Location: 228-238 Abbott Major cut - Abbott from Trounce Alley (laneway) to Cordova (East Sidewalk)
210-214 Abbott Brick restoration - Abbott from Water to Trounce Alley (East Sidewalk)
53 Water Cut near Old Spaghetti Factor
8 Water Cut - middle of sidewalk
18 Water Cut - including curb
38 Water Cut - to curb
46 Water Cut - to curb
45 Powell Cut - to curb
300 Water St. Cut - near curb
328 Water St. Cut - near curb
387 Water St. Cut - adjacent to pole
12 Alexander Major cut, including curb
42 Alexander Cut adjacent to parking spots
41 Alexander Cut adjacent to building
27 Alexander Loose bricks: Replace and/or regrout
27 Alexander Loose bricks: Replace and/or regrout
41 Alexander Asphalting patching/loose bricks
24 Alexander Asphalt patch - raised
Schedule: Aug 1, 2023 - Nov 30, 2023urn:uuid:7016d94a-455f-4010-9e0d-1a3d15a40f2d2023-06-13T07:00:00ZGastown Sidewalk Repair - Summer 20232023-10-10T18:15:05.7821859Z49.28332791715198 -123.1031323933959Continuing the Gastown sidewalk repair program in various locations around the neighbourhood. Construction will be sequenced closer to the date.
Location: 228-238 Abbott Major cut - Abbott from Trounce Alley (laneway) to Cordova (East Sidewalk)
210-214 Abbott Brick restoration - Abbott from Water to Trounce Alley (East Sidewalk)
53 Water Cut near Old Spaghetti Factor
8 Water Cut - middle of sidewalk
18 Water Cut - including curb
38 Water Cut - to curb
46 Water Cut - to curb
45 Powell Cut - to curb
300 Water St. Cut - near curb
328 Water St. Cut - near curb
387 Water St. Cut - adjacent to pole
12 Alexander Major cut, including curb
42 Alexander Cut adjacent to parking spots
41 Alexander Cut adjacent to building
27 Alexander Loose bricks: Replace and/or regrout
27 Alexander Loose bricks: Replace and/or regrout
41 Alexander Asphalting patching/loose bricks
24 Alexander Asphalt patch - raised
Schedule: Aug 1, 2023 - Nov 30, 2023urn:uuid:108522cc-d372-4782-817d-96d53f3d9ee92023-06-13T07:00:00ZGastown Sidewalk Repair - Summer 20232023-10-10T18:15:05.7821859Z49.283672934655215 -123.1030944821466Continuing the Gastown sidewalk repair program in various locations around the neighbourhood. Construction will be sequenced closer to the date.
Location: 228-238 Abbott Major cut - Abbott from Trounce Alley (laneway) to Cordova (East Sidewalk)
210-214 Abbott Brick restoration - Abbott from Water to Trounce Alley (East Sidewalk)
53 Water Cut near Old Spaghetti Factor
8 Water Cut - middle of sidewalk
18 Water Cut - including curb
38 Water Cut - to curb
46 Water Cut - to curb
45 Powell Cut - to curb
300 Water St. Cut - near curb
328 Water St. Cut - near curb
387 Water St. Cut - adjacent to pole
12 Alexander Major cut, including curb
42 Alexander Cut adjacent to parking spots
41 Alexander Cut adjacent to building
27 Alexander Loose bricks: Replace and/or regrout
27 Alexander Loose bricks: Replace and/or regrout
41 Alexander Asphalting patching/loose bricks
24 Alexander Asphalt patch - raised
Schedule: Aug 1, 2023 - Nov 30, 2023urn:uuid:77339337-2950-49db-8e0c-e924312b77da2023-06-13T07:00:00ZGastown Sidewalk Repair - Summer 20232023-10-10T18:15:05.7821859Z49.28355419723081 -123.1030224914937Continuing the Gastown sidewalk repair program in various locations around the neighbourhood. Construction will be sequenced closer to the date.
Location: 228-238 Abbott Major cut - Abbott from Trounce Alley (laneway) to Cordova (East Sidewalk)
210-214 Abbott Brick restoration - Abbott from Water to Trounce Alley (East Sidewalk)
53 Water Cut near Old Spaghetti Factor
8 Water Cut - middle of sidewalk
18 Water Cut - including curb
38 Water Cut - to curb
46 Water Cut - to curb
45 Powell Cut - to curb
300 Water St. Cut - near curb
328 Water St. Cut - near curb
387 Water St. Cut - adjacent to pole
12 Alexander Major cut, including curb
42 Alexander Cut adjacent to parking spots
41 Alexander Cut adjacent to building
27 Alexander Loose bricks: Replace and/or regrout
27 Alexander Loose bricks: Replace and/or regrout
41 Alexander Asphalting patching/loose bricks
24 Alexander Asphalt patch - raised
Schedule: Aug 1, 2023 - Nov 30, 2023urn:uuid:943abd23-313f-47f5-8902-636d8b01852c2023-06-13T07:00:00ZGastown Sidewalk Repair - Summer 20232023-10-10T18:15:05.7821859Z49.28368674121984 -123.10301825661259Continuing the Gastown sidewalk repair program in various locations around the neighbourhood. Construction will be sequenced closer to the date.
Location: 228-238 Abbott Major cut - Abbott from Trounce Alley (laneway) to Cordova (East Sidewalk)
210-214 Abbott Brick restoration - Abbott from Water to Trounce Alley (East Sidewalk)
53 Water Cut near Old Spaghetti Factor
8 Water Cut - middle of sidewalk
18 Water Cut - including curb
38 Water Cut - to curb
46 Water Cut - to curb
45 Powell Cut - to curb
300 Water St. Cut - near curb
328 Water St. Cut - near curb
387 Water St. Cut - adjacent to pole
12 Alexander Major cut, including curb
42 Alexander Cut adjacent to parking spots
41 Alexander Cut adjacent to building
27 Alexander Loose bricks: Replace and/or regrout
27 Alexander Loose bricks: Replace and/or regrout
41 Alexander Asphalting patching/loose bricks
24 Alexander Asphalt patch - raised
Schedule: Aug 1, 2023 - Nov 30, 2023urn:uuid:a3ba95c9-fc99-4c57-a094-fda83bd6c83b2023-06-13T07:00:00ZGastown Sidewalk Repair - Summer 20232023-10-10T18:15:05.7821859Z49.2836011399765 -123.10351372258371Continuing the Gastown sidewalk repair program in various locations around the neighbourhood. Construction will be sequenced closer to the date.
Location: 228-238 Abbott Major cut - Abbott from Trounce Alley (laneway) to Cordova (East Sidewalk)
210-214 Abbott Brick restoration - Abbott from Water to Trounce Alley (East Sidewalk)
53 Water Cut near Old Spaghetti Factor
8 Water Cut - middle of sidewalk
18 Water Cut - including curb
38 Water Cut - to curb
46 Water Cut - to curb
45 Powell Cut - to curb
300 Water St. Cut - near curb
328 Water St. Cut - near curb
387 Water St. Cut - adjacent to pole
12 Alexander Major cut, including curb
42 Alexander Cut adjacent to parking spots
41 Alexander Cut adjacent to building
27 Alexander Loose bricks: Replace and/or regrout
27 Alexander Loose bricks: Replace and/or regrout
41 Alexander Asphalting patching/loose bricks
24 Alexander Asphalt patch - raised
Schedule: Aug 1, 2023 - Nov 30, 2023urn:uuid:f32bb106-f359-4016-b214-825b474e581d2023-06-13T07:00:00ZGastown Sidewalk Repair - Summer 20232023-10-10T18:15:05.7821859Z49.28359561726569 -123.10358994811773Continuing the Gastown sidewalk repair program in various locations around the neighbourhood. Construction will be sequenced closer to the date.
Location: 228-238 Abbott Major cut - Abbott from Trounce Alley (laneway) to Cordova (East Sidewalk)
210-214 Abbott Brick restoration - Abbott from Water to Trounce Alley (East Sidewalk)
53 Water Cut near Old Spaghetti Factor
8 Water Cut - middle of sidewalk
18 Water Cut - including curb
38 Water Cut - to curb
46 Water Cut - to curb
45 Powell Cut - to curb
300 Water St. Cut - near curb
328 Water St. Cut - near curb
387 Water St. Cut - adjacent to pole
12 Alexander Major cut, including curb
42 Alexander Cut adjacent to parking spots
41 Alexander Cut adjacent to building
27 Alexander Loose bricks: Replace and/or regrout
27 Alexander Loose bricks: Replace and/or regrout
41 Alexander Asphalting patching/loose bricks
24 Alexander Asphalt patch - raised
Schedule: Aug 1, 2023 - Nov 30, 2023urn:uuid:705fb48d-0d85-4196-99d6-72995a80e2792023-06-13T07:00:00ZGastown Sidewalk Repair - Summer 20232023-10-10T18:15:05.7821859Z49.283659127960306 -123.10317494256175Continuing the Gastown sidewalk repair program in various locations around the neighbourhood. Construction will be sequenced closer to the date.
Location: 228-238 Abbott Major cut - Abbott from Trounce Alley (laneway) to Cordova (East Sidewalk)
210-214 Abbott Brick restoration - Abbott from Water to Trounce Alley (East Sidewalk)
53 Water Cut near Old Spaghetti Factor
8 Water Cut - middle of sidewalk
18 Water Cut - including curb
38 Water Cut - to curb
46 Water Cut - to curb
45 Powell Cut - to curb
300 Water St. Cut - near curb
328 Water St. Cut - near curb
387 Water St. Cut - adjacent to pole
12 Alexander Major cut, including curb
42 Alexander Cut adjacent to parking spots
41 Alexander Cut adjacent to building
27 Alexander Loose bricks: Replace and/or regrout
27 Alexander Loose bricks: Replace and/or regrout
41 Alexander Asphalting patching/loose bricks
24 Alexander Asphalt patch - raised
Schedule: Aug 1, 2023 - Nov 30, 2023urn:uuid:1e241d0a-aa66-49d8-aafa-1df044fbd9ff2023-06-13T07:00:00ZGastown Sidewalk Repair - Summer 20232023-10-10T18:15:05.7821859Z49.28350449314311 -123.1033316281232Continuing the Gastown sidewalk repair program in various locations around the neighbourhood. Construction will be sequenced closer to the date.
Location: 228-238 Abbott Major cut - Abbott from Trounce Alley (laneway) to Cordova (East Sidewalk)
210-214 Abbott Brick restoration - Abbott from Water to Trounce Alley (East Sidewalk)
53 Water Cut near Old Spaghetti Factor
8 Water Cut - middle of sidewalk
18 Water Cut - including curb
38 Water Cut - to curb
46 Water Cut - to curb
45 Powell Cut - to curb
300 Water St. Cut - near curb
328 Water St. Cut - near curb
387 Water St. Cut - adjacent to pole
12 Alexander Major cut, including curb
42 Alexander Cut adjacent to parking spots
41 Alexander Cut adjacent to building
27 Alexander Loose bricks: Replace and/or regrout
27 Alexander Loose bricks: Replace and/or regrout
41 Alexander Asphalting patching/loose bricks
24 Alexander Asphalt patch - raised
Schedule: Aug 1, 2023 - Nov 30, 2023urn:uuid:5084eaf5-ae59-4859-a809-77f10205f13e2023-06-13T07:00:00ZGastown Sidewalk Repair - Summer 20232023-10-10T18:15:05.7821859Z49.283608754247325 -123.10541947270468Continuing the Gastown sidewalk repair program in various locations around the neighbourhood. Construction will be sequenced closer to the date.
Location: 228-238 Abbott Major cut - Abbott from Trounce Alley (laneway) to Cordova (East Sidewalk)
210-214 Abbott Brick restoration - Abbott from Water to Trounce Alley (East Sidewalk)
53 Water Cut near Old Spaghetti Factor
8 Water Cut - middle of sidewalk
18 Water Cut - including curb
38 Water Cut - to curb
46 Water Cut - to curb
45 Powell Cut - to curb
300 Water St. Cut - near curb
328 Water St. Cut - near curb
387 Water St. Cut - adjacent to pole
12 Alexander Major cut, including curb
42 Alexander Cut adjacent to parking spots
41 Alexander Cut adjacent to building
27 Alexander Loose bricks: Replace and/or regrout
27 Alexander Loose bricks: Replace and/or regrout
41 Alexander Asphalting patching/loose bricks
24 Alexander Asphalt patch - raised
Schedule: Aug 1, 2023 - Nov 30, 2023urn:uuid:0950cd5d-9fa3-469b-a268-619cc73fbbb12023-06-13T07:00:00ZGastown Sidewalk Repair - Summer 20232023-10-10T18:15:05.7821859Z49.28379833674617 -123.10540829998145Continuing the Gastown sidewalk repair program in various locations around the neighbourhood. Construction will be sequenced closer to the date.
Location: 228-238 Abbott Major cut - Abbott from Trounce Alley (laneway) to Cordova (East Sidewalk)
210-214 Abbott Brick restoration - Abbott from Water to Trounce Alley (East Sidewalk)
53 Water Cut near Old Spaghetti Factor
8 Water Cut - middle of sidewalk
18 Water Cut - including curb
38 Water Cut - to curb
46 Water Cut - to curb
45 Powell Cut - to curb
300 Water St. Cut - near curb
328 Water St. Cut - near curb
387 Water St. Cut - adjacent to pole
12 Alexander Major cut, including curb
42 Alexander Cut adjacent to parking spots
41 Alexander Cut adjacent to building
27 Alexander Loose bricks: Replace and/or regrout
27 Alexander Loose bricks: Replace and/or regrout
41 Alexander Asphalting patching/loose bricks
24 Alexander Asphalt patch - raised
Schedule: Aug 1, 2023 - Nov 30, 2023urn:uuid:7db9478b-7ada-4a3c-9332-7c2881a7f8842023-06-13T07:00:00ZGastown Sidewalk Repair - Summer 20232023-10-10T18:15:05.7821859Z49.28358418463171 -123.10526596089012Continuing the Gastown sidewalk repair program in various locations around the neighbourhood. Construction will be sequenced closer to the date.
Location: 228-238 Abbott Major cut - Abbott from Trounce Alley (laneway) to Cordova (East Sidewalk)
210-214 Abbott Brick restoration - Abbott from Water to Trounce Alley (East Sidewalk)
53 Water Cut near Old Spaghetti Factor
8 Water Cut - middle of sidewalk
18 Water Cut - including curb
38 Water Cut - to curb
46 Water Cut - to curb
45 Powell Cut - to curb
300 Water St. Cut - near curb
328 Water St. Cut - near curb
387 Water St. Cut - adjacent to pole
12 Alexander Major cut, including curb
42 Alexander Cut adjacent to parking spots
41 Alexander Cut adjacent to building
27 Alexander Loose bricks: Replace and/or regrout
27 Alexander Loose bricks: Replace and/or regrout
41 Alexander Asphalting patching/loose bricks
24 Alexander Asphalt patch - raised
Schedule: Aug 1, 2023 - Nov 30, 2023urn:uuid:f768b128-1391-46e0-a1db-d9f13928bf9f2023-06-13T07:00:00ZGastown Sidewalk Repair - Summer 20232023-10-10T18:15:05.7821859Z49.28354707387214 -123.10512417787167Continuing the Gastown sidewalk repair program in various locations around the neighbourhood. Construction will be sequenced closer to the date.
Location: 228-238 Abbott Major cut - Abbott from Trounce Alley (laneway) to Cordova (East Sidewalk)
210-214 Abbott Brick restoration - Abbott from Water to Trounce Alley (East Sidewalk)
53 Water Cut near Old Spaghetti Factor
8 Water Cut - middle of sidewalk
18 Water Cut - including curb
38 Water Cut - to curb
46 Water Cut - to curb
45 Powell Cut - to curb
300 Water St. Cut - near curb
328 Water St. Cut - near curb
387 Water St. Cut - adjacent to pole
12 Alexander Major cut, including curb
42 Alexander Cut adjacent to parking spots
41 Alexander Cut adjacent to building
27 Alexander Loose bricks: Replace and/or regrout
27 Alexander Loose bricks: Replace and/or regrout
41 Alexander Asphalting patching/loose bricks
24 Alexander Asphalt patch - raised
Schedule: Aug 1, 2023 - Nov 30, 2023urn:uuid:a5de007e-2f40-41cf-afe3-fc45d708e2e02023-06-13T07:00:00ZGastown Sidewalk Repair - Summer 20232023-10-10T18:15:05.7821859Z49.283498244135785 -123.10467942308166Continuing the Gastown sidewalk repair program in various locations around the neighbourhood. Construction will be sequenced closer to the date.
Location: 228-238 Abbott Major cut - Abbott from Trounce Alley (laneway) to Cordova (East Sidewalk)
210-214 Abbott Brick restoration - Abbott from Water to Trounce Alley (East Sidewalk)
53 Water Cut near Old Spaghetti Factor
8 Water Cut - middle of sidewalk
18 Water Cut - including curb
38 Water Cut - to curb
46 Water Cut - to curb
45 Powell Cut - to curb
300 Water St. Cut - near curb
328 Water St. Cut - near curb
387 Water St. Cut - adjacent to pole
12 Alexander Major cut, including curb
42 Alexander Cut adjacent to parking spots
41 Alexander Cut adjacent to building
27 Alexander Loose bricks: Replace and/or regrout
27 Alexander Loose bricks: Replace and/or regrout
41 Alexander Asphalting patching/loose bricks
24 Alexander Asphalt patch - raised
Schedule: Aug 1, 2023 - Nov 30, 2023urn:uuid:9a6cc054-91e5-4eda-949e-2916079cb7802023-06-13T07:00:00ZGastown Sidewalk Repair - Summer 20232023-10-10T18:15:05.7821859Z49.28437064941991 -123.1096016336179Continuing the Gastown sidewalk repair program in various locations around the neighbourhood. Construction will be sequenced closer to the date.
Location: 228-238 Abbott Major cut - Abbott from Trounce Alley (laneway) to Cordova (East Sidewalk)
210-214 Abbott Brick restoration - Abbott from Water to Trounce Alley (East Sidewalk)
53 Water Cut near Old Spaghetti Factor
8 Water Cut - middle of sidewalk
18 Water Cut - including curb
38 Water Cut - to curb
46 Water Cut - to curb
45 Powell Cut - to curb
300 Water St. Cut - near curb
328 Water St. Cut - near curb
387 Water St. Cut - adjacent to pole
12 Alexander Major cut, including curb
42 Alexander Cut adjacent to parking spots
41 Alexander Cut adjacent to building
27 Alexander Loose bricks: Replace and/or regrout
27 Alexander Loose bricks: Replace and/or regrout
41 Alexander Asphalting patching/loose bricks
24 Alexander Asphalt patch - raised
Schedule: Aug 1, 2023 - Nov 30, 2023urn:uuid:37aa5cdb-9291-4443-8b02-c55ad09a37452023-06-13T07:00:00ZGastown Sidewalk Repair - Summer 20232023-10-10T18:15:05.7821859Z49.28425743631291 -123.1090214727382Continuing the Gastown sidewalk repair program in various locations around the neighbourhood. Construction will be sequenced closer to the date.
Location: 228-238 Abbott Major cut - Abbott from Trounce Alley (laneway) to Cordova (East Sidewalk)
210-214 Abbott Brick restoration - Abbott from Water to Trounce Alley (East Sidewalk)
53 Water Cut near Old Spaghetti Factor
8 Water Cut - middle of sidewalk
18 Water Cut - including curb
38 Water Cut - to curb
46 Water Cut - to curb
45 Powell Cut - to curb
300 Water St. Cut - near curb
328 Water St. Cut - near curb
387 Water St. Cut - adjacent to pole
12 Alexander Major cut, including curb
42 Alexander Cut adjacent to parking spots
41 Alexander Cut adjacent to building
27 Alexander Loose bricks: Replace and/or regrout
27 Alexander Loose bricks: Replace and/or regrout
41 Alexander Asphalting patching/loose bricks
24 Alexander Asphalt patch - raised
Schedule: Aug 1, 2023 - Nov 30, 2023urn:uuid:5a360963-3db3-4e8b-8394-e3026326c29d2023-06-13T07:00:00ZGastown Sidewalk Repair - Summer 20232023-10-10T18:15:05.7821859Z49.283342739161014 -123.10657619696379 49.28296014645059 -123.1067443464482Continuing the Gastown sidewalk repair program in various locations around the neighbourhood. Construction will be sequenced closer to the date.
Location: 228-238 Abbott Major cut - Abbott from Trounce Alley (laneway) to Cordova (East Sidewalk)
210-214 Abbott Brick restoration - Abbott from Water to Trounce Alley (East Sidewalk)
53 Water Cut near Old Spaghetti Factor
8 Water Cut - middle of sidewalk
18 Water Cut - including curb
38 Water Cut - to curb
46 Water Cut - to curb
45 Powell Cut - to curb
300 Water St. Cut - near curb
328 Water St. Cut - near curb
387 Water St. Cut - adjacent to pole
12 Alexander Major cut, including curb
42 Alexander Cut adjacent to parking spots
41 Alexander Cut adjacent to building
27 Alexander Loose bricks: Replace and/or regrout
27 Alexander Loose bricks: Replace and/or regrout
41 Alexander Asphalting patching/loose bricks
24 Alexander Asphalt patch - raised
Schedule: Aug 1, 2023 - Nov 30, 2023urn:uuid:5ae48778-4297-4e35-98e0-67aaf40c976e2023-06-13T07:00:00ZGastown Sidewalk Repair - Summer 20232023-10-10T18:15:05.7821859Z49.28375844566838 -123.10639314323984 49.283426465696294 -123.10653793921583Continuing the Gastown sidewalk repair program in various locations around the neighbourhood. Construction will be sequenced closer to the date.
Location: 228-238 Abbott Major cut - Abbott from Trounce Alley (laneway) to Cordova (East Sidewalk)
210-214 Abbott Brick restoration - Abbott from Water to Trounce Alley (East Sidewalk)
53 Water Cut near Old Spaghetti Factor
8 Water Cut - middle of sidewalk
18 Water Cut - including curb
38 Water Cut - to curb
46 Water Cut - to curb
45 Powell Cut - to curb
300 Water St. Cut - near curb
328 Water St. Cut - near curb
387 Water St. Cut - adjacent to pole
12 Alexander Major cut, including curb
42 Alexander Cut adjacent to parking spots
41 Alexander Cut adjacent to building
27 Alexander Loose bricks: Replace and/or regrout
27 Alexander Loose bricks: Replace and/or regrout
41 Alexander Asphalting patching/loose bricks
24 Alexander Asphalt patch - raised
Schedule: Aug 1, 2023 - Nov 30, 2023urn:uuid:72fd5e37-c990-40d6-bc51-513ff888dfc02023-06-13T07:00:00ZGastown Sidewalk Repair - Summer 20232023-10-10T18:15:05.7821859Z49.28467162918858 -123.11028766342406Repair of red paver sidewalks in various locations through Gastown. April set planned to date.
Contact Katie Geoghegan (internal) or streets.02@vancouver.ca (external).
Location: 375 Water St
Between 157 and 177 Water St.
Schedule: Apr 17, 2023 - May 5, 2023urn:uuid:570576da-ad8c-429a-bdde-a8b8f05631922023-04-05T07:00:00ZGastown Sidewalk Repair Program - April Confirmed Work2023-04-14T17:32:26.6975472Z49.28485710041227 -123.1109708852758 49.28474133932613 -123.11069936287005Repair of red paver sidewalks in various locations through Gastown. April set planned to date.
Contact Katie Geoghegan (internal) or streets.02@vancouver.ca (external).
Location: 375 Water St
Between 157 and 177 Water St.
Schedule: Apr 17, 2023 - May 5, 2023urn:uuid:3228ed91-4b18-45c7-a340-95d118df546e2023-04-05T07:00:00ZGastown Sidewalk Repair Program - April Confirmed Work2023-04-14T17:32:26.6975472Z49.28429872119568 -123.10828698789506Crews will be on-site to perform sidewalk repairs in various locations around Gastown.
Locations:
-Abbott from Trounce Alley to Cordova
-Abbott from Water to Trounce Alley
-Water St 0-100 Block, North Side and South Side
-Powell St
-Carrall West Sidewalk
-Water St 100-200 Block and 200-300 Block
-Alexander North and South Side
Impact:
-Sidewalk cuts and restorations, curb restoration, asphalt patch
Location: Various
Schedule: Aug 14, 2023 - Sep 30, 2023urn:uuid:bd511e12-5d4d-418a-914b-2b14b674363d2023-08-08T07:00:00ZGastown Sidewalk Repairs2023-08-04T17:47:01.6043381Z49.28389213813685 -123.10639595757758 49.28291732517408 -123.10680887923274Crews will be on-site to perform sidewalk repairs in various locations around Gastown.
Locations:
-Abbott from Trounce Alley to Cordova
-Abbott from Water to Trounce Alley
-Water St 0-100 Block, North Side and South Side
-Powell St
-Carrall West Sidewalk
-Water St 100-200 Block and 200-300 Block
-Alexander North and South Side
Impact:
-Sidewalk cuts and restorations, curb restoration, asphalt patch
Location: Various
Schedule: Aug 14, 2023 - Sep 30, 2023urn:uuid:681dd910-d30d-46fa-8639-a13192cd9ca52023-08-08T07:00:00ZGastown Sidewalk Repairs2023-08-04T17:47:01.6043381Z49.28388572495663 -123.10636646317363 49.28349772600268 -123.10428219196194Crews will be on-site to perform sidewalk repairs in various locations around Gastown.
Locations:
-Abbott from Trounce Alley to Cordova
-Abbott from Water to Trounce Alley
-Water St 0-100 Block, North Side and South Side
-Powell St
-Carrall West Sidewalk
-Water St 100-200 Block and 200-300 Block
-Alexander North and South Side
Impact:
-Sidewalk cuts and restorations, curb restoration, asphalt patch
Location: Various
Schedule: Aug 14, 2023 - Sep 30, 2023urn:uuid:f5e6d672-bfea-4637-8bc5-98c8dbdfbdb82023-08-08T07:00:00ZGastown Sidewalk Repairs2023-08-04T17:47:01.6043381Z49.283423973790036 -123.1041150570063 49.283760667775965 -123.10216842634632Crews will be on-site to perform sidewalk repairs in various locations around Gastown.
Locations:
-Abbott from Trounce Alley to Cordova
-Abbott from Water to Trounce Alley
-Water St 0-100 Block, North Side and South Side
-Powell St
-Carrall West Sidewalk
-Water St 100-200 Block and 200-300 Block
-Alexander North and South Side
Impact:
-Sidewalk cuts and restorations, curb restoration, asphalt patch
Location: Various
Schedule: Aug 14, 2023 - Sep 30, 2023urn:uuid:a95f2481-5be7-4a9a-b67a-14c8c112d1272023-08-08T07:00:00ZGastown Sidewalk Repairs2023-08-04T17:47:01.6043381Z49.28325402261936 -123.1021930050163 49.283215543027666 -123.10033485756811Crews will be on-site to perform sidewalk repairs in various locations around Gastown.
Locations:
-Abbott from Trounce Alley to Cordova
-Abbott from Water to Trounce Alley
-Water St 0-100 Block, North Side and South Side
-Powell St
-Carrall West Sidewalk
-Water St 100-200 Block and 200-300 Block
-Alexander North and South Side
Impact:
-Sidewalk cuts and restorations, curb restoration, asphalt patch
Location: Various
Schedule: Aug 14, 2023 - Sep 30, 2023urn:uuid:dc2c8d3b-f2bc-41ce-99bd-d15d4fa6000f2023-08-08T07:00:00ZGastown Sidewalk Repairs2023-08-04T17:47:01.6043381Z49.28327326240395 -123.104252697558 49.282494045124 -123.1042969391639Crews will be on-site to perform sidewalk repairs in various locations around Gastown.
Locations:
-Abbott from Trounce Alley to Cordova
-Abbott from Water to Trounce Alley
-Water St 0-100 Block, North Side and South Side
-Powell St
-Carrall West Sidewalk
-Water St 100-200 Block and 200-300 Block
-Alexander North and South Side
Impact:
-Sidewalk cuts and restorations, curb restoration, asphalt patch
Location: Various
Schedule: Aug 14, 2023 - Sep 30, 2023urn:uuid:e43197a4-ec63-4a2e-948f-c81466af13252023-08-08T07:00:00ZGastown Sidewalk Repairs2023-08-04T17:47:01.6043381Z49.28430204664613 -123.10876289781166 49.28389804333909 -123.10642797216465Crews will be on-site to perform sidewalk repairs in various locations around Gastown.
Locations:
-Abbott from Trounce Alley to Cordova
-Abbott from Water to Trounce Alley
-Water St 0-100 Block, North Side and South Side
-Powell St
-Carrall West Sidewalk
-Water St 100-200 Block and 200-300 Block
-Alexander North and South Side
Impact:
-Sidewalk cuts and restorations, curb restoration, asphalt patch
Location: Various
Schedule: Aug 14, 2023 - Sep 30, 2023urn:uuid:50ee4849-177a-49f7-95c0-c2ba614f9ab72023-08-08T07:00:00ZGastown Sidewalk Repairs2023-08-04T17:47:01.6043381Z49.2846696867789 -123.1109615678507 49.28461716692772 -123.11045370603888 49.28432628673926 -123.1088186387423W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently.
Granville Bridge North Approach – Full closure of Granville Street south of Drake
Anticipated Timeline: March 4 2024 - early September 2024
- All lanes of Granville Street Bridge from Pacific Street to Drake Street to be closed for ~6 months. North Loops to be demolished concurrently.
- Two lanes to remain open at all times on main span
- Significant deep utility installation to occur on Rolston, Continental, Neon, and Pacific Street.
- Granville Bridge Structural Upgrades preceded this work, completed September 2020.
- Numerous City and 3rd party asset relocation
- Events to be restricted along bridge span, including Howe, Granville, and Seymour Streets to manage traffic flows on and off bridge.
Location: Granville Bridge
Schedule: Feb 21, 2023 - Mar 1, 2025urn:uuid:0b76d7d4-d7be-431f-b638-77d5de440fd92023-01-31T08:00:00ZGranville Bridge Interim Connector and North Loops Reconfiguration Project2024-02-28T17:30:44.6891303Z49.275365007644325 -123.12992316005534 49.27505329824126 -123.12945752811063W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently.
Granville Bridge North Approach – Full closure of Granville Street south of Drake
Anticipated Timeline: March 4 2024 - early September 2024
- All lanes of Granville Street Bridge from Pacific Street to Drake Street to be closed for ~6 months. North Loops to be demolished concurrently.
- Two lanes to remain open at all times on main span
- Significant deep utility installation to occur on Rolston, Continental, Neon, and Pacific Street.
- Granville Bridge Structural Upgrades preceded this work, completed September 2020.
- Numerous City and 3rd party asset relocation
- Events to be restricted along bridge span, including Howe, Granville, and Seymour Streets to manage traffic flows on and off bridge.
Location: Granville Bridge
Schedule: Feb 21, 2023 - Mar 1, 2025urn:uuid:98bd1b2d-0ae3-4a01-9c5c-5b78de4dc9ff2023-01-31T08:00:00ZGranville Bridge Interim Connector and North Loops Reconfiguration Project2024-02-28T17:30:44.6891303Z49.275365007644325 -123.12992316005534 49.27568389021357 -123.13039951270936W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently.
Granville Bridge North Approach – Full closure of Granville Street south of Drake
Anticipated Timeline: March 4 2024 - early September 2024
- All lanes of Granville Street Bridge from Pacific Street to Drake Street to be closed for ~6 months. North Loops to be demolished concurrently.
- Two lanes to remain open at all times on main span
- Significant deep utility installation to occur on Rolston, Continental, Neon, and Pacific Street.
- Granville Bridge Structural Upgrades preceded this work, completed September 2020.
- Numerous City and 3rd party asset relocation
- Events to be restricted along bridge span, including Howe, Granville, and Seymour Streets to manage traffic flows on and off bridge.
Location: Granville Bridge
Schedule: Feb 21, 2023 - Mar 1, 2025urn:uuid:28f47e38-9063-44f6-97f6-920e18d0159f2023-01-31T08:00:00ZGranville Bridge Interim Connector and North Loops Reconfiguration Project2024-02-28T17:30:44.6891303Z49.27657602283301 -123.12902759892 49.276270416512006 -123.12948937173W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently.
Granville Bridge North Approach – Full closure of Granville Street south of Drake
Anticipated Timeline: March 4 2024 - early September 2024
- All lanes of Granville Street Bridge from Pacific Street to Drake Street to be closed for ~6 months. North Loops to be demolished concurrently.
- Two lanes to remain open at all times on main span
- Significant deep utility installation to occur on Rolston, Continental, Neon, and Pacific Street.
- Granville Bridge Structural Upgrades preceded this work, completed September 2020.
- Numerous City and 3rd party asset relocation
- Events to be restricted along bridge span, including Howe, Granville, and Seymour Streets to manage traffic flows on and off bridge.
Location: Granville Bridge
Schedule: Feb 21, 2023 - Mar 1, 2025urn:uuid:ed692f8b-0798-474b-8787-4334dee4d0312023-01-31T08:00:00ZGranville Bridge Interim Connector and North Loops Reconfiguration Project2024-02-28T17:30:44.6891303Z49.27657602283301 -123.12902759892 49.276270416512006 -123.12948937173W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently.
Granville Bridge North Approach – Full closure of Granville Street south of Drake
Anticipated Timeline: March 4 2024 - early September 2024
- All lanes of Granville Street Bridge from Pacific Street to Drake Street to be closed for ~6 months. North Loops to be demolished concurrently.
- Two lanes to remain open at all times on main span
- Significant deep utility installation to occur on Rolston, Continental, Neon, and Pacific Street.
- Granville Bridge Structural Upgrades preceded this work, completed September 2020.
- Numerous City and 3rd party asset relocation
- Events to be restricted along bridge span, including Howe, Granville, and Seymour Streets to manage traffic flows on and off bridge.
Location: Granville Bridge
Schedule: Feb 21, 2023 - Mar 1, 2025urn:uuid:838097af-a2d8-43ac-a18d-333fc6ea723b2023-01-31T08:00:00ZGranville Bridge Interim Connector and North Loops Reconfiguration Project2024-02-28T17:30:44.6891303Z49.27673742568899 -123.12878371315001 49.27657602283301 -123.12902759892W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently.
Granville Bridge North Approach – Full closure of Granville Street south of Drake
Anticipated Timeline: March 4 2024 - early September 2024
- All lanes of Granville Street Bridge from Pacific Street to Drake Street to be closed for ~6 months. North Loops to be demolished concurrently.
- Two lanes to remain open at all times on main span
- Significant deep utility installation to occur on Rolston, Continental, Neon, and Pacific Street.
- Granville Bridge Structural Upgrades preceded this work, completed September 2020.
- Numerous City and 3rd party asset relocation
- Events to be restricted along bridge span, including Howe, Granville, and Seymour Streets to manage traffic flows on and off bridge.
Location: Granville Bridge
Schedule: Feb 21, 2023 - Mar 1, 2025urn:uuid:e7a932ae-6152-42b3-a132-195fd92217d22023-01-31T08:00:00ZGranville Bridge Interim Connector and North Loops Reconfiguration Project2024-02-28T17:30:44.6891303Z49.27562958393901 -123.12849595733 49.275360705785005 -123.12890243010999W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently.
Granville Bridge North Approach – Full closure of Granville Street south of Drake
Anticipated Timeline: March 4 2024 - early September 2024
- All lanes of Granville Street Bridge from Pacific Street to Drake Street to be closed for ~6 months. North Loops to be demolished concurrently.
- Two lanes to remain open at all times on main span
- Significant deep utility installation to occur on Rolston, Continental, Neon, and Pacific Street.
- Granville Bridge Structural Upgrades preceded this work, completed September 2020.
- Numerous City and 3rd party asset relocation
- Events to be restricted along bridge span, including Howe, Granville, and Seymour Streets to manage traffic flows on and off bridge.
Location: Granville Bridge
Schedule: Feb 21, 2023 - Mar 1, 2025urn:uuid:812ed255-99ab-4f29-ad00-80ad27c518472023-01-31T08:00:00ZGranville Bridge Interim Connector and North Loops Reconfiguration Project2024-02-28T17:30:44.6891303Z49.275453414362005 -123.12680124793998 49.27530077785099 -123.12705251147W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently.
Granville Bridge North Approach – Full closure of Granville Street south of Drake
Anticipated Timeline: March 4 2024 - early September 2024
- All lanes of Granville Street Bridge from Pacific Street to Drake Street to be closed for ~6 months. North Loops to be demolished concurrently.
- Two lanes to remain open at all times on main span
- Significant deep utility installation to occur on Rolston, Continental, Neon, and Pacific Street.
- Granville Bridge Structural Upgrades preceded this work, completed September 2020.
- Numerous City and 3rd party asset relocation
- Events to be restricted along bridge span, including Howe, Granville, and Seymour Streets to manage traffic flows on and off bridge.
Location: Granville Bridge
Schedule: Feb 21, 2023 - Mar 1, 2025urn:uuid:3fa39bde-f98b-4c71-9143-d07226dfb3732023-01-31T08:00:00ZGranville Bridge Interim Connector and North Loops Reconfiguration Project2024-02-28T17:30:44.6891303Z49.276095181865 -123.12779209585 49.27562958393901 -123.12849595733W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently.
Granville Bridge North Approach – Full closure of Granville Street south of Drake
Anticipated Timeline: March 4 2024 - early September 2024
- All lanes of Granville Street Bridge from Pacific Street to Drake Street to be closed for ~6 months. North Loops to be demolished concurrently.
- Two lanes to remain open at all times on main span
- Significant deep utility installation to occur on Rolston, Continental, Neon, and Pacific Street.
- Granville Bridge Structural Upgrades preceded this work, completed September 2020.
- Numerous City and 3rd party asset relocation
- Events to be restricted along bridge span, including Howe, Granville, and Seymour Streets to manage traffic flows on and off bridge.
Location: Granville Bridge
Schedule: Feb 21, 2023 - Mar 1, 2025urn:uuid:e1f23fcd-b5c4-4f2e-93fa-46c2474e48632023-01-31T08:00:00ZGranville Bridge Interim Connector and North Loops Reconfiguration Project2024-02-28T17:30:44.6891303Z49.27562958393901 -123.12849595733 49.275360705785005 -123.12890243010999W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently.
Granville Bridge North Approach – Full closure of Granville Street south of Drake
Anticipated Timeline: March 4 2024 - early September 2024
- All lanes of Granville Street Bridge from Pacific Street to Drake Street to be closed for ~6 months. North Loops to be demolished concurrently.
- Two lanes to remain open at all times on main span
- Significant deep utility installation to occur on Rolston, Continental, Neon, and Pacific Street.
- Granville Bridge Structural Upgrades preceded this work, completed September 2020.
- Numerous City and 3rd party asset relocation
- Events to be restricted along bridge span, including Howe, Granville, and Seymour Streets to manage traffic flows on and off bridge.
Location: Granville Bridge
Schedule: Feb 21, 2023 - Mar 1, 2025urn:uuid:0405d4e3-9c12-43ec-aef0-907db30d0a862023-01-31T08:00:00ZGranville Bridge Interim Connector and North Loops Reconfiguration Project2024-02-28T17:30:44.6891303Z49.276095181865 -123.12779209585 49.27562958393901 -123.12849595733W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently.
Granville Bridge North Approach – Full closure of Granville Street south of Drake
Anticipated Timeline: March 4 2024 - early September 2024
- All lanes of Granville Street Bridge from Pacific Street to Drake Street to be closed for ~6 months. North Loops to be demolished concurrently.
- Two lanes to remain open at all times on main span
- Significant deep utility installation to occur on Rolston, Continental, Neon, and Pacific Street.
- Granville Bridge Structural Upgrades preceded this work, completed September 2020.
- Numerous City and 3rd party asset relocation
- Events to be restricted along bridge span, including Howe, Granville, and Seymour Streets to manage traffic flows on and off bridge.
Location: Granville Bridge
Schedule: Feb 21, 2023 - Mar 1, 2025urn:uuid:2e2d3f5b-c4d4-4e5c-acd5-a0e74975df6d2023-01-31T08:00:00ZGranville Bridge Interim Connector and North Loops Reconfiguration Project2024-02-28T17:30:44.6891303Z49.275360705785005 -123.12890243010999 49.27383074132001 -123.13121166043001W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently.
Granville Bridge North Approach – Full closure of Granville Street south of Drake
Anticipated Timeline: March 4 2024 - early September 2024
- All lanes of Granville Street Bridge from Pacific Street to Drake Street to be closed for ~6 months. North Loops to be demolished concurrently.
- Two lanes to remain open at all times on main span
- Significant deep utility installation to occur on Rolston, Continental, Neon, and Pacific Street.
- Granville Bridge Structural Upgrades preceded this work, completed September 2020.
- Numerous City and 3rd party asset relocation
- Events to be restricted along bridge span, including Howe, Granville, and Seymour Streets to manage traffic flows on and off bridge.
Location: Granville Bridge
Schedule: Feb 21, 2023 - Mar 1, 2025urn:uuid:41b314a6-9e1b-4f12-88bf-2a2c2506eeb52023-01-31T08:00:00ZGranville Bridge Interim Connector and North Loops Reconfiguration Project2024-02-28T17:30:44.6891303Z49.27530077785099 -123.12705251147 49.275147228826995 -123.12729873941001 49.275077338618985 -123.12741081042 49.274995499532 -123.12754204222 49.27492882607001 -123.12764895169 49.274873661659996 -123.12773569513999 49.27481563765801 -123.12782971730998 49.27476782812698 -123.12791921518 49.27473963471397 -123.12797832619 49.274716007531 -123.12803229357002 49.274696046505994 -123.12808162366 49.274673437101 -123.12814246742 49.274654033892006 -123.12819975878 49.27464034843601 -123.12824368842999 49.274624508545 -123.12829983414998 49.274586862014985 -123.12843897295 49.274562957808 -123.12853154265999 49.274545447061 -123.12860170648 49.274521688872966 -123.12870035288 49.27450349405501 -123.12877888712002 49.274491091220995 -123.12883399664 49.274478361237016 -123.12889206103 49.27446680501501 -123.12894616913002 49.274368509466 -123.12937723053 49.274245444581 -123.12991586876 49.27418283706996 -123.13018846971 49.27414251679599 -123.13033548989 49.27412424492499 -123.13040160868 49.274106689392994 -123.13046262898 49.274090093404 -123.13051826273 49.27406038279099 -123.13061334473 49.27401681558601 -123.13074369363 49.274005760790004 -123.13077522869999 49.27399021291603 -123.13081865722002 49.27397730990401 -123.13085388543999 49.273971156409004 -123.1308704624 49.273963433253016 -123.13089100822998 49.27395728015898 -123.13090722775001 49.27394736519 -123.1309330468 49.273937342382 -123.13095876932998 49.273917848244 -123.13100775502 49.273902991835996 -123.13104420149 49.27388700879001 -123.13108261085999 49.27386580467601 -123.13113233427 49.27383074132001 -123.13121166043001W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently.
Granville Bridge North Approach – Full closure of Granville Street south of Drake
Anticipated Timeline: March 4 2024 - early September 2024
- All lanes of Granville Street Bridge from Pacific Street to Drake Street to be closed for ~6 months. North Loops to be demolished concurrently.
- Two lanes to remain open at all times on main span
- Significant deep utility installation to occur on Rolston, Continental, Neon, and Pacific Street.
- Granville Bridge Structural Upgrades preceded this work, completed September 2020.
- Numerous City and 3rd party asset relocation
- Events to be restricted along bridge span, including Howe, Granville, and Seymour Streets to manage traffic flows on and off bridge.
Location: Granville Bridge
Schedule: Feb 21, 2023 - Mar 1, 2025urn:uuid:4cc7776d-55a3-4262-8bec-8d94beb828992023-01-31T08:00:00ZGranville Bridge Interim Connector and North Loops Reconfiguration Project2024-02-28T17:30:44.6891303Z49.27626147504901 -123.12947353796999 49.276248501373004 -123.12949192650998 49.276206796384 -123.12955104424998 49.27616557785899 -123.12960948951002 49.27612054828799 -123.12967332768999 49.276060835959015 -123.12975548093 49.276039320310986 -123.12978677010001 49.27600980227601 -123.12983109892001 49.27598796265801 -123.12986249717001 49.275968315299 -123.1298881682 49.275951489525994 -123.12990841615002 49.27592360628199 -123.12993878109 49.27589444837599 -123.12996677798999 49.27587300028202 -123.12998594138999 49.275848915257 -123.13000629391 49.27582200503599 -123.1300272714 49.27579155900099 -123.13004887198001 49.275763797791 -123.13006668514001 49.27573200618801 -123.13008498261 49.27568562824001 -123.13010784727001 49.27562173179899 -123.13013502389998 49.275553803582994 -123.13016390835 49.27542079096099 -123.13022047468 49.275085695293996 -123.13036219859998 49.27499921385498 -123.13039558404 49.27491670634299 -123.13043068456001 49.27484667998303 -123.13046150109001 49.274775564393025 -123.13049302953999 49.27467353908898 -123.13054245833 49.274622623580996 -123.13056876076 49.27456019506502 -123.13060227777001 49.274510519134 -123.13063012309001 49.27446808674301 -123.13065582911 49.27441205111796 -123.13069169989 49.27438001290099 -123.13071321275 49.274345453172 -123.13073724848 49.274311979846004 -123.13076306049001 49.274280111902016 -123.13078512362 49.274253895125014 -123.13080524950001 49.274223075668004 -123.13083079348 49.274177870193995 -123.13086666504002 49.274088513273 -123.13094491333 49.274044642291045 -123.13098586106 49.274012512213005 -123.1310169416 49.27397646361601 -123.13105296082001 49.273946303445 -123.13108406024001 49.27392025807893 -123.13111162367998 49.27389021308102 -123.13114426305 49.273861617091 -123.13117620509999 49.27383074132001 -123.13121166043001W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently.
Granville Bridge North Approach – Full closure of Granville Street south of Drake
Anticipated Timeline: March 4 2024 - early September 2024
- All lanes of Granville Street Bridge from Pacific Street to Drake Street to be closed for ~6 months. North Loops to be demolished concurrently.
- Two lanes to remain open at all times on main span
- Significant deep utility installation to occur on Rolston, Continental, Neon, and Pacific Street.
- Granville Bridge Structural Upgrades preceded this work, completed September 2020.
- Numerous City and 3rd party asset relocation
- Events to be restricted along bridge span, including Howe, Granville, and Seymour Streets to manage traffic flows on and off bridge.
Location: Granville Bridge
Schedule: Feb 21, 2023 - Mar 1, 2025urn:uuid:129cca08-d3d0-4bb4-8b10-1f499313cda62023-01-31T08:00:00ZGranville Bridge Interim Connector and North Loops Reconfiguration Project2024-02-28T17:30:44.6891303Z49.27469749405586 -123.1289260455324 49.27505329824126 -123.12945752811063W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently.
Granville Bridge North Approach – Full closure of Granville Street south of Drake
Anticipated Timeline: March 4 2024 - early September 2024
- All lanes of Granville Street Bridge from Pacific Street to Drake Street to be closed for ~6 months. North Loops to be demolished concurrently.
- Two lanes to remain open at all times on main span
- Significant deep utility installation to occur on Rolston, Continental, Neon, and Pacific Street.
- Granville Bridge Structural Upgrades preceded this work, completed September 2020.
- Numerous City and 3rd party asset relocation
- Events to be restricted along bridge span, including Howe, Granville, and Seymour Streets to manage traffic flows on and off bridge.
Location: Granville Bridge
Schedule: Feb 21, 2023 - Mar 1, 2025urn:uuid:176a6bf4-fa47-41f8-83c7-fe3c0b74e8422023-01-31T08:00:00ZGranville Bridge Interim Connector and North Loops Reconfiguration Project2024-02-28T17:30:44.6891303Z49.275360705785005 -123.12890243010999 49.27536870132897 -123.12887122948 49.27537202685102 -123.12885751775 49.275376527996 -123.12883819993 49.275380822295006 -123.12881884034 49.275384603883 -123.12879946565 49.27538867272901 -123.12878061412998 49.275391151852006 -123.12876765632 49.27539322430701 -123.12875638844 49.27539638356299 -123.12873849689 49.275398747 -123.12872441145 49.275401591405 -123.12870653283001 49.275404391780995 -123.12868780173 49.275407438575 -123.12866588175 49.27541011555303 -123.12864486817 49.27541258576099 -123.12862374407 49.27541546793799 -123.12859615952 49.275417480317 -123.1285741956 49.275419051225015 -123.12855286293 49.275420459863994 -123.12853184605 49.275422085250966 -123.12850196232002 49.27542386398099 -123.12844741525 49.275423594223014 -123.12841495574 49.275422568341014 -123.12839105922001 49.27542006750801 -123.12835882764 49.27541696713698 -123.12833185994998 49.275412520201996 -123.12830244164999 49.2754065906 -123.12827163097 49.27540009991699 -123.12824385713 49.27539066532796 -123.12821020531 49.275382292079 -123.12818473625 49.27536580576799 -123.12814250126 49.27534885363201 -123.12810663035002 49.275327468971994 -123.12806885079 49.275306994326996 -123.12803782382001 49.27527784505202 -123.12800161897998 49.27524636963901 -123.12797026116 49.27521292750299 -123.12794410872 49.27517786015801 -123.12792343751002 49.275141590137 -123.12790846855998 49.275104495026 -123.12789939532 49.27506460502204 -123.12789608894002 49.275029457372995 -123.12789920131 49.27499234238701 -123.12790808265 49.27495603043499 -123.12792286385002 49.27492091751603 -123.12794335345 49.274887417646966 -123.12796933256 49.274855872947 -123.12800052708 49.274826643612016 -123.12803658051 49.27480001789701 -123.12807712239999 49.274776329134 -123.12812168619001 49.274755811727005 -123.12816979130999 49.27473870012702 -123.12822091598 49.27472517485799 -123.128274497 49.274715380511 -123.12832992985999 49.274709443657 -123.12838663750001 49.274711972031014 -123.12850736268999 49.274718510832 -123.12856459765001 49.27473128545299 -123.12862795282 49.274744290727966 -123.12867801458 49.27483184596201 -123.12890751343001 49.274891697947 -123.12906241416998 49.274947234227994 -123.12921535182998 49.27504769059598 -123.12944208178W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently.
Granville Bridge North Approach – Full closure of Granville Street south of Drake
Anticipated Timeline: March 4 2024 - early September 2024
- All lanes of Granville Street Bridge from Pacific Street to Drake Street to be closed for ~6 months. North Loops to be demolished concurrently.
- Two lanes to remain open at all times on main span
- Significant deep utility installation to occur on Rolston, Continental, Neon, and Pacific Street.
- Granville Bridge Structural Upgrades preceded this work, completed September 2020.
- Numerous City and 3rd party asset relocation
- Events to be restricted along bridge span, including Howe, Granville, and Seymour Streets to manage traffic flows on and off bridge.
Location: Granville Bridge
Schedule: Feb 21, 2023 - Mar 1, 2025urn:uuid:9e42914a-16e1-464f-8759-8c9a5cc3680e2023-01-31T08:00:00ZGranville Bridge Interim Connector and North Loops Reconfiguration Project2024-02-28T17:30:44.6891303Z49.275360705785005 -123.12890243010999 49.27540446691199 -123.12888672031 49.27544291618304 -123.12887521725 49.27549476001599 -123.12886306167 49.27554182252601 -123.12885527921 49.275596429123965 -123.12885007350002 49.275640776760014 -123.12884885547 49.275720855797005 -123.12885344967 49.27577355243699 -123.12886704622998 49.275833610506965 -123.12890987655 49.275898814435976 -123.12898438212 49.275933346047964 -123.12904159530001 49.275968041398016 -123.12912130082 49.27599330026396 -123.1292094781 49.27601029328599 -123.12932908945 49.276012178360986 -123.12938882974001 49.27600866905101 -123.12946216651001 49.27600078423299 -123.12952284358998 49.27598316393198 -123.1296019313 49.27595261697499 -123.1296894951 49.27592938731999 -123.12973319423 49.27590329262401 -123.12977294012002 49.275874621246004 -123.12980827983 49.27584369741601 -123.12983885676998 49.27581084535103 -123.1298643281 49.275776434164015 -123.12988441983 49.27574083292299 -123.12989889921998 49.27570444659801 -123.12990760238 49.27566765306301 -123.12991046157 49.27563086617499 -123.12990740914 49.275594499633 -123.12989851495001 49.275558931153995 -123.12988384872 49.275524565333995 -123.12986357652 49.27549455676899 -123.12984011252 49.27504769059598 -123.12944208178W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently.
Granville Bridge North Approach – Full closure of Granville Street south of Drake
Anticipated Timeline: March 4 2024 - early September 2024
- All lanes of Granville Street Bridge from Pacific Street to Drake Street to be closed for ~6 months. North Loops to be demolished concurrently.
- Two lanes to remain open at all times on main span
- Significant deep utility installation to occur on Rolston, Continental, Neon, and Pacific Street.
- Granville Bridge Structural Upgrades preceded this work, completed September 2020.
- Numerous City and 3rd party asset relocation
- Events to be restricted along bridge span, including Howe, Granville, and Seymour Streets to manage traffic flows on and off bridge.
Location: Granville Bridge
Schedule: Feb 21, 2023 - Mar 1, 2025urn:uuid:d5aa533a-5a07-4ffc-9b32-f82a56d9b27e2023-01-31T08:00:00ZGranville Bridge Interim Connector and North Loops Reconfiguration Project2024-02-28T17:30:44.6891303Z49.27469749405586 -123.1289260455324 49.274378264090956 -123.12844920232813W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently.
Granville Bridge North Approach – Full closure of Granville Street south of Drake
Anticipated Timeline: March 4 2024 - early September 2024
- All lanes of Granville Street Bridge from Pacific Street to Drake Street to be closed for ~6 months. North Loops to be demolished concurrently.
- Two lanes to remain open at all times on main span
- Significant deep utility installation to occur on Rolston, Continental, Neon, and Pacific Street.
- Granville Bridge Structural Upgrades preceded this work, completed September 2020.
- Numerous City and 3rd party asset relocation
- Events to be restricted along bridge span, including Howe, Granville, and Seymour Streets to manage traffic flows on and off bridge.
Location: Granville Bridge
Schedule: Feb 21, 2023 - Mar 1, 2025urn:uuid:89e27b33-9a00-44ed-95fc-38fcc379030a2023-01-31T08:00:00ZGranville Bridge Interim Connector and North Loops Reconfiguration Project2024-02-28T17:30:44.6891303Z49.26722355143133 -123.13844293323197 49.26701585743834 -123.13865393389275 49.26685016835947 -123.1390544772148 49.266822164504504 -123.13954800367353 49.2669505152335 -123.13998430956416 49.26709986862576 -123.14027756452559 49.26711387047641 -123.14077109098433 49.26711387047641 -123.14091771830134W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently.
Granville Bridge North Approach – Full closure of Granville Street south of Drake
Anticipated Timeline: March 4 2024 - early September 2024
- All lanes of Granville Street Bridge from Pacific Street to Drake Street to be closed for ~6 months. North Loops to be demolished concurrently.
- Two lanes to remain open at all times on main span
- Significant deep utility installation to occur on Rolston, Continental, Neon, and Pacific Street.
- Granville Bridge Structural Upgrades preceded this work, completed September 2020.
- Numerous City and 3rd party asset relocation
- Events to be restricted along bridge span, including Howe, Granville, and Seymour Streets to manage traffic flows on and off bridge.
Location: Granville Bridge
Schedule: Feb 21, 2023 - Mar 1, 2025urn:uuid:16360dc4-3acf-4fce-bdab-bda80cbec8342023-01-31T08:00:00ZGranville Bridge Interim Connector and North Loops Reconfiguration Project2024-02-28T17:30:44.6891303Z49.269537834034 -123.13767846689 49.268532421681016 -123.13947926713W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently.
Granville Bridge North Approach – Full closure of Granville Street south of Drake
Anticipated Timeline: March 4 2024 - early September 2024
- All lanes of Granville Street Bridge from Pacific Street to Drake Street to be closed for ~6 months. North Loops to be demolished concurrently.
- Two lanes to remain open at all times on main span
- Significant deep utility installation to occur on Rolston, Continental, Neon, and Pacific Street.
- Granville Bridge Structural Upgrades preceded this work, completed September 2020.
- Numerous City and 3rd party asset relocation
- Events to be restricted along bridge span, including Howe, Granville, and Seymour Streets to manage traffic flows on and off bridge.
Location: Granville Bridge
Schedule: Feb 21, 2023 - Mar 1, 2025urn:uuid:0ee8efc3-1258-4dfc-befe-6b681f79e7442023-01-31T08:00:00ZGranville Bridge Interim Connector and North Loops Reconfiguration Project2024-02-28T17:30:44.6891303Z49.269537834034 -123.13767846689 49.269524683399 -123.13770082296001 49.26950952375603 -123.13772575772998 49.269494076754995 -123.13775027929998 49.269478360384994 -123.13777438771 49.26946236565098 -123.13779808295 49.26944611057701 -123.13782133756 49.269429586169 -123.13784415153002 49.269412801421 -123.13786652487998 49.269395765328 -123.13788845764 49.269378486920004 -123.13790992232998 49.26936096619602 -123.13793091896 49.26934320314001 -123.13795146127 49.26932520679699 -123.13797150806 49.269306986130005 -123.13799108683001 49.269288541170994 -123.13801017011 49.26926988091603 -123.1380287579 49.26925101436001 -123.13804685024002 49.26923195051501 -123.13806443341 49.26921268040303 -123.13808149363 49.26919322198202 -123.13809805845 49.26917357529999 -123.13811408663 49.269153758314985 -123.13812960572 49.269133753071 -123.13814458816998 49.26911358657 -123.13815902031 49.269093258778014 -123.13817292963 49.26907277874099 -123.13818627493002 49.26905213743001 -123.13819908366001 49.26903136184799 -123.13821134217001 49.269010452011 -123.13822303669 49.26898939890802 -123.13823418097 49.26896822954103 -123.13824476131002 49.26894694392698 -123.13825476399 49.26892555102697 -123.13826421652 49.268904041897 -123.13827307762 49.26888244348902 -123.13828137489001 49.268860755820015 -123.13828909456001 49.268838978904995 -123.13829622289 49.26881711271301 -123.13830278738001 49.26879519325803 -123.13830876063 49.268773202548005 -123.13831414260001 49.26875114956201 -123.13831894704998 49.268729052325 -123.13832314654998 49.26870691080299 -123.13832676859 49.26868472501201 -123.13832979942 49.26716658638699 -123.13842042745W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently.
Granville Bridge North Approach – Full closure of Granville Street south of Drake
Anticipated Timeline: March 4 2024 - early September 2024
- All lanes of Granville Street Bridge from Pacific Street to Drake Street to be closed for ~6 months. North Loops to be demolished concurrently.
- Two lanes to remain open at all times on main span
- Significant deep utility installation to occur on Rolston, Continental, Neon, and Pacific Street.
- Granville Bridge Structural Upgrades preceded this work, completed September 2020.
- Numerous City and 3rd party asset relocation
- Events to be restricted along bridge span, including Howe, Granville, and Seymour Streets to manage traffic flows on and off bridge.
Location: Granville Bridge
Schedule: Feb 21, 2023 - Mar 1, 2025urn:uuid:f3007b4e-f541-4b3a-acc8-bb1493984edb2023-01-31T08:00:00ZGranville Bridge Interim Connector and North Loops Reconfiguration Project2024-02-28T17:30:44.6891303Z49.26934593214 -123.137993766 49.26990657910301 -123.13714486901999W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently.
Granville Bridge North Approach – Full closure of Granville Street south of Drake
Anticipated Timeline: March 4 2024 - early September 2024
- All lanes of Granville Street Bridge from Pacific Street to Drake Street to be closed for ~6 months. North Loops to be demolished concurrently.
- Two lanes to remain open at all times on main span
- Significant deep utility installation to occur on Rolston, Continental, Neon, and Pacific Street.
- Granville Bridge Structural Upgrades preceded this work, completed September 2020.
- Numerous City and 3rd party asset relocation
- Events to be restricted along bridge span, including Howe, Granville, and Seymour Streets to manage traffic flows on and off bridge.
Location: Granville Bridge
Schedule: Feb 21, 2023 - Mar 1, 2025urn:uuid:b6231bc1-3c86-45f3-8a74-385ff5ffb2b82023-01-31T08:00:00ZGranville Bridge Interim Connector and North Loops Reconfiguration Project2024-02-28T17:30:44.6891303Z49.27383074132001 -123.13121166043001 49.269537834034 -123.13767846689W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently.
Granville Bridge North Approach – Full closure of Granville Street south of Drake
Anticipated Timeline: March 4 2024 - early September 2024
- All lanes of Granville Street Bridge from Pacific Street to Drake Street to be closed for ~6 months. North Loops to be demolished concurrently.
- Two lanes to remain open at all times on main span
- Significant deep utility installation to occur on Rolston, Continental, Neon, and Pacific Street.
- Granville Bridge Structural Upgrades preceded this work, completed September 2020.
- Numerous City and 3rd party asset relocation
- Events to be restricted along bridge span, including Howe, Granville, and Seymour Streets to manage traffic flows on and off bridge.
Location: Granville Bridge
Schedule: Feb 21, 2023 - Mar 1, 2025urn:uuid:b3224ff9-774b-4bd8-aa96-0409d6ea0f8d2023-01-31T08:00:00ZGranville Bridge Interim Connector and North Loops Reconfiguration Project2024-02-28T17:30:44.6891303Z49.27064249688797 -123.13614615807002 49.26990657910301 -123.13714486901999W. 4th Ave Eastbound Off-ramp CLOSURE in place permanently.
Granville Bridge North Approach – Full closure of Granville Street south of Drake
Anticipated Timeline: March 4 2024 - early September 2024
- All lanes of Granville Street Bridge from Pacific Street to Drake Street to be closed for ~6 months. North Loops to be demolished concurrently.
- Two lanes to remain open at all times on main span
- Significant deep utility installation to occur on Rolston, Continental, Neon, and Pacific Street.
- Granville Bridge Structural Upgrades preceded this work, completed September 2020.
- Numerous City and 3rd party asset relocation
- Events to be restricted along bridge span, including Howe, Granville, and Seymour Streets to manage traffic flows on and off bridge.
Location: Granville Bridge
Schedule: Feb 21, 2023 - Mar 1, 2025urn:uuid:0f7a58e0-2208-4fef-bf7a-dd689e7a36de2023-01-31T08:00:00ZGranville Bridge Interim Connector and North Loops Reconfiguration Project2024-02-28T17:30:44.6891303Z49.274107794603026 -123.13086142055998 49.27349736775798 -123.13178318925Full closure of Drake Street from Howe to Granville until early March 2024
Location:
Schedule: Nov 1, 2023 - Mar 15, 2024urn:uuid:c21f7aad-aa1e-415a-b494-cbfdbb117a102023-11-07T08:00:00ZGranville Bridge Interim Connector and North Loops Reconfiguration Project - Drake St Utilities Upgrade2024-02-28T17:29:41.0058521Z49.27642986758843 -123.12831266220759 49.27674303348658 -123.12879915983325Full closure of Drake Street from Howe to Granville until early March 2024
Location:
Schedule: Nov 1, 2023 - Mar 15, 2024urn:uuid:7aa62f1d-ef8f-47f1-b940-f4e70e8fab112023-11-07T08:00:00ZGranville Bridge Interim Connector and North Loops Reconfiguration Project - Drake St Utilities Upgrade2024-02-28T17:29:41.0058521Z49.27642986758843 -123.12831266220759 49.27610078974823 -123.12780754220405Street concrete & paving renewal on Hastings St from Victoria Dr to Clark Dr
Location: Hastings, Victoria to Clark
Schedule: Apr 8, 2024 - Jun 30, 2024urn:uuid:f568b52d-e198-4342-abd0-bcb74992590f2024-03-27T07:00:00ZHastings St Upgrades, Clark to Victoria2024-03-27T18:16:44.4742331Z49.281190869616864 -123.06557746685142 49.281324688899815 -123.07711461326976Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:4e14a550-70c9-46db-9e82-af9d72d8d4e62023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26948390191521 -123.0389725213393 49.26895141967316 -123.03898034959772Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:1b0a2530-ab76-4608-9875-3ce25790a7642023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.268020625589685 -123.03646724693999 49.26756276839512 -123.03647239405537Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:b9b889a8-9f75-4d2f-948c-45bbb28e33432023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26847658602364 -123.03645809825618 49.268020625589685 -123.03646724693999Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:a39aa75c-9861-4fab-87f7-684a17c9df6d2023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.268020625589685 -123.03646724693999 49.26756276839512 -123.03647239405537Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:96dcc6c1-267d-4cfd-8b97-bae8a25a5cd22023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.268476586001924 -123.03645816698604 49.26846816938246 -123.03372360630635Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:15adc5cf-dd87-48ca-a77a-0f8031778fa22023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.268476586001924 -123.03645816698604 49.26846816938246 -123.03372360630635Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:bd341640-c638-4594-a5f2-dab348dd38052023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.268476586001924 -123.03645816698604 49.26846816938246 -123.03372360630635Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:42a1024a-460f-4f38-a158-b2e695f51b472023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26849675650996 -123.04151397994187 49.26848617703962 -123.0389865124249Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:5c743c54-199a-4e0e-a00f-b6b1d8bdec3a2023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26849675650996 -123.04151397994187 49.26848617703962 -123.0389865124249Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:a75e3f84-a9b6-41c0-86fd-c2ab2f745aae2023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26948390191521 -123.0389725213393 49.26895141967316 -123.03898034959772Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:9b0fb2f0-5297-46e5-a93e-a2381c138c9b2023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26948390191521 -123.0389725213393 49.26895141967316 -123.03898034959772Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:b2b5da08-3220-426e-8b62-4bd0890f958f2023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26849675650996 -123.04151397994187 49.2680408319425 -123.04152232604672Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:ca5fc527-9c93-4e82-85db-389d0aaf02932023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26849675650996 -123.04151397994187 49.2680408319425 -123.04152232604672Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:4388fe9f-eeb8-4409-bd47-45737596ca3e2023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26849675650996 -123.04151397994187 49.26848617703962 -123.0389865124249Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:86a28947-a2bb-4976-92a9-2ec39a84ad802023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26849675650996 -123.04151397994187 49.2680408319425 -123.04152232604672Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:a6abf135-ec82-42d9-a658-5cbdeaf60f762023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26849675650996 -123.04151397994187 49.26848617703962 -123.0389865124249Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:b0849211-9a0c-42f3-b971-7424b78232b72023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26849675650996 -123.04151397994187 49.26848617703962 -123.0389865124249Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:4d7c44a9-6598-4bf3-a2c8-9da428fa2f232023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26849675650996 -123.04151397994187 49.2680408319425 -123.04152232604672Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:1f4276ab-cfbd-4703-9065-6ebef40f2d482023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.267573151227026 -123.03899916765127 49.26756276839512 -123.03647239405537Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:5b6cbecf-8443-4c43-858b-25a5690a0d1c2023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.267573151227026 -123.03899916765127 49.26756276839512 -123.03647239405537Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:6432b88d-688e-432d-b0f9-7594cf748ef02023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.267573151227026 -123.03899916765127 49.26756276839512 -123.03647239405537Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:e77f1b5e-97f4-49de-a60b-84da08521f462023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.267573151227026 -123.03899916765127 49.26756276839512 -123.03647239405537Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:6f9758de-c001-4606-9e9a-bd30c6bb10a32023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26849675650996 -123.04151397994187 49.2680408319425 -123.04152232604672Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:8f3d2302-ae5f-4714-a3ef-6da995f367382023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.27135878641883 -123.04420098864064 49.270892635101774 -123.0442073630351Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:e044195f-13c6-431b-a5fe-df4e9f30f6a32023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.271357382865574 -123.04360994489754 49.27135581444145 -123.04146860881607Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:58b5a7a3-3f22-47a8-97a5-ef376a90005b2023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.27135878641883 -123.04420098864064 49.271357382865574 -123.04360994489754Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:f320744c-de36-4db4-a41f-d22fc50b4c202023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.27326829744675 -123.04416985235252 49.27326612549274 -123.0427700312841Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:43cc8bd2-2268-430e-81af-5a342e65c7a42023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.27326860805138 -123.04490430233163 49.27326829744675 -123.04416985235252Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:b07fc316-d0f3-4378-af2d-defaca9916882023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.271824722244446 -123.04419348669059 49.27135878641883 -123.04420098864064Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:37ec0b1d-199f-436e-ac33-05701916de3e2023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26758355833556 -123.04152990110767 49.267573151227026 -123.03899916765127Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:c2343724-e538-4782-86c5-985913cbd10e2023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26758355833556 -123.04152990110767 49.267573151227026 -123.03899916765127Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:df3bdee9-3b42-4600-944e-00d799e43c612023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26804206747744 -123.04193691570943 49.2680408319425 -123.04152232604672Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:420073b3-e9d7-4585-91c1-dfaeeb250c872023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26804206747744 -123.04193691570943 49.2680408319425 -123.04152232604672Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:5588f7b2-f3ad-4f28-a098-0fa0b03168472023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26804206747744 -123.04193691570943 49.2680408319425 -123.04152232604672Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:1f6071d4-8ab3-41ce-8e15-69f5f1ee23342023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26804206747744 -123.04193691570943 49.2680408319425 -123.04152232604672Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:cdbe2d87-db14-4708-827e-fa8e45bbbeca2023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26758355833556 -123.04152990110767 49.267573151227026 -123.03899916765127Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:1825cebe-22bd-41ad-97b9-45dcdcc174932023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26758355833556 -123.04152990110767 49.267573151227026 -123.03899916765127Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:5258ace3-1671-4c14-995f-2c26b8419da32023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26758355833556 -123.04152990110767 49.267573151227026 -123.03899916765127Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:9266f0d5-b28e-42d8-9866-66e69815e45f2023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26758355833556 -123.04152990110767 49.267573151227026 -123.03899916765127Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:19f1f0b2-6749-4750-a156-4781d569810e2023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26758355833556 -123.04152990110767 49.267573151227026 -123.03899916765127Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:d841bef1-b4af-4e29-aec4-41ca064bcac82023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26758355833556 -123.04152990110767 49.267573151227026 -123.03899916765127Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:5971bf73-d2dd-40e4-8e24-235ba8e8261a2023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.267573151227026 -123.03899916765127 49.26756276839512 -123.03647239405537Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:3602e7ff-5668-4fd9-8986-80934a9c8def2023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.267573151227026 -123.03899916765127 49.26756276839512 -123.03647239405537Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:1a41c22f-b179-47e0-8e0c-87729f305cc32023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.267573151227026 -123.03899916765127 49.26756276839512 -123.03647239405537Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:a5734e26-b291-461a-99de-2d97d63094b12023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.267573151227026 -123.03899916765127 49.26756276839512 -123.03647239405537Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:b4911da1-b523-493e-aa4d-bde5e0edf3cd2023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.267573151227026 -123.03899916765127 49.26756276839512 -123.03647239405537Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:7998cbeb-4d9e-4c5a-8c39-e8d7d69298762023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.267573151227026 -123.03899916765127 49.26756276839512 -123.03647239405537Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:c1cfafde-481b-4f5b-9efc-022cf9b582f02023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.267573151227026 -123.03899916765127 49.26711632765091 -123.03900632645663Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:e76e6459-ab6e-425b-82dc-e6683703dc0b2023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26712765349092 -123.0389351020858 49.26713543231668 -123.03837481769733Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:9bba3fc6-3c74-4ee8-a911-cead5e618e7f2023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26756276839512 -123.03647239405537 49.26755275046156 -123.03373957350763Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:ff2c5c73-603a-47fb-bade-31cdbdd70c912023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26756276839512 -123.03647239405537 49.26755275046156 -123.03373957350763Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:91c26bc5-7d9d-4165-ade5-14d006170f572023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26756276839512 -123.03647239405537 49.26755275046156 -123.03373957350763Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:0ba8656a-817e-4c2b-8385-97dc5b64117b2023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.267573151227026 -123.03899916765127 49.26756276839512 -123.03647239405537Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:7c241762-3227-4e6b-9696-7cfa922b246f2023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26621752518673 -123.03898636135274 49.26620196724451 -123.03767505974976Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:fc8b2666-8aae-48d2-ac9a-0bdca8e7f5b02023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.267573151227026 -123.03899916765127 49.26711632765091 -123.03900632645663Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:5c76e590-34e5-43fe-bee6-3b568a6388022023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.267573151227026 -123.03899916765127 49.26711632765091 -123.03900632645663Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:c44715bf-45ed-4bfc-9cac-e6fa355e14b92023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.267573151227026 -123.03899916765127 49.26711632765091 -123.03900632645663Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:f0e3980e-8ca7-4219-aa02-e4cb2013372e2023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.267573151227026 -123.03899916765127 49.26711632765091 -123.03900632645663Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:05a80ca8-f67b-4147-b4d2-fed1582f93232023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.267573151227026 -123.03899916765127 49.26711632765091 -123.03900632645663Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:e51e7134-be67-42ae-9fd3-b5edb95fbe732023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26711632765091 -123.03900632645663 49.26666034908996 -123.0390149565635Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:bf784a1b-fe26-46ee-92c7-f2227ca91b382023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.267573151227026 -123.03899916765127 49.26711632765091 -123.03900632645663Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:0e937317-e073-45a7-ab7f-a02f00c2fb642023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.267573151227026 -123.03899916765127 49.26711632765091 -123.03900632645663Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:a0ef2cfd-85f2-4c17-912f-4cf85080a7302023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.267573151227026 -123.03899916765127 49.26711632765091 -123.03900632645663Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:7ce63730-fba9-4510-ac4a-ce465ef37cfd2023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.267573151227026 -123.03899916765127 49.26711632765091 -123.03900632645663Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:02f86a2c-964d-4301-875a-a6dfd23697ec2023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.267573151227026 -123.03899916765127 49.26711632765091 -123.03900632645663Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:f63f6e7a-2143-4708-a2f7-de23ec8d31072023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26711632765091 -123.03900632645663 49.26666034908996 -123.0390149565635Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:9d05fb55-4a74-4ff1-8493-2e92e05aad012023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26711632765091 -123.03900632645663 49.26666034908996 -123.0390149565635Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:5a4dc3c2-2ab2-4f2e-901a-d81fe8e3a30b2023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26711632765091 -123.03900632645663 49.26666034908996 -123.0390149565635Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:29e988af-34a0-49e5-bc5d-7c268570804a2023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26711632765091 -123.03900632645663 49.26666034908996 -123.0390149565635Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:8f764930-a4fe-4bee-bee7-779eb60bf04a2023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26711632765091 -123.03900632645663 49.26666034908996 -123.0390149565635Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:79231b61-2eae-4cc5-a122-d087260496bd2023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26711632765091 -123.03900632645663 49.26666034908996 -123.0390149565635Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:9d102809-b158-424b-ba18-d309c0e1ad9c2023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.265699360649876 -123.03902738055909 49.26568812400441 -123.036500262164Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:f307e33e-4ad0-430d-8502-51fe59e4d9352023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26620196049865 -123.0390214540856 49.265699360649876 -123.03902738055909Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:019d48e2-4ea9-41b0-af3f-0ffa1eecda022023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26666034908996 -123.0390149565635 49.26620196049865 -123.0390214540856Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:e9c732cd-0434-4eb8-a234-bf9956b8753e2023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26666034908996 -123.0390149565635 49.2666500034658 -123.03648539803838Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:078c4a20-bf4e-4b36-b637-20fd2b6041fd2023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26666034908996 -123.0390149565635 49.2666500034658 -123.03648539803838Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:e8fde201-086a-48b8-a7f8-6db1c76a9d552023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26666034908996 -123.0390149565635 49.2666500034658 -123.03648539803838Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:abea8460-c078-4d74-8485-7533feffcb212023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26570807517274 -123.0415605183941 49.265699360649876 -123.03902738055909Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:6ffe8b97-822c-4e1d-a0f6-ee80696059492023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26570807517274 -123.0415605183941 49.265699360649876 -123.03902738055909Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:c675c516-24f3-46be-945a-91107d2abea62023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26666899280835 -123.04154564185728 49.26666034908996 -123.0390149565635Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:ad6bfc27-d0cc-4e10-becd-bec5e46cbc3c2023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26666899280835 -123.04154564185728 49.26666034908996 -123.0390149565635Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:da4fc017-40c5-418a-8cae-98cec5ac49b22023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26620974621625 -123.0399126179691 49.26620974621625 -123.03897086465442Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:2682786c-6f03-472b-a486-a5293e4369732023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26666899280835 -123.04154564185728 49.26666034908996 -123.0390149565635Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:d5208032-625a-4034-a3f7-7a769bb897982023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26520221452668 -123.03902538031582 49.264749637061556 -123.03903086501592Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:994c523b-82ea-462b-83e7-167a7f46a8ee2023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.264758793340434 -123.04156102693383 49.264749637061556 -123.03903086501592Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:1081d122-4bdc-4f3e-8887-bc3b65aa4cc82023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.265699360649876 -123.03902738055909 49.26520221452668 -123.03902538031582Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:fe404797-a2d3-4ba2-b5a6-d756a9f1a40a2023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.264758793340434 -123.04156102693383 49.264749637061556 -123.03903086501592Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:19e4f0b3-4c52-4f5f-91e8-66332c254d772023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.265699360649876 -123.03902738055909 49.26520221452668 -123.03902538031582Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:616743ab-bffe-42f9-9e48-cc63ed5c3a882023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.265699360649876 -123.03902738055909 49.26568812400441 -123.036500262164Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:b3153d70-3ca8-404d-b30f-91526e31f89c2023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.264749637061556 -123.03903086501592 49.26474089249274 -123.03650271110962Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:60e79ec3-6f22-4a9c-a41d-a6c6a48e922e2023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.264749637061556 -123.03903086501592 49.26474089249274 -123.03650271110962Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:92920e42-f6a2-4970-9ebd-7b14c715dcdd2023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.264749637061556 -123.03903086501592 49.26474089249274 -123.03650271110962Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:be920231-5f02-47be-b168-00f41206178a2023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.264758793340434 -123.04156102693383 49.264749637061556 -123.03903086501592Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:66c0802b-1e72-49e4-95bb-2064bd7caf472023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26520221452668 -123.03902538031582 49.264749637061556 -123.03903086501592Hastings Sunrise West Sewer Package
- Project has been reinstated back into this Capital Plan starting 2025.
Area is south of Venables and north of 5th east of Nanaimo and mostly west of Renfrew. Contact Bob Devlin.
Sewer Scope on E. 1st to be integrated with Sewers scope from the Cassiar South Pkg 2. Includes Water scope interest and potential Streets interest.
Constrained start time by the Broadway Subway project.
The E. 1st Ave designs for HSW won’t be ready for IFC until 2025 or 2026, which will push construction into the 2027-2030 capital plan as a result.
Location: Various Locations
Schedule: Jan 1, 2025 - Dec 30, 2025urn:uuid:989ddb81-b0a3-4e8e-89c8-3989b86388952023-09-19T07:00:00ZHastings Sunrise West - Phase 32023-10-23T21:53:44.3090451Z49.26520221452668 -123.03902538031582 49.264749637061556 -123.03903086501592This is a three phase project that will renew 4.5 kilometers of combined sewers with separated sewers. Phase 2 construction is underway and will continue south of East 1st for the rest of 2023.
TDE & GI are partners in this project with potential opportunity to combine the NE Sector Greenway build on Lillooet or Windermere, TBC.
Phase 1
January to Summer 2023
Restart construction
Complete green rainwater infrastructure work
Phase 2
March to Spring 2024
Phase 3
Early 2024 to December 2025
Location: E. 1st Ave and Windermere St
Schedule: Jan 2, 2023 - Dec 31, 2025urn:uuid:a0a8d772-c1e4-4c4a-bd19-ee7061c128032023-02-28T08:00:00ZHastings-Sunrise Sewer Renewal2023-10-12T18:27:38.0243576Z49.268020625589685 -123.03646724693999 49.26756276839512 -123.03647239405537This is a three phase project that will renew 4.5 kilometers of combined sewers with separated sewers. Phase 2 construction is underway and will continue south of East 1st for the rest of 2023.
TDE & GI are partners in this project with potential opportunity to combine the NE Sector Greenway build on Lillooet or Windermere, TBC.
Phase 1
January to Summer 2023
Restart construction
Complete green rainwater infrastructure work
Phase 2
March to Spring 2024
Phase 3
Early 2024 to December 2025
Location: E. 1st Ave and Windermere St
Schedule: Jan 2, 2023 - Dec 31, 2025urn:uuid:a08fd789-e5f4-4eab-be91-4e43f41d52f82023-02-28T08:00:00ZHastings-Sunrise Sewer Renewal2023-10-12T18:27:38.0243576Z49.267573151227026 -123.03899916765127 49.26756276839512 -123.03647239405537This is a three phase project that will renew 4.5 kilometers of combined sewers with separated sewers. Phase 2 construction is underway and will continue south of East 1st for the rest of 2023.
TDE & GI are partners in this project with potential opportunity to combine the NE Sector Greenway build on Lillooet or Windermere, TBC.
Phase 1
January to Summer 2023
Restart construction
Complete green rainwater infrastructure work
Phase 2
March to Spring 2024
Phase 3
Early 2024 to December 2025
Location: E. 1st Ave and Windermere St
Schedule: Jan 2, 2023 - Dec 31, 2025urn:uuid:66293f56-24ad-4126-8fa9-277009e3fa672023-02-28T08:00:00ZHastings-Sunrise Sewer Renewal2023-10-12T18:27:38.0243576Z49.26758028003903 -123.04347134785667 49.2675750804149 -123.03896917978238This is a three phase project that will renew 4.5 kilometers of combined sewers with separated sewers. Phase 2 construction is underway and will continue south of East 1st for the rest of 2023.
TDE & GI are partners in this project with potential opportunity to combine the NE Sector Greenway build on Lillooet or Windermere, TBC.
Phase 1
January to Summer 2023
Restart construction
Complete green rainwater infrastructure work
Phase 2
March to Spring 2024
Phase 3
Early 2024 to December 2025
Location: E. 1st Ave and Windermere St
Schedule: Jan 2, 2023 - Dec 31, 2025urn:uuid:26351d76-8e6f-4906-be36-ce323187535f2023-02-28T08:00:00ZHastings-Sunrise Sewer Renewal2023-10-12T18:27:38.0243576Z49.26847658602364 -123.03645809825618 49.268020625589685 -123.03646724693999This is a three phase project that will renew 4.5 kilometers of combined sewers with separated sewers. Phase 2 construction is underway and will continue south of East 1st for the rest of 2023.
TDE & GI are partners in this project with potential opportunity to combine the NE Sector Greenway build on Lillooet or Windermere, TBC.
Phase 1
January to Summer 2023
Restart construction
Complete green rainwater infrastructure work
Phase 2
March to Spring 2024
Phase 3
Early 2024 to December 2025
Location: E. 1st Ave and Windermere St
Schedule: Jan 2, 2023 - Dec 31, 2025urn:uuid:0f74c546-3f22-4cc5-8ab8-e38b093da5f52023-02-28T08:00:00ZHastings-Sunrise Sewer Renewal2023-10-12T18:27:38.0243576Z49.26855066521904 -123.04199030012295 49.268529332970246 -123.03525567169063This is a three phase project that will renew 4.5 kilometers of combined sewers with separated sewers. Phase 2 construction is underway and will continue south of East 1st for the rest of 2023.
TDE & GI are partners in this project with potential opportunity to combine the NE Sector Greenway build on Lillooet or Windermere, TBC.
Phase 1
January to Summer 2023
Restart construction
Complete green rainwater infrastructure work
Phase 2
March to Spring 2024
Phase 3
Early 2024 to December 2025
Location: E. 1st Ave and Windermere St
Schedule: Jan 2, 2023 - Dec 31, 2025urn:uuid:07472b68-6b37-410e-9391-20443bf0a4f82023-02-28T08:00:00ZHastings-Sunrise Sewer Renewal2023-10-12T18:27:38.0243576Z49.268027870361266 -123.03741340886428 49.268027870361266 -123.03653953729473This is a three phase project that will renew 4.5 kilometers of combined sewers with separated sewers. Phase 2 construction is underway and will continue south of East 1st for the rest of 2023.
TDE & GI are partners in this project with potential opportunity to combine the NE Sector Greenway build on Lillooet or Windermere, TBC.
Phase 1
January to Summer 2023
Restart construction
Complete green rainwater infrastructure work
Phase 2
March to Spring 2024
Phase 3
Early 2024 to December 2025
Location: E. 1st Ave and Windermere St
Schedule: Jan 2, 2023 - Dec 31, 2025urn:uuid:9acac25f-a717-4209-92a0-c787f28615c62023-02-28T08:00:00ZHastings-Sunrise Sewer Renewal2023-10-12T18:27:38.0243576Z49.269447369024164 -123.03898531551609 49.26893641306657 -123.0389907159789 49.26894346077094 -123.04021122057986This is a three phase project that will renew 4.5 kilometers of combined sewers with separated sewers. Phase 2 construction is underway and will continue south of East 1st for the rest of 2023.
TDE & GI are partners in this project with potential opportunity to combine the NE Sector Greenway build on Lillooet or Windermere, TBC.
Phase 1
January to Summer 2023
Restart construction
Complete green rainwater infrastructure work
Phase 2
March to Spring 2024
Phase 3
Early 2024 to December 2025
Location: E. 1st Ave and Windermere St
Schedule: Jan 2, 2023 - Dec 31, 2025urn:uuid:dfee73c9-41f8-4a4c-9211-84bed648d4cf2023-02-28T08:00:00ZHastings-Sunrise Sewer Renewal2023-10-12T18:27:38.0243576Z49.26894171193797 -123.0364508118813 49.26847658602364 -123.03645809825618This is a three phase project that will renew 4.5 kilometers of combined sewers with separated sewers. Phase 2 construction is underway and will continue south of East 1st for the rest of 2023.
TDE & GI are partners in this project with potential opportunity to combine the NE Sector Greenway build on Lillooet or Windermere, TBC.
Phase 1
January to Summer 2023
Restart construction
Complete green rainwater infrastructure work
Phase 2
March to Spring 2024
Phase 3
Early 2024 to December 2025
Location: E. 1st Ave and Windermere St
Schedule: Jan 2, 2023 - Dec 31, 2025urn:uuid:3d68b18c-b4d2-48bd-bcc0-1a13663fa9d12023-02-28T08:00:00ZHastings-Sunrise Sewer Renewal2023-10-12T18:27:38.0243576Z49.26804383948712 -123.0389684741563 49.26856678527406 -123.0389684741563This is a three phase project that will renew 4.5 kilometers of combined sewers with separated sewers. Phase 2 construction is underway and will continue south of East 1st for the rest of 2023.
TDE & GI are partners in this project with potential opportunity to combine the NE Sector Greenway build on Lillooet or Windermere, TBC.
Phase 1
January to Summer 2023
Restart construction
Complete green rainwater infrastructure work
Phase 2
March to Spring 2024
Phase 3
Early 2024 to December 2025
Location: E. 1st Ave and Windermere St
Schedule: Jan 2, 2023 - Dec 31, 2025urn:uuid:71239b70-ae67-45b3-9f51-5675b43c15612023-02-28T08:00:00ZHastings-Sunrise Sewer Renewal2023-10-12T18:27:38.0243576Z49.26572664867041 -123.04346873472214 49.26568726357766 -123.03572311468682This is a three phase project that will renew 4.5 kilometers of combined sewers with separated sewers. Phase 2 construction is underway and will continue south of East 1st for the rest of 2023.
TDE & GI are partners in this project with potential opportunity to combine the NE Sector Greenway build on Lillooet or Windermere, TBC.
Phase 1
January to Summer 2023
Restart construction
Complete green rainwater infrastructure work
Phase 2
March to Spring 2024
Phase 3
Early 2024 to December 2025
Location: E. 1st Ave and Windermere St
Schedule: Jan 2, 2023 - Dec 31, 2025urn:uuid:2f3486a7-e71a-4677-8b67-dd3fdb476bc72023-02-28T08:00:00ZHastings-Sunrise Sewer Renewal2023-10-12T18:27:38.0243576Z49.2662064567875 -123.03997076364995 49.26619875290183 -123.03760958402624This is a three phase project that will renew 4.5 kilometers of combined sewers with separated sewers. Phase 2 construction is underway and will continue south of East 1st for the rest of 2023.
TDE & GI are partners in this project with potential opportunity to combine the NE Sector Greenway build on Lillooet or Windermere, TBC.
Phase 1
January to Summer 2023
Restart construction
Complete green rainwater infrastructure work
Phase 2
March to Spring 2024
Phase 3
Early 2024 to December 2025
Location: E. 1st Ave and Windermere St
Schedule: Jan 2, 2023 - Dec 31, 2025urn:uuid:492bb7b4-6100-4548-9948-6948720de57c2023-02-28T08:00:00ZHastings-Sunrise Sewer Renewal2023-10-12T18:27:38.0243576Z49.26661333351362 -123.03899827240302 49.264737736522676 -123.03903289029972This is a three phase project that will renew 4.5 kilometers of combined sewers with separated sewers. Phase 2 construction is underway and will continue south of East 1st for the rest of 2023.
TDE & GI are partners in this project with potential opportunity to combine the NE Sector Greenway build on Lillooet or Windermere, TBC.
Phase 1
January to Summer 2023
Restart construction
Complete green rainwater infrastructure work
Phase 2
March to Spring 2024
Phase 3
Early 2024 to December 2025
Location: E. 1st Ave and Windermere St
Schedule: Jan 2, 2023 - Dec 31, 2025urn:uuid:7a4428c1-3645-4448-80e5-76d00ce4fd3a2023-02-28T08:00:00ZHastings-Sunrise Sewer Renewal2023-10-12T18:27:38.0243576Z49.266661093530246 -123.03900016815645 49.267597034379634 -123.0389921997174 49.267565836637374 -123.03643433077607 49.269489540793785 -123.03645048390324This is a three phase project that will renew 4.5 kilometers of combined sewers with separated sewers. Phase 2 construction is underway and will continue south of East 1st for the rest of 2023.
TDE & GI are partners in this project with potential opportunity to combine the NE Sector Greenway build on Lillooet or Windermere, TBC.
Phase 1
January to Summer 2023
Restart construction
Complete green rainwater infrastructure work
Phase 2
March to Spring 2024
Phase 3
Early 2024 to December 2025
Location: E. 1st Ave and Windermere St
Schedule: Jan 2, 2023 - Dec 31, 2025urn:uuid:4e50ba52-9fe8-42c6-ae0c-ea95d7eb874d2023-02-28T08:00:00ZHastings-Sunrise Sewer Renewal2023-10-12T18:27:38.0243576Z49.266743352901244 -123.04348522000592 49.26671660598333 -123.03644535491692This is a three phase project that will renew 4.5 kilometers of combined sewers with separated sewers. Phase 2 construction is underway and will continue south of East 1st for the rest of 2023.
TDE & GI are partners in this project with potential opportunity to combine the NE Sector Greenway build on Lillooet or Windermere, TBC.
Phase 1
January to Summer 2023
Restart construction
Complete green rainwater infrastructure work
Phase 2
March to Spring 2024
Phase 3
Early 2024 to December 2025
Location: E. 1st Ave and Windermere St
Schedule: Jan 2, 2023 - Dec 31, 2025urn:uuid:98166a5a-b3dd-46c3-8263-0cd76b5d87752023-02-28T08:00:00ZHastings-Sunrise Sewer Renewal2023-10-12T18:27:38.0243576Z49.2671154843259 -123.03900674744273 49.26710843345421 -123.03836562826372This is a three phase project that will renew 4.5 kilometers of combined sewers with separated sewers. Phase 2 construction is underway and will continue south of East 1st for the rest of 2023.
TDE & GI are partners in this project with potential opportunity to combine the NE Sector Greenway build on Lillooet or Windermere, TBC.
Phase 1
January to Summer 2023
Restart construction
Complete green rainwater infrastructure work
Phase 2
March to Spring 2024
Phase 3
Early 2024 to December 2025
Location: E. 1st Ave and Windermere St
Schedule: Jan 2, 2023 - Dec 31, 2025urn:uuid:f219ef40-7cbb-4ed2-8273-a8c3f4e64fe52023-02-28T08:00:00ZHastings-Sunrise Sewer Renewal2023-10-12T18:27:38.0243576Z49.267573151227026 -123.03899916765127 49.26711632765091 -123.03900632645663This is a three phase project that will renew 4.5 kilometers of combined sewers with separated sewers. Phase 2 construction is underway and will continue south of East 1st for the rest of 2023.
TDE & GI are partners in this project with potential opportunity to combine the NE Sector Greenway build on Lillooet or Windermere, TBC.
Phase 1
January to Summer 2023
Restart construction
Complete green rainwater infrastructure work
Phase 2
March to Spring 2024
Phase 3
Early 2024 to December 2025
Location: E. 1st Ave and Windermere St
Schedule: Jan 2, 2023 - Dec 31, 2025urn:uuid:d05bbb75-2bbf-4a82-8538-fa94259d4aa52023-02-28T08:00:00ZHastings-Sunrise Sewer Renewal2023-10-12T18:27:38.0243576Z49.267564681165055 -123.03648214141053 49.26755948153931 -123.0354940549659This is a three phase project that will renew 4.5 kilometers of combined sewers with separated sewers. Phase 2 construction is underway and will continue south of East 1st for the rest of 2023.
TDE & GI are partners in this project with potential opportunity to combine the NE Sector Greenway build on Lillooet or Windermere, TBC.
Phase 1
January to Summer 2023
Restart construction
Complete green rainwater infrastructure work
Phase 2
March to Spring 2024
Phase 3
Early 2024 to December 2025
Location: E. 1st Ave and Windermere St
Schedule: Jan 2, 2023 - Dec 31, 2025urn:uuid:216179ae-6111-40b0-bfd8-713743b95b592023-02-28T08:00:00ZHastings-Sunrise Sewer Renewal2023-10-12T18:27:38.0243576Z49.26477530273647 -123.04343096963198 49.264751530767 -123.03652776234509Water construction schedule: 17-Feb-23 to 28-Mar-23 as a standalone project then followed by Streets until ~April 2024 (end date may be refined after additional construction planning)
Construction related to Homer St Upgrades Project will be handled in two phases:
Phase 1: April - December 2023 - Complete
Phase 2: Summer (~Jun) 2024 to Summer 2024 (~Sep) - roughly 3 months of construction
-BCH to rebuild old vaults prior to continuation of Phase 2
-Streets work expected to follow in summer 2024
Location: Homer St from W Pender St to W Cordova St
Schedule: Feb 17, 2023 - Sep 30, 2024urn:uuid:967e39f2-43f0-44f3-978b-a3cb826c0d562023-02-21T21:00:00ZHomer Street Upgrades Project (HStU)2024-02-28T18:02:45.2566722Z49.284058069059 -123.1099523723 49.283740504022006 -123.11043281382Water construction schedule: 17-Feb-23 to 28-Mar-23 as a standalone project then followed by Streets until ~April 2024 (end date may be refined after additional construction planning)
Construction related to Homer St Upgrades Project will be handled in two phases:
Phase 1: April - December 2023 - Complete
Phase 2: Summer (~Jun) 2024 to Summer 2024 (~Sep) - roughly 3 months of construction
-BCH to rebuild old vaults prior to continuation of Phase 2
-Streets work expected to follow in summer 2024
Location: Homer St from W Pender St to W Cordova St
Schedule: Feb 17, 2023 - Sep 30, 2024urn:uuid:d271654e-526c-4b87-84a2-2551fb9f64e52023-02-21T21:00:00ZHomer Street Upgrades Project (HStU)2024-02-28T18:02:45.2566722Z49.283740504022006 -123.11043281382 49.28340931725302 -123.11093306005002Water construction schedule: 17-Feb-23 to 28-Mar-23 as a standalone project then followed by Streets until ~April 2024 (end date may be refined after additional construction planning)
Construction related to Homer St Upgrades Project will be handled in two phases:
Phase 1: April - December 2023 - Complete
Phase 2: Summer (~Jun) 2024 to Summer 2024 (~Sep) - roughly 3 months of construction
-BCH to rebuild old vaults prior to continuation of Phase 2
-Streets work expected to follow in summer 2024
Location: Homer St from W Pender St to W Cordova St
Schedule: Feb 17, 2023 - Sep 30, 2024urn:uuid:b7acb61e-e7c3-4141-935d-6688cd16e08b2023-02-21T21:00:00ZHomer Street Upgrades Project (HStU)2024-02-28T18:02:45.2566722Z49.28340931725302 -123.11093306005002 49.283078316048005 -123.11143449625Water construction schedule: 17-Feb-23 to 28-Mar-23 as a standalone project then followed by Streets until ~April 2024 (end date may be refined after additional construction planning)
Construction related to Homer St Upgrades Project will be handled in two phases:
Phase 1: April - December 2023 - Complete
Phase 2: Summer (~Jun) 2024 to Summer 2024 (~Sep) - roughly 3 months of construction
-BCH to rebuild old vaults prior to continuation of Phase 2
-Streets work expected to follow in summer 2024
Location: Homer St from W Pender St to W Cordova St
Schedule: Feb 17, 2023 - Sep 30, 2024urn:uuid:50335445-70ea-407b-b768-ce169b3e282e2023-02-21T21:00:00ZHomer Street Upgrades Project (HStU)2024-02-28T18:02:45.2566722Z49.283078316048005 -123.11143449625 49.28276104264799 -123.11191388815Water construction schedule: 17-Feb-23 to 28-Mar-23 as a standalone project then followed by Streets until ~April 2024 (end date may be refined after additional construction planning)
Construction related to Homer St Upgrades Project will be handled in two phases:
Phase 1: April - December 2023 - Complete
Phase 2: Summer (~Jun) 2024 to Summer 2024 (~Sep) - roughly 3 months of construction
-BCH to rebuild old vaults prior to continuation of Phase 2
-Streets work expected to follow in summer 2024
Location: Homer St from W Pender St to W Cordova St
Schedule: Feb 17, 2023 - Sep 30, 2024urn:uuid:66d2ccc2-2c0a-4f9e-bb8d-ba914a6aac3c2023-02-21T21:00:00ZHomer Street Upgrades Project (HStU)2024-02-28T18:02:45.2566722Z49.28418894524529 -123.11018337646486 49.283963265631115 -123.10980576686858Water construction schedule: 17-Feb-23 to 28-Mar-23 as a standalone project then followed by Streets until ~April 2024 (end date may be refined after additional construction planning)
Construction related to Homer St Upgrades Project will be handled in two phases:
Phase 1: April - December 2023 - Complete
Phase 2: Summer (~Jun) 2024 to Summer 2024 (~Sep) - roughly 3 months of construction
-BCH to rebuild old vaults prior to continuation of Phase 2
-Streets work expected to follow in summer 2024
Location: Homer St from W Pender St to W Cordova St
Schedule: Feb 17, 2023 - Sep 30, 2024urn:uuid:607df4c8-edbe-4e73-8a2a-bbec87a847ee2023-02-21T21:00:00ZHomer Street Upgrades Project (HStU)2024-02-28T18:02:45.2566722Z49.28351531248873 -123.11117266360648 49.283263887092176 -123.11078076522315Water construction schedule: 17-Feb-23 to 28-Mar-23 as a standalone project then followed by Streets until ~April 2024 (end date may be refined after additional construction planning)
Construction related to Homer St Upgrades Project will be handled in two phases:
Phase 1: April - December 2023 - Complete
Phase 2: Summer (~Jun) 2024 to Summer 2024 (~Sep) - roughly 3 months of construction
-BCH to rebuild old vaults prior to continuation of Phase 2
-Streets work expected to follow in summer 2024
Location: Homer St from W Pender St to W Cordova St
Schedule: Feb 17, 2023 - Sep 30, 2024urn:uuid:1b1cd338-1d89-418d-b030-9e9859419ef82023-02-21T21:00:00ZHomer Street Upgrades Project (HStU)2024-02-28T18:02:45.2566722Z49.28289084469469 -123.11210407984288 49.282666847356865 -123.11172534934632Localized pavement upgrades for Island Parkway along the Seawall. Construction to complete within Q1 2024.
Traffic Impact:
-1500 block Island Park Walk - minimal; seawall will remain open with 3-meter wide shared path
-1500 block Anderson St - temporary loading zone right at seawall
-1500 block W 2nd Av - laydown area
Location: 1500 block Island Park Walk
Schedule: Jan 1, 2024 - Mar 31, 2024urn:uuid:eab5240e-d19b-4800-ba8a-77f03bf0cb612023-12-25T08:00:00ZIsland Parkway Seawall Upgrades2023-12-05T16:54:01.4885484Z49.27091965909233 -123.13834876356046 49.27059833913907 -123.13761297708214 49.27047737108501 -123.13758980270488 49.2703412816696 -123.13765932583668 49.27020519187883 -123.13765932583668 49.26991788997654 -123.13718425110267Localized pavement upgrades for Island Parkway along the Seawall. Construction to complete within Q1 2024.
Traffic Impact:
-1500 block Island Park Walk - minimal; seawall will remain open with 3-meter wide shared path
-1500 block Anderson St - temporary loading zone right at seawall
-1500 block W 2nd Av - laydown area
Location: 1500 block Island Park Walk
Schedule: Jan 1, 2024 - Mar 31, 2024urn:uuid:993ab2cc-271b-4180-8923-82f2c580b9222023-12-25T08:00:00ZIsland Parkway Seawall Upgrades2023-12-05T16:54:01.4885484Z49.26958144220089 -123.13765932583675 49.26989898847691 -123.13716687031979Localized pavement upgrades for Island Parkway along the Seawall. Construction to complete within Q1 2024.
Traffic Impact:
-1500 block Island Park Walk - minimal; seawall will remain open with 3-meter wide shared path
-1500 block Anderson St - temporary loading zone right at seawall
-1500 block W 2nd Av - laydown area
Location: 1500 block Island Park Walk
Schedule: Jan 1, 2024 - Mar 31, 2024urn:uuid:2e93b851-8ba7-489e-a1fa-728fa79d8d5e2023-12-25T08:00:00ZIsland Parkway Seawall Upgrades2023-12-05T16:54:01.4885484Z49.269700640403045 -123.14034031192283 49.2696895882265 -123.13904453812017Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:051aa22a-5f2a-4dfc-b88a-40005f46a37a2022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.26673457246906 -123.05942553969516 49.266724150778856 -123.05809151403038Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:8106c473-6e41-46b9-b974-a551f9789cf02022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.26673948016389 -123.06002435412238 49.26673457246906 -123.05942553969516Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:8e5cbff5-cafc-4613-bb38-84c0a98586292022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.267721136386456 -123.06000483006108 49.267706417528984 -123.05807361558195Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:0d08222a-8fb5-47ec-88ca-1876d7233b772022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.267721136386456 -123.06000483006108 49.267706417528984 -123.05807361558195Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:f766e013-5e55-43e6-9f2f-c8a1697219522022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.26408664496242 -123.05741695924763 49.26318251979154 -123.057433352064Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:cc3eb1c1-9d0a-441c-9297-82845468e2062022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.26499082435626 -123.05739976869934 49.26408664496242 -123.05741695924763Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:fb89a73e-ddd9-4a58-9077-1db74cf6d45f2022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.2663452692631 -123.05736066720989 49.26589425684074 -123.0573647903108Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:f5fc051b-0079-48c7-9af2-90f56ccf631a2022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.2663452692631 -123.05736066720989 49.26589425684074 -123.0573647903108Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:2bcfaec1-5248-48a3-85ca-89ef8ad62d952022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.2663452692631 -123.05736066720989 49.26589425684074 -123.0573647903108Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:3688b3d5-5e28-4ae6-a6ac-49677479f9df2022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.2663452692631 -123.05736066720989 49.26589425684074 -123.0573647903108Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:1193154e-f68f-40de-98eb-f29c1b125eb82022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.2663452692631 -123.05736066720989 49.26589425684074 -123.0573647903108Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:eaa49cb3-9468-4010-921d-bc40c27373422022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.26499082435626 -123.05739976869934 49.26408664496242 -123.05741695924763Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:db251477-10b4-44e0-b55e-f2a77e8ae2742022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.26499082435626 -123.05739976869934 49.26408664496242 -123.05741695924763Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:dfe6f235-b5cd-4041-a570-28c0bbc4aad72022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.26589967020803 -123.05810636693613 49.265447639423655 -123.05811415196108Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:a613fabe-f12c-4a37-893c-b41daa1b92052022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.26589967020803 -123.05810636693613 49.265447639423655 -123.05811415196108Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:1a2cbe73-1f6a-4756-95ed-5479d4cef79a2022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.266350298321015 -123.05809735678676 49.26589967020803 -123.05810636693613Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:1b50b2dc-d9d7-4966-b434-f0c855d60eda2022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.266350298321015 -123.05809735678676 49.26589967020803 -123.05810636693613Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:f2dca328-11d3-4d59-ba49-4d0469b914772022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.26672415077479 -123.05809151403038 49.266350298321015 -123.05809735678676Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:1c94dae1-ef94-4687-9b85-6a48bacc00a52022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.26672415077479 -123.05809151403038 49.266350298321015 -123.05809735678676Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:c9c7aa29-7099-4e0a-8659-0c43f1b729832022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.26672415077479 -123.05809151403038 49.266350298321015 -123.05809735678676Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:896a7a72-f581-4fb8-ab94-354cadbd01d52022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.266350298321015 -123.05809735678676 49.26589967020803 -123.05810636693613Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:d14189c0-b881-43a4-a5ec-9e2a61090f732022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.266350298321015 -123.05809735678676 49.26589967020803 -123.05810636693613Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:c6537d4a-2dcc-44b6-8c91-4316251d518e2022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.2649960671647 -123.05812232224615 49.26454444981783 -123.05813064352644Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:97dd6263-a5f2-4ed0-bbee-bd68945e644f2022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.2649960671647 -123.05812232224615 49.26454444981783 -123.05813064352644Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:c325d305-c83e-4f56-b255-3cb4815fc8cb2022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.265447639423655 -123.05811415196108 49.26511073052012 -123.05811932305129 49.2649960671647 -123.05812232224615Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:2130ae3f-2209-46a0-9725-bb8532f1ffb82022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.265447639423655 -123.05811415196108 49.26511073052012 -123.05811932305129 49.2649960671647 -123.05812232224615Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:a3b28dba-9b15-48d2-9021-3c835bfb280c2022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.265447639423655 -123.05811415196108 49.26511073052012 -123.05811932305129 49.2649960671647 -123.05812232224615Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:942f1b84-a23c-42a5-9d92-fb139c2bd3402022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.26589967020803 -123.05810636693613 49.265447639423655 -123.05811415196108Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:564b065d-cb2c-4527-a6df-1ddd416b9b0b2022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.265447639423655 -123.05811415196108 49.26511073052012 -123.05811932305129 49.2649960671647 -123.05812232224615Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:caf213cf-7dd0-462c-935b-ea635de45e2d2022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.26589967020803 -123.05810636693613 49.265447639423655 -123.05811415196108Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:eccb3b36-ea80-4ddf-bffd-50cbf097944d2022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.26589967020803 -123.05810636693613 49.265447639423655 -123.05811415196108Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:8d81098d-226e-42f5-9228-9e7aade9bd4a2022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.26408664496242 -123.05741695924763 49.26318251979154 -123.057433352064Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:e81337e6-481b-48ec-b9c4-afc4b8df4f122022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.26408664496242 -123.05741695924763 49.26318251979154 -123.057433352064Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:339f765a-924c-4a40-a7ca-3518119848d72022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.2640920140031 -123.05813870254663 49.26408664496242 -123.05741695924763Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:0a3cb5df-c8a7-4774-b85f-36c67542506f2022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.2640920140031 -123.05813870254663 49.26408664496242 -123.05741695924763Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:1b20544b-aeae-41d8-8923-b4e95a4673da2022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.26454444981783 -123.05813064352644 49.2640920140031 -123.05813870254663Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:4c919773-54b9-4d05-8e22-3cd98a014e7a2022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.26454444981783 -123.05813064352644 49.2640920140031 -123.05813870254663Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:9ef8bf69-a010-44df-a487-292c9700ab3d2022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.26454444981783 -123.05813064352644 49.2640920140031 -123.05813870254663Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:d6a22a8b-c265-4cd8-bbf4-78a88f38bd8e2022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.2649960671647 -123.05812232224615 49.26454444981783 -123.05813064352644Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:8919db4b-378c-483d-bd5a-3e48a7b501f72022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.2649960671647 -123.05812232224615 49.26454444981783 -123.05813064352644Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:dc4dc0c6-5508-4176-947d-de7142d7dfa72022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.265010415238635 -123.06005576716313 49.2649960671647 -123.05812232224615Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:f0b6c116-e9a1-41f9-a86b-5cfe73e77dcb2022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.265010415238635 -123.06005576716313 49.2649960671647 -123.05812232224615Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:5d6ee15a-d3e1-4eeb-8396-b26fbdc6a4842022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.265010415242784 -123.06005576716318 49.26499606716894 -123.05812232224615Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:553f99bb-1a7f-4ee4-8ea5-4bd51de993c12022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.265010415242784 -123.06005576716318 49.26499606716894 -123.05812232224615Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:f37938f0-ecb6-4498-aaf3-35be1349de732022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.265926320541354 -123.0619715390583 49.26591299394897 -123.06003818273545Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:2186e84b-f2d2-44ea-a3f1-315024414d372022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.2640920140031 -123.05813870254663 49.26408664496242 -123.05741695924763Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:2f76ec86-4ffa-427c-ad0f-780e54fadbbf2022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.26413537269076 -123.06394161537544 49.26412152152864 -123.06200795671687Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:0538cd49-ec49-4723-b26b-b44cb7d6fd5e2022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.26413537269076 -123.06394161537544 49.26412152152864 -123.06200795671687Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:dc7fce48-c2d4-4f54-a243-e11c4a3d1b4b2022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.26457278885846 -123.06199873579857 49.26412152152449 -123.06200795671687Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:57d71ee9-25f9-4ebd-be40-e4a8736f31ba2022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.26413537269076 -123.06394161537544 49.26412152152864 -123.06200795671687Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:77fd2914-fd13-4d60-b8d0-9dce5347990e2022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.26413537269076 -123.06394161537544 49.26412152152864 -123.06200795671687Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:8ccbec2c-7f41-41ef-b9ec-a676a730af3f2022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.26413537269076 -123.06394161537544 49.26412152152864 -123.06200795671687Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:35aeea7c-e6a9-48b5-aa19-d97386f5c38f2022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.26502419137924 -123.06198896508477 49.26457278885846 -123.06199873579857Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:c38d89c8-89c7-4d74-b64e-69526a87fdc72022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.265010415238635 -123.06005576716313 49.2649960671647 -123.05812232224615Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:b5236377-2c39-47e9-8b4b-bc315508f3142022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.26363985674763 -123.05814727030167 49.26318813159912 -123.0581550962084Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:a8e6b73a-deb0-4c37-ba7f-a443ab5e5c5d2022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.2640920140031 -123.05813870254663 49.26363985674763 -123.05814727030167Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:e23df17a-463e-4671-80b4-9245682f98522022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.2640920140031 -123.05813870254663 49.26363985674763 -123.05814727030167Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:6c8541cc-11ef-42cc-ada9-7e1b3a0bb4892022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.26363985674763 -123.05814727030167 49.26318813159912 -123.0581550962084Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:5ecc5991-1a25-4057-bb0d-1c0a45729d842022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.26412152152449 -123.06200795671687 49.263669131259576 -123.06201437215756Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:9c469563-362e-4ddb-a43e-b60222d2e7112022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.263669131259576 -123.06201437215756 49.26321658652785 -123.06202360491628Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:3c35267c-4d05-4e66-95fa-52dc20794dad2022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.26318813159912 -123.0581550962084 49.26318251979154 -123.057433352064Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:e2ebfc3d-ec4a-41db-b3df-3347aae48faa2022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.26318813159912 -123.0581550962084 49.26318251979154 -123.057433352064Sewer Renewal Project
Local Streets: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Location: E 3rd Ave to E 8th Ave, Lakewood Dr to L/E Garden Dr
Schedule: Aug 22, 2022 - Dec 30, 2023urn:uuid:d55bb1f9-7cef-4020-afe0-707cbeb9121a2022-10-26T07:00:00ZLakewood Dr & Garden Dr Sewer Renewal Project2023-12-01T23:13:03.344363Z49.26318813159912 -123.0581550962084 49.26318251979154 -123.057433352064Civil works resumed May 15, with grinding and paving being completed over the summer.
Paving operations on May 27 & May 28 on SW Marine, from Ontario St. to Ash St.
Paving operations from Fremlin and Oak - Q4 2023
The full scope of upgrades includes:
Water main replacement (3,920 metres) COMPLETE
Sewer separation (1,040 metres) COMPLETE
Location: Marine Dr from Ontario to Oak St - (Project complete between Victoria and Ontario)
Schedule: Jan 1, 2021 - Dec 31, 2023urn:uuid:13984017-4b7f-44dc-a035-5a0f5d43dd5b2021-01-04T08:00:00ZMarine Drive Corridor Renewal, Victoria to Oak2023-10-17T19:08:58.8995114Z49.21050783526999 -123.11624768670002 49.21014494803896 -123.11711072836Civil works resumed May 15, with grinding and paving being completed over the summer.
Paving operations on May 27 & May 28 on SW Marine, from Ontario St. to Ash St.
Paving operations from Fremlin and Oak - Q4 2023
The full scope of upgrades includes:
Water main replacement (3,920 metres) COMPLETE
Sewer separation (1,040 metres) COMPLETE
Location: Marine Dr from Ontario to Oak St - (Project complete between Victoria and Ontario)
Schedule: Jan 1, 2021 - Dec 31, 2023urn:uuid:a21dfe67-1a7d-497c-920f-e59ab53c11f82021-01-04T08:00:00ZMarine Drive Corridor Renewal, Victoria to Oak2023-10-17T19:08:58.8995114Z49.21096218016899 -123.11505996548 49.21093809400696 -123.11513797846 49.210906999759004 -123.11523473025 49.210874808843954 -123.11533064184998 49.210841521304985 -123.11542567205 49.21080715514799 -123.11551980716001 49.210771710416026 -123.11561300599 49.210735205117004 -123.11570525484 49.21069765728299 -123.11579651256 49.21050783526999 -123.11624768670002Civil works resumed May 15, with grinding and paving being completed over the summer.
Paving operations on May 27 & May 28 on SW Marine, from Ontario St. to Ash St.
Paving operations from Fremlin and Oak - Q4 2023
The full scope of upgrades includes:
Water main replacement (3,920 metres) COMPLETE
Sewer separation (1,040 metres) COMPLETE
Location: Marine Dr from Ontario to Oak St - (Project complete between Victoria and Ontario)
Schedule: Jan 1, 2021 - Dec 31, 2023urn:uuid:9017e723-edec-4bff-ba3e-073bef114a262021-01-04T08:00:00ZMarine Drive Corridor Renewal, Victoria to Oak2023-10-17T19:08:58.8995114Z49.211054756458 -123.11472859968 49.211036427570974 -123.11479749580998 49.21100005456404 -123.1149292199 49.21096218016899 -123.11505996548Civil works resumed May 15, with grinding and paving being completed over the summer.
Paving operations on May 27 & May 28 on SW Marine, from Ontario St. to Ash St.
Paving operations from Fremlin and Oak - Q4 2023
The full scope of upgrades includes:
Water main replacement (3,920 metres) COMPLETE
Sewer separation (1,040 metres) COMPLETE
Location: Marine Dr from Ontario to Oak St - (Project complete between Victoria and Ontario)
Schedule: Jan 1, 2021 - Dec 31, 2023urn:uuid:0fd40569-eb3c-4aeb-b023-9c54d6cc48972021-01-04T08:00:00ZMarine Drive Corridor Renewal, Victoria to Oak2023-10-17T19:08:58.8995114Z49.21181010856199 -123.11129951345002 49.211664652625984 -123.11176752459001 49.21163895334999 -123.11185089141 49.21161244708901 -123.11194080562001 49.21158697456099 -123.11203139485998 49.21156253576402 -123.11212265911 49.21153914872801 -123.11221455725 49.21151681346501 -123.11230707554 49.21149553902097 -123.11240015909 49.211413186302025 -123.11280704378Civil works resumed May 15, with grinding and paving being completed over the summer.
Paving operations on May 27 & May 28 on SW Marine, from Ontario St. to Ash St.
Paving operations from Fremlin and Oak - Q4 2023
The full scope of upgrades includes:
Water main replacement (3,920 metres) COMPLETE
Sewer separation (1,040 metres) COMPLETE
Location: Marine Dr from Ontario to Oak St - (Project complete between Victoria and Ontario)
Schedule: Jan 1, 2021 - Dec 31, 2023urn:uuid:5b180239-46d2-45ed-97a9-d383d01568792021-01-04T08:00:00ZMarine Drive Corridor Renewal, Victoria to Oak2023-10-17T19:08:58.8995114Z49.212189820646984 -123.10997214560999 49.212154502703015 -123.11011634581 49.212108717467004 -123.11029466987 49.21206089119997 -123.11047176706 49.21201105996499 -123.11064755505998 49.21181010856199 -123.11129951345002Civil works resumed May 15, with grinding and paving being completed over the summer.
Paving operations on May 27 & May 28 on SW Marine, from Ontario St. to Ash St.
Paving operations from Fremlin and Oak - Q4 2023
The full scope of upgrades includes:
Water main replacement (3,920 metres) COMPLETE
Sewer separation (1,040 metres) COMPLETE
Location: Marine Dr from Ontario to Oak St - (Project complete between Victoria and Ontario)
Schedule: Jan 1, 2021 - Dec 31, 2023urn:uuid:06db00f4-cb46-469f-993b-38867835a1fe2021-01-04T08:00:00ZMarine Drive Corridor Renewal, Victoria to Oak2023-10-17T19:08:58.8995114Z49.211413186302025 -123.11280704378 49.211211750301004 -123.11399360674999 49.21120530829302 -123.11403145952 49.211187235726015 -123.11413269105998 49.211168003155024 -123.11423343929002 49.211147628628 -123.11433364934 49.211126112171996 -123.11443329375 49.21110345380302 -123.11453235876 49.21107966255903 -123.11463080320999 49.211054756458 -123.11472859968Civil works resumed May 15, with grinding and paving being completed over the summer.
Paving operations on May 27 & May 28 on SW Marine, from Ontario St. to Ash St.
Paving operations from Fremlin and Oak - Q4 2023
The full scope of upgrades includes:
Water main replacement (3,920 metres) COMPLETE
Sewer separation (1,040 metres) COMPLETE
Location: Marine Dr from Ontario to Oak St - (Project complete between Victoria and Ontario)
Schedule: Jan 1, 2021 - Dec 31, 2023urn:uuid:f1b2954f-afe0-4df9-9fe6-d556758b96df2021-01-04T08:00:00ZMarine Drive Corridor Renewal, Victoria to Oak2023-10-17T19:08:58.8995114Z49.212321519559055 -123.10656607147263 49.212377453130415 -123.10712915240956 49.21239296722666 -123.10736466260916 49.212393347846245 -123.10737130895603 49.21239915985106 -123.10748624516002 49.212403658291606 -123.10760132957472 49.21240683423616 -123.10771649351958 49.21240869667989 -123.10783173700496 49.21240924566089 -123.10794701883049 49.212408472235325 -123.10806228404579 49.21240638541127 -123.10817751893094 49.212402976245045 -123.10829266853551 49.21239825373226 -123.10840773287002 49.21239220894233 -123.1085226432537 49.21238485989201 -123.10863737225604 49.21237619762553 -123.10875187865717 49.212366231151634 -123.10886614873749 49.21235495151467 -123.10898014127724 49.212342376744914 -123.10909381511603 49.2123284889046 -123.10920711528398 49.212313323963 -123.10932005558224 49.21229686399562 -123.10943256731078 49.2122791270333 -123.10954460930994 49.21226010409521 -123.10965616782137 49.212239813199346 -123.10976721541597 49.21221824540413 -123.10987769714467 49.21219542773622 -123.10998757186846Civil works resumed May 15, with grinding and paving being completed over the summer.
Paving operations on May 27 & May 28 on SW Marine, from Ontario St. to Ash St.
Paving operations from Fremlin and Oak - Q4 2023
The full scope of upgrades includes:
Water main replacement (3,920 metres) COMPLETE
Sewer separation (1,040 metres) COMPLETE
Location: Marine Dr from Ontario to Oak St - (Project complete between Victoria and Ontario)
Schedule: Jan 1, 2021 - Dec 31, 2023urn:uuid:de07f3cf-92fc-4dd3-bd6f-f09a96c1de392021-01-04T08:00:00ZMarine Drive Corridor Renewal, Victoria to Oak2023-10-17T19:08:58.8995114Z49.207070857274005 -123.12443524625999 49.20681727553901 -123.1250390099Civil works resumed May 15, with grinding and paving being completed over the summer.
Paving operations on May 27 & May 28 on SW Marine, from Ontario St. to Ash St.
Paving operations from Fremlin and Oak - Q4 2023
The full scope of upgrades includes:
Water main replacement (3,920 metres) COMPLETE
Sewer separation (1,040 metres) COMPLETE
Location: Marine Dr from Ontario to Oak St - (Project complete between Victoria and Ontario)
Schedule: Jan 1, 2021 - Dec 31, 2023urn:uuid:9c95a949-1292-4c8b-8c83-da1ab3ba76ff2021-01-04T08:00:00ZMarine Drive Corridor Renewal, Victoria to Oak2023-10-17T19:08:58.8995114Z49.207508111115004 -123.12339407402001 49.20715211317798 -123.12424174816Civil works resumed May 15, with grinding and paving being completed over the summer.
Paving operations on May 27 & May 28 on SW Marine, from Ontario St. to Ash St.
Paving operations from Fremlin and Oak - Q4 2023
The full scope of upgrades includes:
Water main replacement (3,920 metres) COMPLETE
Sewer separation (1,040 metres) COMPLETE
Location: Marine Dr from Ontario to Oak St - (Project complete between Victoria and Ontario)
Schedule: Jan 1, 2021 - Dec 31, 2023urn:uuid:b9e225d5-eb26-40e8-b510-d0133dfc1e1e2021-01-04T08:00:00ZMarine Drive Corridor Renewal, Victoria to Oak2023-10-17T19:08:58.8995114Z49.207759952764036 -123.12279440798999 49.207508111115004 -123.12339407402001Civil works resumed May 15, with grinding and paving being completed over the summer.
Paving operations on May 27 & May 28 on SW Marine, from Ontario St. to Ash St.
Paving operations from Fremlin and Oak - Q4 2023
The full scope of upgrades includes:
Water main replacement (3,920 metres) COMPLETE
Sewer separation (1,040 metres) COMPLETE
Location: Marine Dr from Ontario to Oak St - (Project complete between Victoria and Ontario)
Schedule: Jan 1, 2021 - Dec 31, 2023urn:uuid:13e11886-8eaf-476c-9bbc-c0820d72e5232021-01-04T08:00:00ZMarine Drive Corridor Renewal, Victoria to Oak2023-10-17T19:08:58.8995114Z49.208785887533 -123.12034667289001 49.20830307098001 -123.12150110878Civil works resumed May 15, with grinding and paving being completed over the summer.
Paving operations on May 27 & May 28 on SW Marine, from Ontario St. to Ash St.
Paving operations from Fremlin and Oak - Q4 2023
The full scope of upgrades includes:
Water main replacement (3,920 metres) COMPLETE
Sewer separation (1,040 metres) COMPLETE
Location: Marine Dr from Ontario to Oak St - (Project complete between Victoria and Ontario)
Schedule: Jan 1, 2021 - Dec 31, 2023urn:uuid:8435a571-ca7c-4990-886b-6466dabe5abe2021-01-04T08:00:00ZMarine Drive Corridor Renewal, Victoria to Oak2023-10-17T19:08:58.8995114Z49.20830307098001 -123.12150110878 49.207759952764036 -123.12279440798999Civil works resumed May 15, with grinding and paving being completed over the summer.
Paving operations on May 27 & May 28 on SW Marine, from Ontario St. to Ash St.
Paving operations from Fremlin and Oak - Q4 2023
The full scope of upgrades includes:
Water main replacement (3,920 metres) COMPLETE
Sewer separation (1,040 metres) COMPLETE
Location: Marine Dr from Ontario to Oak St - (Project complete between Victoria and Ontario)
Schedule: Jan 1, 2021 - Dec 31, 2023urn:uuid:547b3c82-72c7-47b9-8ef3-1f8b982f91382021-01-04T08:00:00ZMarine Drive Corridor Renewal, Victoria to Oak2023-10-17T19:08:58.8995114Z49.20937558746496 -123.11894410332 49.208785887533 -123.12034667289001Civil works resumed May 15, with grinding and paving being completed over the summer.
Paving operations on May 27 & May 28 on SW Marine, from Ontario St. to Ash St.
Paving operations from Fremlin and Oak - Q4 2023
The full scope of upgrades includes:
Water main replacement (3,920 metres) COMPLETE
Sewer separation (1,040 metres) COMPLETE
Location: Marine Dr from Ontario to Oak St - (Project complete between Victoria and Ontario)
Schedule: Jan 1, 2021 - Dec 31, 2023urn:uuid:60fdd3a3-7d54-4e45-b5e7-4db56efd33a32021-01-04T08:00:00ZMarine Drive Corridor Renewal, Victoria to Oak2023-10-17T19:08:58.8995114Z49.20966803784799 -123.11824762629001 49.20937558746496 -123.11894410332Civil works resumed May 15, with grinding and paving being completed over the summer.
Paving operations on May 27 & May 28 on SW Marine, from Ontario St. to Ash St.
Paving operations from Fremlin and Oak - Q4 2023
The full scope of upgrades includes:
Water main replacement (3,920 metres) COMPLETE
Sewer separation (1,040 metres) COMPLETE
Location: Marine Dr from Ontario to Oak St - (Project complete between Victoria and Ontario)
Schedule: Jan 1, 2021 - Dec 31, 2023urn:uuid:4f85abad-1372-4d77-93db-aaa305b81cf52021-01-04T08:00:00ZMarine Drive Corridor Renewal, Victoria to Oak2023-10-17T19:08:58.8995114Z49.21014494803896 -123.11711072836 49.20966803784799 -123.11824762629001Civil works resumed May 15, with grinding and paving being completed over the summer.
Paving operations on May 27 & May 28 on SW Marine, from Ontario St. to Ash St.
Paving operations from Fremlin and Oak - Q4 2023
The full scope of upgrades includes:
Water main replacement (3,920 metres) COMPLETE
Sewer separation (1,040 metres) COMPLETE
Location: Marine Dr from Ontario to Oak St - (Project complete between Victoria and Ontario)
Schedule: Jan 1, 2021 - Dec 31, 2023urn:uuid:6ec43088-579c-4e65-baef-b2c0debcb7782021-01-04T08:00:00ZMarine Drive Corridor Renewal, Victoria to Oak2023-10-17T19:08:58.8995114Z49.20627842860401 -123.12632197345998 49.20601116430697 -123.12695830208001Civil works resumed May 15, with grinding and paving being completed over the summer.
Paving operations on May 27 & May 28 on SW Marine, from Ontario St. to Ash St.
Paving operations from Fremlin and Oak - Q4 2023
The full scope of upgrades includes:
Water main replacement (3,920 metres) COMPLETE
Sewer separation (1,040 metres) COMPLETE
Location: Marine Dr from Ontario to Oak St - (Project complete between Victoria and Ontario)
Schedule: Jan 1, 2021 - Dec 31, 2023urn:uuid:76f1d2fc-a792-4cb0-907a-29934833bc3e2021-01-04T08:00:00ZMarine Drive Corridor Renewal, Victoria to Oak2023-10-17T19:08:58.8995114Z49.20573735775599 -123.12761014776001 49.20546825544602 -123.12825083714Civil works resumed May 15, with grinding and paving being completed over the summer.
Paving operations on May 27 & May 28 on SW Marine, from Ontario St. to Ash St.
Paving operations from Fremlin and Oak - Q4 2023
The full scope of upgrades includes:
Water main replacement (3,920 metres) COMPLETE
Sewer separation (1,040 metres) COMPLETE
Location: Marine Dr from Ontario to Oak St - (Project complete between Victoria and Ontario)
Schedule: Jan 1, 2021 - Dec 31, 2023urn:uuid:4bf83519-e0de-4a4c-b910-6cc59923296e2021-01-04T08:00:00ZMarine Drive Corridor Renewal, Victoria to Oak2023-10-17T19:08:58.8995114Z49.20546825544602 -123.12825083714 49.20516736570801 -123.12896716291Civil works resumed May 15, with grinding and paving being completed over the summer.
Paving operations on May 27 & May 28 on SW Marine, from Ontario St. to Ash St.
Paving operations from Fremlin and Oak - Q4 2023
The full scope of upgrades includes:
Water main replacement (3,920 metres) COMPLETE
Sewer separation (1,040 metres) COMPLETE
Location: Marine Dr from Ontario to Oak St - (Project complete between Victoria and Ontario)
Schedule: Jan 1, 2021 - Dec 31, 2023urn:uuid:cdf6cea0-fc5f-495e-a7a8-7d9f5d7e5d0f2021-01-04T08:00:00ZMarine Drive Corridor Renewal, Victoria to Oak2023-10-17T19:08:58.8995114Z49.20601116430697 -123.12695830208001 49.20573735775599 -123.12761014776001Civil works resumed May 15, with grinding and paving being completed over the summer.
Paving operations on May 27 & May 28 on SW Marine, from Ontario St. to Ash St.
Paving operations from Fremlin and Oak - Q4 2023
The full scope of upgrades includes:
Water main replacement (3,920 metres) COMPLETE
Sewer separation (1,040 metres) COMPLETE
Location: Marine Dr from Ontario to Oak St - (Project complete between Victoria and Ontario)
Schedule: Jan 1, 2021 - Dec 31, 2023urn:uuid:31fd121b-c084-493f-a7b9-2080194ea63f2021-01-04T08:00:00ZMarine Drive Corridor Renewal, Victoria to Oak2023-10-17T19:08:58.8995114Z49.20638187376301 -123.12607566855 49.20627842860401 -123.12632197345998Civil works resumed May 15, with grinding and paving being completed over the summer.
Paving operations on May 27 & May 28 on SW Marine, from Ontario St. to Ash St.
Paving operations from Fremlin and Oak - Q4 2023
The full scope of upgrades includes:
Water main replacement (3,920 metres) COMPLETE
Sewer separation (1,040 metres) COMPLETE
Location: Marine Dr from Ontario to Oak St - (Project complete between Victoria and Ontario)
Schedule: Jan 1, 2021 - Dec 31, 2023urn:uuid:dbefbe6f-c24e-4da5-9ad1-15b2a22ff8972021-01-04T08:00:00ZMarine Drive Corridor Renewal, Victoria to Oak2023-10-17T19:08:58.8995114Z49.20516736570801 -123.12896716291 49.204574899113 -123.13037755937Civil works resumed May 15, with grinding and paving being completed over the summer.
Paving operations on May 27 & May 28 on SW Marine, from Ontario St. to Ash St.
Paving operations from Fremlin and Oak - Q4 2023
The full scope of upgrades includes:
Water main replacement (3,920 metres) COMPLETE
Sewer separation (1,040 metres) COMPLETE
Location: Marine Dr from Ontario to Oak St - (Project complete between Victoria and Ontario)
Schedule: Jan 1, 2021 - Dec 31, 2023urn:uuid:b5a5fa01-66cb-44de-97b9-1758fbafa7cc2021-01-04T08:00:00ZMarine Drive Corridor Renewal, Victoria to Oak2023-10-17T19:08:58.8995114Z49.206547772704 -123.12568067344 49.20638187376301 -123.12607566855Civil works resumed May 15, with grinding and paving being completed over the summer.
Paving operations on May 27 & May 28 on SW Marine, from Ontario St. to Ash St.
Paving operations from Fremlin and Oak - Q4 2023
The full scope of upgrades includes:
Water main replacement (3,920 metres) COMPLETE
Sewer separation (1,040 metres) COMPLETE
Location: Marine Dr from Ontario to Oak St - (Project complete between Victoria and Ontario)
Schedule: Jan 1, 2021 - Dec 31, 2023urn:uuid:612b0baf-0a19-4770-b1c6-f62b6b9ef56d2021-01-04T08:00:00ZMarine Drive Corridor Renewal, Victoria to Oak2023-10-17T19:08:58.8995114Z49.20681727553901 -123.1250390099 49.206547772704 -123.12568067344Crews will be on site to conduct Utility Maintenance on behalf of Metro Vancouver
Traffic Impacts:
Single Lane Alternating Traffic, Both Sides, 1500-1700 Block of Discovery St from NW Marine Dr to 460m North
WO# PD783707
Location: 1500-1700 Block of Discovery Street
Schedule: Apr 10, 2024 8:00 AM - 4:00 PMurn:uuid:792c8b42-8806-41f1-ab83-d0ba7e6b6e082024-03-22T07:00:00ZMetro Vancouver - Utility Maintenance on 1500-1700 Block of Discovery Street2024-03-22T21:28:52.0817324Z49.27180782160704 -123.20280278476145 49.2759786805988 -123.20259280648825Crews will be on site to conduct Utility Maintenance on behalf of Metro Vancouver
Traffic Impacts:
- Parking Lane Closure, Both Sides, 1700-1800 Block of E 13th Ave from Victoria Dr to 60m West of Victoria Dr
- Parking Lane Closure, Both Sides, 1700-1800 Block of E 14th Ave from Victoria Dr to 60m West of Victoria Dr
- Parking Lane Closure, Both Sides, 1800 Block of E 15th Ave from Victoria Dr to 60m West of Victoria Dr
WO# PD783688
Location: 1700-1800 Block of E 13th Ave, 1700-1800 Block of E 14th Ave and 1800 Block of E 15th Ave
Schedule: Apr 12, 2024 8:00 AM - 4:00 PMurn:uuid:84347b8c-545d-464f-b731-272d48e29dc42024-03-15T07:00:00ZMetro Vancouver - Utility Maintenance on 1700-1800 Block of E 13th Ave, 1700-1800 Block of E 14th Ave and 1800 Block of E 15th Ave2024-03-15T22:55:37.5892108Z49.256831737993224 -123.06601359179196 49.256831737993224 -123.06680752566037Crews will be on site to conduct Utility Maintenance on behalf of Metro Vancouver
Traffic Impacts:
- Parking Lane Closure, Both Sides, 1700-1800 Block of E 13th Ave from Victoria Dr to 60m West of Victoria Dr
- Parking Lane Closure, Both Sides, 1700-1800 Block of E 14th Ave from Victoria Dr to 60m West of Victoria Dr
- Parking Lane Closure, Both Sides, 1800 Block of E 15th Ave from Victoria Dr to 60m West of Victoria Dr
WO# PD783688
Location: 1700-1800 Block of E 13th Ave, 1700-1800 Block of E 14th Ave and 1800 Block of E 15th Ave
Schedule: Apr 12, 2024 8:00 AM - 4:00 PMurn:uuid:11be3554-fc0d-4983-b480-1cac699c73272024-03-15T07:00:00ZMetro Vancouver - Utility Maintenance on 1700-1800 Block of E 13th Ave, 1700-1800 Block of E 14th Ave and 1800 Block of E 15th Ave2024-03-15T22:55:37.5892108Z49.25773108750798 -123.06600108206092 49.25772758638004 -123.06684329569158Crews will be on site to conduct Utility Maintenance on behalf of Metro Vancouver
Traffic Impacts:
- Parking Lane Closure, Both Sides, 1700-1800 Block of E 13th Ave from Victoria Dr to 60m West of Victoria Dr
- Parking Lane Closure, Both Sides, 1700-1800 Block of E 14th Ave from Victoria Dr to 60m West of Victoria Dr
- Parking Lane Closure, Both Sides, 1800 Block of E 15th Ave from Victoria Dr to 60m West of Victoria Dr
WO# PD783688
Location: 1700-1800 Block of E 13th Ave, 1700-1800 Block of E 14th Ave and 1800 Block of E 15th Ave
Schedule: Apr 12, 2024 8:00 AM - 4:00 PMurn:uuid:d4996db3-ff26-4c3c-a138-1a67ef9609f82024-03-15T07:00:00ZMetro Vancouver - Utility Maintenance on 1700-1800 Block of E 13th Ave, 1700-1800 Block of E 14th Ave and 1800 Block of E 15th Ave2024-03-15T22:55:37.5892108Z49.258639880737974 -123.06596755842412 49.25862608743458 -123.06684463794731Alleyway lane closure on the North Side of 3400 Matapan Crescent and Both Sides of Lane West of 2900 Block of Skeena Street to facilitate utility maintenance.
WO# PD782432
Location: North Side of 3400 Block of Matapan Crescent From 50m West of Skeena Street to 70m West of Skeena Street. Both Sides of Lane West of 2900 Block of Skeena Street From Matapan Crescent to Lane North of Matapan Crescent.
Schedule: Apr 15, 2024 8:00 AM - 11:00 AMurn:uuid:eeced675-697b-4b68-8395-de46321008812024-03-26T07:00:00ZMetro Vancouver Utilty Maintenance on 3400 Block of Matapan Crescent2024-03-26T21:01:16.6812939Z49.25727361121287 -123.02899029551598 49.25729041673648 -123.02996402511224Alleyway lane closure on the North Side of 3400 Matapan Crescent and Both Sides of Lane West of 2900 Block of Skeena Street to facilitate utility maintenance.
WO# PD782432
Location: North Side of 3400 Block of Matapan Crescent From 50m West of Skeena Street to 70m West of Skeena Street. Both Sides of Lane West of 2900 Block of Skeena Street From Matapan Crescent to Lane North of Matapan Crescent.
Schedule: Apr 15, 2024 8:00 AM - 11:00 AMurn:uuid:b1769b74-4056-4823-853b-c6a68d8e78742024-03-26T07:00:00ZMetro Vancouver Utilty Maintenance on 3400 Block of Matapan Crescent2024-03-26T21:01:16.6812939Z49.257696549516425 -123.02974954707119 49.257307222254354 -123.02975812605536New St. Paul’s Hospital Area Improvements.
National/Station Intersection (ongoing)
-Sep 2023 to Oct 13, 2023
National between Station and National Yards (to be confirmed)
-Tentative start date Jun 2024
Prior, Dunlevy (to be confirmed)
-Anticipated 2025
Location: Prior St, Station, National Ave, Dunlevy Ave
Schedule: Jan 3, 2022 - Jan 1, 2027urn:uuid:d120382f-88ea-4f58-889c-1f6023291c602022-11-08T08:00:00ZNew St. Paul’s Hospital Area Improvements 2023-10-05T01:00:30.9809704Z49.27657162567556 -123.09370167553425 49.276680508278304 -123.09892304197999 49.27568500423942 -123.09870846525881 49.2754516798002 -123.09818632769746 49.274596148410325 -123.09824593219675 49.27409837808176 -123.0953849083744 49.27409837808176 -123.09495575493203 49.27576277852242 -123.09416897449411 49.27584055268278 -123.09342987660786 49.27657162567556 -123.09370167553425New St. Paul’s Hospital Area Improvements.
National/Station Intersection (ongoing)
-Sep 2023 to Oct 13, 2023
National between Station and National Yards (to be confirmed)
-Tentative start date Jun 2024
Prior, Dunlevy (to be confirmed)
-Anticipated 2025
Location: Prior St, Station, National Ave, Dunlevy Ave
Schedule: Jan 3, 2022 - Jan 1, 2027urn:uuid:7a80273b-8396-4b21-8f39-4775f06b6d462022-11-08T08:00:00ZNew St. Paul’s Hospital Area Improvements 2023-10-05T01:00:30.9809704Z49.274943175396544 -123.0990940701304 49.27490428741058 -123.09849802382816New St. Paul’s Hospital Area Improvements.
National/Station Intersection (ongoing)
-Sep 2023 to Oct 13, 2023
National between Station and National Yards (to be confirmed)
-Tentative start date Jun 2024
Prior, Dunlevy (to be confirmed)
-Anticipated 2025
Location: Prior St, Station, National Ave, Dunlevy Ave
Schedule: Jan 3, 2022 - Jan 1, 2027urn:uuid:f24d3cce-3ee9-4cfb-95f3-e53fcd55c4542022-11-08T08:00:00ZNew St. Paul’s Hospital Area Improvements 2023-10-05T01:00:30.9809704Z49.27547982476287 -123.09908214883765 49.275324274754695 -123.09849802382816 49.274562072880315 -123.0984861025354New St. Paul’s Hospital Area Improvements.
National/Station Intersection (ongoing)
-Sep 2023 to Oct 13, 2023
National between Station and National Yards (to be confirmed)
-Tentative start date Jun 2024
Prior, Dunlevy (to be confirmed)
-Anticipated 2025
Location: Prior St, Station, National Ave, Dunlevy Ave
Schedule: Jan 3, 2022 - Jan 1, 2027urn:uuid:302c9ac3-b3a2-4121-a360-ac5e780cf55d2022-11-08T08:00:00ZNew St. Paul’s Hospital Area Improvements 2023-10-05T01:00:30.9809704Z49.27675813894081 -123.09903321718957 49.27491240929686 -123.09911508814972Oak Street Upgrades - PM is Reid Plasterer.
o Phase 1 – Fremlin St (Daytime Work) – underway until Mar 2024
o Phase 2 – W 70th Ave (Daytime Work) – Feb 2024 to Jun 2024
o Phase 3 – Oak St (Nighttime Work) – Jun 2024 to Q2 2025
Consisting of sewer upgrades / separation from W. 64th Ave to W. 70th Ave, then eastward on W. 70th Ave to Fremlin, and south on Fremlin to SW Marine Dr . It also includes full width grind and overlay from W. 64th Ave to the Oak St Bridge abutment
Location: Oak St from Park Dr to Oak St Bridge, W. 70th Ave from Oak St to Fremlin St, and Fremlin St from W 70th Ave to SW Marine Dr
Schedule: Sep 1, 2023 - Jul 1, 2025urn:uuid:113a6453-6e02-4cb2-b902-ac06851e82342024-01-29T08:00:00ZOak Street Upgrades 2024-02-28T18:08:29.3671259Z49.21072925422601 -123.13017074044 49.20847130656301 -123.13024569212Oak Street Upgrades - PM is Reid Plasterer.
o Phase 1 – Fremlin St (Daytime Work) – underway until Mar 2024
o Phase 2 – W 70th Ave (Daytime Work) – Feb 2024 to Jun 2024
o Phase 3 – Oak St (Nighttime Work) – Jun 2024 to Q2 2025
Consisting of sewer upgrades / separation from W. 64th Ave to W. 70th Ave, then eastward on W. 70th Ave to Fremlin, and south on Fremlin to SW Marine Dr . It also includes full width grind and overlay from W. 64th Ave to the Oak St Bridge abutment
Location: Oak St from Park Dr to Oak St Bridge, W. 70th Ave from Oak St to Fremlin St, and Fremlin St from W 70th Ave to SW Marine Dr
Schedule: Sep 1, 2023 - Jul 1, 2025urn:uuid:b87a812c-60f7-4c29-8170-602a623f96812024-01-29T08:00:00ZOak Street Upgrades 2024-02-28T18:08:29.3671259Z49.212988127486 -123.13009577084 49.21072925422601 -123.13017074044Oak Street Upgrades - PM is Reid Plasterer.
o Phase 1 – Fremlin St (Daytime Work) – underway until Mar 2024
o Phase 2 – W 70th Ave (Daytime Work) – Feb 2024 to Jun 2024
o Phase 3 – Oak St (Nighttime Work) – Jun 2024 to Q2 2025
Consisting of sewer upgrades / separation from W. 64th Ave to W. 70th Ave, then eastward on W. 70th Ave to Fremlin, and south on Fremlin to SW Marine Dr . It also includes full width grind and overlay from W. 64th Ave to the Oak St Bridge abutment
Location: Oak St from Park Dr to Oak St Bridge, W. 70th Ave from Oak St to Fremlin St, and Fremlin St from W 70th Ave to SW Marine Dr
Schedule: Sep 1, 2023 - Jul 1, 2025urn:uuid:6cb59ab9-5496-4d64-a87c-5d14ea00ae9e2024-01-29T08:00:00ZOak Street Upgrades 2024-02-28T18:08:29.3671259Z49.21341269386198 -123.1300816851 49.212988127486 -123.13009577084Oak Street Upgrades - PM is Reid Plasterer.
o Phase 1 – Fremlin St (Daytime Work) – underway until Mar 2024
o Phase 2 – W 70th Ave (Daytime Work) – Feb 2024 to Jun 2024
o Phase 3 – Oak St (Nighttime Work) – Jun 2024 to Q2 2025
Consisting of sewer upgrades / separation from W. 64th Ave to W. 70th Ave, then eastward on W. 70th Ave to Fremlin, and south on Fremlin to SW Marine Dr . It also includes full width grind and overlay from W. 64th Ave to the Oak St Bridge abutment
Location: Oak St from Park Dr to Oak St Bridge, W. 70th Ave from Oak St to Fremlin St, and Fremlin St from W 70th Ave to SW Marine Dr
Schedule: Sep 1, 2023 - Jul 1, 2025urn:uuid:badfb3c8-73ca-4e18-a687-1cdb4fad8acb2024-01-29T08:00:00ZOak Street Upgrades 2024-02-28T18:08:29.3671259Z49.214458686694 -123.13004695791999 49.21341269386198 -123.1300816851Oak Street Upgrades - PM is Reid Plasterer.
o Phase 1 – Fremlin St (Daytime Work) – underway until Mar 2024
o Phase 2 – W 70th Ave (Daytime Work) – Feb 2024 to Jun 2024
o Phase 3 – Oak St (Nighttime Work) – Jun 2024 to Q2 2025
Consisting of sewer upgrades / separation from W. 64th Ave to W. 70th Ave, then eastward on W. 70th Ave to Fremlin, and south on Fremlin to SW Marine Dr . It also includes full width grind and overlay from W. 64th Ave to the Oak St Bridge abutment
Location: Oak St from Park Dr to Oak St Bridge, W. 70th Ave from Oak St to Fremlin St, and Fremlin St from W 70th Ave to SW Marine Dr
Schedule: Sep 1, 2023 - Jul 1, 2025urn:uuid:840a2339-0be0-417f-b117-a57f3c74ac852024-01-29T08:00:00ZOak Street Upgrades 2024-02-28T18:08:29.3671259Z49.20691428730899 -123.13029861847 49.205641593237004 -123.13034158073002Oak Street Upgrades - PM is Reid Plasterer.
o Phase 1 – Fremlin St (Daytime Work) – underway until Mar 2024
o Phase 2 – W 70th Ave (Daytime Work) – Feb 2024 to Jun 2024
o Phase 3 – Oak St (Nighttime Work) – Jun 2024 to Q2 2025
Consisting of sewer upgrades / separation from W. 64th Ave to W. 70th Ave, then eastward on W. 70th Ave to Fremlin, and south on Fremlin to SW Marine Dr . It also includes full width grind and overlay from W. 64th Ave to the Oak St Bridge abutment
Location: Oak St from Park Dr to Oak St Bridge, W. 70th Ave from Oak St to Fremlin St, and Fremlin St from W 70th Ave to SW Marine Dr
Schedule: Sep 1, 2023 - Jul 1, 2025urn:uuid:723b15d9-0162-4119-ae07-c5a58c7868212024-01-29T08:00:00ZOak Street Upgrades 2024-02-28T18:08:29.3671259Z49.20847130656301 -123.13024569212 49.20691428730899 -123.13029861847Oak Street Upgrades - PM is Reid Plasterer.
o Phase 1 – Fremlin St (Daytime Work) – underway until Mar 2024
o Phase 2 – W 70th Ave (Daytime Work) – Feb 2024 to Jun 2024
o Phase 3 – Oak St (Nighttime Work) – Jun 2024 to Q2 2025
Consisting of sewer upgrades / separation from W. 64th Ave to W. 70th Ave, then eastward on W. 70th Ave to Fremlin, and south on Fremlin to SW Marine Dr . It also includes full width grind and overlay from W. 64th Ave to the Oak St Bridge abutment
Location: Oak St from Park Dr to Oak St Bridge, W. 70th Ave from Oak St to Fremlin St, and Fremlin St from W 70th Ave to SW Marine Dr
Schedule: Sep 1, 2023 - Jul 1, 2025urn:uuid:0ec1b568-7bd7-4868-952c-2e6cd46a7b462024-01-29T08:00:00ZOak Street Upgrades 2024-02-28T18:08:29.3671259Z49.208428944480005 -123.12748303539 49.20843956663899 -123.12817508929999Oak Street Upgrades - PM is Reid Plasterer.
o Phase 1 – Fremlin St (Daytime Work) – underway until Mar 2024
o Phase 2 – W 70th Ave (Daytime Work) – Feb 2024 to Jun 2024
o Phase 3 – Oak St (Nighttime Work) – Jun 2024 to Q2 2025
Consisting of sewer upgrades / separation from W. 64th Ave to W. 70th Ave, then eastward on W. 70th Ave to Fremlin, and south on Fremlin to SW Marine Dr . It also includes full width grind and overlay from W. 64th Ave to the Oak St Bridge abutment
Location: Oak St from Park Dr to Oak St Bridge, W. 70th Ave from Oak St to Fremlin St, and Fremlin St from W 70th Ave to SW Marine Dr
Schedule: Sep 1, 2023 - Jul 1, 2025urn:uuid:83638612-3598-496b-9662-6228b81ad3702024-01-29T08:00:00ZOak Street Upgrades 2024-02-28T18:08:29.3671259Z49.20843956663899 -123.12817508929999 49.208450184054016 -123.12886767894001Oak Street Upgrades - PM is Reid Plasterer.
o Phase 1 – Fremlin St (Daytime Work) – underway until Mar 2024
o Phase 2 – W 70th Ave (Daytime Work) – Feb 2024 to Jun 2024
o Phase 3 – Oak St (Nighttime Work) – Jun 2024 to Q2 2025
Consisting of sewer upgrades / separation from W. 64th Ave to W. 70th Ave, then eastward on W. 70th Ave to Fremlin, and south on Fremlin to SW Marine Dr . It also includes full width grind and overlay from W. 64th Ave to the Oak St Bridge abutment
Location: Oak St from Park Dr to Oak St Bridge, W. 70th Ave from Oak St to Fremlin St, and Fremlin St from W 70th Ave to SW Marine Dr
Schedule: Sep 1, 2023 - Jul 1, 2025urn:uuid:52d100c0-4476-4917-b65c-6d48afd25d4a2024-01-29T08:00:00ZOak Street Upgrades 2024-02-28T18:08:29.3671259Z49.208450184054016 -123.12886767894001 49.20846076413801 -123.12955777005Oak Street Upgrades - PM is Reid Plasterer.
o Phase 1 – Fremlin St (Daytime Work) – underway until Mar 2024
o Phase 2 – W 70th Ave (Daytime Work) – Feb 2024 to Jun 2024
o Phase 3 – Oak St (Nighttime Work) – Jun 2024 to Q2 2025
Consisting of sewer upgrades / separation from W. 64th Ave to W. 70th Ave, then eastward on W. 70th Ave to Fremlin, and south on Fremlin to SW Marine Dr . It also includes full width grind and overlay from W. 64th Ave to the Oak St Bridge abutment
Location: Oak St from Park Dr to Oak St Bridge, W. 70th Ave from Oak St to Fremlin St, and Fremlin St from W 70th Ave to SW Marine Dr
Schedule: Sep 1, 2023 - Jul 1, 2025urn:uuid:4510f5ec-9216-4e9d-ad08-de7be46a88e62024-01-29T08:00:00ZOak Street Upgrades 2024-02-28T18:08:29.3671259Z49.20846076413801 -123.12955777005 49.20847130656301 -123.13024569212Oak Street Upgrades - PM is Reid Plasterer.
o Phase 1 – Fremlin St (Daytime Work) – underway until Mar 2024
o Phase 2 – W 70th Ave (Daytime Work) – Feb 2024 to Jun 2024
o Phase 3 – Oak St (Nighttime Work) – Jun 2024 to Q2 2025
Consisting of sewer upgrades / separation from W. 64th Ave to W. 70th Ave, then eastward on W. 70th Ave to Fremlin, and south on Fremlin to SW Marine Dr . It also includes full width grind and overlay from W. 64th Ave to the Oak St Bridge abutment
Location: Oak St from Park Dr to Oak St Bridge, W. 70th Ave from Oak St to Fremlin St, and Fremlin St from W 70th Ave to SW Marine Dr
Schedule: Sep 1, 2023 - Jul 1, 2025urn:uuid:17bba4c5-c64e-4c7c-8f0c-40568dd4dbc82024-01-29T08:00:00ZOak Street Upgrades 2024-02-28T18:08:29.3671259Z49.208428944480005 -123.12748303539 49.20687761606001 -123.12755629946999Oak Street Upgrades - PM is Reid Plasterer.
o Phase 1 – Fremlin St (Daytime Work) – underway until Mar 2024
o Phase 2 – W 70th Ave (Daytime Work) – Feb 2024 to Jun 2024
o Phase 3 – Oak St (Nighttime Work) – Jun 2024 to Q2 2025
Consisting of sewer upgrades / separation from W. 64th Ave to W. 70th Ave, then eastward on W. 70th Ave to Fremlin, and south on Fremlin to SW Marine Dr . It also includes full width grind and overlay from W. 64th Ave to the Oak St Bridge abutment
Location: Oak St from Park Dr to Oak St Bridge, W. 70th Ave from Oak St to Fremlin St, and Fremlin St from W 70th Ave to SW Marine Dr
Schedule: Sep 1, 2023 - Jul 1, 2025urn:uuid:465bd0d4-3ecb-4ac8-8b7c-6c363cd9cbb42024-01-29T08:00:00ZOak Street Upgrades 2024-02-28T18:08:29.3671259Z49.20687761606001 -123.12755629946999 49.20573735775599 -123.12761014776001Oakridge Centre redevelopment
QuadReal Property Group and Westbank Development, the owners of Oakridge Centre, are moving forward with the redevelopment of the Oakridge Centre, based on the rezoning that was approved in 2014.
The Oakridge Centre is currently home to shops, services, offices, and community and residential space. Many of the shops and services will remain open throughout the redevelopment. The current site design reflects a number of refinements responding to conditions of the 2014 rezoning and policy changes that have emerged since Council approved the rezoning of the site.
https://vancouver.ca/home-property-development/oakridge-redevelopment.aspx
Location: W 41st Ave and Cambie St
Schedule: Jun 1, 2021 - May 30, 2025urn:uuid:30fdeccb-489f-43cd-b621-04d324eb66e72023-10-30T07:00:00ZOakridge Town Centre - Development Site at W 41st Ave and Cambie St2024-02-06T18:41:26.3231862Z49.233580135672895 -123.1216228741687 49.23275501524799 -123.12159903289285 49.231914312289945 -123.12114603686496 49.23121371556235 -123.12021620484302 49.23040412441472 -123.11909563737572 49.23041969406913 -123.1184280659363 49.22996351441765 -123.1184495236084 49.22990123776134 -123.1166136995307 49.233450919508414 -123.11647064925636 49.233580135672895 -123.1216228741687Southbound Direction only.
Location:
Schedule: Apr 3, 2024 9:30 AM - 2:30 PMurn:uuid:ac6e8893-9cc8-4f02-973a-6f274d4cc7332024-03-27T07:00:00ZParks Bd Maintenance2024-03-19T17:30:07.6403992Z49.25117568525468 -123.10099496119085 49.25096531622509 -123.1010001587966Construction underway until fall 2022
Localized sewer renewal works are now underway.
In early September, City of Vancouver crews will be focused on sewer renewal works at two localized sections including:
Eton Street to Dundas Street
Venables Street to Kitchener Street
-----
TDM / TDE
TDM Improv. 2 signal rebuilds (Hastings & E. 1st), 1 preduct (Venables), 1 new signal (@ Cambridge), TDE improv. (new signal @ Pandora), new curb ramps, signs and paint
Feb-22 Oct-22
Location: Renfrew St from McGill St to E 1st Ave
Schedule: Jun 18, 2021 - Mar 6, 2023urn:uuid:06f8b770-2b9b-4eee-85ad-c2db0c0ee7bb2021-06-10T07:00:00ZRenfrew Rehab (McGill to E 1st Ave)2023-03-29T01:02:21.381426Z49.28477708140301 -123.04407237962 49.285683057309 -123.04407146825Construction underway until fall 2022
Localized sewer renewal works are now underway.
In early September, City of Vancouver crews will be focused on sewer renewal works at two localized sections including:
Eton Street to Dundas Street
Venables Street to Kitchener Street
-----
TDM / TDE
TDM Improv. 2 signal rebuilds (Hastings & E. 1st), 1 preduct (Venables), 1 new signal (@ Cambridge), TDE improv. (new signal @ Pandora), new curb ramps, signs and paint
Feb-22 Oct-22
Location: Renfrew St from McGill St to E 1st Ave
Schedule: Jun 18, 2021 - Mar 6, 2023urn:uuid:b00a8ae1-6b5f-47c2-9ae0-70bbbd5803e22021-06-10T07:00:00ZRenfrew Rehab (McGill to E 1st Ave)2023-03-29T01:02:21.381426Z49.28568312942204 -123.04407106954 49.28671931103699 -123.04406807401999Construction underway until fall 2022
Localized sewer renewal works are now underway.
In early September, City of Vancouver crews will be focused on sewer renewal works at two localized sections including:
Eton Street to Dundas Street
Venables Street to Kitchener Street
-----
TDM / TDE
TDM Improv. 2 signal rebuilds (Hastings & E. 1st), 1 preduct (Venables), 1 new signal (@ Cambridge), TDE improv. (new signal @ Pandora), new curb ramps, signs and paint
Feb-22 Oct-22
Location: Renfrew St from McGill St to E 1st Ave
Schedule: Jun 18, 2021 - Mar 6, 2023urn:uuid:3be48feb-db3b-494e-b31b-8fac4fea09802021-06-10T07:00:00ZRenfrew Rehab (McGill to E 1st Ave)2023-03-29T01:02:21.381426Z49.28671931103699 -123.04406807401999 49.287210798344006 -123.04406716443998Construction underway until fall 2022
Localized sewer renewal works are now underway.
In early September, City of Vancouver crews will be focused on sewer renewal works at two localized sections including:
Eton Street to Dundas Street
Venables Street to Kitchener Street
-----
TDM / TDE
TDM Improv. 2 signal rebuilds (Hastings & E. 1st), 1 preduct (Venables), 1 new signal (@ Cambridge), TDE improv. (new signal @ Pandora), new curb ramps, signs and paint
Feb-22 Oct-22
Location: Renfrew St from McGill St to E 1st Ave
Schedule: Jun 18, 2021 - Mar 6, 2023urn:uuid:e1542e1a-95b2-4a09-a09f-3f2b2fe6ae672021-06-10T07:00:00ZRenfrew Rehab (McGill to E 1st Ave)2023-03-29T01:02:21.381426Z49.287210798344006 -123.04406716443998 49.28770553255299 -123.04406706906Construction underway until fall 2022
Localized sewer renewal works are now underway.
In early September, City of Vancouver crews will be focused on sewer renewal works at two localized sections including:
Eton Street to Dundas Street
Venables Street to Kitchener Street
-----
TDM / TDE
TDM Improv. 2 signal rebuilds (Hastings & E. 1st), 1 preduct (Venables), 1 new signal (@ Cambridge), TDE improv. (new signal @ Pandora), new curb ramps, signs and paint
Feb-22 Oct-22
Location: Renfrew St from McGill St to E 1st Ave
Schedule: Jun 18, 2021 - Mar 6, 2023urn:uuid:1d3b30a6-84be-4715-ae57-2d06eb3ccc782021-06-10T07:00:00ZRenfrew Rehab (McGill to E 1st Ave)2023-03-29T01:02:21.381426Z49.28770553255299 -123.04406706906 49.28820858634799 -123.04406933259999Construction underway until fall 2022
Localized sewer renewal works are now underway.
In early September, City of Vancouver crews will be focused on sewer renewal works at two localized sections including:
Eton Street to Dundas Street
Venables Street to Kitchener Street
-----
TDM / TDE
TDM Improv. 2 signal rebuilds (Hastings & E. 1st), 1 preduct (Venables), 1 new signal (@ Cambridge), TDE improv. (new signal @ Pandora), new curb ramps, signs and paint
Feb-22 Oct-22
Location: Renfrew St from McGill St to E 1st Ave
Schedule: Jun 18, 2021 - Mar 6, 2023urn:uuid:ba60e6e5-ea97-4455-b5ad-730022f3f7232021-06-10T07:00:00ZRenfrew Rehab (McGill to E 1st Ave)2023-03-29T01:02:21.381426Z49.28820858634799 -123.04406933259999 49.288711085372 -123.04406379854Construction underway until fall 2022
Localized sewer renewal works are now underway.
In early September, City of Vancouver crews will be focused on sewer renewal works at two localized sections including:
Eton Street to Dundas Street
Venables Street to Kitchener Street
-----
TDM / TDE
TDM Improv. 2 signal rebuilds (Hastings & E. 1st), 1 preduct (Venables), 1 new signal (@ Cambridge), TDE improv. (new signal @ Pandora), new curb ramps, signs and paint
Feb-22 Oct-22
Location: Renfrew St from McGill St to E 1st Ave
Schedule: Jun 18, 2021 - Mar 6, 2023urn:uuid:e067d3e3-a321-4cbd-91e1-ad47626604132021-06-10T07:00:00ZRenfrew Rehab (McGill to E 1st Ave)2023-03-29T01:02:21.381426Z49.27962294266101 -123.04407870341 49.279081036630004 -123.04407985659Construction underway until fall 2022
Localized sewer renewal works are now underway.
In early September, City of Vancouver crews will be focused on sewer renewal works at two localized sections including:
Eton Street to Dundas Street
Venables Street to Kitchener Street
-----
TDM / TDE
TDM Improv. 2 signal rebuilds (Hastings & E. 1st), 1 preduct (Venables), 1 new signal (@ Cambridge), TDE improv. (new signal @ Pandora), new curb ramps, signs and paint
Feb-22 Oct-22
Location: Renfrew St from McGill St to E 1st Ave
Schedule: Jun 18, 2021 - Mar 6, 2023urn:uuid:ab4d8ede-0691-4740-88f7-44b1d5e40b6d2021-06-10T07:00:00ZRenfrew Rehab (McGill to E 1st Ave)2023-03-29T01:02:21.381426Z49.280210480750014 -123.04407867708 49.27962294266101 -123.04407870341Construction underway until fall 2022
Localized sewer renewal works are now underway.
In early September, City of Vancouver crews will be focused on sewer renewal works at two localized sections including:
Eton Street to Dundas Street
Venables Street to Kitchener Street
-----
TDM / TDE
TDM Improv. 2 signal rebuilds (Hastings & E. 1st), 1 preduct (Venables), 1 new signal (@ Cambridge), TDE improv. (new signal @ Pandora), new curb ramps, signs and paint
Feb-22 Oct-22
Location: Renfrew St from McGill St to E 1st Ave
Schedule: Jun 18, 2021 - Mar 6, 2023urn:uuid:8ea71cc4-60e3-4e31-bf84-5210573ffc322021-06-10T07:00:00ZRenfrew Rehab (McGill to E 1st Ave)2023-03-29T01:02:21.381426Z49.28071082047799 -123.04407616689 49.280210480750014 -123.04407867708Construction underway until fall 2022
Localized sewer renewal works are now underway.
In early September, City of Vancouver crews will be focused on sewer renewal works at two localized sections including:
Eton Street to Dundas Street
Venables Street to Kitchener Street
-----
TDM / TDE
TDM Improv. 2 signal rebuilds (Hastings & E. 1st), 1 preduct (Venables), 1 new signal (@ Cambridge), TDE improv. (new signal @ Pandora), new curb ramps, signs and paint
Feb-22 Oct-22
Location: Renfrew St from McGill St to E 1st Ave
Schedule: Jun 18, 2021 - Mar 6, 2023urn:uuid:02ab1a86-c1a4-4c94-a64b-64617b0d2d582021-06-10T07:00:00ZRenfrew Rehab (McGill to E 1st Ave)2023-03-29T01:02:21.381426Z49.281123249209 -123.0440765207 49.28071082047799 -123.04407616689Construction underway until fall 2022
Localized sewer renewal works are now underway.
In early September, City of Vancouver crews will be focused on sewer renewal works at two localized sections including:
Eton Street to Dundas Street
Venables Street to Kitchener Street
-----
TDM / TDE
TDM Improv. 2 signal rebuilds (Hastings & E. 1st), 1 preduct (Venables), 1 new signal (@ Cambridge), TDE improv. (new signal @ Pandora), new curb ramps, signs and paint
Feb-22 Oct-22
Location: Renfrew St from McGill St to E 1st Ave
Schedule: Jun 18, 2021 - Mar 6, 2023urn:uuid:f66c05f4-b138-4ccb-af80-bc0cc0b170812021-06-10T07:00:00ZRenfrew Rehab (McGill to E 1st Ave)2023-03-29T01:02:21.381426Z49.28206520650099 -123.04407532525 49.281123249209 -123.0440765207Construction underway until fall 2022
Localized sewer renewal works are now underway.
In early September, City of Vancouver crews will be focused on sewer renewal works at two localized sections including:
Eton Street to Dundas Street
Venables Street to Kitchener Street
-----
TDM / TDE
TDM Improv. 2 signal rebuilds (Hastings & E. 1st), 1 preduct (Venables), 1 new signal (@ Cambridge), TDE improv. (new signal @ Pandora), new curb ramps, signs and paint
Feb-22 Oct-22
Location: Renfrew St from McGill St to E 1st Ave
Schedule: Jun 18, 2021 - Mar 6, 2023urn:uuid:15504985-0171-42f2-af56-bd99d589de0b2021-06-10T07:00:00ZRenfrew Rehab (McGill to E 1st Ave)2023-03-29T01:02:21.381426Z49.28296922205399 -123.04407397220001 49.28206520650099 -123.04407532525Construction underway until fall 2022
Localized sewer renewal works are now underway.
In early September, City of Vancouver crews will be focused on sewer renewal works at two localized sections including:
Eton Street to Dundas Street
Venables Street to Kitchener Street
-----
TDM / TDE
TDM Improv. 2 signal rebuilds (Hastings & E. 1st), 1 preduct (Venables), 1 new signal (@ Cambridge), TDE improv. (new signal @ Pandora), new curb ramps, signs and paint
Feb-22 Oct-22
Location: Renfrew St from McGill St to E 1st Ave
Schedule: Jun 18, 2021 - Mar 6, 2023urn:uuid:480c0204-f4f2-49a4-9b3a-8894009c8e032021-06-10T07:00:00ZRenfrew Rehab (McGill to E 1st Ave)2023-03-29T01:02:21.381426Z49.28387306634801 -123.04407316897 49.28296922205399 -123.04407397220001Construction underway until fall 2022
Localized sewer renewal works are now underway.
In early September, City of Vancouver crews will be focused on sewer renewal works at two localized sections including:
Eton Street to Dundas Street
Venables Street to Kitchener Street
-----
TDM / TDE
TDM Improv. 2 signal rebuilds (Hastings & E. 1st), 1 preduct (Venables), 1 new signal (@ Cambridge), TDE improv. (new signal @ Pandora), new curb ramps, signs and paint
Feb-22 Oct-22
Location: Renfrew St from McGill St to E 1st Ave
Schedule: Jun 18, 2021 - Mar 6, 2023urn:uuid:7d86d040-63f7-4248-aa51-0c853451e1b22021-06-10T07:00:00ZRenfrew Rehab (McGill to E 1st Ave)2023-03-29T01:02:21.381426Z49.28477708140301 -123.04407237962 49.28387306634801 -123.04407316897Construction underway until fall 2022
Localized sewer renewal works are now underway.
In early September, City of Vancouver crews will be focused on sewer renewal works at two localized sections including:
Eton Street to Dundas Street
Venables Street to Kitchener Street
-----
TDM / TDE
TDM Improv. 2 signal rebuilds (Hastings & E. 1st), 1 preduct (Venables), 1 new signal (@ Cambridge), TDE improv. (new signal @ Pandora), new curb ramps, signs and paint
Feb-22 Oct-22
Location: Renfrew St from McGill St to E 1st Ave
Schedule: Jun 18, 2021 - Mar 6, 2023urn:uuid:eacb78d6-9105-42db-96d0-8b8da180ce832021-06-10T07:00:00ZRenfrew Rehab (McGill to E 1st Ave)2023-03-29T01:02:21.381426Z49.27826792546196 -123.04408200542 49.277861144859 -123.04408333396002Construction underway until fall 2022
Localized sewer renewal works are now underway.
In early September, City of Vancouver crews will be focused on sewer renewal works at two localized sections including:
Eton Street to Dundas Street
Venables Street to Kitchener Street
-----
TDM / TDE
TDM Improv. 2 signal rebuilds (Hastings & E. 1st), 1 preduct (Venables), 1 new signal (@ Cambridge), TDE improv. (new signal @ Pandora), new curb ramps, signs and paint
Feb-22 Oct-22
Location: Renfrew St from McGill St to E 1st Ave
Schedule: Jun 18, 2021 - Mar 6, 2023urn:uuid:7661f85d-e17e-40de-83f1-7bc2b45d4aa72021-06-10T07:00:00ZRenfrew Rehab (McGill to E 1st Ave)2023-03-29T01:02:21.381426Z49.278674184343004 -123.04408060765 49.27826792546196 -123.04408200542Construction underway until fall 2022
Localized sewer renewal works are now underway.
In early September, City of Vancouver crews will be focused on sewer renewal works at two localized sections including:
Eton Street to Dundas Street
Venables Street to Kitchener Street
-----
TDM / TDE
TDM Improv. 2 signal rebuilds (Hastings & E. 1st), 1 preduct (Venables), 1 new signal (@ Cambridge), TDE improv. (new signal @ Pandora), new curb ramps, signs and paint
Feb-22 Oct-22
Location: Renfrew St from McGill St to E 1st Ave
Schedule: Jun 18, 2021 - Mar 6, 2023urn:uuid:bd897e41-86b2-46d0-a21f-c15c9d176d532021-06-10T07:00:00ZRenfrew Rehab (McGill to E 1st Ave)2023-03-29T01:02:21.381426Z49.279081036630004 -123.04407985659 49.278674184343004 -123.04408060765Construction underway until fall 2022
Localized sewer renewal works are now underway.
In early September, City of Vancouver crews will be focused on sewer renewal works at two localized sections including:
Eton Street to Dundas Street
Venables Street to Kitchener Street
-----
TDM / TDE
TDM Improv. 2 signal rebuilds (Hastings & E. 1st), 1 preduct (Venables), 1 new signal (@ Cambridge), TDE improv. (new signal @ Pandora), new curb ramps, signs and paint
Feb-22 Oct-22
Location: Renfrew St from McGill St to E 1st Ave
Schedule: Jun 18, 2021 - Mar 6, 2023urn:uuid:eebfbc50-f650-4050-bcb0-01a6b7dfef682021-06-10T07:00:00ZRenfrew Rehab (McGill to E 1st Ave)2023-03-29T01:02:21.381426Z49.27907770424483 -123.04669797453244 49.27908392575546 -123.04411351684391Construction underway until fall 2022
Localized sewer renewal works are now underway.
In early September, City of Vancouver crews will be focused on sewer renewal works at two localized sections including:
Eton Street to Dundas Street
Venables Street to Kitchener Street
-----
TDM / TDE
TDM Improv. 2 signal rebuilds (Hastings & E. 1st), 1 preduct (Venables), 1 new signal (@ Cambridge), TDE improv. (new signal @ Pandora), new curb ramps, signs and paint
Feb-22 Oct-22
Location: Renfrew St from McGill St to E 1st Ave
Schedule: Jun 18, 2021 - Mar 6, 2023urn:uuid:a29dc300-ba21-4483-8c23-386f12aae0ef2021-06-10T07:00:00ZRenfrew Rehab (McGill to E 1st Ave)2023-03-29T01:02:21.381426Z49.27909636877439 -123.04670751025695 49.28026600312677 -123.04669797453244Construction underway until fall 2022
Localized sewer renewal works are now underway.
In early September, City of Vancouver crews will be focused on sewer renewal works at two localized sections including:
Eton Street to Dundas Street
Venables Street to Kitchener Street
-----
TDM / TDE
TDM Improv. 2 signal rebuilds (Hastings & E. 1st), 1 preduct (Venables), 1 new signal (@ Cambridge), TDE improv. (new signal @ Pandora), new curb ramps, signs and paint
Feb-22 Oct-22
Location: Renfrew St from McGill St to E 1st Ave
Schedule: Jun 18, 2021 - Mar 6, 2023urn:uuid:a2e04a75-0fa5-4adf-a85d-90855d29c6482021-06-10T07:00:00ZRenfrew Rehab (McGill to E 1st Ave)2023-03-29T01:02:21.381426Z49.279108812003756 -123.04973065874944 49.27912125501638 -123.04890096198503Construction underway until fall 2022
Localized sewer renewal works are now underway.
In early September, City of Vancouver crews will be focused on sewer renewal works at two localized sections including:
Eton Street to Dundas Street
Venables Street to Kitchener Street
-----
TDM / TDE
TDM Improv. 2 signal rebuilds (Hastings & E. 1st), 1 preduct (Venables), 1 new signal (@ Cambridge), TDE improv. (new signal @ Pandora), new curb ramps, signs and paint
Feb-22 Oct-22
Location: Renfrew St from McGill St to E 1st Ave
Schedule: Jun 18, 2021 - Mar 6, 2023urn:uuid:cbac1a61-344d-44fa-b538-b506ef4b688c2021-06-10T07:00:00ZRenfrew Rehab (McGill to E 1st Ave)2023-03-29T01:02:21.381426Z49.27962519609838 -123.04936826225456 49.27963141775356 -123.04669797453244Construction underway until fall 2022
Localized sewer renewal works are now underway.
In early September, City of Vancouver crews will be focused on sewer renewal works at two localized sections including:
Eton Street to Dundas Street
Venables Street to Kitchener Street
-----
TDM / TDE
TDM Improv. 2 signal rebuilds (Hastings & E. 1st), 1 preduct (Venables), 1 new signal (@ Cambridge), TDE improv. (new signal @ Pandora), new curb ramps, signs and paint
Feb-22 Oct-22
Location: Renfrew St from McGill St to E 1st Ave
Schedule: Jun 18, 2021 - Mar 6, 2023urn:uuid:3c162fd1-c80a-4371-ba51-a1f6463f3ed62021-06-10T07:00:00ZRenfrew Rehab (McGill to E 1st Ave)2023-03-29T01:02:21.381426Z49.285690865123 -123.05195189621001 49.28618649939099 -123.0519509181Construction underway until fall 2022
Localized sewer renewal works are now underway.
In early September, City of Vancouver crews will be focused on sewer renewal works at two localized sections including:
Eton Street to Dundas Street
Venables Street to Kitchener Street
-----
TDM / TDE
TDM Improv. 2 signal rebuilds (Hastings & E. 1st), 1 preduct (Venables), 1 new signal (@ Cambridge), TDE improv. (new signal @ Pandora), new curb ramps, signs and paint
Feb-22 Oct-22
Location: Renfrew St from McGill St to E 1st Ave
Schedule: Jun 18, 2021 - Mar 6, 2023urn:uuid:694451d4-627a-41e1-a362-d9900d97a0752021-06-10T07:00:00ZRenfrew Rehab (McGill to E 1st Ave)2023-03-29T01:02:21.381426Z49.27372777926104 -123.04414647675999 49.273262679998 -123.04415442007002Construction underway until fall 2022
Localized sewer renewal works are now underway.
In early September, City of Vancouver crews will be focused on sewer renewal works at two localized sections including:
Eton Street to Dundas Street
Venables Street to Kitchener Street
-----
TDM / TDE
TDM Improv. 2 signal rebuilds (Hastings & E. 1st), 1 preduct (Venables), 1 new signal (@ Cambridge), TDE improv. (new signal @ Pandora), new curb ramps, signs and paint
Feb-22 Oct-22
Location: Renfrew St from McGill St to E 1st Ave
Schedule: Jun 18, 2021 - Mar 6, 2023urn:uuid:04aa8053-fce1-4ad9-92d0-b76166f8fb012021-06-10T07:00:00ZRenfrew Rehab (McGill to E 1st Ave)2023-03-29T01:02:21.381426Z49.27421236228599 -123.04413794580002 49.27372777926104 -123.04414647675999Construction underway until fall 2022
Localized sewer renewal works are now underway.
In early September, City of Vancouver crews will be focused on sewer renewal works at two localized sections including:
Eton Street to Dundas Street
Venables Street to Kitchener Street
-----
TDM / TDE
TDM Improv. 2 signal rebuilds (Hastings & E. 1st), 1 preduct (Venables), 1 new signal (@ Cambridge), TDE improv. (new signal @ Pandora), new curb ramps, signs and paint
Feb-22 Oct-22
Location: Renfrew St from McGill St to E 1st Ave
Schedule: Jun 18, 2021 - Mar 6, 2023urn:uuid:4fd02449-57d8-4d68-ad9e-8a4a6c207ec52021-06-10T07:00:00ZRenfrew Rehab (McGill to E 1st Ave)2023-03-29T01:02:21.381426Z49.275380313802 -123.04411832484999 49.27421236228599 -123.04413794580002Construction underway until fall 2022
Localized sewer renewal works are now underway.
In early September, City of Vancouver crews will be focused on sewer renewal works at two localized sections including:
Eton Street to Dundas Street
Venables Street to Kitchener Street
-----
TDM / TDE
TDM Improv. 2 signal rebuilds (Hastings & E. 1st), 1 preduct (Venables), 1 new signal (@ Cambridge), TDE improv. (new signal @ Pandora), new curb ramps, signs and paint
Feb-22 Oct-22
Location: Renfrew St from McGill St to E 1st Ave
Schedule: Jun 18, 2021 - Mar 6, 2023urn:uuid:0ffba5f1-d950-4302-8ee9-886a3772c63a2021-06-10T07:00:00ZRenfrew Rehab (McGill to E 1st Ave)2023-03-29T01:02:21.381426Z49.27641143870301 -123.04410035451998 49.275380313802 -123.04411832484999Construction underway until fall 2022
Localized sewer renewal works are now underway.
In early September, City of Vancouver crews will be focused on sewer renewal works at two localized sections including:
Eton Street to Dundas Street
Venables Street to Kitchener Street
-----
TDM / TDE
TDM Improv. 2 signal rebuilds (Hastings & E. 1st), 1 preduct (Venables), 1 new signal (@ Cambridge), TDE improv. (new signal @ Pandora), new curb ramps, signs and paint
Feb-22 Oct-22
Location: Renfrew St from McGill St to E 1st Ave
Schedule: Jun 18, 2021 - Mar 6, 2023urn:uuid:c6bdc0ca-0493-4735-9dfb-9b9bad1044e42021-06-10T07:00:00ZRenfrew Rehab (McGill to E 1st Ave)2023-03-29T01:02:21.381426Z49.277454310585995 -123.04408379627999 49.27703961222102 -123.04409021837Construction underway until fall 2022
Localized sewer renewal works are now underway.
In early September, City of Vancouver crews will be focused on sewer renewal works at two localized sections including:
Eton Street to Dundas Street
Venables Street to Kitchener Street
-----
TDM / TDE
TDM Improv. 2 signal rebuilds (Hastings & E. 1st), 1 preduct (Venables), 1 new signal (@ Cambridge), TDE improv. (new signal @ Pandora), new curb ramps, signs and paint
Feb-22 Oct-22
Location: Renfrew St from McGill St to E 1st Ave
Schedule: Jun 18, 2021 - Mar 6, 2023urn:uuid:2be6902e-9e62-4374-be5d-e47c2a22fa382021-06-10T07:00:00ZRenfrew Rehab (McGill to E 1st Ave)2023-03-29T01:02:21.381426Z49.276624859853996 -123.0440966403 49.27641143870301 -123.04410035451998Construction underway until fall 2022
Localized sewer renewal works are now underway.
In early September, City of Vancouver crews will be focused on sewer renewal works at two localized sections including:
Eton Street to Dundas Street
Venables Street to Kitchener Street
-----
TDM / TDE
TDM Improv. 2 signal rebuilds (Hastings & E. 1st), 1 preduct (Venables), 1 new signal (@ Cambridge), TDE improv. (new signal @ Pandora), new curb ramps, signs and paint
Feb-22 Oct-22
Location: Renfrew St from McGill St to E 1st Ave
Schedule: Jun 18, 2021 - Mar 6, 2023urn:uuid:1e3673c8-cd17-4e3b-b0b9-3a1bfc5d8f452021-06-10T07:00:00ZRenfrew Rehab (McGill to E 1st Ave)2023-03-29T01:02:21.381426Z49.277861144859 -123.04408333396002 49.277454310585995 -123.04408379627999Construction underway until fall 2022
Localized sewer renewal works are now underway.
In early September, City of Vancouver crews will be focused on sewer renewal works at two localized sections including:
Eton Street to Dundas Street
Venables Street to Kitchener Street
-----
TDM / TDE
TDM Improv. 2 signal rebuilds (Hastings & E. 1st), 1 preduct (Venables), 1 new signal (@ Cambridge), TDE improv. (new signal @ Pandora), new curb ramps, signs and paint
Feb-22 Oct-22
Location: Renfrew St from McGill St to E 1st Ave
Schedule: Jun 18, 2021 - Mar 6, 2023urn:uuid:c1458c8e-e2ee-4f0a-b55e-687eda5f50232021-06-10T07:00:00ZRenfrew Rehab (McGill to E 1st Ave)2023-03-29T01:02:21.381426Z49.27703961222102 -123.04409021837 49.276624859853996 -123.0440966403Construction underway until fall 2022
Localized sewer renewal works are now underway.
In early September, City of Vancouver crews will be focused on sewer renewal works at two localized sections including:
Eton Street to Dundas Street
Venables Street to Kitchener Street
-----
TDM / TDE
TDM Improv. 2 signal rebuilds (Hastings & E. 1st), 1 preduct (Venables), 1 new signal (@ Cambridge), TDE improv. (new signal @ Pandora), new curb ramps, signs and paint
Feb-22 Oct-22
Location: Renfrew St from McGill St to E 1st Ave
Schedule: Jun 18, 2021 - Mar 6, 2023urn:uuid:d17d2180-520a-42ae-9d23-6664ad09f7c32021-06-10T07:00:00ZRenfrew Rehab (McGill to E 1st Ave)2023-03-29T01:02:21.381426Z49.270422700859996 -123.04419984704002 49.26995437229999 -123.04420714038Construction underway until fall 2022
Localized sewer renewal works are now underway.
In early September, City of Vancouver crews will be focused on sewer renewal works at two localized sections including:
Eton Street to Dundas Street
Venables Street to Kitchener Street
-----
TDM / TDE
TDM Improv. 2 signal rebuilds (Hastings & E. 1st), 1 preduct (Venables), 1 new signal (@ Cambridge), TDE improv. (new signal @ Pandora), new curb ramps, signs and paint
Feb-22 Oct-22
Location: Renfrew St from McGill St to E 1st Ave
Schedule: Jun 18, 2021 - Mar 6, 2023urn:uuid:cdcb467c-4395-4a63-a47c-e4799fac81df2021-06-10T07:00:00ZRenfrew Rehab (McGill to E 1st Ave)2023-03-29T01:02:21.381426Z49.27135316905898 -123.04418555687 49.27088701776398 -123.04419193138999Construction underway until fall 2022
Localized sewer renewal works are now underway.
In early September, City of Vancouver crews will be focused on sewer renewal works at two localized sections including:
Eton Street to Dundas Street
Venables Street to Kitchener Street
-----
TDM / TDE
TDM Improv. 2 signal rebuilds (Hastings & E. 1st), 1 preduct (Venables), 1 new signal (@ Cambridge), TDE improv. (new signal @ Pandora), new curb ramps, signs and paint
Feb-22 Oct-22
Location: Renfrew St from McGill St to E 1st Ave
Schedule: Jun 18, 2021 - Mar 6, 2023urn:uuid:e7afdcc4-c22b-4eaa-a297-ea85d73080d32021-06-10T07:00:00ZRenfrew Rehab (McGill to E 1st Ave)2023-03-29T01:02:21.381426Z49.27088701776398 -123.04419193138999 49.270422700859996 -123.04419984704002Construction underway until fall 2022
Localized sewer renewal works are now underway.
In early September, City of Vancouver crews will be focused on sewer renewal works at two localized sections including:
Eton Street to Dundas Street
Venables Street to Kitchener Street
-----
TDM / TDE
TDM Improv. 2 signal rebuilds (Hastings & E. 1st), 1 preduct (Venables), 1 new signal (@ Cambridge), TDE improv. (new signal @ Pandora), new curb ramps, signs and paint
Feb-22 Oct-22
Location: Renfrew St from McGill St to E 1st Ave
Schedule: Jun 18, 2021 - Mar 6, 2023urn:uuid:e7c6f8a0-3ff9-4b53-9fdc-e0f2277f830c2021-06-10T07:00:00ZRenfrew Rehab (McGill to E 1st Ave)2023-03-29T01:02:21.381426Z49.271819104863 -123.04417805480001 49.27135316905898 -123.04418555687Construction underway until fall 2022
Localized sewer renewal works are now underway.
In early September, City of Vancouver crews will be focused on sewer renewal works at two localized sections including:
Eton Street to Dundas Street
Venables Street to Kitchener Street
-----
TDM / TDE
TDM Improv. 2 signal rebuilds (Hastings & E. 1st), 1 preduct (Venables), 1 new signal (@ Cambridge), TDE improv. (new signal @ Pandora), new curb ramps, signs and paint
Feb-22 Oct-22
Location: Renfrew St from McGill St to E 1st Ave
Schedule: Jun 18, 2021 - Mar 6, 2023urn:uuid:05807f80-69b2-44a0-ac05-64a63892849f2021-06-10T07:00:00ZRenfrew Rehab (McGill to E 1st Ave)2023-03-29T01:02:21.381426Z49.26995437229999 -123.04420714038 49.26949010910698 -123.04421553691002Construction underway until fall 2022
Localized sewer renewal works are now underway.
In early September, City of Vancouver crews will be focused on sewer renewal works at two localized sections including:
Eton Street to Dundas Street
Venables Street to Kitchener Street
-----
TDM / TDE
TDM Improv. 2 signal rebuilds (Hastings & E. 1st), 1 preduct (Venables), 1 new signal (@ Cambridge), TDE improv. (new signal @ Pandora), new curb ramps, signs and paint
Feb-22 Oct-22
Location: Renfrew St from McGill St to E 1st Ave
Schedule: Jun 18, 2021 - Mar 6, 2023urn:uuid:dd95b9e3-75d4-4f32-9740-1a6140f0e81a2021-06-10T07:00:00ZRenfrew Rehab (McGill to E 1st Ave)2023-03-29T01:02:21.381426Z49.272286057090014 -123.04417053973998 49.271819104863 -123.04417805480001Construction underway until fall 2022
Localized sewer renewal works are now underway.
In early September, City of Vancouver crews will be focused on sewer renewal works at two localized sections including:
Eton Street to Dundas Street
Venables Street to Kitchener Street
-----
TDM / TDE
TDM Improv. 2 signal rebuilds (Hastings & E. 1st), 1 preduct (Venables), 1 new signal (@ Cambridge), TDE improv. (new signal @ Pandora), new curb ramps, signs and paint
Feb-22 Oct-22
Location: Renfrew St from McGill St to E 1st Ave
Schedule: Jun 18, 2021 - Mar 6, 2023urn:uuid:9122e1ab-7289-4408-8897-0b7f2bff187a2021-06-10T07:00:00ZRenfrew Rehab (McGill to E 1st Ave)2023-03-29T01:02:21.381426Z49.272750274779014 -123.04416292588002 49.272286057090014 -123.04417053973998Construction underway until fall 2022
Localized sewer renewal works are now underway.
In early September, City of Vancouver crews will be focused on sewer renewal works at two localized sections including:
Eton Street to Dundas Street
Venables Street to Kitchener Street
-----
TDM / TDE
TDM Improv. 2 signal rebuilds (Hastings & E. 1st), 1 preduct (Venables), 1 new signal (@ Cambridge), TDE improv. (new signal @ Pandora), new curb ramps, signs and paint
Feb-22 Oct-22
Location: Renfrew St from McGill St to E 1st Ave
Schedule: Jun 18, 2021 - Mar 6, 2023urn:uuid:dc2d4378-a1c5-4fa1-b952-5917f55a85fa2021-06-10T07:00:00ZRenfrew Rehab (McGill to E 1st Ave)2023-03-29T01:02:21.381426Z49.273262679998 -123.04415442007002 49.272750274779014 -123.04416292588002Crews will be on site to conduct Underground Utility Construction on behalf of Rogers/Shaw
Traffic Impacts:
Single Lane Alternating Traffic, Both Sides, 400 Block of E Kent Ave North from Prince Edward St to St. George St
WO# PER-1441792
Location: 400 Block of E Kent Ave North
Schedule: Apr 6, 2024 - Apr 14, 2024; Weekends; 7:00 AM - 7:00 PMurn:uuid:b3d04c75-519f-4161-9213-dbf8970735962024-03-14T07:00:00ZRogers/Shaw - Underground Utility Construction on 400 Block of E Kent Ave North2024-03-14T22:15:29.5084958Z49.2075796586071 -123.0985468452909 49.20797433458202 -123.0940819848564Lord Selkirk Elementary School Street. Full closure of 1700 E 22nd Av from Monday May 6th, 2024 to Friday June 14th, 2024, all school days.
Times: 8:40-9:10AM, 2:45-3:30PM
Play Street: Tuesdays, 2:45-4:00PM
Location: E 22nd Ave from Welwyn St to Commercial St
Schedule: May 6, 2024 - Jun 14, 2024urn:uuid:f84d3589-73ca-460c-b4a1-37a39dca83ca2024-03-11T07:00:00ZSchool Street Closure at 1700 E 22nd Av2024-03-11T19:34:19.1211493Z49.25033964345627 -123.06942284614551 49.250322835779826 -123.06814323673554L'Ecole Bilingue School Street. Full closure of 1100 W 14th Av from Monday May 6th, 2024 to Friday May 31st, all school days.
Times: 8:40-9:10am, 2:45-3:30pm
Play Street: Fridays, 2:45-4:00PM
Location: W 14th Av between Adler St and Spruce St
Schedule: May 6, 2024 - May 31, 2024urn:uuid:28360734-c907-4771-8bcf-566004fd750f2024-03-11T07:00:00ZSchool Street Closure at 1100 W 14th Av2024-03-11T19:21:16.6970519Z49.2587965946295 -123.13150961732636 49.258764835009885 -123.12920491899382General Gordon Elementary School Street.
Full Closure of 2200 Bayswater St from Monday May 6 – Friday May 31, 2024
Times: 8:40-9:10AM, 2:45-3:30PM
Play Street: Wednesdays 2:45-4:00PM
Location: Bayswater St between W 6th Av and W 7th Av
Schedule: May 6, 2024 - May 31, 2024urn:uuid:25722a2c-3325-4b62-a35e-5375211d10fc2024-03-11T07:00:00ZSchool Street Closure at 2200 Bayswater St2024-03-11T19:23:40.5935112Z49.26663809825061 -123.17114233363367 49.26587078369508 -123.17116378142141Seawall Closure
Location: Seawall east of Cambie Bridge
Schedule: Jan 15, 2024 - May 4, 2024urn:uuid:434c20b1-f3a5-437e-a438-16814523ed552024-02-20T08:00:00ZSeawall Closure 2024-02-20T22:15:52.1416028Z49.27126134967142 -123.11316538483014 49.27159429456859 -123.11142092724079Westbound direction closure to vehicles along W. 1st Ave between Columbia to Spyglass. Detour established for the Seawall closure.
Location: West 1st Ave
Schedule: Jan 15, 2024 - May 4, 2024urn:uuid:51807d27-4211-45f5-bb94-bf0159616d552024-02-20T08:00:00ZSeawall Detour 2024-02-20T22:14:43.0596Z49.27152945227144 -123.11118993580283 49.27016654335509 -123.11013584670081 49.26800951490404 -123.11444307285907 49.26803321902585 -123.11524272666063 49.27099614457097 -123.11517003086048Full closure of 5700 block of Lanark St from March 25 Monday 25, 2023 to April Wednesday 3, 2024 at 3:30 pm
Location: Lanark St from E 41st Av to E 43rd Av
Schedule: Mar 25, 2024 - Apr 3, 2024; Weekdays; 7:00 AM - 3:30 PMurn:uuid:dac9c9f4-2c38-4ac5-8d06-3ca0a3eda30f2024-03-25T07:00:00ZSewer Service of 5700 block of Lanark St2024-03-25T23:44:00.7451852Z49.23270597486464 -123.0756671872333 49.23227984321247 -123.07568013497196Full closure of 5700 block of Lanark St from March 25 Monday 25, 2023 to April Wednesday 3, 2024 at 3:30 pm
Location: Lanark St from E 41st Av to E 43rd Av
Schedule: Mar 25, 2024 - Apr 3, 2024; Weekdays; 7:00 AM - 3:30 PMurn:uuid:c0f069a0-4e5d-44dc-9939-1be6042ea0982024-03-25T07:00:00ZSewer Service of 5700 block of Lanark St2024-03-25T23:44:00.7451852Z49.23227984321247 -123.07568013497196 49.23062680852158 -123.0757404634964Full Closure of 5700-5800 block of Inverness St from March Tuesday 26, 2024 to April Thursday 4, 2024
Location: Inverness St from E 41st Av to E 43rd Av
Schedule: Mar 26, 2024 - Apr 4, 2024; Weekdaysurn:uuid:e6ca1466-0067-4c9f-85ef-47f839184bc42024-03-26T07:00:00ZSewer Service of 5700-5800 block of Inverness St2024-03-27T00:28:33.702808Z49.232327659413414 -123.07982708854237 49.230856808181386 -123.07988062233261Full Closure of 5700-5800 block of Inverness St from March Tuesday 26, 2024 to April Thursday 4, 2024
Location: Inverness St from E 41st Av to E 43rd Av
Schedule: Mar 26, 2024 - Apr 4, 2024; Weekdaysurn:uuid:07fd26f0-5ef4-4b17-90d9-49103dcdd6e62024-03-26T07:00:00ZSewer Service of 5700-5800 block of Inverness St2024-03-27T00:28:33.702808Z49.232752551597656 -123.07981210032003 49.232327659413414 -123.07982708854237**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:524d42de-162b-42bc-a300-37a04fd882dd2021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.248203942203105 -123.13058603728044 49.248227676676066 -123.13205356974795**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:13c2e6b1-762b-4375-8c55-837bb7a2ed1b2021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.248203942203105 -123.13058603728044 49.248227676676066 -123.13205356974795**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:6ca4a1f6-b55b-4084-b124-a2eb86f9c3ba2021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.250058740170005 -123.13197022924 49.24930228142401 -123.13199819506**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:38d4c9fb-a65d-4c15-a8c7-e2fe31183ef22021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.25072481094497 -123.13194560812002 49.250058740170005 -123.13197022924**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:ea562f1a-2b3f-4a2a-8e35-a83958cad4c42021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.248203942203105 -123.13058603728044 49.248227676676066 -123.13205356974795**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:63da82f4-db52-438a-b88c-ff4926d148432021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.24725607600499 -123.12921880957 49.24726698711899 -123.12990070360999**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:dbd33b0b-9c38-43fd-ad9a-36c8b521ffb72021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.247715625062966 -123.12920216031 49.24725607600499 -123.12921880957**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:ecaeae94-7529-4fa3-9a4e-7b46e8d7497b2021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.248161648945 -123.12830234289001 49.248175938689 -123.12918549901002**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:c0da4b50-b558-4e24-9c30-90851f9f71b12021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.2486266323221 -123.1283021814034 49.24816725552324 -123.12831778176235**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:4855d00b-fd25-442d-a3df-390b1c3dd9562021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.248175938689 -123.12918549901002 49.24818695001599 -123.12986644416**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:15e5e17f-98bd-4f2f-a64b-ff5695a342f02021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.249248657974846 -123.12828105248445 49.2486266323221 -123.1283021814034**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:6384c442-291e-40f1-b58d-27abbd9790c72021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.248652115012334 -123.12986478645426 49.24819255641344 -123.12988188328455**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:df4e45dc-415b-40fe-979d-c004004e02d72021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.24927342360081 -123.12984164166019 49.248652115012334 -123.12986478645426**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:477007c3-a8f7-4681-9a12-149d759dcdbf2021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.244483250916005 -123.12842733393002 49.244497233714014 -123.12931865352999**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:86a64df0-f469-469d-a914-290b85362b922021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.244943005815 -123.12841172294 49.244483250916005 -123.12842733393002**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:33ecf71b-ac6d-4c70-89bb-e0bad0a9bd672021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.245400961588985 -123.12839614822 49.244943005815 -123.12841172294**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:31731e3b-904d-4318-8c12-bef6764489172021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.245389168347 -123.12768234719 49.245400961588985 -123.12839614822**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:684e17f7-3a10-43c6-895e-7b39fa99c0642021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.243543779784005 -123.12845925893 49.243549286420006 -123.12882139350002 49.243552636364996 -123.12896318928001 49.24355760541201 -123.12910486565002 49.243564184597034 -123.12924639511 49.243570317869 -123.12935220189999**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:3d0c1f55-3ec4-4422-9c8c-fcef80453d742021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.244037099679986 -123.12933531289 49.243570317869 -123.12935220189999**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:fa0f8609-0a62-4331-9d12-184dc114ff372021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.242390501562994 -123.12849843162999 49.24194164006698 -123.12851369837999**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:6c0b1d2a-0dcb-4d0e-b201-309f3518cfb72021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.242417189409 -123.12939392336 49.241975199330994 -123.1294099281**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:73bb2a06-8cb9-40db-98f3-3d23ffe741d62021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.242390501562994 -123.12849843162999 49.242396673255 -123.12885292076 49.242399630243995 -123.12899214308 49.242404170328996 -123.12913127336 49.24241030256999 -123.12927025671002 49.242417189409 -123.12939392336**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:cf84450a-056d-4ab7-af2b-9403d2ad9bb32021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.244483250916005 -123.12842733393002 49.24402275834001 -123.12844297019998**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:a4750caf-78a8-4f18-a106-d24c796a2fb82021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.244497233714014 -123.12931865352999 49.244037099679986 -123.12933531289**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:7fa92ea5-c574-4060-b720-045c7eda0a8f2021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.244472060063 -123.12771397357999 49.244483250916005 -123.12842733393002**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:88b0f2a2-3a14-4ff7-8e19-8e062b8e84fd2021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.24727823907699 -123.13060377234 49.24681708866299 -123.13062039047999**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:a647377a-5301-4b6f-bf8e-be60a638166b2021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.24726698711899 -123.12990070360999 49.24727823907699 -123.13060377234**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:aa3823f6-91f0-408e-af41-0e1600cac81f2021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.247738058116 -123.13058719159999 49.24727823907699 -123.13060377234**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:3e8dd522-e774-47a5-b8ed-f3d8acf0c8152021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.247738058116 -123.13058719159999 49.24776183705001 -123.13205513626002**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:fc03d43e-c60a-412f-b7bc-887b8c7d63ea2021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.248198335886 -123.13057059803998 49.247738058116 -123.13058719159999**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:9a0f4803-0ed1-45bc-adbb-818a67cc28712021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.24818695001599 -123.12986644416 49.248198335886 -123.13057059803998**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:8d4a2278-cf50-4481-9b91-b18a990bf07e2021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.24346794879898 -123.13421268085001 49.243863142462004 -123.13567855065**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:1e5ecf55-a468-41af-b336-230824e6dcd32021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.24417037557299 -123.13071580764999 49.244622791474995 -123.13069951167**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:d3797890-7a81-4627-acbc-eadbfafdf7732021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.244622791474995 -123.13069951167 49.24417037557299 -123.13071580764999**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:ba8eeb7c-2b3e-4d33-bcdb-defbbbc68fc22021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.24417037557299 -123.13071580764999 49.24472248254801 -123.13233004856**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:4909df06-045f-4df6-b6a6-9e2094256a292021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.245009539466 -123.13068555641 49.244622791474995 -123.13069951167**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:0f846dd0-5e5c-4716-9916-b5622416ebd72021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.244622791474995 -123.13069951167 49.24463454313201 -123.13074378341001 49.24464690636802 -123.13078812549001 49.24465978268799 -123.13083213920001 49.24467315414802 -123.13087578328 49.24468702071701 -123.13091908521001 49.24470139143702 -123.13096200379 49.24471623933999 -123.13100452522002 49.24473157341998 -123.13104664952 49.244747384698 -123.13108836293 49.24476367319099 -123.1311296517 49.24478042993496 -123.13117048835001 49.24479765492998 -123.13121087286001 49.24481533018701 -123.13125080518999 49.24483346474699 -123.13129024415 49.244844430581 -123.13131342414 49.24507418549001 -123.13179653641 49.24507878959304 -123.13180569915998 49.245093749803004 -123.13183624063001 49.245108367732996 -123.13186717965999 49.245122625406 -123.13189850245001 49.245136522839005 -123.13193019527 49.245150060046996 -123.13196224437002 49.24516321902399 -123.13199466345 49.245176017790016 -123.13202742506999 49.245188429359985 -123.13206052916 49.24520047175599 -123.13209394829998 49.245212126986985 -123.13212768242 49.24521921769801 -123.13214912125**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:629c4355-4358-43fe-be4a-9785cf8593d12021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.245438494784 -123.13067009104999 49.245009539466 -123.13068555641**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:3e41e93f-7faf-41d9-87b2-e2acc2e393f92021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.245438494784 -123.13067009104999 49.24545156631501 -123.13146170418 49.245451666273 -123.13147662563 49.245451596934004 -123.13149803172 49.24545129373101 -123.13151942344999 49.24545073865798 -123.1315408145 49.24544994074196 -123.13156217744 49.24544889996798 -123.13158352598 49.24544760737004 -123.13160483264 49.245446080939985 -123.13162609746001 49.245444311667 -123.13164733415 49.245442290586 -123.13166851521 49.24544003570503 -123.13168962695 49.245437537996 -123.13171069681998 49.245434806502004 -123.13173168363 49.245431823232025 -123.13175258733 49.24542861515701 -123.13177342174 49.24542515532201 -123.13179415929 49.24542147069698 -123.13181481381001 49.245417543323015 -123.13183535775 49.24541338219501 -123.13185579116 49.24540899630901 -123.13187611405 49.245404367690014 -123.13189631263 49.24539950533301 -123.13191638692999 49.245394427229 -123.13193633699 49.245389115419016 -123.13195613530002 49.245383587877996 -123.13197579562 49.245377826630005 -123.13199530419 49.245371840671 -123.13201466100999 49.245365648024006 -123.13203383867001 49.245359221670014 -123.13205286456001 49.24535258862801 -123.13207171129 49.24534573990201 -123.13209037880999 49.245338675493 -123.13210886715 49.245331404426 -123.13212714883 49.245323926671006 -123.13214525134002**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:9b52a4f1-fc4d-42ca-a36b-ab74f081de5b2021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.242580977947995 -123.13077312102 49.242581764410005 -123.13077764316 49.24260668237201 -123.13091164846 49.242633130160044 -123.13104495726999 49.24266108981499 -123.13117754207 49.242690561373024 -123.1313093754 49.24272153591903 -123.13144038854 49.24275400447499 -123.13157056774999 49.24278795812799 -123.13169984431 49.242789695854015 -123.13170629245 49.242883349785956 -123.13204907905**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:1d49d771-ef49-454d-bded-7e207633436d2021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.24317346434299 -123.13312279606 49.24316245488501 -123.13312217569 49.24313502203901 -123.13311988997 49.243107626012005 -123.13311687619999 49.24308025780999 -123.13311313434 49.243052944418 -123.13310866447 49.24302568585199 -123.13310345285 49.242998491075014 -123.13309752699 49.24297136010301 -123.13309087314 49.242944319906 -123.13308350511998 49.24291736150303 -123.13307540917 49.24289050285401 -123.13306661282 49.24286375298601 -123.13305708859998 49.242837102886995 -123.13304685024 49.24281058852199 -123.13303591158 49.242784191916 -123.13302425883 49.24275794003796 -123.13301190579 49.242731832874 -123.13299886622002 49.24270587045402 -123.13298511263 49.24268008871101 -123.13297068633 49.242654460675 -123.13295557353 49.24262901333199 -123.13293977427999 49.242603746665 -123.13292330234 49.242578669669996 -123.13290615771999 49.24255380033699 -123.13288834048001 49.242529129638 -123.13286987806 49.242504675595 -123.13285074304 49.242480447156 -123.13283097667 49.242456444351006 -123.13281055146 49.24243268512501 -123.13278950868 49.242409169507 -123.13276782085 49.242385897465965 -123.13274551545 49.24236288699197 -123.13272259253 49.242340147096 -123.13269903837998 49.24231767771403 -123.13267490794 49.24229548787298 -123.13265017377998 49.242273577556006 -123.13262484962 49.242264702476035 -123.13261420583 49.242249987635006 -123.13259733652998 49.24223509244598 -123.13258085144001 49.242219998886014 -123.13256477798 49.242204733959 -123.1325491025 49.242189288652014 -123.13253383871 49.242173671960984 -123.13251898662 49.242157883885994 -123.13250454625 49.24214194238601 -123.13249054511002 49.24212583849899 -123.13247695571 49.242109572191964 -123.13246380552 49.24209317045097 -123.13245109462 49.242088865382016 -123.13244790946999**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:3c24487e-3e0e-429d-9b3c-739191cdd5562021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.24363064277799 -123.13003076766998 49.242477218431986 -123.13007142846**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:d5198ba7-e9f8-4bd0-9f4b-96fba7487f082021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.24346794879898 -123.13421268085001 49.24288271853999 -123.13395691197**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:c5b73419-12df-4bce-b8c1-593ac7d5dd352021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.242883349785956 -123.13204907905 49.242653114353004 -123.13205893413 49.242056011212014 -123.13156933165**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:452bb209-676a-4284-82a0-a83cbf43edda2021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.242477218431986 -123.13007142846 49.242480335940996 -123.13009880426 49.24249751563201 -123.13023560504 49.24251625187699 -123.13037192917001 49.242536535711 -123.13050774913998 49.24255837620899 -123.1306429963 49.242580977947995 -123.13077312102**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:603b0642-56ea-468d-a11a-e82b0480ebf62021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.242883349785956 -123.13204907905 49.24317346434299 -123.13312279606**Work paused to resume Q3 2024**
Sewer Package for 2021
Sewer and Streets, Residential Streets Only (low impact)
Location: Various Locations
Schedule: Feb 1, 2021 - Jan 1, 2025urn:uuid:d2681cf0-4a5f-4f7a-a63f-eeb0eca33f062021-02-23T08:00:00ZShaughnessy Sewer Package 2023-12-06T23:47:18.212494Z49.24317346434299 -123.13312279606 49.24346794879898 -123.13421268085001Crews will be on site to conduct Underground Utility Construction on behalf of Shaw
Traffic Impacts:
- Single Lane Alternating Traffic, Parking Lane and Sidewalk Closure, Both Sides, 2100 Block of Brunswick St from E 5th Ave to E 6th Ave
- Single Lane Alternating Traffic, Parking Lane and Sidewalk Closure, Both Sides, 300 Block of E 5th Ave from Brunswick St to 30m W of Brunswick St
- Total Road Closure, Both Sides, Lane South of 300 Block of E 5th Ave from Brunswick St to 30m W of Brunswick St
WO# PER-4310768
Location: 2100 Block of Brunswick St, 300 Block of E 5th Ave and Lane South of 300 Block of E 5th Ave
Schedule: Mar 20, 2024 - Apr 5, 2024; Weekdays; 7:00 AM - 8:00 PMurn:uuid:225b2a93-1479-4676-a50f-0d59785de8332024-03-12T07:00:00ZShaw - Underground Utility Construction on 2100 Block of Brunswick St, 300 Block of E 5th Ave and Lane South of 300 Block of E 5th Ave2024-03-12T17:35:10.3886599Z49.266327982442306 -123.09692007413086 49.265442343458744 -123.09691470971283Crews will be on site to conduct Underground Utility Construction on behalf of Shaw
Traffic Impacts:
- Single Lane Alternating Traffic, Parking Lane and Sidewalk Closure, Both Sides, 2100 Block of Brunswick St from E 5th Ave to E 6th Ave
- Single Lane Alternating Traffic, Parking Lane and Sidewalk Closure, Both Sides, 300 Block of E 5th Ave from Brunswick St to 30m W of Brunswick St
- Total Road Closure, Both Sides, Lane South of 300 Block of E 5th Ave from Brunswick St to 30m W of Brunswick St
WO# PER-4310768
Location: 2100 Block of Brunswick St, 300 Block of E 5th Ave and Lane South of 300 Block of E 5th Ave
Schedule: Mar 20, 2024 - Apr 5, 2024; Weekdays; 7:00 AM - 8:00 PMurn:uuid:e99ec3c7-1cd7-49b2-b1b2-d2a76aa3ee4c2024-03-12T07:00:00ZShaw - Underground Utility Construction on 2100 Block of Brunswick St, 300 Block of E 5th Ave and Lane South of 300 Block of E 5th Ave2024-03-12T17:35:10.3886599Z49.266349006638904 -123.09688928194788 49.26635341701305 -123.09735563522841Crews will be on site to conduct Underground Utility Construction on behalf of Shaw
Traffic Impacts:
- Single Lane Alternating Traffic, Parking Lane and Sidewalk Closure, Both Sides, 2100 Block of Brunswick St from E 5th Ave to E 6th Ave
- Single Lane Alternating Traffic, Parking Lane and Sidewalk Closure, Both Sides, 300 Block of E 5th Ave from Brunswick St to 30m W of Brunswick St
- Total Road Closure, Both Sides, Lane South of 300 Block of E 5th Ave from Brunswick St to 30m W of Brunswick St
WO# PER-4310768
Location: 2100 Block of Brunswick St, 300 Block of E 5th Ave and Lane South of 300 Block of E 5th Ave
Schedule: Mar 20, 2024 - Apr 5, 2024; Weekdays; 7:00 AM - 8:00 PMurn:uuid:c9e9bef8-431f-48d8-b26a-63bc07cf310e2024-03-12T07:00:00ZShaw - Underground Utility Construction on 2100 Block of Brunswick St, 300 Block of E 5th Ave and Lane South of 300 Block of E 5th Ave2024-03-12T17:35:10.3886599Z49.26587709432761 -123.09688252320468 49.26589473599057 -123.09732860025562Transportation is formalizing its Slow Streets program, installing permanent barriers and signage in place of the temporary barriers and signage at intersections across the City. This project will calm traffic flow in key locations and will aid in improving safety for all modes of transportation.
Please contact slowstreets@vancouver.ca for more information on the program.
Location: West 1E W 13th Ave. E of Granville St.
West 2W W 13th Ave. W of Hemlock St.
West 3N Alder St. N of W Broadway
West 4N Alder St. N of W 12th Ave.
West 4S Alder St. S of W 12th Ave.
West 5E W 14th Ave. E of Cambie St.
West 6E W 18th Ave. E of Cambie St.
West 7W E 14th Ave. W of Main St.
Central 19S St. George St. S of E 12th Ave.
Central 20S Glen Dr. S of E 12th
Central 21N Woodland Dr. N of N Grandview Hwy
Central 22N Woodland Dr. N of E Broadway
Central 22S Woodland Dr. S of E Broadway
Central 23N Woodland Dr. N of E 12th Ave.
Central 23S Woodland Dr. S of E 12th Ave.
Central 24N Lakewood St. N of E Broadway
Schedule: Jan 31, 2023 - Feb 3, 2023urn:uuid:18d95821-bae3-40ed-a994-7ba8bccfe18a2023-01-23T08:00:00ZSlow Streets Barrier Installation - Packages 1 (West) & 4 (Central)2023-01-23T21:13:45.9021786Z49.26022191078471 -123.13149057754062 49.26021490888198 -123.13149057754062Transportation is formalizing its Slow Streets program, installing permanent barriers and signage in place of the temporary barriers and signage at intersections across the City. This project will calm traffic flow in key locations and will aid in improving safety for all modes of transportation.
Please contact slowstreets@vancouver.ca for more information on the program.
Location: West 1E W 13th Ave. E of Granville St.
West 2W W 13th Ave. W of Hemlock St.
West 3N Alder St. N of W Broadway
West 4N Alder St. N of W 12th Ave.
West 4S Alder St. S of W 12th Ave.
West 5E W 14th Ave. E of Cambie St.
West 6E W 18th Ave. E of Cambie St.
West 7W E 14th Ave. W of Main St.
Central 19S St. George St. S of E 12th Ave.
Central 20S Glen Dr. S of E 12th
Central 21N Woodland Dr. N of N Grandview Hwy
Central 22N Woodland Dr. N of E Broadway
Central 22S Woodland Dr. S of E Broadway
Central 23N Woodland Dr. N of E 12th Ave.
Central 23S Woodland Dr. S of E 12th Ave.
Central 24N Lakewood St. N of E Broadway
Schedule: Jan 31, 2023 - Feb 3, 2023urn:uuid:b127a633-56a7-4fc1-9260-bf553e94880f2023-01-23T08:00:00ZSlow Streets Barrier Installation - Packages 1 (West) & 4 (Central)2023-01-23T21:13:45.9021786Z49.260628019442095 -123.13147626715525 49.26022191078471 -123.13149057754062Transportation is formalizing its Slow Streets program, installing permanent barriers and signage in place of the temporary barriers and signage at intersections across the City. This project will calm traffic flow in key locations and will aid in improving safety for all modes of transportation.
Please contact slowstreets@vancouver.ca for more information on the program.
Location: West 1E W 13th Ave. E of Granville St.
West 2W W 13th Ave. W of Hemlock St.
West 3N Alder St. N of W Broadway
West 4N Alder St. N of W 12th Ave.
West 4S Alder St. S of W 12th Ave.
West 5E W 14th Ave. E of Cambie St.
West 6E W 18th Ave. E of Cambie St.
West 7W E 14th Ave. W of Main St.
Central 19S St. George St. S of E 12th Ave.
Central 20S Glen Dr. S of E 12th
Central 21N Woodland Dr. N of N Grandview Hwy
Central 22N Woodland Dr. N of E Broadway
Central 22S Woodland Dr. S of E Broadway
Central 23N Woodland Dr. N of E 12th Ave.
Central 23S Woodland Dr. S of E 12th Ave.
Central 24N Lakewood St. N of E Broadway
Schedule: Jan 31, 2023 - Feb 3, 2023urn:uuid:dff669d0-885d-410f-814c-2c943b3399f62023-01-23T08:00:00ZSlow Streets Barrier Installation - Packages 1 (West) & 4 (Central)2023-01-23T21:13:45.9021786Z49.2606863681838 -123.13148700010804 49.26113214967796 -123.13146195644238Transportation is formalizing its Slow Streets program, installing permanent barriers and signage in place of the temporary barriers and signage at intersections across the City. This project will calm traffic flow in key locations and will aid in improving safety for all modes of transportation.
Please contact slowstreets@vancouver.ca for more information on the program.
Location: West 1E W 13th Ave. E of Granville St.
West 2W W 13th Ave. W of Hemlock St.
West 3N Alder St. N of W Broadway
West 4N Alder St. N of W 12th Ave.
West 4S Alder St. S of W 12th Ave.
West 5E W 14th Ave. E of Cambie St.
West 6E W 18th Ave. E of Cambie St.
West 7W E 14th Ave. W of Main St.
Central 19S St. George St. S of E 12th Ave.
Central 20S Glen Dr. S of E 12th
Central 21N Woodland Dr. N of N Grandview Hwy
Central 22N Woodland Dr. N of E Broadway
Central 22S Woodland Dr. S of E Broadway
Central 23N Woodland Dr. N of E 12th Ave.
Central 23S Woodland Dr. S of E 12th Ave.
Central 24N Lakewood St. N of E Broadway
Schedule: Jan 31, 2023 - Feb 3, 2023urn:uuid:5fc688f2-7e5a-4239-81e5-b2cc514dc95f2023-01-23T08:00:00ZSlow Streets Barrier Installation - Packages 1 (West) & 4 (Central)2023-01-23T21:13:45.9021786Z49.262317339753736 -123.07364448945707 49.26189257375191 -123.07364806688965Transportation is formalizing its Slow Streets program, installing permanent barriers and signage in place of the temporary barriers and signage at intersections across the City. This project will calm traffic flow in key locations and will aid in improving safety for all modes of transportation.
Please contact slowstreets@vancouver.ca for more information on the program.
Location: West 1E W 13th Ave. E of Granville St.
West 2W W 13th Ave. W of Hemlock St.
West 3N Alder St. N of W Broadway
West 4N Alder St. N of W 12th Ave.
West 4S Alder St. S of W 12th Ave.
West 5E W 14th Ave. E of Cambie St.
West 6E W 18th Ave. E of Cambie St.
West 7W E 14th Ave. W of Main St.
Central 19S St. George St. S of E 12th Ave.
Central 20S Glen Dr. S of E 12th
Central 21N Woodland Dr. N of N Grandview Hwy
Central 22N Woodland Dr. N of E Broadway
Central 22S Woodland Dr. S of E Broadway
Central 23N Woodland Dr. N of E 12th Ave.
Central 23S Woodland Dr. S of E 12th Ave.
Central 24N Lakewood St. N of E Broadway
Schedule: Jan 31, 2023 - Feb 3, 2023urn:uuid:034999d7-7481-439e-8efa-ae8ecaeed33a2023-01-23T08:00:00ZSlow Streets Barrier Installation - Packages 1 (West) & 4 (Central)2023-01-23T21:13:45.9021786Z49.26239435734766 -123.0736301787442 49.262844791135905 -123.0736337565043Transportation is formalizing its Slow Streets program, installing permanent barriers and signage in place of the temporary barriers and signage at intersections across the City. This project will calm traffic flow in key locations and will aid in improving safety for all modes of transportation.
Please contact slowstreets@vancouver.ca for more information on the program.
Location: West 1E W 13th Ave. E of Granville St.
West 2W W 13th Ave. W of Hemlock St.
West 3N Alder St. N of W Broadway
West 4N Alder St. N of W 12th Ave.
West 4S Alder St. S of W 12th Ave.
West 5E W 14th Ave. E of Cambie St.
West 6E W 18th Ave. E of Cambie St.
West 7W E 14th Ave. W of Main St.
Central 19S St. George St. S of E 12th Ave.
Central 20S Glen Dr. S of E 12th
Central 21N Woodland Dr. N of N Grandview Hwy
Central 22N Woodland Dr. N of E Broadway
Central 22S Woodland Dr. S of E Broadway
Central 23N Woodland Dr. N of E 12th Ave.
Central 23S Woodland Dr. S of E 12th Ave.
Central 24N Lakewood St. N of E Broadway
Schedule: Jan 31, 2023 - Feb 3, 2023urn:uuid:8e8dfe72-2c3c-4526-96e2-40441288b22a2023-01-23T08:00:00ZSlow Streets Barrier Installation - Packages 1 (West) & 4 (Central)2023-01-23T21:13:45.9021786Z49.26231502285404 -123.06205045234957 49.26274445273802 -123.06203614163667Transportation is formalizing its Slow Streets program, installing permanent barriers and signage in place of the temporary barriers and signage at intersections across the City. This project will calm traffic flow in key locations and will aid in improving safety for all modes of transportation.
Please contact slowstreets@vancouver.ca for more information on the program.
Location: West 1E W 13th Ave. E of Granville St.
West 2W W 13th Ave. W of Hemlock St.
West 3N Alder St. N of W Broadway
West 4N Alder St. N of W 12th Ave.
West 4S Alder St. S of W 12th Ave.
West 5E W 14th Ave. E of Cambie St.
West 6E W 18th Ave. E of Cambie St.
West 7W E 14th Ave. W of Main St.
Central 19S St. George St. S of E 12th Ave.
Central 20S Glen Dr. S of E 12th
Central 21N Woodland Dr. N of N Grandview Hwy
Central 22N Woodland Dr. N of E Broadway
Central 22S Woodland Dr. S of E Broadway
Central 23N Woodland Dr. N of E 12th Ave.
Central 23S Woodland Dr. S of E 12th Ave.
Central 24N Lakewood St. N of E Broadway
Schedule: Jan 31, 2023 - Feb 3, 2023urn:uuid:3a55a20f-d81d-4980-8736-c0993bd3abc42023-01-23T08:00:00ZSlow Streets Barrier Installation - Packages 1 (West) & 4 (Central)2023-01-23T21:13:45.9021786Z49.26506975236171 -123.07359023916617 49.26552949666666 -123.07358308397349Transportation is formalizing its Slow Streets program, installing permanent barriers and signage in place of the temporary barriers and signage at intersections across the City. This project will calm traffic flow in key locations and will aid in improving safety for all modes of transportation.
Please contact slowstreets@vancouver.ca for more information on the program.
Location: West 1E W 13th Ave. E of Granville St.
West 2W W 13th Ave. W of Hemlock St.
West 3N Alder St. N of W Broadway
West 4N Alder St. N of W 12th Ave.
West 4S Alder St. S of W 12th Ave.
West 5E W 14th Ave. E of Cambie St.
West 6E W 18th Ave. E of Cambie St.
West 7W E 14th Ave. W of Main St.
Central 19S St. George St. S of E 12th Ave.
Central 20S Glen Dr. S of E 12th
Central 21N Woodland Dr. N of N Grandview Hwy
Central 22N Woodland Dr. N of E Broadway
Central 22S Woodland Dr. S of E Broadway
Central 23N Woodland Dr. N of E 12th Ave.
Central 23S Woodland Dr. S of E 12th Ave.
Central 24N Lakewood St. N of E Broadway
Schedule: Jan 31, 2023 - Feb 3, 2023urn:uuid:2205227d-c77f-4f32-aee0-b5119af77e642023-01-23T08:00:00ZSlow Streets Barrier Installation - Packages 1 (West) & 4 (Central)2023-01-23T21:13:45.9021786Z49.26352934309483 -123.13137122144022 49.26393542453488 -123.13135333329475Transportation is formalizing its Slow Streets program, installing permanent barriers and signage in place of the temporary barriers and signage at intersections across the City. This project will calm traffic flow in key locations and will aid in improving safety for all modes of transportation.
Please contact slowstreets@vancouver.ca for more information on the program.
Location: West 1E W 13th Ave. E of Granville St.
West 2W W 13th Ave. W of Hemlock St.
West 3N Alder St. N of W Broadway
West 4N Alder St. N of W 12th Ave.
West 4S Alder St. S of W 12th Ave.
West 5E W 14th Ave. E of Cambie St.
West 6E W 18th Ave. E of Cambie St.
West 7W E 14th Ave. W of Main St.
Central 19S St. George St. S of E 12th Ave.
Central 20S Glen Dr. S of E 12th
Central 21N Woodland Dr. N of N Grandview Hwy
Central 22N Woodland Dr. N of E Broadway
Central 22S Woodland Dr. S of E Broadway
Central 23N Woodland Dr. N of E 12th Ave.
Central 23S Woodland Dr. S of E 12th Ave.
Central 24N Lakewood St. N of E Broadway
Schedule: Jan 31, 2023 - Feb 3, 2023urn:uuid:71d107a1-32f9-414d-9a76-8a09eb3902c82023-01-23T08:00:00ZSlow Streets Barrier Installation - Packages 1 (West) & 4 (Central)2023-01-23T21:13:45.9021786Z49.25839837520118 -123.10127334678218 49.25841938167949 -123.1019745663094Transportation is formalizing its Slow Streets program, installing permanent barriers and signage in place of the temporary barriers and signage at intersections across the City. This project will calm traffic flow in key locations and will aid in improving safety for all modes of transportation.
Please contact slowstreets@vancouver.ca for more information on the program.
Location: West 1E W 13th Ave. E of Granville St.
West 2W W 13th Ave. W of Hemlock St.
West 3N Alder St. N of W Broadway
West 4N Alder St. N of W 12th Ave.
West 4S Alder St. S of W 12th Ave.
West 5E W 14th Ave. E of Cambie St.
West 6E W 18th Ave. E of Cambie St.
West 7W E 14th Ave. W of Main St.
Central 19S St. George St. S of E 12th Ave.
Central 20S Glen Dr. S of E 12th
Central 21N Woodland Dr. N of N Grandview Hwy
Central 22N Woodland Dr. N of E Broadway
Central 22S Woodland Dr. S of E Broadway
Central 23N Woodland Dr. N of E 12th Ave.
Central 23S Woodland Dr. S of E 12th Ave.
Central 24N Lakewood St. N of E Broadway
Schedule: Jan 31, 2023 - Feb 3, 2023urn:uuid:3179ebb4-ed1f-49c2-8d53-ea19223add2e2023-01-23T08:00:00ZSlow Streets Barrier Installation - Packages 1 (West) & 4 (Central)2023-01-23T21:13:45.9021786Z49.25956516797197 -123.0736993029207 49.25915204851495 -123.0737064581134Transportation is formalizing its Slow Streets program, installing permanent barriers and signage in place of the temporary barriers and signage at intersections across the City. This project will calm traffic flow in key locations and will aid in improving safety for all modes of transportation.
Please contact slowstreets@vancouver.ca for more information on the program.
Location: West 1E W 13th Ave. E of Granville St.
West 2W W 13th Ave. W of Hemlock St.
West 3N Alder St. N of W Broadway
West 4N Alder St. N of W 12th Ave.
West 4S Alder St. S of W 12th Ave.
West 5E W 14th Ave. E of Cambie St.
West 6E W 18th Ave. E of Cambie St.
West 7W E 14th Ave. W of Main St.
Central 19S St. George St. S of E 12th Ave.
Central 20S Glen Dr. S of E 12th
Central 21N Woodland Dr. N of N Grandview Hwy
Central 22N Woodland Dr. N of E Broadway
Central 22S Woodland Dr. S of E Broadway
Central 23N Woodland Dr. N of E 12th Ave.
Central 23S Woodland Dr. S of E 12th Ave.
Central 24N Lakewood St. N of E Broadway
Schedule: Jan 31, 2023 - Feb 3, 2023urn:uuid:9fba63b9-92ed-493a-b6c3-d7a87f4dc3ad2023-01-23T08:00:00ZSlow Streets Barrier Installation - Packages 1 (West) & 4 (Central)2023-01-23T21:13:45.9021786Z49.25962282190471 -123.08144211781767 49.25923070895644 -123.08144211781767Transportation is formalizing its Slow Streets program, installing permanent barriers and signage in place of the temporary barriers and signage at intersections across the City. This project will calm traffic flow in key locations and will aid in improving safety for all modes of transportation.
Please contact slowstreets@vancouver.ca for more information on the program.
Location: West 1E W 13th Ave. E of Granville St.
West 2W W 13th Ave. W of Hemlock St.
West 3N Alder St. N of W Broadway
West 4N Alder St. N of W 12th Ave.
West 4S Alder St. S of W 12th Ave.
West 5E W 14th Ave. E of Cambie St.
West 6E W 18th Ave. E of Cambie St.
West 7W E 14th Ave. W of Main St.
Central 19S St. George St. S of E 12th Ave.
Central 20S Glen Dr. S of E 12th
Central 21N Woodland Dr. N of N Grandview Hwy
Central 22N Woodland Dr. N of E Broadway
Central 22S Woodland Dr. S of E Broadway
Central 23N Woodland Dr. N of E 12th Ave.
Central 23S Woodland Dr. S of E 12th Ave.
Central 24N Lakewood St. N of E Broadway
Schedule: Jan 31, 2023 - Feb 3, 2023urn:uuid:918470ff-ead7-40ff-9d99-4c1513e5dcbb2023-01-23T08:00:00ZSlow Streets Barrier Installation - Packages 1 (West) & 4 (Central)2023-01-23T21:13:45.9021786Z49.25972202416864 -123.0930479817002 49.25933691414363 -123.0930551368929Transportation is formalizing its Slow Streets program, installing permanent barriers and signage in place of the temporary barriers and signage at intersections across the City. This project will calm traffic flow in key locations and will aid in improving safety for all modes of transportation.
Please contact slowstreets@vancouver.ca for more information on the program.
Location: West 1E W 13th Ave. E of Granville St.
West 2W W 13th Ave. W of Hemlock St.
West 3N Alder St. N of W Broadway
West 4N Alder St. N of W 12th Ave.
West 4S Alder St. S of W 12th Ave.
West 5E W 14th Ave. E of Cambie St.
West 6E W 18th Ave. E of Cambie St.
West 7W E 14th Ave. W of Main St.
Central 19S St. George St. S of E 12th Ave.
Central 20S Glen Dr. S of E 12th
Central 21N Woodland Dr. N of N Grandview Hwy
Central 22N Woodland Dr. N of E Broadway
Central 22S Woodland Dr. S of E Broadway
Central 23N Woodland Dr. N of E 12th Ave.
Central 23S Woodland Dr. S of E 12th Ave.
Central 24N Lakewood St. N of E Broadway
Schedule: Jan 31, 2023 - Feb 3, 2023urn:uuid:b15a2863-0992-4aad-a775-3ef881060fff2023-01-23T08:00:00ZSlow Streets Barrier Installation - Packages 1 (West) & 4 (Central)2023-01-23T21:13:45.9021786Z49.2587332351946 -123.11490835929251 49.258719230965795 -123.11427869283843Transportation is formalizing its Slow Streets program, installing permanent barriers and signage in place of the temporary barriers and signage at intersections across the City. This project will calm traffic flow in key locations and will aid in improving safety for all modes of transportation.
Please contact slowstreets@vancouver.ca for more information on the program.
Location: West 1E W 13th Ave. E of Granville St.
West 2W W 13th Ave. W of Hemlock St.
West 3N Alder St. N of W Broadway
West 4N Alder St. N of W 12th Ave.
West 4S Alder St. S of W 12th Ave.
West 5E W 14th Ave. E of Cambie St.
West 6E W 18th Ave. E of Cambie St.
West 7W E 14th Ave. W of Main St.
Central 19S St. George St. S of E 12th Ave.
Central 20S Glen Dr. S of E 12th
Central 21N Woodland Dr. N of N Grandview Hwy
Central 22N Woodland Dr. N of E Broadway
Central 22S Woodland Dr. S of E Broadway
Central 23N Woodland Dr. N of E 12th Ave.
Central 23S Woodland Dr. S of E 12th Ave.
Central 24N Lakewood St. N of E Broadway
Schedule: Jan 31, 2023 - Feb 3, 2023urn:uuid:8c6fabee-1bd3-42ba-8b3d-1d167faca2472023-01-23T08:00:00ZSlow Streets Barrier Installation - Packages 1 (West) & 4 (Central)2023-01-23T21:13:45.9021786Z49.25964218986118 -123.0737100358735 49.26004830328904 -123.0736957251606Transportation is formalizing its Slow Streets program, installing permanent barriers and signage in place of the temporary barriers and signage at intersections across the City. This project will calm traffic flow in key locations and will aid in improving safety for all modes of transportation.
Please contact slowstreets@vancouver.ca for more information on the program.
Location: West 1E W 13th Ave. E of Granville St.
West 2W W 13th Ave. W of Hemlock St.
West 3N Alder St. N of W Broadway
West 4N Alder St. N of W 12th Ave.
West 4S Alder St. S of W 12th Ave.
West 5E W 14th Ave. E of Cambie St.
West 6E W 18th Ave. E of Cambie St.
West 7W E 14th Ave. W of Main St.
Central 19S St. George St. S of E 12th Ave.
Central 20S Glen Dr. S of E 12th
Central 21N Woodland Dr. N of N Grandview Hwy
Central 22N Woodland Dr. N of E Broadway
Central 22S Woodland Dr. S of E Broadway
Central 23N Woodland Dr. N of E 12th Ave.
Central 23S Woodland Dr. S of E 12th Ave.
Central 24N Lakewood St. N of E Broadway
Schedule: Jan 31, 2023 - Feb 3, 2023urn:uuid:f9ce452e-80ac-416c-8140-ee50a9477c912023-01-23T08:00:00ZSlow Streets Barrier Installation - Packages 1 (West) & 4 (Central)2023-01-23T21:13:45.9021786Z49.259794911633634 -123.13629290545536 49.25980658149902 -123.13700485793535Transportation is formalizing its Slow Streets program, installing permanent barriers and signage in place of the temporary barriers and signage at intersections across the City. This project will calm traffic flow in key locations and will aid in improving safety for all modes of transportation.
Please contact slowstreets@vancouver.ca for more information on the program.
Location: West 1E W 13th Ave. E of Granville St.
West 2W W 13th Ave. W of Hemlock St.
West 3N Alder St. N of W Broadway
West 4N Alder St. N of W 12th Ave.
West 4S Alder St. S of W 12th Ave.
West 5E W 14th Ave. E of Cambie St.
West 6E W 18th Ave. E of Cambie St.
West 7W E 14th Ave. W of Main St.
Central 19S St. George St. S of E 12th Ave.
Central 20S Glen Dr. S of E 12th
Central 21N Woodland Dr. N of N Grandview Hwy
Central 22N Woodland Dr. N of E Broadway
Central 22S Woodland Dr. S of E Broadway
Central 23N Woodland Dr. N of E 12th Ave.
Central 23S Woodland Dr. S of E 12th Ave.
Central 24N Lakewood St. N of E Broadway
Schedule: Jan 31, 2023 - Feb 3, 2023urn:uuid:d3756c41-d3cd-4c9a-960b-a682c3d95f712023-01-23T08:00:00ZSlow Streets Barrier Installation - Packages 1 (West) & 4 (Central)2023-01-23T21:13:45.9021786Z49.259843900019575 -123.1386573225403 49.25983689806324 -123.138020500566Transportation is formalizing its Slow Streets program, installing permanent barriers and signage in place of the temporary barriers and signage at intersections across the City. This project will calm traffic flow in key locations and will aid in improving safety for all modes of transportation.
Please contact slowstreets@vancouver.ca for more information on the program.
Location: West 1E W 13th Ave. E of Granville St.
West 2W W 13th Ave. W of Hemlock St.
West 3N Alder St. N of W Broadway
West 4N Alder St. N of W 12th Ave.
West 4S Alder St. S of W 12th Ave.
West 5E W 14th Ave. E of Cambie St.
West 6E W 18th Ave. E of Cambie St.
West 7W E 14th Ave. W of Main St.
Central 19S St. George St. S of E 12th Ave.
Central 20S Glen Dr. S of E 12th
Central 21N Woodland Dr. N of N Grandview Hwy
Central 22N Woodland Dr. N of E Broadway
Central 22S Woodland Dr. S of E Broadway
Central 23N Woodland Dr. N of E 12th Ave.
Central 23S Woodland Dr. S of E 12th Ave.
Central 24N Lakewood St. N of E Broadway
Schedule: Jan 31, 2023 - Feb 3, 2023urn:uuid:aa9a7c9d-2ddb-4614-a547-fa9de94ebec12023-01-23T08:00:00ZSlow Streets Barrier Installation - Packages 1 (West) & 4 (Central)2023-01-23T21:13:45.9021786Z49.254882982551834 -123.11505172273841 49.2548573060908 -123.11450076438638Transportation is formalizing its Slow Streets program, installing permanent barriers and signage in place of the temporary barriers and signage at intersections across the City. This project will calm traffic flow in key locations and will aid in improving safety for all modes of transportation.
Please contact slowstreets@vancouver.ca for more information on the program
Location: Northeast 13S Lakewood St. S of Dundas St.
Northeast 14S Lakewood St. S of E Hastings St.
Northeast 16S Lakewood St. S of E 1st Ave.
Northeast 16W Charles St. W of Nanaimo St.
Northeast 17W Kitchener St. W of Renfrew St.
Northeast 17E Kitchener St. E of Renfrew St.
Northeast 18N Lillooet St. N of E 1st Ave.
Schedule: Feb 21, 2023 - Feb 24, 2023urn:uuid:b0d3fd36-bdcc-4a76-ba95-89067e7be3172023-01-23T08:00:00ZSlow Streets Barrier Installation - Packages 3 (Northeast)2024-03-02T02:00:25.2193695Z49.28480006653996 -123.06166784495892 49.28440348798364 -123.06165353424602Transportation is formalizing its Slow Streets program, installing permanent barriers and signage in place of the temporary barriers and signage at intersections across the City. This project will calm traffic flow in key locations and will aid in improving safety for all modes of transportation.
Please contact slowstreets@vancouver.ca for more information on the program
Location: Northeast 13S Lakewood St. S of Dundas St.
Northeast 14S Lakewood St. S of E Hastings St.
Northeast 16S Lakewood St. S of E 1st Ave.
Northeast 16W Charles St. W of Nanaimo St.
Northeast 17W Kitchener St. W of Renfrew St.
Northeast 17E Kitchener St. E of Renfrew St.
Northeast 18N Lillooet St. N of E 1st Ave.
Schedule: Feb 21, 2023 - Feb 24, 2023urn:uuid:1299b536-0180-44e3-babd-5c3c953545572023-01-23T08:00:00ZSlow Streets Barrier Installation - Packages 3 (Northeast)2024-03-02T02:00:25.2193695Z49.28114614026995 -123.06172668110919 49.28078686032694 -123.06173383662941Transportation is formalizing its Slow Streets program, installing permanent barriers and signage in place of the temporary barriers and signage at intersections across the City. This project will calm traffic flow in key locations and will aid in improving safety for all modes of transportation.
Please contact slowstreets@vancouver.ca for more information on the program
Location: Northeast 13S Lakewood St. S of Dundas St.
Northeast 14S Lakewood St. S of E Hastings St.
Northeast 16S Lakewood St. S of E 1st Ave.
Northeast 16W Charles St. W of Nanaimo St.
Northeast 17W Kitchener St. W of Renfrew St.
Northeast 17E Kitchener St. E of Renfrew St.
Northeast 18N Lillooet St. N of E 1st Ave.
Schedule: Feb 21, 2023 - Feb 24, 2023urn:uuid:b4a69b74-ac25-4364-9b9e-9c3eafbc60f22023-01-23T08:00:00ZSlow Streets Barrier Installation - Packages 3 (Northeast)2024-03-02T02:00:25.2193695Z49.26950918961481 -123.06189166014293 49.269138157136695 -123.06189166014293Transportation is formalizing its Slow Streets program, installing permanent barriers and signage in place of the temporary barriers and signage at intersections across the City. This project will calm traffic flow in key locations and will aid in improving safety for all modes of transportation.
Please contact slowstreets@vancouver.ca for more information on the program
Location: Northeast 13S Lakewood St. S of Dundas St.
Northeast 14S Lakewood St. S of E Hastings St.
Northeast 16S Lakewood St. S of E 1st Ave.
Northeast 16W Charles St. W of Nanaimo St.
Northeast 17W Kitchener St. W of Renfrew St.
Northeast 17E Kitchener St. E of Renfrew St.
Northeast 18N Lillooet St. N of E 1st Ave.
Schedule: Feb 21, 2023 - Feb 24, 2023urn:uuid:1db424a4-a53b-4479-9c1c-faee156056462023-01-23T08:00:00ZSlow Streets Barrier Installation - Packages 3 (Northeast)2024-03-02T02:00:25.2193695Z49.27305894826867 -123.05666244831033 49.27295628038226 -123.05727780437907Transportation is formalizing its Slow Streets program, installing permanent barriers and signage in place of the temporary barriers and signage at intersections across the City. This project will calm traffic flow in key locations and will aid in improving safety for all modes of transportation.
Please contact slowstreets@vancouver.ca for more information on the program
Location: Northeast 13S Lakewood St. S of Dundas St.
Northeast 14S Lakewood St. S of E Hastings St.
Northeast 16S Lakewood St. S of E 1st Ave.
Northeast 16W Charles St. W of Nanaimo St.
Northeast 17W Kitchener St. W of Renfrew St.
Northeast 17E Kitchener St. E of Renfrew St.
Northeast 18N Lillooet St. N of E 1st Ave.
Schedule: Feb 21, 2023 - Feb 24, 2023urn:uuid:9b170e9d-32a8-48d2-b48c-916098128ada2023-01-23T08:00:00ZSlow Streets Barrier Installation - Packages 3 (Northeast)2024-03-02T02:00:25.2193695Z49.272295246504115 -123.04490418591435 49.27229057967554 -123.04423158748536Transportation is formalizing its Slow Streets program, installing permanent barriers and signage in place of the temporary barriers and signage at intersections across the City. This project will calm traffic flow in key locations and will aid in improving safety for all modes of transportation.
Please contact slowstreets@vancouver.ca for more information on the program
Location: Northeast 13S Lakewood St. S of Dundas St.
Northeast 14S Lakewood St. S of E Hastings St.
Northeast 16S Lakewood St. S of E 1st Ave.
Northeast 16W Charles St. W of Nanaimo St.
Northeast 17W Kitchener St. W of Renfrew St.
Northeast 17E Kitchener St. E of Renfrew St.
Northeast 18N Lillooet St. N of E 1st Ave.
Schedule: Feb 21, 2023 - Feb 24, 2023urn:uuid:99d50348-3e96-4f6c-8ba3-a7d832ead16d2023-01-23T08:00:00ZSlow Streets Barrier Installation - Packages 3 (Northeast)2024-03-02T02:00:25.2193695Z49.27228591284651 -123.04410636981208 49.2722882463145 -123.0435911880785Transportation is formalizing its Slow Streets program, installing permanent barriers and signage in place of the temporary barriers and signage at intersections across the City. This project will calm traffic flow in key locations and will aid in improving safety for all modes of transportation.
Please contact slowstreets@vancouver.ca for more information on the program
Location: Northeast 13S Lakewood St. S of Dundas St.
Northeast 14S Lakewood St. S of E Hastings St.
Northeast 16S Lakewood St. S of E 1st Ave.
Northeast 16W Charles St. W of Nanaimo St.
Northeast 17W Kitchener St. W of Renfrew St.
Northeast 17E Kitchener St. E of Renfrew St.
Northeast 18N Lillooet St. N of E 1st Ave.
Schedule: Feb 21, 2023 - Feb 24, 2023urn:uuid:5d4e4d51-ac57-44ec-b2af-c6ee19fcbf522023-01-23T08:00:00ZSlow Streets Barrier Installation - Packages 3 (Northeast)2024-03-02T02:00:25.2193695Z49.269529478186996 -123.03893585111882 49.269979846843796 -123.03892154040592Transportation is formalizing its Slow Streets program, installing permanent barriers and signage in place of the temporary barriers and signage at intersections across the City. This project will calm traffic flow in key locations and will aid in improving safety for all modes of transportation.
Please contact slowstreets@vancouver.ca for more information on the program
Location: South 25S Ontario St. S of 33rd Ave.
South 26W E 27th Ave. W of Fraser St.
South 27W E 51st Ave. W of Fraser St.
South 28E E 51st Ave. E of Fraser St.
South 29N Windsor St. N of E 41st Ave.
South 29N Inverness St. N of E 49th Ave.
South 29S Inverness St. S of E 49th Ave.
South 30W E 37th Ave. W of Knight St.
South 31N Gladstone St. N of E 33rd Ave.
South 31S Gladstone St. S of E 33rd Ave.
Central North 8N McLean Dr. N of E Hastings St.
Central North 8S McLean Dr. S of E Hastings St.
Central North 9S McLean Dr. S of Venables St.
Central North 11E Charles St. E of Commercial Dr.
Central North 12W Charles St. W of Victoria Dr.
Central North 12E Charles St. E of Victoria Dr.
Schedule: Feb 7, 2023 - Feb 10, 2023urn:uuid:8c793b25-80d2-4eae-b138-8577547c30d92023-01-23T08:00:00ZSlow Streets Barrier Installation - Packages 5 (South) and 2 (Central North)2023-01-23T21:22:56.4599792Z49.27304149109307 -123.06946803801189 49.273036824335094 -123.06895285627833Transportation is formalizing its Slow Streets program, installing permanent barriers and signage in place of the temporary barriers and signage at intersections across the City. This project will calm traffic flow in key locations and will aid in improving safety for all modes of transportation.
Please contact slowstreets@vancouver.ca for more information on the program
Location: South 25S Ontario St. S of 33rd Ave.
South 26W E 27th Ave. W of Fraser St.
South 27W E 51st Ave. W of Fraser St.
South 28E E 51st Ave. E of Fraser St.
South 29N Windsor St. N of E 41st Ave.
South 29N Inverness St. N of E 49th Ave.
South 29S Inverness St. S of E 49th Ave.
South 30W E 37th Ave. W of Knight St.
South 31N Gladstone St. N of E 33rd Ave.
South 31S Gladstone St. S of E 33rd Ave.
Central North 8N McLean Dr. N of E Hastings St.
Central North 8S McLean Dr. S of E Hastings St.
Central North 9S McLean Dr. S of Venables St.
Central North 11E Charles St. E of Commercial Dr.
Central North 12W Charles St. W of Victoria Dr.
Central North 12E Charles St. E of Victoria Dr.
Schedule: Feb 7, 2023 - Feb 10, 2023urn:uuid:d2fd2f63-6f7c-4e77-a410-7aee4a7001242023-01-23T08:00:00ZSlow Streets Barrier Installation - Packages 5 (South) and 2 (Central North)2023-01-23T21:22:56.4599792Z49.27669079869577 -123.07444003827663 49.27627548933245 -123.07444361570919Transportation is formalizing its Slow Streets program, installing permanent barriers and signage in place of the temporary barriers and signage at intersections across the City. This project will calm traffic flow in key locations and will aid in improving safety for all modes of transportation.
Please contact slowstreets@vancouver.ca for more information on the program
Location: South 25S Ontario St. S of 33rd Ave.
South 26W E 27th Ave. W of Fraser St.
South 27W E 51st Ave. W of Fraser St.
South 28E E 51st Ave. E of Fraser St.
South 29N Windsor St. N of E 41st Ave.
South 29N Inverness St. N of E 49th Ave.
South 29S Inverness St. S of E 49th Ave.
South 30W E 37th Ave. W of Knight St.
South 31N Gladstone St. N of E 33rd Ave.
South 31S Gladstone St. S of E 33rd Ave.
Central North 8N McLean Dr. N of E Hastings St.
Central North 8S McLean Dr. S of E Hastings St.
Central North 9S McLean Dr. S of Venables St.
Central North 11E Charles St. E of Commercial Dr.
Central North 12W Charles St. W of Victoria Dr.
Central North 12E Charles St. E of Victoria Dr.
Schedule: Feb 7, 2023 - Feb 10, 2023urn:uuid:a6c62519-fd12-432c-a5fa-d483fc529fc52023-01-23T08:00:00ZSlow Streets Barrier Installation - Packages 5 (South) and 2 (Central North)2023-01-23T21:22:56.4599792Z49.28126137331353 -123.07413082483565 49.28083443754721 -123.07410220340986Transportation is formalizing its Slow Streets program, installing permanent barriers and signage in place of the temporary barriers and signage at intersections across the City. This project will calm traffic flow in key locations and will aid in improving safety for all modes of transportation.
Please contact slowstreets@vancouver.ca for more information on the program
Location: South 25S Ontario St. S of 33rd Ave.
South 26W E 27th Ave. W of Fraser St.
South 27W E 51st Ave. W of Fraser St.
South 28E E 51st Ave. E of Fraser St.
South 29N Windsor St. N of E 41st Ave.
South 29N Inverness St. N of E 49th Ave.
South 29S Inverness St. S of E 49th Ave.
South 30W E 37th Ave. W of Knight St.
South 31N Gladstone St. N of E 33rd Ave.
South 31S Gladstone St. S of E 33rd Ave.
Central North 8N McLean Dr. N of E Hastings St.
Central North 8S McLean Dr. S of E Hastings St.
Central North 9S McLean Dr. S of Venables St.
Central North 11E Charles St. E of Commercial Dr.
Central North 12W Charles St. W of Victoria Dr.
Central North 12E Charles St. E of Victoria Dr.
Schedule: Feb 7, 2023 - Feb 10, 2023urn:uuid:8bc44dc1-c07b-4ce2-93ff-04d4c229f5152023-01-23T08:00:00ZSlow Streets Barrier Installation - Packages 5 (South) and 2 (Central North)2023-01-23T21:22:56.4599792Z49.28132203058982 -123.07413082483565 49.28177695751691 -123.07412366931544Transportation is formalizing its Slow Streets program, installing permanent barriers and signage in place of the temporary barriers and signage at intersections across the City. This project will calm traffic flow in key locations and will aid in improving safety for all modes of transportation.
Please contact slowstreets@vancouver.ca for more information on the program
Location: South 25S Ontario St. S of 33rd Ave.
South 26W E 27th Ave. W of Fraser St.
South 27W E 51st Ave. W of Fraser St.
South 28E E 51st Ave. E of Fraser St.
South 29N Windsor St. N of E 41st Ave.
South 29N Inverness St. N of E 49th Ave.
South 29S Inverness St. S of E 49th Ave.
South 30W E 37th Ave. W of Knight St.
South 31N Gladstone St. N of E 33rd Ave.
South 31S Gladstone St. S of E 33rd Ave.
Central North 8N McLean Dr. N of E Hastings St.
Central North 8S McLean Dr. S of E Hastings St.
Central North 9S McLean Dr. S of Venables St.
Central North 11E Charles St. E of Commercial Dr.
Central North 12W Charles St. W of Victoria Dr.
Central North 12E Charles St. E of Victoria Dr.
Schedule: Feb 7, 2023 - Feb 10, 2023urn:uuid:de07deea-f935-44a9-a083-84d75ffa3a002023-01-23T08:00:00ZSlow Streets Barrier Installation - Packages 5 (South) and 2 (Central North)2023-01-23T21:22:56.4599792Z49.273026216476836 -123.06641763052386 49.27301921639096 -123.06575218745131Transportation is formalizing its Slow Streets program, installing permanent barriers and signage in place of the temporary barriers and signage at intersections across the City. This project will calm traffic flow in key locations and will aid in improving safety for all modes of transportation.
Please contact slowstreets@vancouver.ca for more information on the program
Location: South 25S Ontario St. S of 33rd Ave.
South 26W E 27th Ave. W of Fraser St.
South 27W E 51st Ave. W of Fraser St.
South 28E E 51st Ave. E of Fraser St.
South 29N Windsor St. N of E 41st Ave.
South 29N Inverness St. N of E 49th Ave.
South 29S Inverness St. S of E 49th Ave.
South 30W E 37th Ave. W of Knight St.
South 31N Gladstone St. N of E 33rd Ave.
South 31S Gladstone St. S of E 33rd Ave.
Central North 8N McLean Dr. N of E Hastings St.
Central North 8S McLean Dr. S of E Hastings St.
Central North 9S McLean Dr. S of Venables St.
Central North 11E Charles St. E of Commercial Dr.
Central North 12W Charles St. W of Victoria Dr.
Central North 12E Charles St. E of Victoria Dr.
Schedule: Feb 7, 2023 - Feb 10, 2023urn:uuid:424b0f8d-40cc-4f11-bfad-6cb37e4dda6f2023-01-23T08:00:00ZSlow Streets Barrier Installation - Packages 5 (South) and 2 (Central North)2023-01-23T21:22:56.4599792Z49.273012216304096 -123.06564843535604 49.273012216304096 -123.06511536547701Transportation is formalizing its Slow Streets program, installing permanent barriers and signage in place of the temporary barriers and signage at intersections across the City. This project will calm traffic flow in key locations and will aid in improving safety for all modes of transportation.
Please contact slowstreets@vancouver.ca for more information on the program
Location: South 25S Ontario St. S of 33rd Ave.
South 26W E 27th Ave. W of Fraser St.
South 27W E 51st Ave. W of Fraser St.
South 28E E 51st Ave. E of Fraser St.
South 29N Windsor St. N of E 41st Ave.
South 29N Inverness St. N of E 49th Ave.
South 29S Inverness St. S of E 49th Ave.
South 30W E 37th Ave. W of Knight St.
South 31N Gladstone St. N of E 33rd Ave.
South 31S Gladstone St. S of E 33rd Ave.
Central North 8N McLean Dr. N of E Hastings St.
Central North 8S McLean Dr. S of E Hastings St.
Central North 9S McLean Dr. S of Venables St.
Central North 11E Charles St. E of Commercial Dr.
Central North 12W Charles St. W of Victoria Dr.
Central North 12E Charles St. E of Victoria Dr.
Schedule: Feb 7, 2023 - Feb 10, 2023urn:uuid:da586500-cf90-435d-9d9c-6da93c4104822023-01-23T08:00:00ZSlow Streets Barrier Installation - Packages 5 (South) and 2 (Central North)2023-01-23T21:22:56.4599792Z49.23977069236014 -123.06289028544947 49.2393971014705 -123.06290101840224Transportation is formalizing its Slow Streets program, installing permanent barriers and signage in place of the temporary barriers and signage at intersections across the City. This project will calm traffic flow in key locations and will aid in improving safety for all modes of transportation.
Please contact slowstreets@vancouver.ca for more information on the program
Location: South 25S Ontario St. S of 33rd Ave.
South 26W E 27th Ave. W of Fraser St.
South 27W E 51st Ave. W of Fraser St.
South 28E E 51st Ave. E of Fraser St.
South 29N Windsor St. N of E 41st Ave.
South 29N Inverness St. N of E 49th Ave.
South 29S Inverness St. S of E 49th Ave.
South 30W E 37th Ave. W of Knight St.
South 31N Gladstone St. N of E 33rd Ave.
South 31S Gladstone St. S of E 33rd Ave.
Central North 8N McLean Dr. N of E Hastings St.
Central North 8S McLean Dr. S of E Hastings St.
Central North 9S McLean Dr. S of Venables St.
Central North 11E Charles St. E of Commercial Dr.
Central North 12W Charles St. W of Victoria Dr.
Central North 12E Charles St. E of Victoria Dr.
Schedule: Feb 7, 2023 - Feb 10, 2023urn:uuid:9faa3e7c-1c4a-4e44-b99c-fd58dfe7a7f32023-01-23T08:00:00ZSlow Streets Barrier Installation - Packages 5 (South) and 2 (Central North)2023-01-23T21:22:56.4599792Z49.23983840544844 -123.06289028544947 49.24021199299983 -123.06288312992925Transportation is formalizing its Slow Streets program, installing permanent barriers and signage in place of the temporary barriers and signage at intersections across the City. This project will calm traffic flow in key locations and will aid in improving safety for all modes of transportation.
Please contact slowstreets@vancouver.ca for more information on the program
Location: South 25S Ontario St. S of 33rd Ave.
South 26W E 27th Ave. W of Fraser St.
South 27W E 51st Ave. W of Fraser St.
South 28E E 51st Ave. E of Fraser St.
South 29N Windsor St. N of E 41st Ave.
South 29N Inverness St. N of E 49th Ave.
South 29S Inverness St. S of E 49th Ave.
South 30W E 37th Ave. W of Knight St.
South 31N Gladstone St. N of E 33rd Ave.
South 31S Gladstone St. S of E 33rd Ave.
Central North 8N McLean Dr. N of E Hastings St.
Central North 8S McLean Dr. S of E Hastings St.
Central North 9S McLean Dr. S of Venables St.
Central North 11E Charles St. E of Commercial Dr.
Central North 12W Charles St. W of Victoria Dr.
Central North 12E Charles St. E of Victoria Dr.
Schedule: Feb 7, 2023 - Feb 10, 2023urn:uuid:9712ae5a-86ad-410b-8c74-49bbac25f7e12023-01-23T08:00:00ZSlow Streets Barrier Installation - Packages 5 (South) and 2 (Central North)2023-01-23T21:22:56.4599792Z49.24053960101705 -123.10537799066289 49.24019170004621 -123.10538872361566Transportation is formalizing its Slow Streets program, installing permanent barriers and signage in place of the temporary barriers and signage at intersections across the City. This project will calm traffic flow in key locations and will aid in improving safety for all modes of transportation.
Please contact slowstreets@vancouver.ca for more information on the program
Location: South 25S Ontario St. S of 33rd Ave.
South 26W E 27th Ave. W of Fraser St.
South 27W E 51st Ave. W of Fraser St.
South 28E E 51st Ave. E of Fraser St.
South 29N Windsor St. N of E 41st Ave.
South 29N Inverness St. N of E 49th Ave.
South 29S Inverness St. S of E 49th Ave.
South 30W E 37th Ave. W of Knight St.
South 31N Gladstone St. N of E 33rd Ave.
South 31S Gladstone St. S of E 33rd Ave.
Central North 8N McLean Dr. N of E Hastings St.
Central North 8S McLean Dr. S of E Hastings St.
Central North 9S McLean Dr. S of Venables St.
Central North 11E Charles St. E of Commercial Dr.
Central North 12W Charles St. W of Victoria Dr.
Central North 12E Charles St. E of Victoria Dr.
Schedule: Feb 7, 2023 - Feb 10, 2023urn:uuid:3fe76163-ef0e-4a5b-991d-d5e06a1ff82b2023-01-23T08:00:00ZSlow Streets Barrier Installation - Packages 5 (South) and 2 (Central North)2023-01-23T21:22:56.4599792Z49.24660708237138 -123.09026359193268 49.24661175152238 -123.0908360160265Transportation is formalizing its Slow Streets program, installing permanent barriers and signage in place of the temporary barriers and signage at intersections across the City. This project will calm traffic flow in key locations and will aid in improving safety for all modes of transportation.
Please contact slowstreets@vancouver.ca for more information on the program
Location: South 25S Ontario St. S of 33rd Ave.
South 26W E 27th Ave. W of Fraser St.
South 27W E 51st Ave. W of Fraser St.
South 28E E 51st Ave. E of Fraser St.
South 29N Windsor St. N of E 41st Ave.
South 29N Inverness St. N of E 49th Ave.
South 29S Inverness St. S of E 49th Ave.
South 30W E 37th Ave. W of Knight St.
South 31N Gladstone St. N of E 33rd Ave.
South 31S Gladstone St. S of E 33rd Ave.
Central North 8N McLean Dr. N of E Hastings St.
Central North 8S McLean Dr. S of E Hastings St.
Central North 9S McLean Dr. S of Venables St.
Central North 11E Charles St. E of Commercial Dr.
Central North 12W Charles St. W of Victoria Dr.
Central North 12E Charles St. E of Victoria Dr.
Schedule: Feb 7, 2023 - Feb 10, 2023urn:uuid:02a24b77-c996-431e-8bf7-582fc41398602023-01-23T08:00:00ZSlow Streets Barrier Installation - Packages 5 (South) and 2 (Central North)2023-01-23T21:22:56.4599792Z49.22357884429391 -123.09076797987245 49.22357183719379 -123.09019197785476Transportation is formalizing its Slow Streets program, installing permanent barriers and signage in place of the temporary barriers and signage at intersections across the City. This project will calm traffic flow in key locations and will aid in improving safety for all modes of transportation.
Please contact slowstreets@vancouver.ca for more information on the program
Location: South 25S Ontario St. S of 33rd Ave.
South 26W E 27th Ave. W of Fraser St.
South 27W E 51st Ave. W of Fraser St.
South 28E E 51st Ave. E of Fraser St.
South 29N Windsor St. N of E 41st Ave.
South 29N Inverness St. N of E 49th Ave.
South 29S Inverness St. S of E 49th Ave.
South 30W E 37th Ave. W of Knight St.
South 31N Gladstone St. N of E 33rd Ave.
South 31S Gladstone St. S of E 33rd Ave.
Central North 8N McLean Dr. N of E Hastings St.
Central North 8S McLean Dr. S of E Hastings St.
Central North 9S McLean Dr. S of Venables St.
Central North 11E Charles St. E of Commercial Dr.
Central North 12W Charles St. W of Victoria Dr.
Central North 12E Charles St. E of Victoria Dr.
Schedule: Feb 7, 2023 - Feb 10, 2023urn:uuid:2c6c8a36-9e3f-4d5f-9d44-2723a693a9982023-01-23T08:00:00ZSlow Streets Barrier Installation - Packages 5 (South) and 2 (Central North)2023-01-23T21:22:56.4599792Z49.22358818705689 -123.0914477334941 49.22357884429391 -123.0909003527384Transportation is formalizing its Slow Streets program, installing permanent barriers and signage in place of the temporary barriers and signage at intersections across the City. This project will calm traffic flow in key locations and will aid in improving safety for all modes of transportation.
Please contact slowstreets@vancouver.ca for more information on the program
Location: South 25S Ontario St. S of 33rd Ave.
South 26W E 27th Ave. W of Fraser St.
South 27W E 51st Ave. W of Fraser St.
South 28E E 51st Ave. E of Fraser St.
South 29N Windsor St. N of E 41st Ave.
South 29N Inverness St. N of E 49th Ave.
South 29S Inverness St. S of E 49th Ave.
South 30W E 37th Ave. W of Knight St.
South 31N Gladstone St. N of E 33rd Ave.
South 31S Gladstone St. S of E 33rd Ave.
Central North 8N McLean Dr. N of E Hastings St.
Central North 8S McLean Dr. S of E Hastings St.
Central North 9S McLean Dr. S of Venables St.
Central North 11E Charles St. E of Commercial Dr.
Central North 12W Charles St. W of Victoria Dr.
Central North 12E Charles St. E of Victoria Dr.
Schedule: Feb 7, 2023 - Feb 10, 2023urn:uuid:785672f5-c971-4717-8e01-b3c97828e6042023-01-23T08:00:00ZSlow Streets Barrier Installation - Packages 5 (South) and 2 (Central North)2023-01-23T21:22:56.4599792Z49.225284517895204 -123.08006909733618 49.22492950245692 -123.08008340804908Transportation is formalizing its Slow Streets program, installing permanent barriers and signage in place of the temporary barriers and signage at intersections across the City. This project will calm traffic flow in key locations and will aid in improving safety for all modes of transportation.
Please contact slowstreets@vancouver.ca for more information on the program
Location: South 25S Ontario St. S of 33rd Ave.
South 26W E 27th Ave. W of Fraser St.
South 27W E 51st Ave. W of Fraser St.
South 28E E 51st Ave. E of Fraser St.
South 29N Windsor St. N of E 41st Ave.
South 29N Inverness St. N of E 49th Ave.
South 29S Inverness St. S of E 49th Ave.
South 30W E 37th Ave. W of Knight St.
South 31N Gladstone St. N of E 33rd Ave.
South 31S Gladstone St. S of E 33rd Ave.
Central North 8N McLean Dr. N of E Hastings St.
Central North 8S McLean Dr. S of E Hastings St.
Central North 9S McLean Dr. S of Venables St.
Central North 11E Charles St. E of Commercial Dr.
Central North 12W Charles St. W of Victoria Dr.
Central North 12E Charles St. E of Victoria Dr.
Schedule: Feb 7, 2023 - Feb 10, 2023urn:uuid:14355ac5-f7b0-4715-a9a5-65a136f3a0bb2023-01-23T08:00:00ZSlow Streets Barrier Installation - Packages 5 (South) and 2 (Central North)2023-01-23T21:22:56.4599792Z49.225384949385614 -123.0800619421435 49.22578900907965 -123.08004763143062Transportation is formalizing its Slow Streets program, installing permanent barriers and signage in place of the temporary barriers and signage at intersections across the City. This project will calm traffic flow in key locations and will aid in improving safety for all modes of transportation.
Please contact slowstreets@vancouver.ca for more information on the program
Location: South 25S Ontario St. S of 33rd Ave.
South 26W E 27th Ave. W of Fraser St.
South 27W E 51st Ave. W of Fraser St.
South 28E E 51st Ave. E of Fraser St.
South 29N Windsor St. N of E 41st Ave.
South 29N Inverness St. N of E 49th Ave.
South 29S Inverness St. S of E 49th Ave.
South 30W E 37th Ave. W of Knight St.
South 31N Gladstone St. N of E 33rd Ave.
South 31S Gladstone St. S of E 33rd Ave.
Central North 8N McLean Dr. N of E Hastings St.
Central North 8S McLean Dr. S of E Hastings St.
Central North 9S McLean Dr. S of Venables St.
Central North 11E Charles St. E of Commercial Dr.
Central North 12W Charles St. W of Victoria Dr.
Central North 12E Charles St. E of Victoria Dr.
Schedule: Feb 7, 2023 - Feb 10, 2023urn:uuid:d257d0c0-8cd6-4485-ada4-30b16bb4d5782023-01-23T08:00:00ZSlow Streets Barrier Installation - Packages 5 (South) and 2 (Central North)2023-01-23T21:22:56.4599792Z49.23285531822248 -123.08480266748035 49.23327332827682 -123.08479908972025Transportation is formalizing its Slow Streets program, installing permanent barriers and signage in place of the temporary barriers and signage at intersections across the City. This project will calm traffic flow in key locations and will aid in improving safety for all modes of transportation.
Please contact slowstreets@vancouver.ca for more information on the program
Location: South 25S Ontario St. S of 33rd Ave.
South 26W E 27th Ave. W of Fraser St.
South 27W E 51st Ave. W of Fraser St.
South 28E E 51st Ave. E of Fraser St.
South 29N Windsor St. N of E 41st Ave.
South 29N Inverness St. N of E 49th Ave.
South 29S Inverness St. S of E 49th Ave.
South 30W E 37th Ave. W of Knight St.
South 31N Gladstone St. N of E 33rd Ave.
South 31S Gladstone St. S of E 33rd Ave.
Central North 8N McLean Dr. N of E Hastings St.
Central North 8S McLean Dr. S of E Hastings St.
Central North 9S McLean Dr. S of Venables St.
Central North 11E Charles St. E of Commercial Dr.
Central North 12W Charles St. W of Victoria Dr.
Central North 12E Charles St. E of Victoria Dr.
Schedule: Feb 7, 2023 - Feb 10, 2023urn:uuid:5ff7411b-40c2-4412-826f-766c008f494b2023-01-23T08:00:00ZSlow Streets Barrier Installation - Packages 5 (South) and 2 (Central North)2023-01-23T21:22:56.4599792Z49.2368593709495 -123.07696207846176 49.236857035913005 -123.07696565622189 49.23686871130826 -123.07773842882226St George Rainway, Broadway to E. 5th. Green Infrastructure Led project.
Update as of Mar 2024: Block 4 is substantially complete; Blocks 3 and 2 expected complete in Q1 2025. Project will then be paused until Developer frontage work is complete, then Block 1 restarted as separate project phase in Q1 2026. Project is anticipated to be completed in Q2 2026.
Location: St George St from E Broadway to E.5th Ave
Schedule: Mar 29, 2023 - Jun 30, 2026urn:uuid:9949573a-04ae-4f13-a8ed-628747617bd62023-02-13T08:00:00ZSt George Rainway Project2024-03-27T22:17:54.8909522Z49.26481131848101 -123.09295247626 49.26435919738199 -123.09295764724St George Rainway, Broadway to E. 5th. Green Infrastructure Led project.
Update as of Mar 2024: Block 4 is substantially complete; Blocks 3 and 2 expected complete in Q1 2025. Project will then be paused until Developer frontage work is complete, then Block 1 restarted as separate project phase in Q1 2026. Project is anticipated to be completed in Q2 2026.
Location: St George St from E Broadway to E.5th Ave
Schedule: Mar 29, 2023 - Jun 30, 2026urn:uuid:ec8b51f7-8e8c-4cc9-81d9-fb361622f6f52023-02-13T08:00:00ZSt George Rainway Project2024-03-27T22:17:54.8909522Z49.265263432185975 -123.0929452709 49.26481131848101 -123.09295247626St George Rainway, Broadway to E. 5th. Green Infrastructure Led project.
Update as of Mar 2024: Block 4 is substantially complete; Blocks 3 and 2 expected complete in Q1 2025. Project will then be paused until Developer frontage work is complete, then Block 1 restarted as separate project phase in Q1 2026. Project is anticipated to be completed in Q2 2026.
Location: St George St from E Broadway to E.5th Ave
Schedule: Mar 29, 2023 - Jun 30, 2026urn:uuid:162a6e55-7aa7-4f8f-b899-5355e889b9fc2023-02-13T08:00:00ZSt George Rainway Project2024-03-27T22:17:54.8909522Z49.265721148230995 -123.09295361336781 49.26526904362453 -123.09296070878524St George Rainway, Broadway to E. 5th. Green Infrastructure Led project.
Update as of Mar 2024: Block 4 is substantially complete; Blocks 3 and 2 expected complete in Q1 2025. Project will then be paused until Developer frontage work is complete, then Block 1 restarted as separate project phase in Q1 2026. Project is anticipated to be completed in Q2 2026.
Location: St George St from E Broadway to E.5th Ave
Schedule: Mar 29, 2023 - Jun 30, 2026urn:uuid:f529bee2-8bdb-4ec9-a9d3-4f67acb2ce5e2023-02-13T08:00:00ZSt George Rainway Project2024-03-27T22:17:54.8909522Z49.265721148230995 -123.09295361336781 49.26526904362453 -123.09296070878524St George Rainway, Broadway to E. 5th. Green Infrastructure Led project.
Update as of Mar 2024: Block 4 is substantially complete; Blocks 3 and 2 expected complete in Q1 2025. Project will then be paused until Developer frontage work is complete, then Block 1 restarted as separate project phase in Q1 2026. Project is anticipated to be completed in Q2 2026.
Location: St George St from E Broadway to E.5th Ave
Schedule: Mar 29, 2023 - Jun 30, 2026urn:uuid:0d12075b-66b8-40f2-9c53-0c72f5eddd122023-02-13T08:00:00ZSt George Rainway Project2024-03-27T22:17:54.8909522Z49.265721148230995 -123.09295361336781 49.26526904362453 -123.09296070878524St George Rainway, Broadway to E. 5th. Green Infrastructure Led project.
Update as of Mar 2024: Block 4 is substantially complete; Blocks 3 and 2 expected complete in Q1 2025. Project will then be paused until Developer frontage work is complete, then Block 1 restarted as separate project phase in Q1 2026. Project is anticipated to be completed in Q2 2026.
Location: St George St from E Broadway to E.5th Ave
Schedule: Mar 29, 2023 - Jun 30, 2026urn:uuid:216d9311-b019-4726-b41e-32bbf5ac90502023-02-13T08:00:00ZSt George Rainway Project2024-03-27T22:17:54.8909522Z49.26617318066309 -123.09294673761639 49.265721148230995 -123.09295361336781St George Rainway, Broadway to E. 5th. Green Infrastructure Led project.
Update as of Mar 2024: Block 4 is substantially complete; Blocks 3 and 2 expected complete in Q1 2025. Project will then be paused until Developer frontage work is complete, then Block 1 restarted as separate project phase in Q1 2026. Project is anticipated to be completed in Q2 2026.
Location: St George St from E Broadway to E.5th Ave
Schedule: Mar 29, 2023 - Jun 30, 2026urn:uuid:7d74f0f0-270c-438e-8a87-0fa7793a09902023-02-13T08:00:00ZSt George Rainway Project2024-03-27T22:17:54.8909522Z49.26617318066309 -123.09294673761639 49.265721148230995 -123.09295361336781St George Rainway, Broadway to E. 5th. Green Infrastructure Led project.
Update as of Mar 2024: Block 4 is substantially complete; Blocks 3 and 2 expected complete in Q1 2025. Project will then be paused until Developer frontage work is complete, then Block 1 restarted as separate project phase in Q1 2026. Project is anticipated to be completed in Q2 2026.
Location: St George St from E Broadway to E.5th Ave
Schedule: Mar 29, 2023 - Jun 30, 2026urn:uuid:287bfd30-1ecf-4b95-9e87-3f7e5325cdcb2023-02-13T08:00:00ZSt George Rainway Project2024-03-27T22:17:54.8909522Z49.26617318066309 -123.09294673761639 49.265721148230995 -123.09295361336781St George Rainway, Broadway to E. 5th. Green Infrastructure Led project.
Update as of Mar 2024: Block 4 is substantially complete; Blocks 3 and 2 expected complete in Q1 2025. Project will then be paused until Developer frontage work is complete, then Block 1 restarted as separate project phase in Q1 2026. Project is anticipated to be completed in Q2 2026.
Location: St George St from E Broadway to E.5th Ave
Schedule: Mar 29, 2023 - Jun 30, 2026urn:uuid:23e6288f-36b2-47fc-9fe9-0731bdf5936c2023-02-13T08:00:00ZSt George Rainway Project2024-03-27T22:17:54.8909522Z49.26300839402131 -123.09299630747745 49.26251142029801 -123.09300440363242St George Rainway, Broadway to E. 5th. Green Infrastructure Led project.
Update as of Mar 2024: Block 4 is substantially complete; Blocks 3 and 2 expected complete in Q1 2025. Project will then be paused until Developer frontage work is complete, then Block 1 restarted as separate project phase in Q1 2026. Project is anticipated to be completed in Q2 2026.
Location: St George St from E Broadway to E.5th Ave
Schedule: Mar 29, 2023 - Jun 30, 2026urn:uuid:2566250a-d7b6-4ca8-a47c-b8bb04b81a372023-02-13T08:00:00ZSt George Rainway Project2024-03-27T22:17:54.8909522Z49.26346089445195 -123.09298939210346 49.26300839402131 -123.09299630747745St George Rainway, Broadway to E. 5th. Green Infrastructure Led project.
Update as of Mar 2024: Block 4 is substantially complete; Blocks 3 and 2 expected complete in Q1 2025. Project will then be paused until Developer frontage work is complete, then Block 1 restarted as separate project phase in Q1 2026. Project is anticipated to be completed in Q2 2026.
Location: St George St from E Broadway to E.5th Ave
Schedule: Mar 29, 2023 - Jun 30, 2026urn:uuid:fbe43455-6aa4-4231-8e94-9ab7e1daa3b22023-02-13T08:00:00ZSt George Rainway Project2024-03-27T22:17:54.8909522Z49.26390702806401 -123.09296680400999 49.26345528309798 -123.09297395471002St George Rainway, Broadway to E. 5th. Green Infrastructure Led project.
Update as of Mar 2024: Block 4 is substantially complete; Blocks 3 and 2 expected complete in Q1 2025. Project will then be paused until Developer frontage work is complete, then Block 1 restarted as separate project phase in Q1 2026. Project is anticipated to be completed in Q2 2026.
Location: St George St from E Broadway to E.5th Ave
Schedule: Mar 29, 2023 - Jun 30, 2026urn:uuid:444c16ad-5ee4-4f7f-9fce-3f47a43632ad2023-02-13T08:00:00ZSt George Rainway Project2024-03-27T22:17:54.8909522Z49.26435919738199 -123.09295764724 49.26390702806401 -123.09296680400999Full closure of 1166 W 14th Ave from May Monday 6, 2024 to May Friday 31, 2024 at 4:00 pm.
Location: W 14th Ave from Alder St to Spruce St
Schedule: May 6, 2024 - May 31, 2024; Weekdays; 8:40 AM - 4:00 PMurn:uuid:b8743130-369d-464c-a766-974b0fd890492024-03-13T07:00:00ZStreet Service of 1166 W 14th Ave2024-03-13T18:21:19.0090342Z49.25876376803379 -123.12917746121988 49.25880155480991 -123.13154715036113Full closure of 1750 E 22nd Av from May Monday 6, 2024 to June Friday 14, 2024 at 4:00 pm.
Location: E 22nd Ave from Welwyn St to Commercial St
Schedule: May 6, 2024 - Jun 14, 2024; Weekdays; 8:40 AM - 4:00 PMurn:uuid:0c7f6488-b4e2-4f9d-a5ac-3df92966528d2024-03-13T07:00:00ZStreets Service of 1750 E 22nd Av2024-03-13T18:33:25.9866049Z49.25035141997262 -123.06987552194408 49.2503455143669 -123.06946570385813Full closure of 1750 E 22nd Av from May Monday 6, 2024 to June Friday 14, 2024 at 4:00 pm.
Location: E 22nd Ave from Welwyn St to Commercial St
Schedule: May 6, 2024 - Jun 14, 2024; Weekdays; 8:40 AM - 4:00 PMurn:uuid:0c540845-ea16-4351-8ac2-758b62fec77b2024-03-13T07:00:00ZStreets Service of 1750 E 22nd Av2024-03-13T18:33:25.9866049Z49.2503455143669 -123.06946570385813 49.25033443323838 -123.06878750444173Full closure of 1750 E 22nd Av from May Monday 6, 2024 to June Friday 14, 2024 at 4:00 pm.
Location: E 22nd Ave from Welwyn St to Commercial St
Schedule: May 6, 2024 - Jun 14, 2024; Weekdays; 8:40 AM - 4:00 PMurn:uuid:79c14ed7-eca6-4dca-906b-f1e10daa30712024-03-13T07:00:00ZStreets Service of 1750 E 22nd Av2024-03-13T18:33:25.9866049Z49.25033443323838 -123.06878750444173 49.250322619232236 -123.06810978525478Full closure of 1750 E 22nd Av from May Monday 6, 2024 to June Friday 14, 2024 at 4:00 pm.
Location: E 22nd Ave from Welwyn St to Commercial St
Schedule: May 6, 2024 - Jun 14, 2024; Weekdays; 8:40 AM - 4:00 PMurn:uuid:c767b461-ed3f-45c1-bd36-bdc6d427e4832024-03-13T07:00:00ZStreets Service of 1750 E 22nd Av2024-03-13T18:33:25.9866049Z49.250322619232236 -123.06810978525478 49.2503197463887 -123.06779433074232Crews will be on site to conduct Utility Maintenance on behalf of Telus
Traffic Impacts:
Single Lane Alternating Traffic and Parking Lane Closure, South Side, 100 Block of W Woodstock Ave from Columbia St to Manitoba St
WO# NW 2772189
Location: 100 Block of W Woodstock Avenue
Schedule: Apr 1, 2024 - Apr 5, 2024; Weekdays; 8:00 AM - 4:00 PMurn:uuid:82d6dbaf-c2f9-4920-ae5d-f0733b5364732024-03-18T07:00:00ZTelus - Utility Maintenance on 100 Block of W Woodstock Avenue2024-03-18T23:08:06.0320216Z49.233882298519575 -123.1107143653509 49.2337842194832 -123.10809116493432Crews will be on site to conduct Utility Maintenance on behalf of Telus
Traffic Impacts:
Travel Lane Closure, South Side, 1000 Block of SE Marine Dr from Ross St to Prince Albert St
WO# 2877859
Location: 1000 Block of SE Marine Drive
Schedule: Apr 2, 2024 - Apr 5, 2024; Tu - F; 8:00 AM - 3:00 PMurn:uuid:c7106caa-bcab-4390-bf1b-3cbd02f483582024-03-19T07:00:00ZTelus - Utility Maintenance on 1000 Block of SE Marine Drive2024-03-19T16:55:21.3342597Z49.211116025449655 -123.08406863509629 49.211056450046755 -123.08823678790544Crews will be on site to conduct Utility Maintenance on behalf of Telus
Traffic Impacts:
Parking Lane and Sidewalk Closure, Both Sides, 1300-1400 Block of E 15th Ave from 50m West of Knight St to Woodland Dr
WO# 2907658
Location: 1300-1400 Block of E 15th Avenue
Schedule: Apr 10, 2024 - Apr 24, 2024; Weekdays; 8:00 AM - 5:00 PMurn:uuid:60b64caf-c019-4d6c-a708-3dfefe42396e2024-03-26T07:00:00ZTelus - Utility Maintenance on 1300-1400 Block of E 15th Avenue2024-03-26T17:09:58.1550489Z49.25664226160637 -123.07657678173902 49.25653604133481 -123.07429832889518Crews will be on site to conduct Utility Maintenance on behalf of Telus
Traffic Impacts:
Parking Lane Closure, East Side, 1700 Block of Larch St from W 2nd Ave to W 1st Ave
WO# NW 2843979
Location: 1700 Block of Larch Street
Schedule: Mar 28, 2024 - Mar 29, 2024; Th - F; 9:00 AM - 4:00 PMurn:uuid:b0d6df54-3428-4ec4-a636-af0a6416c9722024-03-13T07:00:00ZTelus - Utility Maintenance on 1700 Block of Larch Street2024-03-13T20:46:27.5980194Z49.27092334054416 -123.16216173545821 49.27004828481009 -123.16219928638442Parking lane closure on East side of 1900 Block Highbury Street from W 4th Avenue to Lane North of W 4th Avenue, East side of 2100 Block Highbury Street from W 5th Avenue to W 6th Avenue and East side of 2200 Block Highbury Street from W 7th Avenue to 40m North of W 7th Avenue to facilitate utility maintenance work.
WO# CSTL_2053
Location: East side of 1900 Block Highbury Street from W 4th Avenue to Lane North of W 4th Avenue. East side of 2100 Block Highbury Street from W 5th Avenue to W 6th Avenue. East side of 2200 Block Highbury Street W 7th Avenue to 40 meters North of W 7th Avenue.
Schedule: Mar 20, 2024 - Mar 29, 2024; Weekdays; 8:00 AM - 6:00 PMurn:uuid:18170304-342e-48e0-a4b3-43df3317226b2024-03-12T07:00:00ZTelus - Utility Maintenance on 1900, 2100, 2200 Block Highbury Street2024-03-12T17:43:06.8806047Z49.26867412161471 -123.18762369813398 49.26912216456904 -123.18759687604381Parking lane closure on East side of 1900 Block Highbury Street from W 4th Avenue to Lane North of W 4th Avenue, East side of 2100 Block Highbury Street from W 5th Avenue to W 6th Avenue and East side of 2200 Block Highbury Street from W 7th Avenue to 40m North of W 7th Avenue to facilitate utility maintenance work.
WO# CSTL_2053
Location: East side of 1900 Block Highbury Street from W 4th Avenue to Lane North of W 4th Avenue. East side of 2100 Block Highbury Street from W 5th Avenue to W 6th Avenue. East side of 2200 Block Highbury Street W 7th Avenue to 40 meters North of W 7th Avenue.
Schedule: Mar 20, 2024 - Mar 29, 2024; Weekdays; 8:00 AM - 6:00 PMurn:uuid:81d66870-6d17-4bf7-9310-703fbf4c7ecb2024-03-12T07:00:00ZTelus - Utility Maintenance on 1900, 2100, 2200 Block Highbury Street2024-03-12T17:43:06.8806047Z49.26695191863155 -123.18769879998635 49.26780602681188 -123.1876719778962Parking lane closure on East side of 1900 Block Highbury Street from W 4th Avenue to Lane North of W 4th Avenue, East side of 2100 Block Highbury Street from W 5th Avenue to W 6th Avenue and East side of 2200 Block Highbury Street from W 7th Avenue to 40m North of W 7th Avenue to facilitate utility maintenance work.
WO# CSTL_2053
Location: East side of 1900 Block Highbury Street from W 4th Avenue to Lane North of W 4th Avenue. East side of 2100 Block Highbury Street from W 5th Avenue to W 6th Avenue. East side of 2200 Block Highbury Street W 7th Avenue to 40 meters North of W 7th Avenue.
Schedule: Mar 20, 2024 - Mar 29, 2024; Weekdays; 8:00 AM - 6:00 PMurn:uuid:b2344bf1-f663-434e-904a-4f8ef9c4d2932024-03-12T07:00:00ZTelus - Utility Maintenance on 1900, 2100, 2200 Block Highbury Street2024-03-12T17:43:06.8806047Z49.266111797800676 -123.18773098649447 49.26653186000419 -123.1877202576584Crews will be on site to conduct Utility Maintenance on behalf of Telus
Traffic Impacts:
Parking Lane Closure, North Side, 200 Block of E 21st Ave from Main St to 25m East
WO# 2894087
Location: 200 Block of E 21st Avenue
Schedule: Apr 4, 2024 - Apr 5, 2024; Th - F; 8:00 AM - 4:00 PMurn:uuid:00c3e499-aed7-41d4-88cc-eb3a3a0e42e92024-03-18T07:00:00ZTelus - Utility Maintenance on 200 Block of E 21st Avenue2024-03-18T17:12:04.6621882Z49.25208792767344 -123.10096142936706 49.25208267538105 -123.10057250905987Parking lane closure on East side of 2400 Block Highbury Street from W Broadway to W 8th Avenue to facilitate utility maintenance work.
WO# STL_2053
Location: East side of 2400 Block Highbury Street from W Broadway to W 8th Avenue
Schedule: Mar 20, 2024 - Mar 29, 2024; Weekdays; 8:00 AM - 6:00 PMurn:uuid:12499d56-41d4-4589-a44e-19f28cdb850f2024-03-12T07:00:00ZTelus - Utility Maintenance on 2400 Highbury Street2024-03-12T17:48:24.8608569Z49.26527077439715 -123.1877690414154 49.26439561840377 -123.1878065923416Parking lane closure on East side of 3300 Block Clark Drive from E 17th avenue to Lane South of E 17th Avenue to facilitate utility maintenance work.
WO# 2894087
Location: East side of 3300 Block Clark Drive from E 17th avenue to Lane South of E 17th Avenue.
Schedule: Mar 25, 2024 - Mar 28, 2024; M - Th; 8:00 AM - 4:00 PMurn:uuid:abc9b8e1-2522-4f9d-bf5d-5810c010a2d32024-03-13T07:00:00ZTelus - Utility Maintenance on 3300 Block Clark Street2024-03-13T17:59:32.8301165Z49.25531937665306 -123.07786185789081 49.254902720328374 -123.07787795114488Crews will be on site to conduct Utility Maintenance on behalf of Telus
Traffic Impacts:
Parking Lane Closure, East Side, 3500 Block of Clark Dr from E 20th Ave to Lane North of E 20th Ave
WO# 2894087
Location: 3500 Block of Clark Drive
Schedule: Apr 1, 2024 - Apr 3, 2024; Weekdays; 8:00 AM - 4:00 PMurn:uuid:0d870ee2-eb3e-4e92-8527-67507437fd212024-03-13T07:00:00ZTelus - Utility Maintenance on 3500 Block of Clark Drive2024-03-13T22:04:04.2668453Z49.25263850581581 -123.07796025911614 49.25309369729189 -123.07795489469814Crews will be on site to conduct Utility Maintenance on behalf of Telus
Traffic Impacts:
Parking Lane Closure, East Side, 3600-3700 Block of St. George St from 30m North of E 21st Ave to 45m South of E 21st Ave
WO# 2894087
Location: 3600-3700 Block of St. George Street
Schedule: Apr 8, 2024 - Apr 11, 2024; M - Th; 8:00 AM - 4:00 PMurn:uuid:b7728ae9-bea5-4fa9-8934-fb96fe75950e2024-03-18T07:00:00ZTelus - Utility Maintenance on 3600-3700 Block of St. George Street2024-03-18T17:24:23.082106Z49.25227581695441 -123.09395615224051 49.251568505905226 -123.09396688107655Travel Lane and Parking Lane Closure on 400-500 Block Pacific Street from 55m West of Richards Street to Home Street and North side of 1300 Block Pacific Boulevard from Homer Street to 40m East of Homer Street to facilitate utility maintenance.
WO#3PD2921
Location: Both sides on 400-500 Block Pacific Street to 55m West of Richards Street to Home Street. North side of 1300 Block of Pacific Boulevard from Homer Street to 40m East of Homer Street.
Schedule: Mar 23, 2024 - Mar 31, 2024; Weekends; 8:00 AM - 4:00 PMurn:uuid:d21907fd-dd89-4339-9cf8-22989492ae662024-03-08T08:00:00ZTelus - Utility Maintenance on 400-500 Block Pacific Street2024-03-07T18:41:05.0196849Z49.274180352923025 -123.12811281058326 49.27347781546584 -123.12710080199757 49.273292935524665 -123.12676076711277 49.273208418749334 -123.12654217325827 49.27311861951691 -123.12624261871689 49.273049949405305 -123.1258701995574 49.27301825547539 -123.12539253150491 49.27304466708506 -123.12506059268884Crews will be on site to conduct Utility Maintenance on behalf of Telus
Traffic Impacts:
- Parking Lane Closure, West Side, 4000 Block of Crown St from Lane North of King Edward Ave to 25m South of W 27th Ave
- Parking Lane Closure, West Side, 4400 Block of Crown St from Lane North of W 28th Ave to W 29th Ave
WO# CSTL_2045
Location: 4000-4400 Block of Crown Street
Schedule: Apr 8, 2024 - Apr 12, 2024; Weekdays; 8:00 AM - 5:00 PMurn:uuid:124301c1-730c-4be8-9d77-50fde4ea39e32024-03-27T07:00:00ZTelus - Utility Maintenance on 4000-4400 Block of Crown Street2024-03-27T17:27:53.7371801Z49.24788756238334 -123.19363096356615 49.250656047067764 -123.19361979661264Crews will be on site to conduct Utility Maintenance on behalf of Telus
Traffic Impacts:
- Parking Lane Closure, West Side, 4000 Block of Crown St from Lane North of King Edward Ave to 25m South of W 27th Ave
- Parking Lane Closure, West Side, 4400 Block of Crown St from Lane North of W 28th Ave to W 29th Ave
WO# CSTL_2045
Location: 4000-4400 Block of Crown Street
Schedule: Apr 8, 2024 - Apr 12, 2024; Weekdays; 8:00 AM - 5:00 PMurn:uuid:4fb0ca76-407f-4a92-9601-6ce7591b14332024-03-27T07:00:00ZTelus - Utility Maintenance on 4000-4400 Block of Crown Street2024-03-27T17:27:53.7371801Z49.247651361170455 -123.19364068132833 49.24621664456231 -123.19366483284422Crews will be on site to conduct Utility Maintenance on behalf of Telus
Traffic Impacts:
- Parking Lane Closure, West Side, 4500-4600 Block of Crown St from W 29th Ave to Lane South of W 30th Ave
- Parking Lane Closure, West Side, 4600-4800 Block of Crown St from 25m North of W 31st Ave to W 33rd Ave
WO# CSTL_2045
Location: 4500-4600 Block of Crown Street
Schedule: Apr 8, 2024 - Apr 12, 2024; Weekdays; 8:00 AM - 5:00 PMurn:uuid:bfa00538-0bbe-46ca-996e-f35832d70eb92024-03-27T07:00:00ZTelus - Utility Maintenance on 4500-4600 Block of Crown Street2024-03-27T18:42:20.7195533Z49.246207574032496 -123.19366820223944 49.244792698436925 -123.19365882681815Crews will be on site to conduct Utility Maintenance on behalf of Telus
Traffic Impacts:
- Parking Lane Closure, West Side, 4500-4600 Block of Crown St from W 29th Ave to Lane South of W 30th Ave
- Parking Lane Closure, West Side, 4600-4800 Block of Crown St from 25m North of W 31st Ave to W 33rd Ave
WO# CSTL_2045
Location: 4500-4600 Block of Crown Street
Schedule: Apr 8, 2024 - Apr 12, 2024; Weekdays; 8:00 AM - 5:00 PMurn:uuid:ea1b213a-3c73-4e1b-8058-5f9afca7eac92024-03-27T07:00:00ZTelus - Utility Maintenance on 4500-4600 Block of Crown Street2024-03-27T18:42:20.7195533Z49.24454288059286 -123.19367951162435 49.24242747633514 -123.19370019643053Crews will be on site to conduct Utility Maintenance on behalf of Telus
Traffic Impacts:
Parking Lane Closure, North Side, 600 Block of W 24th Ave from Ash St to Lane West of Ash St
WO# 2894087
Location: 600 Block of W 24th Avenue
Schedule: Apr 11, 2024 - Apr 15, 2024; M, Th, F; 8:00 AM - 4:00 PMurn:uuid:a71dae18-25d9-4851-9c96-14b752a6a0b22024-03-27T07:00:00ZTelus - Utility Maintenance on 600 Block of W 24th Avenue2024-03-27T22:47:48.668399Z49.250050960885744 -123.11841221543189 49.25006496757405 -123.11968894692296Parking lane closure on South side of 800 Block W 33rd Avenue from Willow St to Laurel Street to facilitate utility maintenance work.
No Weekend Work and will not be working on the East Long Weekend (Friday, March 29th to April 1).
WO# 2923459
Location: South side of 800 Block W 33rd Avenue from Willow Street to Laurel Street.
Schedule: Mar 28, 2024 - Apr 5, 2024; Weekdays; 8:00 AM - 4:00 PMurn:uuid:15974f5b-8a19-49ab-b464-56b9bcdbc0ee2024-03-22T07:00:00ZTelus - Utility Maintenance on 800 Block W 33rd Avenue2024-03-22T22:41:06.4867648Z49.24128126592635 -123.12364556192152 49.24133585880705 -123.12501767757071Crews will be on site to conduct Utility Maintenance on behalf of Telus
Traffic Impacts:
Alleyway Lane Closure, Both Sides, Lane East of 5100-5300 Block of Cambie St from W 35th Ave to Lane South of W 37th Ave
WO# 2854452
Location: Lane East of 5100-5300 Block of Cambie Street
Schedule: Apr 2, 2024 - Apr 12, 2024; Weekdays; 8:00 AM - 6:00 PMurn:uuid:4b91d146-fcad-47a6-b95b-a276396663242024-03-19T07:00:00ZTelus - Utility Maintenance on Lane East of 5100-5300 Block of Cambie Street2024-03-19T19:13:11.6464803Z49.23944022319901 -123.11602740359568 49.238767488466806 -123.11527804110719 49.23823930188357 -123.11515030886484 49.236743903329824 -123.11520969201574Crews will be on site to conduct Utility Maintenance on behalf of Telus
Traffic Impacts:
Alleyway Lane Closure, Both Sides, Lane North of 500 Block of W Pender St from Richards St to 55m W of Richards St
WO# 2917286
Location: Lane North of 500 Block of W Pender Street
Schedule: Mar 28, 2024 - Apr 5, 2024; Weekdays; 8:00 AM - 4:00 PMurn:uuid:d508fd6e-790f-49ef-a5ed-a5c1c6fd35732024-03-19T07:00:00ZTelus - Utility Maintenance on Lane North of 500 Block of W Pender Street2024-03-19T21:30:20.4256356Z49.283706648481115 -123.11240713156948 49.284049577201245 -123.11294357337248Crew will be on site to do a utility maintenance - Telus
Traffic Impacts: Travel Lane Closure, Two (2) Travel Lanes to remain open on Victoria Dr Southbound
WO: 3PD2944
Location: East side of the street of 1500 Block of Victoria Drive, from Laneway S of Graveley St, to Laneway N of Graveley St
Schedule: Apr 6, 2024 - Apr 6, 2024; Sa; 7:00 AM - 5:00 PMurn:uuid:158f3271-3ddf-4c05-80a3-caa775428c5b2024-03-01T08:00:00ZTelus Utility Maintenance 1500 Block of Victoria Drive2024-03-01T19:40:14.5257514Z49.270034555527644 -123.0657504863515 49.27084835809205 -123.06573706757673Temporary Taxi Zone (No Stopping Except for Taxis)
East side of Howe St between Cordova St and Hastings St
Duration: Feb 26 - Mar 31, 2024
Location:
Schedule: Feb 26, 2024 - Mar 31, 2024urn:uuid:a96ec09c-a1e3-430b-b95c-487cff833f422024-02-08T08:00:00ZTemporary Taxi Zone (No Stopping Except for Taxis)2024-02-09T07:09:24.2007675Z49.28652366849914 -123.11392942817301 49.28598141131707 -123.11474047735653Temporary Taxi Zone (No Stopping Except for Taxis)
East side of Howe St between Cordova St and Hastings St
Duration: Feb 26 - Mar 31, 2024
Location:
Schedule: Feb 26, 2024 - Mar 31, 2024urn:uuid:b174d07b-2d65-4e11-a40e-783beddbab152024-02-08T08:00:00ZTemporary Taxi Zone (No Stopping Except for Taxis)2024-02-09T07:09:24.2007675Z49.28598141131707 -123.11472695987015 49.28598141131707 -123.11474723609975Alleyway lane closure on South side of Lane North of 1100 Block Melville St from 60m West of Thurlow St to 145m West of Thurlow St to facilitate underground utility construction.
WO# 112312
Location: South side of Lane North of 1100 Block Melville St from 60m West of Thurlow St to 145m West of Thurlow St.
Schedule: Apr 1, 2024 - Apr 3, 2024; M - W; 9:00 AM - 5:00 PMurn:uuid:d85a4a4a-2b97-4a0a-ba6a-98e748246f2b2024-03-25T07:00:00ZTeraSpan - Underground Utility Construction on Lane North of 1100 Block Melville St2024-03-25T17:46:07.5546901Z49.287723236086606 -123.12288050191049 49.28720086929616 -123.12207965047836Hosting 30-40 vendors. We will be hosting student DJs to host a break-dance competition. This is a family friendly event. Vintage Streetwear Market
Location: North Plaza, Vancouver Art Gallery
Schedule: Aug 18, 2024urn:uuid:b07e2c5b-68e5-426c-9d98-6615f11d20662023-08-31T07:00:00ZThe Vintage Expo 20242023-08-31T15:44:22.8053671Z49.28320930030901 -123.11994762897186TransLink will be undertaking essential maintenance work from Rupert Station to refurbish protective industrial coating.
Work will include:
-Protective coating maintenance
-Signage and chicanes will be present along the Greenway, spanning Rupert Station
Traffic Impacts:
-Maintenance work will be done mostly during non-revenue hours so as to minimize disruption for customers during this time
-The section of the Central Valley Greenway will remain open during construction
Note:
-To ensure safety during the maintenance work, TransLink strongly encourages cyclists travelling on the Central Valley Greenway to dismount and walk bikes through the construction zone next to Rupert Station.
-Cyclists and pedestrians will not be required to take a detour around the construction zone.
For questions related to the project, contact:
Customer Information
T: 604.953.3333
Monday to Friday: 5:30 a.m. to 12:30 a.m.
Saturday and Sunday: 6:30 a.m. to 11:30 p.m.
Location:
Schedule: Jul 30, 2023 - Dec 31, 2023urn:uuid:db5972da-2da9-495a-bb07-869cb4c8ed052023-07-27T23:15:00ZTranslink - Rupert Station Maintenance2023-07-26T22:29:00.5074158Z49.261025534877916 -123.03378460059494 49.26041592710439 -123.03374400628748 49.26157550055095 -123.03009053255168 49.261025534877916 -123.03378460059494Sewer and Drainage design is planning for an urgent repair project to fix a partially blocked sewer main along W 59th Ave. Since the existing alignment is in the boulevard and too close to buildings, a new alignment has been proposed. The repair will involve installing ~ 30m of pipe along the new alignment in the street
Dear Resident:
In January 2022, the City will commence repair work on W 59th to critical sewer infrastructure in
your neighborhood.
The sewer work will require temporary road closures and parking changes on W 59th between
Alberta Street and Columbia Street.
What: W 59th – Sewer Repair Work
When: January 17th (estimated duration – 2 weeks)
Location: W 59th Ave and Columbia St
Schedule: Feb 1, 2022 - Feb 25, 2022urn:uuid:c9f109c2-3b08-4286-9e34-e136a55087582022-01-10T08:00:00ZUrgent Sewer Repair Project on W 59th Ave and Columbia St2023-03-29T01:02:21.381426Z49.2169013166006 -123.11261363484941 49.21691091174719 -123.11333392394711Sewer and Drainage design is planning for an urgent repair project to fix a partially blocked sewer main along W 59th Ave. Since the existing alignment is in the boulevard and too close to buildings, a new alignment has been proposed. The repair will involve installing ~ 30m of pipe along the new alignment in the street
Dear Resident:
In January 2022, the City will commence repair work on W 59th to critical sewer infrastructure in
your neighborhood.
The sewer work will require temporary road closures and parking changes on W 59th between
Alberta Street and Columbia Street.
What: W 59th – Sewer Repair Work
When: January 17th (estimated duration – 2 weeks)
Location: W 59th Ave and Columbia St
Schedule: Feb 1, 2022 - Feb 25, 2022urn:uuid:7bc1dcd9-9126-426b-8d11-bfdab4e5245f2022-01-10T08:00:00ZUrgent Sewer Repair Project on W 59th Ave and Columbia St2023-03-29T01:02:21.381426Z49.216887736458915 -123.11159122670398 49.2169013166006 -123.11261363484941Sewer and Drainage design is planning for an urgent repair project to fix a partially blocked sewer main along W 59th Ave. Since the existing alignment is in the boulevard and too close to buildings, a new alignment has been proposed. The repair will involve installing ~ 30m of pipe along the new alignment in the street
Dear Resident:
In January 2022, the City will commence repair work on W 59th to critical sewer infrastructure in
your neighborhood.
The sewer work will require temporary road closures and parking changes on W 59th between
Alberta Street and Columbia Street.
What: W 59th – Sewer Repair Work
When: January 17th (estimated duration – 2 weeks)
Location: W 59th Ave and Columbia St
Schedule: Feb 1, 2022 - Feb 25, 2022urn:uuid:b63a3dd8-d801-407e-a6a8-ed0b78e6ec172022-01-10T08:00:00ZUrgent Sewer Repair Project on W 59th Ave and Columbia St2023-03-29T01:02:21.381426Z49.21679954921265 -123.11264649957593 49.21690272338245 -123.11264053909328MAY 2023 UPDATE: Project is substantially complete and only remaining scope is final street repaving
Works include:
- Sewers separation of approximately 540m on W49th Ave from laneway west of Oak St to Tisdall St.
- Installation of parking protected bike lanes, through line painting on both sides of the street from east of Oak St to west of Cambie St.
Location: W 49th Ave from laneway west of Oak St to Cambie St
Schedule: Sep 6, 2022 - Aug 31, 2024urn:uuid:50e26781-6daa-4882-ab65-04fafed83e132022-08-23T07:00:00ZW. 49th Avenue Upgrades 2023-11-10T16:56:08.8209448Z49.226575806604245 -123.12905699011935 49.22630721671442 -123.12180608513701MAY 2023 UPDATE: Project is substantially complete and only remaining scope is final street repaving
Works include:
- Sewers separation of approximately 540m on W49th Ave from laneway west of Oak St to Tisdall St.
- Installation of parking protected bike lanes, through line painting on both sides of the street from east of Oak St to west of Cambie St.
Location: W 49th Ave from laneway west of Oak St to Cambie St
Schedule: Sep 6, 2022 - Aug 31, 2024urn:uuid:fb4013c7-135b-4131-b41c-01257a7c68722022-08-23T07:00:00ZW. 49th Avenue Upgrades 2023-11-10T16:56:08.8209448Z49.226597009124816 -123.12823712825777 49.22615109814927 -123.11688065528868MAY 2023 UPDATE: Project is substantially complete and only remaining scope is final street repaving
Works include:
- Sewers separation of approximately 540m on W49th Ave from laneway west of Oak St to Tisdall St.
- Installation of parking protected bike lanes, through line painting on both sides of the street from east of Oak St to west of Cambie St.
Location: W 49th Ave from laneway west of Oak St to Cambie St
Schedule: Sep 6, 2022 - Aug 31, 2024urn:uuid:4664f636-463b-417f-a80f-ec02a13ef5b82022-08-23T07:00:00ZW. 49th Avenue Upgrades 2023-11-10T16:56:08.8209448Z49.22647340690301 -123.1282103061676 49.22603899026387 -123.11683773994444Update as of Feb 6, 2024 - Majority of sewer work is complete with pending deficiency check and follow up, and G.I. works are near completion (expected completion by the end of January/early February).
Permanent paving is expect to be done in April this spring.
Location: W 54th Ave from Cambie St to Neal St
Schedule: May 15, 2023 - Apr 30, 2024urn:uuid:5b713d0a-80b1-4b34-b1bf-356bd64cf8ef2024-02-06T08:00:00ZW. 54th Ave Upgrades, Cambie St to Neal St 2024-02-06T18:33:11.0377995Z49.221684723804 -123.12114962113 49.221542253721 -123.1220326451 49.221531439876 -123.12210218960001 49.22152141729501 -123.12217199693998 49.221512203954006 -123.12224208092 49.221503781920006 -123.12231238654002 49.22149616918199 -123.12238291387001 49.22148935678902 -123.12245362168 49.221483818262016 -123.12251907290998Update as of Feb 6, 2024 - Majority of sewer work is complete with pending deficiency check and follow up, and G.I. works are near completion (expected completion by the end of January/early February).
Permanent paving is expect to be done in April this spring.
Location: W 54th Ave from Cambie St to Neal St
Schedule: May 15, 2023 - Apr 30, 2024urn:uuid:153901b3-312d-46b0-95f8-64d89263e2c12024-02-06T08:00:00ZW. 54th Ave Upgrades, Cambie St to Neal St 2024-02-06T18:33:11.0377995Z49.22178798790199 -123.11892651114002 49.221800174565004 -123.11968610024 49.221800763806016 -123.11976849982 49.22180043264103 -123.11986229557 49.221799021999004 -123.11995606125 49.22179654989799 -123.12004976942 49.22179298938204 -123.12014339255 49.221788367450046 -123.12023691695 49.221782684147 -123.12033030143 49.221775930505004 -123.12042351849 49.221768115534985 -123.12051655442002 49.221759230299 -123.12060935425002Update as of Feb 6, 2024 - Majority of sewer work is complete with pending deficiency check and follow up, and G.I. works are near completion (expected completion by the end of January/early February).
Permanent paving is expect to be done in April this spring.
Location: W 54th Ave from Cambie St to Neal St
Schedule: May 15, 2023 - Apr 30, 2024urn:uuid:ee8ea45c-99ed-475d-bc8b-7592bbafb3152024-02-06T08:00:00ZW. 54th Ave Upgrades, Cambie St to Neal St 2024-02-06T18:33:11.0377995Z49.221759230299 -123.12060935425002 49.221754137039966 -123.12066288687 49.221747832408994 -123.12072214319001 49.22174085329101 -123.12078121933 49.221733208709 -123.12084008783 49.22172487166398 -123.12089876236 49.221715878167004 -123.12095721554002 49.221706219265 -123.12101540615 49.221684723804 -123.12114962113Update as of Feb 6, 2024 - Majority of sewer work is complete with pending deficiency check and follow up, and G.I. works are near completion (expected completion by the end of January/early February).
Permanent paving is expect to be done in April this spring.
Location: W 54th Ave from Cambie St to Neal St
Schedule: May 15, 2023 - Apr 30, 2024urn:uuid:09ea24f9-8190-40b6-b7c7-c0634a3b886d2024-02-06T08:00:00ZW. 54th Ave Upgrades, Cambie St to Neal St 2024-02-06T18:33:11.0377995Z49.221764816946006 -123.11756359115 49.221776660377 -123.11824546358999Update as of Feb 6, 2024 - Majority of sewer work is complete with pending deficiency check and follow up, and G.I. works are near completion (expected completion by the end of January/early February).
Permanent paving is expect to be done in April this spring.
Location: W 54th Ave from Cambie St to Neal St
Schedule: May 15, 2023 - Apr 30, 2024urn:uuid:16f9fc07-eb52-4dc7-b3af-1cf444cb8c352024-02-06T08:00:00ZW. 54th Ave Upgrades, Cambie St to Neal St 2024-02-06T18:33:11.0377995Z49.22175013035098 -123.11666482689 49.221764816946006 -123.11756359115Update as of Feb 6, 2024 - Majority of sewer work is complete with pending deficiency check and follow up, and G.I. works are near completion (expected completion by the end of January/early February).
Permanent paving is expect to be done in April this spring.
Location: W 54th Ave from Cambie St to Neal St
Schedule: May 15, 2023 - Apr 30, 2024urn:uuid:de2f9a80-0efd-44a2-81ba-26488d95c0822024-02-06T08:00:00ZW. 54th Ave Upgrades, Cambie St to Neal St 2024-02-06T18:33:11.0377995Z49.221776660377 -123.11824546358999 49.221787191470014 -123.11887878698L/S W 48th Av - Columbia St to Manitoba St Thu, Aug, 22, 2024 Mon, Sep, 09, 2024
Manitoba St - W 48th Av to W 49th Av Tue, Sep, 10, 2024 Thu, Sep, 19, 2024
Location:
Schedule: Aug 22, 2024 - Sep 19, 2024; All days; 7:00 AM - 3:00 PMurn:uuid:1fd3f446-bbbd-429e-867a-58ada4e8330d2024-03-18T07:00:00ZWater Capital Project2024-03-18T16:27:37.4522571Z49.22634199092329 -123.1084094335147 49.22638430733787 -123.11077703013736L/S W 48th Av - Columbia St to Manitoba St Thu, Aug, 22, 2024 Mon, Sep, 09, 2024
Manitoba St - W 48th Av to W 49th Av Tue, Sep, 10, 2024 Thu, Sep, 19, 2024
Location:
Schedule: Aug 22, 2024 - Sep 19, 2024; All days; 7:00 AM - 3:00 PMurn:uuid:0a553cb7-5559-4f27-9920-cf56bb44bf652024-03-18T07:00:00ZWater Capital Project2024-03-18T16:27:37.4522571Z49.22679294821191 -123.1083927164484 49.22634199092329 -123.1084094335147L/S W 48th Av - Columbia St to Manitoba St Thu, Aug, 22, 2024 Mon, Sep, 09, 2024
Manitoba St - W 48th Av to W 49th Av Tue, Sep, 10, 2024 Thu, Sep, 19, 2024
Location:
Schedule: Aug 22, 2024 - Sep 19, 2024; All days; 7:00 AM - 3:00 PMurn:uuid:9e87bbf2-eded-4864-9e40-22ff4b521efc2024-03-18T07:00:00ZWater Capital Project2024-03-18T16:27:37.4522571Z49.22634199092329 -123.1084094335147 49.22582433025627 -123.10842982242546Cypress St - W 52nd Av to W 57th Av Fri, Nov, 24, 2023 Mon, Feb, 05, 2024
Location: Cypress St - W 52nd Av to W 57th Av
Schedule: Nov 24, 2023 - Feb 5, 2024; Weekdays; 7:00 AM - 3:00 PMurn:uuid:48b4b727-0134-4d1c-be4e-0cedd2bba8022023-10-31T07:00:00ZWater Capital Project2023-12-04T17:04:46.5532529Z49.2218340101135 -123.14961688888721 49.219942729906194 -123.14969060855904Cypress St - W 52nd Av to W 57th Av Fri, Nov, 24, 2023 Mon, Feb, 05, 2024
Location: Cypress St - W 52nd Av to W 57th Av
Schedule: Nov 24, 2023 - Feb 5, 2024; Weekdays; 7:00 AM - 3:00 PMurn:uuid:bc04e469-f6dc-4741-8c4c-46dd9b208bcb2023-10-31T07:00:00ZWater Capital Project2023-12-04T17:04:46.5532529Z49.219942729906194 -123.14969060855904 49.21947694911512 -123.14970860571674Cypress St - W 52nd Av to W 57th Av Fri, Nov, 24, 2023 Mon, Feb, 05, 2024
Location: Cypress St - W 52nd Av to W 57th Av
Schedule: Nov 24, 2023 - Feb 5, 2024; Weekdays; 7:00 AM - 3:00 PMurn:uuid:d108e8c3-3410-4e0f-b724-66d19a80928f2023-10-31T07:00:00ZWater Capital Project2023-12-04T17:04:46.5532529Z49.22420577721934 -123.14952526289542 49.2218340101135 -123.14961688888721E 6th Av - Windermere St to Rupert St Tue, May, 30, 2023 Tue, Jun, 20, 2023 - COMPLETE
Windermere St - E 5th Av to E 6th Av Wed, Jun, 21, 2023 Fri, Jun, 30, 2023 - COMPLETE
E 6th Av - Penticton St to Windermere St Tue, Jul, 04, 2023 Fri, Dec, 01, 2023 - COMPLETE
E 8th Av - Windermere St to Cassiar St Tue, Feb, 06, 2024 Tue, Mar, 12, 2024
Windermere St - E 8th Av to Broadway Wed, Mar, 13, 2024 Thu, Mar, 21, 2024
E 8th Av - Renfrew St to Windermere St Fri, Mar, 22, 2024 Mon, May, 13, 2024
Lillooet St - E 7th Av to E 8th Av Tue, May, 14, 2024 Thu, May, 23, 2024
E 7th Av - Lillooet St to Windermere St Tue, Jun, 25, 2024 Thu, Jul, 11, 2024
Windermere St - E 6th Av to E 7th Av Fri, Jul, 12, 2024 Mon, Jul, 22, 2024
E 7th Av - Windermere St to 2311 Cassiar St Tue, Jul, 23, 2024 Tue, Aug, 13, 2024
Location: E 6th Av, E 7th Av, E 8th Av, Windermere St, Lillooet St
Schedule: Recurring schedule as follows:
- Feb 6, 2023 - May 23, 2024; Weekdays; 7:00 AM - 3:00 PM
- Jun 25, 2024 - Aug 13, 2024; All days; 7:00 AM - 3:00 PM
urn:uuid:baf6277b-3f29-405c-83f3-a0570e90f1d22023-06-23T07:00:00ZWater Capital Project2024-01-12T22:55:22.3757438Z49.2651930108195 -123.03649805514345 49.26474089249274 -123.03650271110962E 6th Av - Windermere St to Rupert St Tue, May, 30, 2023 Tue, Jun, 20, 2023 - COMPLETE
Windermere St - E 5th Av to E 6th Av Wed, Jun, 21, 2023 Fri, Jun, 30, 2023 - COMPLETE
E 6th Av - Penticton St to Windermere St Tue, Jul, 04, 2023 Fri, Dec, 01, 2023 - COMPLETE
E 8th Av - Windermere St to Cassiar St Tue, Feb, 06, 2024 Tue, Mar, 12, 2024
Windermere St - E 8th Av to Broadway Wed, Mar, 13, 2024 Thu, Mar, 21, 2024
E 8th Av - Renfrew St to Windermere St Fri, Mar, 22, 2024 Mon, May, 13, 2024
Lillooet St - E 7th Av to E 8th Av Tue, May, 14, 2024 Thu, May, 23, 2024
E 7th Av - Lillooet St to Windermere St Tue, Jun, 25, 2024 Thu, Jul, 11, 2024
Windermere St - E 6th Av to E 7th Av Fri, Jul, 12, 2024 Mon, Jul, 22, 2024
E 7th Av - Windermere St to 2311 Cassiar St Tue, Jul, 23, 2024 Tue, Aug, 13, 2024
Location: E 6th Av, E 7th Av, E 8th Av, Windermere St, Lillooet St
Schedule: Recurring schedule as follows:
- Feb 6, 2023 - May 23, 2024; Weekdays; 7:00 AM - 3:00 PM
- Jun 25, 2024 - Aug 13, 2024; All days; 7:00 AM - 3:00 PM
urn:uuid:de51913d-e1d1-455d-b102-828da0a1eb122023-06-23T07:00:00ZWater Capital Project2024-01-12T22:55:22.3757438Z49.264758793340434 -123.04156102693383 49.264749637061556 -123.03903086501592E 6th Av - Windermere St to Rupert St Tue, May, 30, 2023 Tue, Jun, 20, 2023 - COMPLETE
Windermere St - E 5th Av to E 6th Av Wed, Jun, 21, 2023 Fri, Jun, 30, 2023 - COMPLETE
E 6th Av - Penticton St to Windermere St Tue, Jul, 04, 2023 Fri, Dec, 01, 2023 - COMPLETE
E 8th Av - Windermere St to Cassiar St Tue, Feb, 06, 2024 Tue, Mar, 12, 2024
Windermere St - E 8th Av to Broadway Wed, Mar, 13, 2024 Thu, Mar, 21, 2024
E 8th Av - Renfrew St to Windermere St Fri, Mar, 22, 2024 Mon, May, 13, 2024
Lillooet St - E 7th Av to E 8th Av Tue, May, 14, 2024 Thu, May, 23, 2024
E 7th Av - Lillooet St to Windermere St Tue, Jun, 25, 2024 Thu, Jul, 11, 2024
Windermere St - E 6th Av to E 7th Av Fri, Jul, 12, 2024 Mon, Jul, 22, 2024
E 7th Av - Windermere St to 2311 Cassiar St Tue, Jul, 23, 2024 Tue, Aug, 13, 2024
Location: E 6th Av, E 7th Av, E 8th Av, Windermere St, Lillooet St
Schedule: Recurring schedule as follows:
- Feb 6, 2023 - May 23, 2024; Weekdays; 7:00 AM - 3:00 PM
- Jun 25, 2024 - Aug 13, 2024; All days; 7:00 AM - 3:00 PM
urn:uuid:457e15b5-2ca4-446d-ad91-23ec6dc1ec732023-06-23T07:00:00ZWater Capital Project2024-01-12T22:55:22.3757438Z49.26568812400441 -123.036500262164 49.2651930108195 -123.03649805514345E 6th Av - Windermere St to Rupert St Tue, May, 30, 2023 Tue, Jun, 20, 2023 - COMPLETE
Windermere St - E 5th Av to E 6th Av Wed, Jun, 21, 2023 Fri, Jun, 30, 2023 - COMPLETE
E 6th Av - Penticton St to Windermere St Tue, Jul, 04, 2023 Fri, Dec, 01, 2023 - COMPLETE
E 8th Av - Windermere St to Cassiar St Tue, Feb, 06, 2024 Tue, Mar, 12, 2024
Windermere St - E 8th Av to Broadway Wed, Mar, 13, 2024 Thu, Mar, 21, 2024
E 8th Av - Renfrew St to Windermere St Fri, Mar, 22, 2024 Mon, May, 13, 2024
Lillooet St - E 7th Av to E 8th Av Tue, May, 14, 2024 Thu, May, 23, 2024
E 7th Av - Lillooet St to Windermere St Tue, Jun, 25, 2024 Thu, Jul, 11, 2024
Windermere St - E 6th Av to E 7th Av Fri, Jul, 12, 2024 Mon, Jul, 22, 2024
E 7th Av - Windermere St to 2311 Cassiar St Tue, Jul, 23, 2024 Tue, Aug, 13, 2024
Location: E 6th Av, E 7th Av, E 8th Av, Windermere St, Lillooet St
Schedule: Recurring schedule as follows:
- Feb 6, 2023 - May 23, 2024; Weekdays; 7:00 AM - 3:00 PM
- Jun 25, 2024 - Aug 13, 2024; All days; 7:00 AM - 3:00 PM
urn:uuid:646314ca-6c53-45d3-b62e-a84700f39b982023-06-23T07:00:00ZWater Capital Project2024-01-12T22:55:22.3757438Z49.26477496525732 -123.0495436959967 49.26476997869088 -123.04431691465969E 6th Av - Windermere St to Rupert St Tue, May, 30, 2023 Tue, Jun, 20, 2023 - COMPLETE
Windermere St - E 5th Av to E 6th Av Wed, Jun, 21, 2023 Fri, Jun, 30, 2023 - COMPLETE
E 6th Av - Penticton St to Windermere St Tue, Jul, 04, 2023 Fri, Dec, 01, 2023 - COMPLETE
E 8th Av - Windermere St to Cassiar St Tue, Feb, 06, 2024 Tue, Mar, 12, 2024
Windermere St - E 8th Av to Broadway Wed, Mar, 13, 2024 Thu, Mar, 21, 2024
E 8th Av - Renfrew St to Windermere St Fri, Mar, 22, 2024 Mon, May, 13, 2024
Lillooet St - E 7th Av to E 8th Av Tue, May, 14, 2024 Thu, May, 23, 2024
E 7th Av - Lillooet St to Windermere St Tue, Jun, 25, 2024 Thu, Jul, 11, 2024
Windermere St - E 6th Av to E 7th Av Fri, Jul, 12, 2024 Mon, Jul, 22, 2024
E 7th Av - Windermere St to 2311 Cassiar St Tue, Jul, 23, 2024 Tue, Aug, 13, 2024
Location: E 6th Av, E 7th Av, E 8th Av, Windermere St, Lillooet St
Schedule: Recurring schedule as follows:
- Feb 6, 2023 - May 23, 2024; Weekdays; 7:00 AM - 3:00 PM
- Jun 25, 2024 - Aug 13, 2024; All days; 7:00 AM - 3:00 PM
urn:uuid:99bf775a-4458-4774-9457-76bc1d05d9362023-06-23T07:00:00ZWater Capital Project2024-01-12T22:55:22.3757438Z49.264768150543745 -123.04429119263114 49.26476571385095 -123.04353110893598E 6th Av - Windermere St to Rupert St Tue, May, 30, 2023 Tue, Jun, 20, 2023 - COMPLETE
Windermere St - E 5th Av to E 6th Av Wed, Jun, 21, 2023 Fri, Jun, 30, 2023 - COMPLETE
E 6th Av - Penticton St to Windermere St Tue, Jul, 04, 2023 Fri, Dec, 01, 2023 - COMPLETE
E 8th Av - Windermere St to Cassiar St Tue, Feb, 06, 2024 Tue, Mar, 12, 2024
Windermere St - E 8th Av to Broadway Wed, Mar, 13, 2024 Thu, Mar, 21, 2024
E 8th Av - Renfrew St to Windermere St Fri, Mar, 22, 2024 Mon, May, 13, 2024
Lillooet St - E 7th Av to E 8th Av Tue, May, 14, 2024 Thu, May, 23, 2024
E 7th Av - Lillooet St to Windermere St Tue, Jun, 25, 2024 Thu, Jul, 11, 2024
Windermere St - E 6th Av to E 7th Av Fri, Jul, 12, 2024 Mon, Jul, 22, 2024
E 7th Av - Windermere St to 2311 Cassiar St Tue, Jul, 23, 2024 Tue, Aug, 13, 2024
Location: E 6th Av, E 7th Av, E 8th Av, Windermere St, Lillooet St
Schedule: Recurring schedule as follows:
- Feb 6, 2023 - May 23, 2024; Weekdays; 7:00 AM - 3:00 PM
- Jun 25, 2024 - Aug 13, 2024; All days; 7:00 AM - 3:00 PM
urn:uuid:dc7345e9-faee-49b4-8e19-3581b77eb0ab2023-06-23T07:00:00ZWater Capital Project2024-01-12T22:55:22.3757438Z49.26476571385095 -123.04353110893598 49.264758793340434 -123.04156102693383E 6th Av - Windermere St to Rupert St Tue, May, 30, 2023 Tue, Jun, 20, 2023 - COMPLETE
Windermere St - E 5th Av to E 6th Av Wed, Jun, 21, 2023 Fri, Jun, 30, 2023 - COMPLETE
E 6th Av - Penticton St to Windermere St Tue, Jul, 04, 2023 Fri, Dec, 01, 2023 - COMPLETE
E 8th Av - Windermere St to Cassiar St Tue, Feb, 06, 2024 Tue, Mar, 12, 2024
Windermere St - E 8th Av to Broadway Wed, Mar, 13, 2024 Thu, Mar, 21, 2024
E 8th Av - Renfrew St to Windermere St Fri, Mar, 22, 2024 Mon, May, 13, 2024
Lillooet St - E 7th Av to E 8th Av Tue, May, 14, 2024 Thu, May, 23, 2024
E 7th Av - Lillooet St to Windermere St Tue, Jun, 25, 2024 Thu, Jul, 11, 2024
Windermere St - E 6th Av to E 7th Av Fri, Jul, 12, 2024 Mon, Jul, 22, 2024
E 7th Av - Windermere St to 2311 Cassiar St Tue, Jul, 23, 2024 Tue, Aug, 13, 2024
Location: E 6th Av, E 7th Av, E 8th Av, Windermere St, Lillooet St
Schedule: Recurring schedule as follows:
- Feb 6, 2023 - May 23, 2024; Weekdays; 7:00 AM - 3:00 PM
- Jun 25, 2024 - Aug 13, 2024; All days; 7:00 AM - 3:00 PM
urn:uuid:84d85cc5-eb77-400f-86ff-7dfb95d82d342023-06-23T07:00:00ZWater Capital Project2024-01-12T22:55:22.3757438Z49.262971581785706 -123.04431176951252 49.262920704157835 -123.03101786377984E 6th Av - Windermere St to Rupert St Tue, May, 30, 2023 Tue, Jun, 20, 2023 - COMPLETE
Windermere St - E 5th Av to E 6th Av Wed, Jun, 21, 2023 Fri, Jun, 30, 2023 - COMPLETE
E 6th Av - Penticton St to Windermere St Tue, Jul, 04, 2023 Fri, Dec, 01, 2023 - COMPLETE
E 8th Av - Windermere St to Cassiar St Tue, Feb, 06, 2024 Tue, Mar, 12, 2024
Windermere St - E 8th Av to Broadway Wed, Mar, 13, 2024 Thu, Mar, 21, 2024
E 8th Av - Renfrew St to Windermere St Fri, Mar, 22, 2024 Mon, May, 13, 2024
Lillooet St - E 7th Av to E 8th Av Tue, May, 14, 2024 Thu, May, 23, 2024
E 7th Av - Lillooet St to Windermere St Tue, Jun, 25, 2024 Thu, Jul, 11, 2024
Windermere St - E 6th Av to E 7th Av Fri, Jul, 12, 2024 Mon, Jul, 22, 2024
E 7th Av - Windermere St to 2311 Cassiar St Tue, Jul, 23, 2024 Tue, Aug, 13, 2024
Location: E 6th Av, E 7th Av, E 8th Av, Windermere St, Lillooet St
Schedule: Recurring schedule as follows:
- Feb 6, 2023 - May 23, 2024; Weekdays; 7:00 AM - 3:00 PM
- Jun 25, 2024 - Aug 13, 2024; All days; 7:00 AM - 3:00 PM
urn:uuid:c3f9ed64-a53d-48f5-86ca-00b4ac8586e12023-06-23T07:00:00ZWater Capital Project2024-01-12T22:55:22.3757438Z49.263857709963105 -123.03903404831173 49.262958373076145 -123.03903404831173E 6th Av - Windermere St to Rupert St Tue, May, 30, 2023 Tue, Jun, 20, 2023 - COMPLETE
Windermere St - E 5th Av to E 6th Av Wed, Jun, 21, 2023 Fri, Jun, 30, 2023 - COMPLETE
E 6th Av - Penticton St to Windermere St Tue, Jul, 04, 2023 Fri, Dec, 01, 2023 - COMPLETE
E 8th Av - Windermere St to Cassiar St Tue, Feb, 06, 2024 Tue, Mar, 12, 2024
Windermere St - E 8th Av to Broadway Wed, Mar, 13, 2024 Thu, Mar, 21, 2024
E 8th Av - Renfrew St to Windermere St Fri, Mar, 22, 2024 Mon, May, 13, 2024
Lillooet St - E 7th Av to E 8th Av Tue, May, 14, 2024 Thu, May, 23, 2024
E 7th Av - Lillooet St to Windermere St Tue, Jun, 25, 2024 Thu, Jul, 11, 2024
Windermere St - E 6th Av to E 7th Av Fri, Jul, 12, 2024 Mon, Jul, 22, 2024
E 7th Av - Windermere St to 2311 Cassiar St Tue, Jul, 23, 2024 Tue, Aug, 13, 2024
Location: E 6th Av, E 7th Av, E 8th Av, Windermere St, Lillooet St
Schedule: Recurring schedule as follows:
- Feb 6, 2023 - May 23, 2024; Weekdays; 7:00 AM - 3:00 PM
- Jun 25, 2024 - Aug 13, 2024; All days; 7:00 AM - 3:00 PM
urn:uuid:52a6a7ab-89bc-49e8-9a7a-2fd0fd3650932023-06-23T07:00:00ZWater Capital Project2024-01-12T22:55:22.3757438Z49.26384249280778 -123.03651933222142 49.2647268594101 -123.03650239217212E 6th Av - Windermere St to Rupert St Tue, May, 30, 2023 Tue, Jun, 20, 2023 - COMPLETE
Windermere St - E 5th Av to E 6th Av Wed, Jun, 21, 2023 Fri, Jun, 30, 2023 - COMPLETE
E 6th Av - Penticton St to Windermere St Tue, Jul, 04, 2023 Fri, Dec, 01, 2023 - COMPLETE
E 8th Av - Windermere St to Cassiar St Tue, Feb, 06, 2024 Tue, Mar, 12, 2024
Windermere St - E 8th Av to Broadway Wed, Mar, 13, 2024 Thu, Mar, 21, 2024
E 8th Av - Renfrew St to Windermere St Fri, Mar, 22, 2024 Mon, May, 13, 2024
Lillooet St - E 7th Av to E 8th Av Tue, May, 14, 2024 Thu, May, 23, 2024
E 7th Av - Lillooet St to Windermere St Tue, Jun, 25, 2024 Thu, Jul, 11, 2024
Windermere St - E 6th Av to E 7th Av Fri, Jul, 12, 2024 Mon, Jul, 22, 2024
E 7th Av - Windermere St to 2311 Cassiar St Tue, Jul, 23, 2024 Tue, Aug, 13, 2024
Location: E 6th Av, E 7th Av, E 8th Av, Windermere St, Lillooet St
Schedule: Recurring schedule as follows:
- Feb 6, 2023 - May 23, 2024; Weekdays; 7:00 AM - 3:00 PM
- Jun 25, 2024 - Aug 13, 2024; All days; 7:00 AM - 3:00 PM
urn:uuid:e38968f3-faca-46d5-8316-9ef558f97c562023-06-23T07:00:00ZWater Capital Project2024-01-12T22:55:22.3757438Z49.264749637061556 -123.03903086501592 49.26474089249274 -123.03650271110962E 6th Av - Windermere St to Rupert St Tue, May, 30, 2023 Tue, Jun, 20, 2023 - COMPLETE
Windermere St - E 5th Av to E 6th Av Wed, Jun, 21, 2023 Fri, Jun, 30, 2023 - COMPLETE
E 6th Av - Penticton St to Windermere St Tue, Jul, 04, 2023 Fri, Dec, 01, 2023 - COMPLETE
E 8th Av - Windermere St to Cassiar St Tue, Feb, 06, 2024 Tue, Mar, 12, 2024
Windermere St - E 8th Av to Broadway Wed, Mar, 13, 2024 Thu, Mar, 21, 2024
E 8th Av - Renfrew St to Windermere St Fri, Mar, 22, 2024 Mon, May, 13, 2024
Lillooet St - E 7th Av to E 8th Av Tue, May, 14, 2024 Thu, May, 23, 2024
E 7th Av - Lillooet St to Windermere St Tue, Jun, 25, 2024 Thu, Jul, 11, 2024
Windermere St - E 6th Av to E 7th Av Fri, Jul, 12, 2024 Mon, Jul, 22, 2024
E 7th Av - Windermere St to 2311 Cassiar St Tue, Jul, 23, 2024 Tue, Aug, 13, 2024
Location: E 6th Av, E 7th Av, E 8th Av, Windermere St, Lillooet St
Schedule: Recurring schedule as follows:
- Feb 6, 2023 - May 23, 2024; Weekdays; 7:00 AM - 3:00 PM
- Jun 25, 2024 - Aug 13, 2024; All days; 7:00 AM - 3:00 PM
urn:uuid:1ee467e9-9119-42a8-964d-eb64038b10752023-06-23T07:00:00ZWater Capital Project2024-01-12T22:55:22.3757438Z49.263829458791946 -123.03298763729669 49.263857709963105 -123.03903404831173E 6th Av - Windermere St to Rupert St Tue, May, 30, 2023 Tue, Jun, 20, 2023 - COMPLETE
Windermere St - E 5th Av to E 6th Av Wed, Jun, 21, 2023 Fri, Jun, 30, 2023 - COMPLETE
E 6th Av - Penticton St to Windermere St Tue, Jul, 04, 2023 Fri, Dec, 01, 2023 - COMPLETE
E 8th Av - Windermere St to Cassiar St Tue, Feb, 06, 2024 Tue, Mar, 12, 2024
Windermere St - E 8th Av to Broadway Wed, Mar, 13, 2024 Thu, Mar, 21, 2024
E 8th Av - Renfrew St to Windermere St Fri, Mar, 22, 2024 Mon, May, 13, 2024
Lillooet St - E 7th Av to E 8th Av Tue, May, 14, 2024 Thu, May, 23, 2024
E 7th Av - Lillooet St to Windermere St Tue, Jun, 25, 2024 Thu, Jul, 11, 2024
Windermere St - E 6th Av to E 7th Av Fri, Jul, 12, 2024 Mon, Jul, 22, 2024
E 7th Av - Windermere St to 2311 Cassiar St Tue, Jul, 23, 2024 Tue, Aug, 13, 2024
Location: E 6th Av, E 7th Av, E 8th Av, Windermere St, Lillooet St
Schedule: Recurring schedule as follows:
- Feb 6, 2023 - May 23, 2024; Weekdays; 7:00 AM - 3:00 PM
- Jun 25, 2024 - Aug 13, 2024; All days; 7:00 AM - 3:00 PM
urn:uuid:bb8b6bd2-57f9-45eb-a0c7-7e3fd771efca2023-06-23T07:00:00ZWater Capital Project2024-01-12T22:55:22.3757438Z49.264733711479465 -123.0345217174447 49.264731435217726 -123.033762253404E 6th Av - Windermere St to Rupert St Tue, May, 30, 2023 Tue, Jun, 20, 2023 - COMPLETE
Windermere St - E 5th Av to E 6th Av Wed, Jun, 21, 2023 Fri, Jun, 30, 2023 - COMPLETE
E 6th Av - Penticton St to Windermere St Tue, Jul, 04, 2023 Fri, Dec, 01, 2023 - COMPLETE
E 8th Av - Windermere St to Cassiar St Tue, Feb, 06, 2024 Tue, Mar, 12, 2024
Windermere St - E 8th Av to Broadway Wed, Mar, 13, 2024 Thu, Mar, 21, 2024
E 8th Av - Renfrew St to Windermere St Fri, Mar, 22, 2024 Mon, May, 13, 2024
Lillooet St - E 7th Av to E 8th Av Tue, May, 14, 2024 Thu, May, 23, 2024
E 7th Av - Lillooet St to Windermere St Tue, Jun, 25, 2024 Thu, Jul, 11, 2024
Windermere St - E 6th Av to E 7th Av Fri, Jul, 12, 2024 Mon, Jul, 22, 2024
E 7th Av - Windermere St to 2311 Cassiar St Tue, Jul, 23, 2024 Tue, Aug, 13, 2024
Location: E 6th Av, E 7th Av, E 8th Av, Windermere St, Lillooet St
Schedule: Recurring schedule as follows:
- Feb 6, 2023 - May 23, 2024; Weekdays; 7:00 AM - 3:00 PM
- Jun 25, 2024 - Aug 13, 2024; All days; 7:00 AM - 3:00 PM
urn:uuid:dd807637-a267-4b00-ad40-a339586542572023-06-23T07:00:00ZWater Capital Project2024-01-12T22:55:22.3757438Z49.26474089249274 -123.03650271110962 49.264733711479465 -123.0345217174447E 6th Av - Windermere St to Rupert St Tue, May, 30, 2023 Tue, Jun, 20, 2023 - COMPLETE
Windermere St - E 5th Av to E 6th Av Wed, Jun, 21, 2023 Fri, Jun, 30, 2023 - COMPLETE
E 6th Av - Penticton St to Windermere St Tue, Jul, 04, 2023 Fri, Dec, 01, 2023 - COMPLETE
E 8th Av - Windermere St to Cassiar St Tue, Feb, 06, 2024 Tue, Mar, 12, 2024
Windermere St - E 8th Av to Broadway Wed, Mar, 13, 2024 Thu, Mar, 21, 2024
E 8th Av - Renfrew St to Windermere St Fri, Mar, 22, 2024 Mon, May, 13, 2024
Lillooet St - E 7th Av to E 8th Av Tue, May, 14, 2024 Thu, May, 23, 2024
E 7th Av - Lillooet St to Windermere St Tue, Jun, 25, 2024 Thu, Jul, 11, 2024
Windermere St - E 6th Av to E 7th Av Fri, Jul, 12, 2024 Mon, Jul, 22, 2024
E 7th Av - Windermere St to 2311 Cassiar St Tue, Jul, 23, 2024 Tue, Aug, 13, 2024
Location: E 6th Av, E 7th Av, E 8th Av, Windermere St, Lillooet St
Schedule: Recurring schedule as follows:
- Feb 6, 2023 - May 23, 2024; Weekdays; 7:00 AM - 3:00 PM
- Jun 25, 2024 - Aug 13, 2024; All days; 7:00 AM - 3:00 PM
urn:uuid:3e461cd0-67dc-4adc-a5ec-c1af0408cd6a2023-06-23T07:00:00ZWater Capital Project2024-01-12T22:55:22.3757438Z49.262929592760685 -123.03648603460017 49.261929989700576 -123.0364741606871Glen Dr, North and South Terminal Av
Terminal Av - Glen Dr to 865 Terminal Av Fri, Mar, 15, 2024 Wed, Apr, 10, 2024
Terminal Av - Glen Dr to 900 Terminal Av Thu, Apr, 11, 2024 Tue, Apr, 16, 2024
Glen Dr - Malkin Av to Terminal Av Mon, Oct, 07, 2024 Mon, Nov, 18, 2024
Location:
Schedule: Recurring schedule as follows:
- Mar 15, 2024 - Apr 16, 2024; All days; 7:00 AM - 3:00 PM
- Oct 7, 2024 - Nov 18, 2024; All days; 7:00 AM - 3:00 PM
urn:uuid:481fe75b-aca3-4001-a671-2c0f53ad18e12024-03-01T08:00:00ZWater Capital Project2024-03-01T23:08:47.9723909Z49.27039493621703 -123.08584351722882 49.27043808496785 -123.08568370453351 49.26974770042591 -123.08153408523782Glen Dr, North and South Terminal Av
Terminal Av - Glen Dr to 865 Terminal Av Fri, Mar, 15, 2024 Wed, Apr, 10, 2024
Terminal Av - Glen Dr to 900 Terminal Av Thu, Apr, 11, 2024 Tue, Apr, 16, 2024
Glen Dr - Malkin Av to Terminal Av Mon, Oct, 07, 2024 Mon, Nov, 18, 2024
Location:
Schedule: Recurring schedule as follows:
- Mar 15, 2024 - Apr 16, 2024; All days; 7:00 AM - 3:00 PM
- Oct 7, 2024 - Nov 18, 2024; All days; 7:00 AM - 3:00 PM
urn:uuid:adc1cc86-50a7-44de-8fa3-6721aebfb4412024-03-01T08:00:00ZWater Capital Project2024-03-01T23:08:47.9723909Z49.26979804129195 -123.08264726332243 49.2696398269685 -123.08160572541156 49.26965421010976 -123.08151204210739Glen Dr, North and South Terminal Av
Terminal Av - Glen Dr to 865 Terminal Av Fri, Mar, 15, 2024 Wed, Apr, 10, 2024
Terminal Av - Glen Dr to 900 Terminal Av Thu, Apr, 11, 2024 Tue, Apr, 16, 2024
Glen Dr - Malkin Av to Terminal Av Mon, Oct, 07, 2024 Mon, Nov, 18, 2024
Location:
Schedule: Recurring schedule as follows:
- Mar 15, 2024 - Apr 16, 2024; All days; 7:00 AM - 3:00 PM
- Oct 7, 2024 - Nov 18, 2024; All days; 7:00 AM - 3:00 PM
urn:uuid:fbbab3df-ee13-4116-a64b-b525695377682024-03-01T08:00:00ZWater Capital Project2024-03-01T23:08:47.9723909Z49.273233548280956 -123.0815069302515 49.269687531464484 -123.08139787254976W 62nd Ave from East Blvd to Granville St Nov, 24, 2023 Jan, 26, 2024
Location: W 62nd Ave from East Blvd to Granville St
Schedule: Nov 24, 2023 - Jan 26, 2024; All days; 7:00 AM - 6:00 PMurn:uuid:fe221675-7be4-4d81-9c48-bd824463531b2023-11-10T08:00:00ZWater Capital Project 2024-02-28T02:00:22.9189019Z49.214993636865785 -123.14347910149569 49.21505956658976 -123.14751148863253W 62nd Ave from East Blvd to Granville St Nov, 24, 2023 Jan, 26, 2024
Location: W 62nd Ave from East Blvd to Granville St
Schedule: Nov 24, 2023 - Jan 26, 2024; All days; 7:00 AM - 6:00 PMurn:uuid:ebcc2724-64b1-4808-b44e-95be9c1b7b612023-11-10T08:00:00ZWater Capital Project 2024-02-28T02:00:22.9189019Z49.21495260775143 -123.14100404267181 49.214993636865785 -123.14347910149569W 62nd Ave from East Blvd to Granville St Nov, 24, 2023 Jan, 26, 2024
Location: W 62nd Ave from East Blvd to Granville St
Schedule: Nov 24, 2023 - Jan 26, 2024; All days; 7:00 AM - 6:00 PMurn:uuid:c28735d6-5b0b-471f-a855-1cd097b520312023-11-10T08:00:00ZWater Capital Project 2024-02-28T02:00:22.9189019Z49.21494141275218 -123.14032105204367 49.21495260775143 -123.14100404267181Project is part of the Renfrew Heights grouped replacement.
Dieppe Dr - Malta Av to Normandy Dr Mon, Oct, 23, 2023 Fri, Dec, 08, 2023 - COMPLETED
Malta Av - Haida Dr to Dieppe Dr - 2023 Tue, Jan, 02, 2024 Wed, Jan, 10, 2024
Malta Pl - Malta Av to 92 Malta Pl Thu, Jan, 11, 2024 Thu, Jan, 18, 2024
Haida Dr - Malta Av to Dieppe Dr Fri, Jan, 19, 2024 Mon, Feb, 12, 2024
Malta Av - Worthington Dr to Haida Dr Tue, Feb, 13, 2024 Mon, Feb, 26, 2024
Worthington Dr - Falaise Av to Mons Dr Tue, Feb, 27, 2024 Fri, Mar, 08, 2024
Worthington Dr - Mons Dr to Normandy Dr Mon, Mar, 11, 2024 Mon, Apr, 15, 2024
Vimy Cr - Matapan Cr to Dieppe Dr Tue, Apr, 16, 2024 Mon, May, 27, 2024
Matapan Cr - Falaise Av to Skeena St Tue, May, 28, 2024 Fri, Jun, 28, 2024
Dieppe Dr - Skeena St to Malta Av Tue, Jul, 02, 2024 Mon, Jul, 22, 2024
Dieppe Pl - Dieppe Dr to Vimy Cr Tue, Jul, 23, 2024 Tue, Aug, 13, 2024
Falaise Av - Seaforth Dr to Dieppe Dr Wed, Aug, 14, 2024 Thu, Sep, 19, 2024
Falaise Pl - 89 Falaise Pl to Falaise Av Fri, Sep, 20, 2024 Wed, Sep, 25, 2024
Location: Various Locations
Schedule: Oct 20, 2023 - Sep 26, 2024; Weekdays; 7:00 AM - 6:00 PMurn:uuid:84f126a0-1d2d-4484-9d88-abcb9f005cf52023-12-05T08:00:00ZWater Capital Project 2024-01-12T23:03:14.5319104Z49.25474694682316 -123.03101921163568 49.254758261830005 -123.03063782458389 49.25686276807096 -123.02738744322222Project is part of the Renfrew Heights grouped replacement.
Dieppe Dr - Malta Av to Normandy Dr Mon, Oct, 23, 2023 Fri, Dec, 08, 2023 - COMPLETED
Malta Av - Haida Dr to Dieppe Dr - 2023 Tue, Jan, 02, 2024 Wed, Jan, 10, 2024
Malta Pl - Malta Av to 92 Malta Pl Thu, Jan, 11, 2024 Thu, Jan, 18, 2024
Haida Dr - Malta Av to Dieppe Dr Fri, Jan, 19, 2024 Mon, Feb, 12, 2024
Malta Av - Worthington Dr to Haida Dr Tue, Feb, 13, 2024 Mon, Feb, 26, 2024
Worthington Dr - Falaise Av to Mons Dr Tue, Feb, 27, 2024 Fri, Mar, 08, 2024
Worthington Dr - Mons Dr to Normandy Dr Mon, Mar, 11, 2024 Mon, Apr, 15, 2024
Vimy Cr - Matapan Cr to Dieppe Dr Tue, Apr, 16, 2024 Mon, May, 27, 2024
Matapan Cr - Falaise Av to Skeena St Tue, May, 28, 2024 Fri, Jun, 28, 2024
Dieppe Dr - Skeena St to Malta Av Tue, Jul, 02, 2024 Mon, Jul, 22, 2024
Dieppe Pl - Dieppe Dr to Vimy Cr Tue, Jul, 23, 2024 Tue, Aug, 13, 2024
Falaise Av - Seaforth Dr to Dieppe Dr Wed, Aug, 14, 2024 Thu, Sep, 19, 2024
Falaise Pl - 89 Falaise Pl to Falaise Av Fri, Sep, 20, 2024 Wed, Sep, 25, 2024
Location: Various Locations
Schedule: Oct 20, 2023 - Sep 26, 2024; Weekdays; 7:00 AM - 6:00 PMurn:uuid:6d00a21b-89da-49c2-b7e6-f65ef80a2b952023-12-05T08:00:00ZWater Capital Project 2024-01-12T23:03:14.5319104Z49.2556102914788 -123.02941062434542 49.256313042439416 -123.03044392285899 49.257282142270725 -123.03010527880835 49.25725380628839 -123.02786501816547 49.25517390076607 -123.02473038990155 49.25502654718653 -123.02460014218977 49.251512600744604 -123.02463487491295Project is part of the Renfrew Heights grouped replacement.
Dieppe Dr - Malta Av to Normandy Dr Mon, Oct, 23, 2023 Fri, Dec, 08, 2023 - COMPLETED
Malta Av - Haida Dr to Dieppe Dr - 2023 Tue, Jan, 02, 2024 Wed, Jan, 10, 2024
Malta Pl - Malta Av to 92 Malta Pl Thu, Jan, 11, 2024 Thu, Jan, 18, 2024
Haida Dr - Malta Av to Dieppe Dr Fri, Jan, 19, 2024 Mon, Feb, 12, 2024
Malta Av - Worthington Dr to Haida Dr Tue, Feb, 13, 2024 Mon, Feb, 26, 2024
Worthington Dr - Falaise Av to Mons Dr Tue, Feb, 27, 2024 Fri, Mar, 08, 2024
Worthington Dr - Mons Dr to Normandy Dr Mon, Mar, 11, 2024 Mon, Apr, 15, 2024
Vimy Cr - Matapan Cr to Dieppe Dr Tue, Apr, 16, 2024 Mon, May, 27, 2024
Matapan Cr - Falaise Av to Skeena St Tue, May, 28, 2024 Fri, Jun, 28, 2024
Dieppe Dr - Skeena St to Malta Av Tue, Jul, 02, 2024 Mon, Jul, 22, 2024
Dieppe Pl - Dieppe Dr to Vimy Cr Tue, Jul, 23, 2024 Tue, Aug, 13, 2024
Falaise Av - Seaforth Dr to Dieppe Dr Wed, Aug, 14, 2024 Thu, Sep, 19, 2024
Falaise Pl - 89 Falaise Pl to Falaise Av Fri, Sep, 20, 2024 Wed, Sep, 25, 2024
Location: Various Locations
Schedule: Oct 20, 2023 - Sep 26, 2024; Weekdays; 7:00 AM - 6:00 PMurn:uuid:242ccd22-6024-4541-aa3d-d2916740878e2023-12-05T08:00:00ZWater Capital Project 2024-01-12T23:03:14.5319104Z49.2535710006502 -123.02464983810387 49.25359944665212 -123.02610980905047 49.254538155518674 -123.0275915706082 49.25580396193598 -123.02567399682759Project is part of the Renfrew Heights grouped replacement.
Dieppe Dr - Malta Av to Normandy Dr Mon, Oct, 23, 2023 Fri, Dec, 08, 2023 - COMPLETED
Malta Av - Haida Dr to Dieppe Dr - 2023 Tue, Jan, 02, 2024 Wed, Jan, 10, 2024
Malta Pl - Malta Av to 92 Malta Pl Thu, Jan, 11, 2024 Thu, Jan, 18, 2024
Haida Dr - Malta Av to Dieppe Dr Fri, Jan, 19, 2024 Mon, Feb, 12, 2024
Malta Av - Worthington Dr to Haida Dr Tue, Feb, 13, 2024 Mon, Feb, 26, 2024
Worthington Dr - Falaise Av to Mons Dr Tue, Feb, 27, 2024 Fri, Mar, 08, 2024
Worthington Dr - Mons Dr to Normandy Dr Mon, Mar, 11, 2024 Mon, Apr, 15, 2024
Vimy Cr - Matapan Cr to Dieppe Dr Tue, Apr, 16, 2024 Mon, May, 27, 2024
Matapan Cr - Falaise Av to Skeena St Tue, May, 28, 2024 Fri, Jun, 28, 2024
Dieppe Dr - Skeena St to Malta Av Tue, Jul, 02, 2024 Mon, Jul, 22, 2024
Dieppe Pl - Dieppe Dr to Vimy Cr Tue, Jul, 23, 2024 Tue, Aug, 13, 2024
Falaise Av - Seaforth Dr to Dieppe Dr Wed, Aug, 14, 2024 Thu, Sep, 19, 2024
Falaise Pl - 89 Falaise Pl to Falaise Av Fri, Sep, 20, 2024 Wed, Sep, 25, 2024
Location: Various Locations
Schedule: Oct 20, 2023 - Sep 26, 2024; Weekdays; 7:00 AM - 6:00 PMurn:uuid:7e96ce74-c684-41a6-8fd5-f7f54cb26edb2023-12-05T08:00:00ZWater Capital Project 2024-01-12T23:03:14.5319104Z49.25515684023881 -123.02660009780116 49.25462349180319 -123.02588100763344Project is part of the Renfrew Heights grouped replacement.
Dieppe Dr - Malta Av to Normandy Dr Mon, Oct, 23, 2023 Fri, Dec, 08, 2023 - COMPLETED
Malta Av - Haida Dr to Dieppe Dr - 2023 Tue, Jan, 02, 2024 Wed, Jan, 10, 2024
Malta Pl - Malta Av to 92 Malta Pl Thu, Jan, 11, 2024 Thu, Jan, 18, 2024
Haida Dr - Malta Av to Dieppe Dr Fri, Jan, 19, 2024 Mon, Feb, 12, 2024
Malta Av - Worthington Dr to Haida Dr Tue, Feb, 13, 2024 Mon, Feb, 26, 2024
Worthington Dr - Falaise Av to Mons Dr Tue, Feb, 27, 2024 Fri, Mar, 08, 2024
Worthington Dr - Mons Dr to Normandy Dr Mon, Mar, 11, 2024 Mon, Apr, 15, 2024
Vimy Cr - Matapan Cr to Dieppe Dr Tue, Apr, 16, 2024 Mon, May, 27, 2024
Matapan Cr - Falaise Av to Skeena St Tue, May, 28, 2024 Fri, Jun, 28, 2024
Dieppe Dr - Skeena St to Malta Av Tue, Jul, 02, 2024 Mon, Jul, 22, 2024
Dieppe Pl - Dieppe Dr to Vimy Cr Tue, Jul, 23, 2024 Tue, Aug, 13, 2024
Falaise Av - Seaforth Dr to Dieppe Dr Wed, Aug, 14, 2024 Thu, Sep, 19, 2024
Falaise Pl - 89 Falaise Pl to Falaise Av Fri, Sep, 20, 2024 Wed, Sep, 25, 2024
Location: Various Locations
Schedule: Oct 20, 2023 - Sep 26, 2024; Weekdays; 7:00 AM - 6:00 PMurn:uuid:342f6e35-86b6-4144-8f82-03d431fa20042023-12-05T08:00:00ZWater Capital Project 2024-01-12T23:03:14.5319104Z49.25454526688134 -123.02760246591374 49.25404035758535 -123.02841961383162 49.25429636857805 -123.02882274013774 49.25399768895747 -123.02931302888848 49.254822609226636 -123.03043524536234Project is part of the Renfrew Heights grouped replacement.
Dieppe Dr - Malta Av to Normandy Dr Mon, Oct, 23, 2023 Fri, Dec, 08, 2023 - COMPLETED
Malta Av - Haida Dr to Dieppe Dr - 2023 Tue, Jan, 02, 2024 Wed, Jan, 10, 2024
Malta Pl - Malta Av to 92 Malta Pl Thu, Jan, 11, 2024 Thu, Jan, 18, 2024
Haida Dr - Malta Av to Dieppe Dr Fri, Jan, 19, 2024 Mon, Feb, 12, 2024
Malta Av - Worthington Dr to Haida Dr Tue, Feb, 13, 2024 Mon, Feb, 26, 2024
Worthington Dr - Falaise Av to Mons Dr Tue, Feb, 27, 2024 Fri, Mar, 08, 2024
Worthington Dr - Mons Dr to Normandy Dr Mon, Mar, 11, 2024 Mon, Apr, 15, 2024
Vimy Cr - Matapan Cr to Dieppe Dr Tue, Apr, 16, 2024 Mon, May, 27, 2024
Matapan Cr - Falaise Av to Skeena St Tue, May, 28, 2024 Fri, Jun, 28, 2024
Dieppe Dr - Skeena St to Malta Av Tue, Jul, 02, 2024 Mon, Jul, 22, 2024
Dieppe Pl - Dieppe Dr to Vimy Cr Tue, Jul, 23, 2024 Tue, Aug, 13, 2024
Falaise Av - Seaforth Dr to Dieppe Dr Wed, Aug, 14, 2024 Thu, Sep, 19, 2024
Falaise Pl - 89 Falaise Pl to Falaise Av Fri, Sep, 20, 2024 Wed, Sep, 25, 2024
Location: Various Locations
Schedule: Oct 20, 2023 - Sep 26, 2024; Weekdays; 7:00 AM - 6:00 PMurn:uuid:858718ec-5ce2-4a5a-a664-061d621de6622023-12-05T08:00:00ZWater Capital Project 2024-01-12T23:03:14.5319104Z49.25620929757869 -123.02844140444267 49.25650085273716 -123.0288554260544Project is part of the Renfrew Heights grouped replacement.
Dieppe Dr - Malta Av to Normandy Dr Mon, Oct, 23, 2023 Fri, Dec, 08, 2023 - COMPLETED
Malta Av - Haida Dr to Dieppe Dr - 2023 Tue, Jan, 02, 2024 Wed, Jan, 10, 2024
Malta Pl - Malta Av to 92 Malta Pl Thu, Jan, 11, 2024 Thu, Jan, 18, 2024
Haida Dr - Malta Av to Dieppe Dr Fri, Jan, 19, 2024 Mon, Feb, 12, 2024
Malta Av - Worthington Dr to Haida Dr Tue, Feb, 13, 2024 Mon, Feb, 26, 2024
Worthington Dr - Falaise Av to Mons Dr Tue, Feb, 27, 2024 Fri, Mar, 08, 2024
Worthington Dr - Mons Dr to Normandy Dr Mon, Mar, 11, 2024 Mon, Apr, 15, 2024
Vimy Cr - Matapan Cr to Dieppe Dr Tue, Apr, 16, 2024 Mon, May, 27, 2024
Matapan Cr - Falaise Av to Skeena St Tue, May, 28, 2024 Fri, Jun, 28, 2024
Dieppe Dr - Skeena St to Malta Av Tue, Jul, 02, 2024 Mon, Jul, 22, 2024
Dieppe Pl - Dieppe Dr to Vimy Cr Tue, Jul, 23, 2024 Tue, Aug, 13, 2024
Falaise Av - Seaforth Dr to Dieppe Dr Wed, Aug, 14, 2024 Thu, Sep, 19, 2024
Falaise Pl - 89 Falaise Pl to Falaise Av Fri, Sep, 20, 2024 Wed, Sep, 25, 2024
Location: Various Locations
Schedule: Oct 20, 2023 - Sep 26, 2024; Weekdays; 7:00 AM - 6:00 PMurn:uuid:d290320d-f833-4da3-a3e6-857168aa8a2f2023-12-05T08:00:00ZWater Capital Project 2024-01-12T23:03:14.5319104Z49.25721906663446 -123.02779858141396 49.25758172512647 -123.02723202552423 49.25759594697382 -123.02551056724393 49.25699862585677 -123.02464983810377 49.25592485186192 -123.02467162871493 49.25552662510455 -123.02517281277119Project is part of the Renfrew Heights grouped replacement.
Dieppe Dr - Malta Av to Normandy Dr Mon, Oct, 23, 2023 Fri, Dec, 08, 2023 - COMPLETED
Malta Av - Haida Dr to Dieppe Dr - 2023 Tue, Jan, 02, 2024 Wed, Jan, 10, 2024
Malta Pl - Malta Av to 92 Malta Pl Thu, Jan, 11, 2024 Thu, Jan, 18, 2024
Haida Dr - Malta Av to Dieppe Dr Fri, Jan, 19, 2024 Mon, Feb, 12, 2024
Malta Av - Worthington Dr to Haida Dr Tue, Feb, 13, 2024 Mon, Feb, 26, 2024
Worthington Dr - Falaise Av to Mons Dr Tue, Feb, 27, 2024 Fri, Mar, 08, 2024
Worthington Dr - Mons Dr to Normandy Dr Mon, Mar, 11, 2024 Mon, Apr, 15, 2024
Vimy Cr - Matapan Cr to Dieppe Dr Tue, Apr, 16, 2024 Mon, May, 27, 2024
Matapan Cr - Falaise Av to Skeena St Tue, May, 28, 2024 Fri, Jun, 28, 2024
Dieppe Dr - Skeena St to Malta Av Tue, Jul, 02, 2024 Mon, Jul, 22, 2024
Dieppe Pl - Dieppe Dr to Vimy Cr Tue, Jul, 23, 2024 Tue, Aug, 13, 2024
Falaise Av - Seaforth Dr to Dieppe Dr Wed, Aug, 14, 2024 Thu, Sep, 19, 2024
Falaise Pl - 89 Falaise Pl to Falaise Av Fri, Sep, 20, 2024 Wed, Sep, 25, 2024
Location: Various Locations
Schedule: Oct 20, 2023 - Sep 26, 2024; Weekdays; 7:00 AM - 6:00 PMurn:uuid:00105845-afdd-495a-a8c9-d7550cdeac872023-12-05T08:00:00ZWater Capital Project 2024-01-12T23:03:14.5319104Z49.25647951949125 -123.02663278371779 49.25679240617342 -123.02622965741163 49.256799517211306 -123.02602264660577 49.25665729625854 -123.02581563579992 49.25652929705063 -123.02584832171664 49.25626618652532 -123.02627323863392Project is part of the Renfrew Heights grouped replacement.
Dieppe Dr - Malta Av to Normandy Dr Mon, Oct, 23, 2023 Fri, Dec, 08, 2023 - COMPLETED
Malta Av - Haida Dr to Dieppe Dr - 2023 Tue, Jan, 02, 2024 Wed, Jan, 10, 2024
Malta Pl - Malta Av to 92 Malta Pl Thu, Jan, 11, 2024 Thu, Jan, 18, 2024
Haida Dr - Malta Av to Dieppe Dr Fri, Jan, 19, 2024 Mon, Feb, 12, 2024
Malta Av - Worthington Dr to Haida Dr Tue, Feb, 13, 2024 Mon, Feb, 26, 2024
Worthington Dr - Falaise Av to Mons Dr Tue, Feb, 27, 2024 Fri, Mar, 08, 2024
Worthington Dr - Mons Dr to Normandy Dr Mon, Mar, 11, 2024 Mon, Apr, 15, 2024
Vimy Cr - Matapan Cr to Dieppe Dr Tue, Apr, 16, 2024 Mon, May, 27, 2024
Matapan Cr - Falaise Av to Skeena St Tue, May, 28, 2024 Fri, Jun, 28, 2024
Dieppe Dr - Skeena St to Malta Av Tue, Jul, 02, 2024 Mon, Jul, 22, 2024
Dieppe Pl - Dieppe Dr to Vimy Cr Tue, Jul, 23, 2024 Tue, Aug, 13, 2024
Falaise Av - Seaforth Dr to Dieppe Dr Wed, Aug, 14, 2024 Thu, Sep, 19, 2024
Falaise Pl - 89 Falaise Pl to Falaise Av Fri, Sep, 20, 2024 Wed, Sep, 25, 2024
Location: Various Locations
Schedule: Oct 20, 2023 - Sep 26, 2024; Weekdays; 7:00 AM - 6:00 PMurn:uuid:9eea0aa7-ddc8-43c8-b406-28fd677f8afd2023-12-05T08:00:00ZWater Capital Project 2024-01-12T23:03:14.5319104Z49.2540098447478 -123.02925385060556 49.252125277359426 -123.02637748993466 49.25194748426924 -123.02623585096224 49.251506554642475 -123.02626853687896Water Capital Project :
Bidwell St - Barclay St to Davie St Mon, Jul 17, 2023 Wed, Sep 14, 2023 - COMPLETE
Nelson St - L/W of Chilco St to Cardero St Thurs, Sep 14, 2023 Wed, Dec, 13, 2023 - COMPLETE
Burnaby St - Beach Av to Cardero St Thu, Dec, 14, 2023 Tue, Feb, 6, 2024 - COMPLETE
Bidwell St - Burnaby St to Harwood St Wed, Jan, 31, 2024 Tue, Feb, 7, 2024 - COMPLETE
Bidwell St - W Georgia St to Haro St Wed, Feb, 7, 2024 Thu, Mar, 21, 2024 - IN CONSTRUCTION
Location: Bidwell St, Burnaby St, Nelson St
Schedule: Jul 17, 2023 - Mar 21, 2024; All days; 7:00 AM - 3:30 PMurn:uuid:e8283ada-aa96-46a7-a622-ef85fea1e4712023-07-24T07:00:00ZWater Capital Project 2024-02-26T15:57:09.1896717Z49.28729730623962 -123.13865880510856 49.28694521709525 -123.13919016454405Water Capital Project :
Bidwell St - Barclay St to Davie St Mon, Jul 17, 2023 Wed, Sep 14, 2023 - COMPLETE
Nelson St - L/W of Chilco St to Cardero St Thurs, Sep 14, 2023 Wed, Dec, 13, 2023 - COMPLETE
Burnaby St - Beach Av to Cardero St Thu, Dec, 14, 2023 Tue, Feb, 6, 2024 - COMPLETE
Bidwell St - Burnaby St to Harwood St Wed, Jan, 31, 2024 Tue, Feb, 7, 2024 - COMPLETE
Bidwell St - W Georgia St to Haro St Wed, Feb, 7, 2024 Thu, Mar, 21, 2024 - IN CONSTRUCTION
Location: Bidwell St, Burnaby St, Nelson St
Schedule: Jul 17, 2023 - Mar 21, 2024; All days; 7:00 AM - 3:30 PMurn:uuid:8093d2d4-f477-4e5b-b88a-ef6262469b7c2023-07-24T07:00:00ZWater Capital Project 2024-02-26T15:57:09.1896717Z49.28764945620415 -123.13812717700783 49.28729730623962 -123.13865880510856Water Capital Project :
Bidwell St - Barclay St to Davie St Mon, Jul 17, 2023 Wed, Sep 14, 2023 - COMPLETE
Nelson St - L/W of Chilco St to Cardero St Thurs, Sep 14, 2023 Wed, Dec, 13, 2023 - COMPLETE
Burnaby St - Beach Av to Cardero St Thu, Dec, 14, 2023 Tue, Feb, 6, 2024 - COMPLETE
Bidwell St - Burnaby St to Harwood St Wed, Jan, 31, 2024 Tue, Feb, 7, 2024 - COMPLETE
Bidwell St - W Georgia St to Haro St Wed, Feb, 7, 2024 Thu, Mar, 21, 2024 - IN CONSTRUCTION
Location: Bidwell St, Burnaby St, Nelson St
Schedule: Jul 17, 2023 - Mar 21, 2024; All days; 7:00 AM - 3:30 PMurn:uuid:93e8ee42-b34e-4670-b4ec-8be86f4e87b92023-07-24T07:00:00ZWater Capital Project 2024-02-26T15:57:09.1896717Z49.28731484406467 -123.13555322103191 49.29215142555438 -123.14290246450958Water Capital Project :
Bidwell St - Barclay St to Davie St Mon, Jul 17, 2023 Wed, Sep 14, 2023 - COMPLETE
Nelson St - L/W of Chilco St to Cardero St Thurs, Sep 14, 2023 Wed, Dec, 13, 2023 - COMPLETE
Burnaby St - Beach Av to Cardero St Thu, Dec, 14, 2023 Tue, Feb, 6, 2024 - COMPLETE
Bidwell St - Burnaby St to Harwood St Wed, Jan, 31, 2024 Tue, Feb, 7, 2024 - COMPLETE
Bidwell St - W Georgia St to Haro St Wed, Feb, 7, 2024 Thu, Mar, 21, 2024 - IN CONSTRUCTION
Location: Bidwell St, Burnaby St, Nelson St
Schedule: Jul 17, 2023 - Mar 21, 2024; All days; 7:00 AM - 3:30 PMurn:uuid:376bf70e-704b-4323-8bbe-53b90dcbc4152023-07-24T07:00:00ZWater Capital Project 2024-02-26T15:57:09.1896717Z49.28800175597033 -123.13759609181447 49.28764945620415 -123.13812717700783Water Capital Project :
Bidwell St - Barclay St to Davie St Mon, Jul 17, 2023 Wed, Sep 14, 2023 - COMPLETE
Nelson St - L/W of Chilco St to Cardero St Thurs, Sep 14, 2023 Wed, Dec, 13, 2023 - COMPLETE
Burnaby St - Beach Av to Cardero St Thu, Dec, 14, 2023 Tue, Feb, 6, 2024 - COMPLETE
Bidwell St - Burnaby St to Harwood St Wed, Jan, 31, 2024 Tue, Feb, 7, 2024 - COMPLETE
Bidwell St - W Georgia St to Haro St Wed, Feb, 7, 2024 Thu, Mar, 21, 2024 - IN CONSTRUCTION
Location: Bidwell St, Burnaby St, Nelson St
Schedule: Jul 17, 2023 - Mar 21, 2024; All days; 7:00 AM - 3:30 PMurn:uuid:759effb4-add1-4864-8dbe-8658141672942023-07-24T07:00:00ZWater Capital Project 2024-02-26T15:57:09.1896717Z49.288353729537334 -123.13706492939808 49.28800175597033 -123.13759609181447Water Capital Project :
Bidwell St - Barclay St to Davie St Mon, Jul 17, 2023 Wed, Sep 14, 2023 - COMPLETE
Nelson St - L/W of Chilco St to Cardero St Thurs, Sep 14, 2023 Wed, Dec, 13, 2023 - COMPLETE
Burnaby St - Beach Av to Cardero St Thu, Dec, 14, 2023 Tue, Feb, 6, 2024 - COMPLETE
Bidwell St - Burnaby St to Harwood St Wed, Jan, 31, 2024 Tue, Feb, 7, 2024 - COMPLETE
Bidwell St - W Georgia St to Haro St Wed, Feb, 7, 2024 Thu, Mar, 21, 2024 - IN CONSTRUCTION
Location: Bidwell St, Burnaby St, Nelson St
Schedule: Jul 17, 2023 - Mar 21, 2024; All days; 7:00 AM - 3:30 PMurn:uuid:651c331b-900a-4652-95a1-4893923f9bc72023-07-24T07:00:00ZWater Capital Project 2024-02-26T15:57:09.1896717Z49.28870572727581 -123.13653406202826 49.288353729537334 -123.13706492939808Water Capital Project :
Bidwell St - Barclay St to Davie St Mon, Jul 17, 2023 Wed, Sep 14, 2023 - COMPLETE
Nelson St - L/W of Chilco St to Cardero St Thurs, Sep 14, 2023 Wed, Dec, 13, 2023 - COMPLETE
Burnaby St - Beach Av to Cardero St Thu, Dec, 14, 2023 Tue, Feb, 6, 2024 - COMPLETE
Bidwell St - Burnaby St to Harwood St Wed, Jan, 31, 2024 Tue, Feb, 7, 2024 - COMPLETE
Bidwell St - W Georgia St to Haro St Wed, Feb, 7, 2024 Thu, Mar, 21, 2024 - IN CONSTRUCTION
Location: Bidwell St, Burnaby St, Nelson St
Schedule: Jul 17, 2023 - Mar 21, 2024; All days; 7:00 AM - 3:30 PMurn:uuid:d6c6828e-7209-4c4a-bd0d-1769eb470b612023-07-24T07:00:00ZWater Capital Project 2024-02-26T15:57:09.1896717Z49.28905761510441 -123.13600277425316 49.28870572727581 -123.13653406202826Water Capital Project :
Bidwell St - Barclay St to Davie St Mon, Jul 17, 2023 Wed, Sep 14, 2023 - COMPLETE
Nelson St - L/W of Chilco St to Cardero St Thurs, Sep 14, 2023 Wed, Dec, 13, 2023 - COMPLETE
Burnaby St - Beach Av to Cardero St Thu, Dec, 14, 2023 Tue, Feb, 6, 2024 - COMPLETE
Bidwell St - Burnaby St to Harwood St Wed, Jan, 31, 2024 Tue, Feb, 7, 2024 - COMPLETE
Bidwell St - W Georgia St to Haro St Wed, Feb, 7, 2024 Thu, Mar, 21, 2024 - IN CONSTRUCTION
Location: Bidwell St, Burnaby St, Nelson St
Schedule: Jul 17, 2023 - Mar 21, 2024; All days; 7:00 AM - 3:30 PMurn:uuid:fc6fbdc5-acc0-44c1-bd4c-8aa6d9e48f3a2023-07-24T07:00:00ZWater Capital Project 2024-02-26T15:57:09.1896717Z49.290113237210534 -123.1344085629369 49.28976143764854 -123.13493992862982Water Capital Project :
Bidwell St - Barclay St to Davie St Mon, Jul 17, 2023 Wed, Sep 14, 2023 - COMPLETE
Nelson St - L/W of Chilco St to Cardero St Thurs, Sep 14, 2023 Wed, Dec, 13, 2023 - COMPLETE
Burnaby St - Beach Av to Cardero St Thu, Dec, 14, 2023 Tue, Feb, 6, 2024 - COMPLETE
Bidwell St - Burnaby St to Harwood St Wed, Jan, 31, 2024 Tue, Feb, 7, 2024 - COMPLETE
Bidwell St - W Georgia St to Haro St Wed, Feb, 7, 2024 Thu, Mar, 21, 2024 - IN CONSTRUCTION
Location: Bidwell St, Burnaby St, Nelson St
Schedule: Jul 17, 2023 - Mar 21, 2024; All days; 7:00 AM - 3:30 PMurn:uuid:d9389f4f-fc0a-4549-956b-ceb9fcd43f532023-07-24T07:00:00ZWater Capital Project 2024-02-26T15:57:09.1896717Z49.29158448716095 -123.13218543017524 49.29116785649603 -123.13281447344144Water Capital Project :
Bidwell St - Barclay St to Davie St Mon, Jul 17, 2023 Wed, Sep 14, 2023 - COMPLETE
Nelson St - L/W of Chilco St to Cardero St Thurs, Sep 14, 2023 Wed, Dec, 13, 2023 - COMPLETE
Burnaby St - Beach Av to Cardero St Thu, Dec, 14, 2023 Tue, Feb, 6, 2024 - COMPLETE
Bidwell St - Burnaby St to Harwood St Wed, Jan, 31, 2024 Tue, Feb, 7, 2024 - COMPLETE
Bidwell St - W Georgia St to Haro St Wed, Feb, 7, 2024 Thu, Mar, 21, 2024 - IN CONSTRUCTION
Location: Bidwell St, Burnaby St, Nelson St
Schedule: Jul 17, 2023 - Mar 21, 2024; All days; 7:00 AM - 3:30 PMurn:uuid:d4134795-070b-42a1-b2e6-0b090290dd682023-07-24T07:00:00ZWater Capital Project 2024-02-26T15:57:09.1896717Z49.2904643964082 -123.13387654160667 49.290113237210534 -123.1344085629369Water Capital Project :
Bidwell St - Barclay St to Davie St Mon, Jul 17, 2023 Wed, Sep 14, 2023 - COMPLETE
Nelson St - L/W of Chilco St to Cardero St Thurs, Sep 14, 2023 Wed, Dec, 13, 2023 - COMPLETE
Burnaby St - Beach Av to Cardero St Thu, Dec, 14, 2023 Tue, Feb, 6, 2024 - COMPLETE
Bidwell St - Burnaby St to Harwood St Wed, Jan, 31, 2024 Tue, Feb, 7, 2024 - COMPLETE
Bidwell St - W Georgia St to Haro St Wed, Feb, 7, 2024 Thu, Mar, 21, 2024 - IN CONSTRUCTION
Location: Bidwell St, Burnaby St, Nelson St
Schedule: Jul 17, 2023 - Mar 21, 2024; All days; 7:00 AM - 3:30 PMurn:uuid:259e6cf0-12cf-4ef8-8330-a7f2da64bdec2023-07-24T07:00:00ZWater Capital Project 2024-02-26T15:57:09.1896717Z49.290816262614726 -123.13334550478977 49.2904643964082 -123.13387654160667Water Capital Project :
Bidwell St - Barclay St to Davie St Mon, Jul 17, 2023 Wed, Sep 14, 2023 - COMPLETE
Nelson St - L/W of Chilco St to Cardero St Thurs, Sep 14, 2023 Wed, Dec, 13, 2023 - COMPLETE
Burnaby St - Beach Av to Cardero St Thu, Dec, 14, 2023 Tue, Feb, 6, 2024 - COMPLETE
Bidwell St - Burnaby St to Harwood St Wed, Jan, 31, 2024 Tue, Feb, 7, 2024 - COMPLETE
Bidwell St - W Georgia St to Haro St Wed, Feb, 7, 2024 Thu, Mar, 21, 2024 - IN CONSTRUCTION
Location: Bidwell St, Burnaby St, Nelson St
Schedule: Jul 17, 2023 - Mar 21, 2024; All days; 7:00 AM - 3:30 PMurn:uuid:46a814a6-f08a-42a8-b3aa-e1b41ca5e2dd2023-07-24T07:00:00ZWater Capital Project 2024-02-26T15:57:09.1896717Z49.29116785649603 -123.13281447344144 49.290816262614726 -123.13334550478977Water Capital Project :
Bidwell St - Barclay St to Davie St Mon, Jul 17, 2023 Wed, Sep 14, 2023 - COMPLETE
Nelson St - L/W of Chilco St to Cardero St Thurs, Sep 14, 2023 Wed, Dec, 13, 2023 - COMPLETE
Burnaby St - Beach Av to Cardero St Thu, Dec, 14, 2023 Tue, Feb, 6, 2024 - COMPLETE
Bidwell St - Burnaby St to Harwood St Wed, Jan, 31, 2024 Tue, Feb, 7, 2024 - COMPLETE
Bidwell St - W Georgia St to Haro St Wed, Feb, 7, 2024 Thu, Mar, 21, 2024 - IN CONSTRUCTION
Location: Bidwell St, Burnaby St, Nelson St
Schedule: Jul 17, 2023 - Mar 21, 2024; All days; 7:00 AM - 3:30 PMurn:uuid:34b9902c-6bc9-4e85-97b7-c080d1d415ff2023-07-24T07:00:00ZWater Capital Project 2024-02-26T15:57:09.1896717Z49.284520368042365 -123.13974347698736 49.28553847179202 -123.14131656259529Water Capital Project :
Bidwell St - Barclay St to Davie St Mon, Jul 17, 2023 Wed, Sep 14, 2023 - COMPLETE
Nelson St - L/W of Chilco St to Cardero St Thurs, Sep 14, 2023 Wed, Dec, 13, 2023 - COMPLETE
Burnaby St - Beach Av to Cardero St Thu, Dec, 14, 2023 Tue, Feb, 6, 2024 - COMPLETE
Bidwell St - Burnaby St to Harwood St Wed, Jan, 31, 2024 Tue, Feb, 7, 2024 - COMPLETE
Bidwell St - W Georgia St to Haro St Wed, Feb, 7, 2024 Thu, Mar, 21, 2024 - IN CONSTRUCTION
Location: Bidwell St, Burnaby St, Nelson St
Schedule: Jul 17, 2023 - Mar 21, 2024; All days; 7:00 AM - 3:30 PMurn:uuid:a561e1cc-700c-4b8d-831d-41db5e052db22023-07-24T07:00:00ZWater Capital Project 2024-02-26T15:57:09.1896717Z49.28518694548532 -123.1418483396272 49.28483556079172 -123.1423799857588Water Capital Project :
Bidwell St - Barclay St to Davie St Mon, Jul 17, 2023 Wed, Sep 14, 2023 - COMPLETE
Nelson St - L/W of Chilco St to Cardero St Thurs, Sep 14, 2023 Wed, Dec, 13, 2023 - COMPLETE
Burnaby St - Beach Av to Cardero St Thu, Dec, 14, 2023 Tue, Feb, 6, 2024 - COMPLETE
Bidwell St - Burnaby St to Harwood St Wed, Jan, 31, 2024 Tue, Feb, 7, 2024 - COMPLETE
Bidwell St - W Georgia St to Haro St Wed, Feb, 7, 2024 Thu, Mar, 21, 2024 - IN CONSTRUCTION
Location: Bidwell St, Burnaby St, Nelson St
Schedule: Jul 17, 2023 - Mar 21, 2024; All days; 7:00 AM - 3:30 PMurn:uuid:54788801-bb1f-4a84-9db2-bb62175c92d22023-07-24T07:00:00ZWater Capital Project 2024-02-26T15:57:09.1896717Z49.28553847179202 -123.14131656259529 49.28518694548532 -123.1418483396272Water Capital Project :
Bidwell St - Barclay St to Davie St Mon, Jul 17, 2023 Wed, Sep 14, 2023 - COMPLETE
Nelson St - L/W of Chilco St to Cardero St Thurs, Sep 14, 2023 Wed, Dec, 13, 2023 - COMPLETE
Burnaby St - Beach Av to Cardero St Thu, Dec, 14, 2023 Tue, Feb, 6, 2024 - COMPLETE
Bidwell St - Burnaby St to Harwood St Wed, Jan, 31, 2024 Tue, Feb, 7, 2024 - COMPLETE
Bidwell St - W Georgia St to Haro St Wed, Feb, 7, 2024 Thu, Mar, 21, 2024 - IN CONSTRUCTION
Location: Bidwell St, Burnaby St, Nelson St
Schedule: Jul 17, 2023 - Mar 21, 2024; All days; 7:00 AM - 3:30 PMurn:uuid:ebb7c969-f996-4acd-8375-0ff3fc86f0332023-07-24T07:00:00ZWater Capital Project 2024-02-26T15:57:09.1896717Z49.28553847179202 -123.14131656259529 49.28630814037572 -123.14250593536156Water Capital Project :
Bidwell St - Barclay St to Davie St Mon, Jul 17, 2023 Wed, Sep 14, 2023 - COMPLETE
Nelson St - L/W of Chilco St to Cardero St Thurs, Sep 14, 2023 Wed, Dec, 13, 2023 - COMPLETE
Burnaby St - Beach Av to Cardero St Thu, Dec, 14, 2023 Tue, Feb, 6, 2024 - COMPLETE
Bidwell St - Burnaby St to Harwood St Wed, Jan, 31, 2024 Tue, Feb, 7, 2024 - COMPLETE
Bidwell St - W Georgia St to Haro St Wed, Feb, 7, 2024 Thu, Mar, 21, 2024 - IN CONSTRUCTION
Location: Bidwell St, Burnaby St, Nelson St
Schedule: Jul 17, 2023 - Mar 21, 2024; All days; 7:00 AM - 3:30 PMurn:uuid:94057e16-d9f9-4e05-8b61-93b3da7680432023-07-24T07:00:00ZWater Capital Project 2024-02-26T15:57:09.1896717Z49.28659329653337 -123.13972140688756 49.28624177797883 -123.14025290408401Water Capital Project :
Bidwell St - Barclay St to Davie St Mon, Jul 17, 2023 Wed, Sep 14, 2023 - COMPLETE
Nelson St - L/W of Chilco St to Cardero St Thurs, Sep 14, 2023 Wed, Dec, 13, 2023 - COMPLETE
Burnaby St - Beach Av to Cardero St Thu, Dec, 14, 2023 Tue, Feb, 6, 2024 - COMPLETE
Bidwell St - Burnaby St to Harwood St Wed, Jan, 31, 2024 Tue, Feb, 7, 2024 - COMPLETE
Bidwell St - W Georgia St to Haro St Wed, Feb, 7, 2024 Thu, Mar, 21, 2024 - IN CONSTRUCTION
Location: Bidwell St, Burnaby St, Nelson St
Schedule: Jul 17, 2023 - Mar 21, 2024; All days; 7:00 AM - 3:30 PMurn:uuid:df3c9c37-aebe-45f6-8ca7-df03d8785d482023-07-24T07:00:00ZWater Capital Project 2024-02-26T15:57:09.1896717Z49.28694521709525 -123.13919016454405 49.28659329653337 -123.13972140688756E 57th Av - Ontario St to Prince Edward St
Start Date: Thursday January 25th, 2024
Finish Date: Wednesday March 20th, 2024
Location: E 57th Av
Schedule: Jan 25, 2024 - Mar 20, 2024; All days; 7:00 AM - 3:00 PMurn:uuid:1f702103-7271-480a-b603-cee1699132ce2024-03-06T08:00:00ZWater Capital Project 2024-03-06T18:15:58.8437338Z49.21855843940247 -123.10620672695487 49.21837973988585 -123.09777386181206Crews will complete the water upgrades.
Traffic Impacts: Reduced travel lanes on E 38th Ave from Fraser St to Prince Albert St
Location: E 38th Ave from Fraser St to Prince Albert St
Schedule: Nov 9, 2021 - Nov 30, 2021urn:uuid:046e1cd5-d584-4cd0-8c7a-baee197f670b2021-11-22T08:00:00ZWater Upgrades on E 38th Ave from Fraser St to Prince Albert St2023-03-29T01:02:21.381426Z49.23569996518469 -123.09049886371693 49.235690535943945 -123.08982167355427Crews will complete the water upgrades.
Traffic Impacts: Reduced travel lanes on E 38th Ave from Fraser St to Prince Albert St
Location: E 38th Ave from Fraser St to Prince Albert St
Schedule: Nov 9, 2021 - Nov 30, 2021urn:uuid:a0f03583-f5e6-4105-95fb-0fd4245de0fa2021-11-22T08:00:00ZWater Upgrades on E 38th Ave from Fraser St to Prince Albert St2023-03-29T01:02:21.381426Z49.23569996518469 -123.09049886371693 49.235690535943945 -123.08982167355427Crews will complete the water upgrades.
Traffic Impacts: Reduced travel lanes on E 38th Ave from Fraser St to Prince Albert St
Location: E 38th Ave from Fraser St to Prince Albert St
Schedule: Nov 9, 2021 - Nov 30, 2021urn:uuid:6215eeb5-c150-43b6-a705-b8517f6361182021-11-22T08:00:00ZWater Upgrades on E 38th Ave from Fraser St to Prince Albert St2023-03-29T01:02:21.381426Z49.235690535943945 -123.08982167355427 49.23566694645149 -123.08810972864065Crews will complete the water upgrades.
Traffic Impacts: Reduced travel lanes on E 38th Ave from Fraser St to Prince Albert St
Location: E 38th Ave from Fraser St to Prince Albert St
Schedule: Nov 9, 2021 - Nov 30, 2021urn:uuid:488797ce-0801-4cd4-a8c2-0e6e8bc88fff2021-11-22T08:00:00ZWater Upgrades on E 38th Ave from Fraser St to Prince Albert St2023-03-29T01:02:21.381426Z49.235690535943945 -123.08982167355427 49.23566694645149 -123.08810972864065Full closure of 600-700 block of Bidwell St from March Friday 15, 2024 to March Sunday 31, 2024 at 3:30 pm
Location: Bidwell St from W Georgia St to Eihu Lane
Schedule: Mar 15, 2024 - Mar 31, 2024; All days; 7:00 AM - 3:30 PMurn:uuid:673c7017-53e1-46e0-b939-b7c1237f26e82024-03-15T07:00:00ZWaterworks Service of 600-700 block of Bidwell St2024-03-16T01:29:26.9763318Z49.29158448716095 -123.13218543017524 49.29116785649603 -123.13281447344144Full closure of 600-700 block of Bidwell St from March Friday 15, 2024 to March Sunday 31, 2024 at 3:30 pm
Location: Bidwell St from W Georgia St to Eihu Lane
Schedule: Mar 15, 2024 - Mar 31, 2024; All days; 7:00 AM - 3:30 PMurn:uuid:523ac9d3-5415-4f02-b02d-65c10e7f8b432024-03-15T07:00:00ZWaterworks Service of 600-700 block of Bidwell St2024-03-16T01:29:26.9763318Z49.29116785649603 -123.13281447344144 49.290816262614726 -123.13334550478977Integrated project on W King Edward Ave from Arbutus to Dunbar – PM is Petru Roman.
Scope includes;
- Water renewal (north side of King Edward between Arbutus & Quesnel) - completed;
- Sewers renewal (both sides of King Edward between Dunbar & Quesnel);
- Streets restoration & spot improvements on King Edward;
- Green Rainwater Infrastructure (various locations);
- Intersection improvements at Arbutus (Transportation Design);
- Bus stop upgrades and a relocation at Quesnel & King Edward (Transit Integration & Projects);
- Sewer separation work on W 29th Avenue (Dunbar Street to Collingwood Street) and W 30th Avenue (Collingwood Street to Blenheim Street)
Location: W King Edward Avenue from Arbutus Street to Dunbar Street
W 29th Avenue from Dunbar Street to Collingwood Street
W 30th Avenue from Collingwood Street to Blenheim Street
Schedule: Jul 4, 2022 - Feb 28, 2025; All days; 7:00 AM - 5:00 PMurn:uuid:86cdc4d8-4065-46ba-98c7-049f213c416f2022-06-30T07:00:00ZWest King Edward Avenue Integrated Project 2024-03-27T19:24:12.6522117Z49.25005959403299 -123.18346161783779 49.25006399785926 -123.18455969450504Integrated project on W King Edward Ave from Arbutus to Dunbar – PM is Petru Roman.
Scope includes;
- Water renewal (north side of King Edward between Arbutus & Quesnel) - completed;
- Sewers renewal (both sides of King Edward between Dunbar & Quesnel);
- Streets restoration & spot improvements on King Edward;
- Green Rainwater Infrastructure (various locations);
- Intersection improvements at Arbutus (Transportation Design);
- Bus stop upgrades and a relocation at Quesnel & King Edward (Transit Integration & Projects);
- Sewer separation work on W 29th Avenue (Dunbar Street to Collingwood Street) and W 30th Avenue (Collingwood Street to Blenheim Street)
Location: W King Edward Avenue from Arbutus Street to Dunbar Street
W 29th Avenue from Dunbar Street to Collingwood Street
W 30th Avenue from Collingwood Street to Blenheim Street
Schedule: Jul 4, 2022 - Feb 28, 2025; All days; 7:00 AM - 5:00 PMurn:uuid:7986a2ec-b300-4ab7-8b97-b0ca3162fde92022-06-30T07:00:00ZWest King Edward Avenue Integrated Project 2024-03-27T19:24:12.6522117Z49.25005959403299 -123.18346161783779 49.25006399785926 -123.18455969450504Integrated project on W King Edward Ave from Arbutus to Dunbar – PM is Petru Roman.
Scope includes;
- Water renewal (north side of King Edward between Arbutus & Quesnel) - completed;
- Sewers renewal (both sides of King Edward between Dunbar & Quesnel);
- Streets restoration & spot improvements on King Edward;
- Green Rainwater Infrastructure (various locations);
- Intersection improvements at Arbutus (Transportation Design);
- Bus stop upgrades and a relocation at Quesnel & King Edward (Transit Integration & Projects);
- Sewer separation work on W 29th Avenue (Dunbar Street to Collingwood Street) and W 30th Avenue (Collingwood Street to Blenheim Street)
Location: W King Edward Avenue from Arbutus Street to Dunbar Street
W 29th Avenue from Dunbar Street to Collingwood Street
W 30th Avenue from Collingwood Street to Blenheim Street
Schedule: Jul 4, 2022 - Feb 28, 2025; All days; 7:00 AM - 5:00 PMurn:uuid:1bd881cd-c257-440e-8ca6-5704dfc36ba22022-06-30T07:00:00ZWest King Edward Avenue Integrated Project 2024-03-27T19:24:12.6522117Z49.25005959403299 -123.18346161783779 49.25006399785926 -123.18455969450504Integrated project on W King Edward Ave from Arbutus to Dunbar – PM is Petru Roman.
Scope includes;
- Water renewal (north side of King Edward between Arbutus & Quesnel) - completed;
- Sewers renewal (both sides of King Edward between Dunbar & Quesnel);
- Streets restoration & spot improvements on King Edward;
- Green Rainwater Infrastructure (various locations);
- Intersection improvements at Arbutus (Transportation Design);
- Bus stop upgrades and a relocation at Quesnel & King Edward (Transit Integration & Projects);
- Sewer separation work on W 29th Avenue (Dunbar Street to Collingwood Street) and W 30th Avenue (Collingwood Street to Blenheim Street)
Location: W King Edward Avenue from Arbutus Street to Dunbar Street
W 29th Avenue from Dunbar Street to Collingwood Street
W 30th Avenue from Collingwood Street to Blenheim Street
Schedule: Jul 4, 2022 - Feb 28, 2025; All days; 7:00 AM - 5:00 PMurn:uuid:158a6dad-ad63-4152-8bb6-3dca201e71242022-06-30T07:00:00ZWest King Edward Avenue Integrated Project 2024-03-27T19:24:12.6522117Z49.25006399785926 -123.18455969450504 49.25006638925291 -123.18520134708868Integrated project on W King Edward Ave from Arbutus to Dunbar – PM is Petru Roman.
Scope includes;
- Water renewal (north side of King Edward between Arbutus & Quesnel) - completed;
- Sewers renewal (both sides of King Edward between Dunbar & Quesnel);
- Streets restoration & spot improvements on King Edward;
- Green Rainwater Infrastructure (various locations);
- Intersection improvements at Arbutus (Transportation Design);
- Bus stop upgrades and a relocation at Quesnel & King Edward (Transit Integration & Projects);
- Sewer separation work on W 29th Avenue (Dunbar Street to Collingwood Street) and W 30th Avenue (Collingwood Street to Blenheim Street)
Location: W King Edward Avenue from Arbutus Street to Dunbar Street
W 29th Avenue from Dunbar Street to Collingwood Street
W 30th Avenue from Collingwood Street to Blenheim Street
Schedule: Jul 4, 2022 - Feb 28, 2025; All days; 7:00 AM - 5:00 PMurn:uuid:f4739fb4-ec8e-4dc7-b737-a79c70513f152022-06-30T07:00:00ZWest King Edward Avenue Integrated Project 2024-03-27T19:24:12.6522117Z49.25006399785926 -123.18455969450504 49.25006638925291 -123.18520134708868Integrated project on W King Edward Ave from Arbutus to Dunbar – PM is Petru Roman.
Scope includes;
- Water renewal (north side of King Edward between Arbutus & Quesnel) - completed;
- Sewers renewal (both sides of King Edward between Dunbar & Quesnel);
- Streets restoration & spot improvements on King Edward;
- Green Rainwater Infrastructure (various locations);
- Intersection improvements at Arbutus (Transportation Design);
- Bus stop upgrades and a relocation at Quesnel & King Edward (Transit Integration & Projects);
- Sewer separation work on W 29th Avenue (Dunbar Street to Collingwood Street) and W 30th Avenue (Collingwood Street to Blenheim Street)
Location: W King Edward Avenue from Arbutus Street to Dunbar Street
W 29th Avenue from Dunbar Street to Collingwood Street
W 30th Avenue from Collingwood Street to Blenheim Street
Schedule: Jul 4, 2022 - Feb 28, 2025; All days; 7:00 AM - 5:00 PMurn:uuid:e181eb6a-918f-4f42-8a08-c1467f824de52022-06-30T07:00:00ZWest King Edward Avenue Integrated Project 2024-03-27T19:24:12.6522117Z49.25006399785926 -123.18455969450504 49.25006638925291 -123.18520134708868Integrated project on W King Edward Ave from Arbutus to Dunbar – PM is Petru Roman.
Scope includes;
- Water renewal (north side of King Edward between Arbutus & Quesnel) - completed;
- Sewers renewal (both sides of King Edward between Dunbar & Quesnel);
- Streets restoration & spot improvements on King Edward;
- Green Rainwater Infrastructure (various locations);
- Intersection improvements at Arbutus (Transportation Design);
- Bus stop upgrades and a relocation at Quesnel & King Edward (Transit Integration & Projects);
- Sewer separation work on W 29th Avenue (Dunbar Street to Collingwood Street) and W 30th Avenue (Collingwood Street to Blenheim Street)
Location: W King Edward Avenue from Arbutus Street to Dunbar Street
W 29th Avenue from Dunbar Street to Collingwood Street
W 30th Avenue from Collingwood Street to Blenheim Street
Schedule: Jul 4, 2022 - Feb 28, 2025; All days; 7:00 AM - 5:00 PMurn:uuid:07e56888-fd25-465d-a17e-2503178900dc2022-06-30T07:00:00ZWest King Edward Avenue Integrated Project 2024-03-27T19:24:12.6522117Z49.2510555146917 -123.15602998954454 49.250628011237524 -123.1571289684377Integrated project on W King Edward Ave from Arbutus to Dunbar – PM is Petru Roman.
Scope includes;
- Water renewal (north side of King Edward between Arbutus & Quesnel) - completed;
- Sewers renewal (both sides of King Edward between Dunbar & Quesnel);
- Streets restoration & spot improvements on King Edward;
- Green Rainwater Infrastructure (various locations);
- Intersection improvements at Arbutus (Transportation Design);
- Bus stop upgrades and a relocation at Quesnel & King Edward (Transit Integration & Projects);
- Sewer separation work on W 29th Avenue (Dunbar Street to Collingwood Street) and W 30th Avenue (Collingwood Street to Blenheim Street)
Location: W King Edward Avenue from Arbutus Street to Dunbar Street
W 29th Avenue from Dunbar Street to Collingwood Street
W 30th Avenue from Collingwood Street to Blenheim Street
Schedule: Jul 4, 2022 - Feb 28, 2025; All days; 7:00 AM - 5:00 PMurn:uuid:6f7e420f-ada7-4a81-a0bd-8dc0977a925b2022-06-30T07:00:00ZWest King Edward Avenue Integrated Project 2024-03-27T19:24:12.6522117Z49.2511500764613 -123.15578711011032 49.2510555146917 -123.15602998954454Integrated project on W King Edward Ave from Arbutus to Dunbar – PM is Petru Roman.
Scope includes;
- Water renewal (north side of King Edward between Arbutus & Quesnel) - completed;
- Sewers renewal (both sides of King Edward between Dunbar & Quesnel);
- Streets restoration & spot improvements on King Edward;
- Green Rainwater Infrastructure (various locations);
- Intersection improvements at Arbutus (Transportation Design);
- Bus stop upgrades and a relocation at Quesnel & King Edward (Transit Integration & Projects);
- Sewer separation work on W 29th Avenue (Dunbar Street to Collingwood Street) and W 30th Avenue (Collingwood Street to Blenheim Street)
Location: W King Edward Avenue from Arbutus Street to Dunbar Street
W 29th Avenue from Dunbar Street to Collingwood Street
W 30th Avenue from Collingwood Street to Blenheim Street
Schedule: Jul 4, 2022 - Feb 28, 2025; All days; 7:00 AM - 5:00 PMurn:uuid:30f9ba70-aafa-4d90-a43d-f16036236d292022-06-30T07:00:00ZWest King Edward Avenue Integrated Project 2024-03-27T19:24:12.6522117Z49.25155339719626 -123.15312132051368 49.251555404686655 -123.15313372135708 49.25156296564606 -123.1531842576968 49.25156995061778 -123.15323499838856 49.25157635066094 -123.153285902179 49.25158217475246 -123.15333698283557 49.2515874049563 -123.15338819907704 49.2515920592445 -123.15343956469869 49.25159611969943 -123.15349102467799 49.25159958628453 -123.15354260649565 49.25160246806783 -123.15359425521267 49.25160476503112 -123.1536459845686 49.25160646823372 -123.15369775330991 49.25160757765744 -123.153749575176 49.25160765215898 -123.15375442608432 49.25160807989843 -123.15380476177539 49.251608234977226 -123.15382340919417Integrated project on W King Edward Ave from Arbutus to Dunbar – PM is Petru Roman.
Scope includes;
- Water renewal (north side of King Edward between Arbutus & Quesnel) - completed;
- Sewers renewal (both sides of King Edward between Dunbar & Quesnel);
- Streets restoration & spot improvements on King Edward;
- Green Rainwater Infrastructure (various locations);
- Intersection improvements at Arbutus (Transportation Design);
- Bus stop upgrades and a relocation at Quesnel & King Edward (Transit Integration & Projects);
- Sewer separation work on W 29th Avenue (Dunbar Street to Collingwood Street) and W 30th Avenue (Collingwood Street to Blenheim Street)
Location: W King Edward Avenue from Arbutus Street to Dunbar Street
W 29th Avenue from Dunbar Street to Collingwood Street
W 30th Avenue from Collingwood Street to Blenheim Street
Schedule: Jul 4, 2022 - Feb 28, 2025; All days; 7:00 AM - 5:00 PMurn:uuid:394d21a3-d5ba-4de7-adae-df9473875e032022-06-30T07:00:00ZWest King Edward Avenue Integrated Project 2024-03-27T19:24:12.6522117Z49.25155466148246 -123.15450272155275 49.251554013387704 -123.15450304932094 49.25154589739236 -123.15455184675231 49.25153723296401 -123.1546004225948 49.25152801112611 -123.15464876307746 49.25151824091091 -123.15469684074453 49.251507922300505 -123.15474466933576 49.251497055368674 -123.1547921938849 49.2514856490742 -123.15483944190117 49.251473703491115 -123.15488635841831 49.25147090999491 -123.15489677929288Integrated project on W King Edward Ave from Arbutus to Dunbar – PM is Petru Roman.
Scope includes;
- Water renewal (north side of King Edward between Arbutus & Quesnel) - completed;
- Sewers renewal (both sides of King Edward between Dunbar & Quesnel);
- Streets restoration & spot improvements on King Edward;
- Green Rainwater Infrastructure (various locations);
- Intersection improvements at Arbutus (Transportation Design);
- Bus stop upgrades and a relocation at Quesnel & King Edward (Transit Integration & Projects);
- Sewer separation work on W 29th Avenue (Dunbar Street to Collingwood Street) and W 30th Avenue (Collingwood Street to Blenheim Street)
Location: W King Edward Avenue from Arbutus Street to Dunbar Street
W 29th Avenue from Dunbar Street to Collingwood Street
W 30th Avenue from Collingwood Street to Blenheim Street
Schedule: Jul 4, 2022 - Feb 28, 2025; All days; 7:00 AM - 5:00 PMurn:uuid:7748ad05-c0cf-4af5-83be-f6c1cea5f2542022-06-30T07:00:00ZWest King Edward Avenue Integrated Project 2024-03-27T19:24:12.6522117Z49.25147090999491 -123.15489677929288 49.25146122757815 -123.15493297094567 49.25144822140942 -123.15497922451715 49.251434684966824 -123.15502513287274 49.2514206273014 -123.1550706548159 49.25140604837668 -123.15511581782789 49.251390957243615 -123.15516058071225 49.25137536291629 -123.15520492975493 49.251359256400065 -123.15524886492688 49.251342655722766 -123.15529235880115 49.2511500764613 -123.15578711011032Integrated project on W King Edward Ave from Arbutus to Dunbar – PM is Petru Roman.
Scope includes;
- Water renewal (north side of King Edward between Arbutus & Quesnel) - completed;
- Sewers renewal (both sides of King Edward between Dunbar & Quesnel);
- Streets restoration & spot improvements on King Edward;
- Green Rainwater Infrastructure (various locations);
- Intersection improvements at Arbutus (Transportation Design);
- Bus stop upgrades and a relocation at Quesnel & King Edward (Transit Integration & Projects);
- Sewer separation work on W 29th Avenue (Dunbar Street to Collingwood Street) and W 30th Avenue (Collingwood Street to Blenheim Street)
Location: W King Edward Avenue from Arbutus Street to Dunbar Street
W 29th Avenue from Dunbar Street to Collingwood Street
W 30th Avenue from Collingwood Street to Blenheim Street
Schedule: Jul 4, 2022 - Feb 28, 2025; All days; 7:00 AM - 5:00 PMurn:uuid:bdb10405-f2e1-4eef-bd92-526c3e3c41e82022-06-30T07:00:00ZWest King Edward Avenue Integrated Project 2024-03-27T19:24:12.6522117Z49.251608234977226 -123.15382340919417 49.251607940882366 -123.15385512318863 49.251607226188725 -123.15390545532942 49.251605935799375 -123.15395577193725 49.251604069769144 -123.15400603178671 49.25160162807987 -123.15405624861714 49.251598610786516 -123.15410638120328 49.25159502688447 -123.15415642957132 49.25159086739697 -123.15420637995024 49.25158614135597 -123.154256204884 49.25158084876168 -123.15430590437089 49.25157498065576 -123.15435545089869 49.25156855504724 -123.15440483078072 49.25156156295941 -123.15445403024592 49.25155466148246 -123.15450272155275Integrated project on W King Edward Ave from Arbutus to Dunbar – PM is Petru Roman.
Scope includes;
- Water renewal (north side of King Edward between Arbutus & Quesnel) - completed;
- Sewers renewal (both sides of King Edward between Dunbar & Quesnel);
- Streets restoration & spot improvements on King Edward;
- Green Rainwater Infrastructure (various locations);
- Intersection improvements at Arbutus (Transportation Design);
- Bus stop upgrades and a relocation at Quesnel & King Edward (Transit Integration & Projects);
- Sewer separation work on W 29th Avenue (Dunbar Street to Collingwood Street) and W 30th Avenue (Collingwood Street to Blenheim Street)
Location: W King Edward Avenue from Arbutus Street to Dunbar Street
W 29th Avenue from Dunbar Street to Collingwood Street
W 30th Avenue from Collingwood Street to Blenheim Street
Schedule: Jul 4, 2022 - Feb 28, 2025; All days; 7:00 AM - 5:00 PMurn:uuid:e029a82b-870e-4bee-89ea-e7238462413d2022-06-30T07:00:00ZWest King Edward Avenue Integrated Project 2024-03-27T19:24:12.6522117Z49.2497813431159 -123.15930394905813 49.24855797210665 -123.16244456970458Integrated project on W King Edward Ave from Arbutus to Dunbar – PM is Petru Roman.
Scope includes;
- Water renewal (north side of King Edward between Arbutus & Quesnel) - completed;
- Sewers renewal (both sides of King Edward between Dunbar & Quesnel);
- Streets restoration & spot improvements on King Edward;
- Green Rainwater Infrastructure (various locations);
- Intersection improvements at Arbutus (Transportation Design);
- Bus stop upgrades and a relocation at Quesnel & King Edward (Transit Integration & Projects);
- Sewer separation work on W 29th Avenue (Dunbar Street to Collingwood Street) and W 30th Avenue (Collingwood Street to Blenheim Street)
Location: W King Edward Avenue from Arbutus Street to Dunbar Street
W 29th Avenue from Dunbar Street to Collingwood Street
W 30th Avenue from Collingwood Street to Blenheim Street
Schedule: Jul 4, 2022 - Feb 28, 2025; All days; 7:00 AM - 5:00 PMurn:uuid:816e0890-afcc-440f-8b36-e68d460556442022-06-30T07:00:00ZWest King Edward Avenue Integrated Project 2024-03-27T19:24:12.6522117Z49.24855797210665 -123.16244456970458 49.248464107121436 -123.16268091306092 49.24844769064933 -123.16271935977653 49.24831689869782 -123.16310937665534 49.24821351439414 -123.16351811389634 49.24813866823729 -123.1639411376764 49.24809317626509 -123.16437379340249 49.24807753988688 -123.16481132933711 49.248078686494665 -123.16484620607638 49.24808390200491 -123.16540754290212Integrated project on W King Edward Ave from Arbutus to Dunbar – PM is Petru Roman.
Scope includes;
- Water renewal (north side of King Edward between Arbutus & Quesnel) - completed;
- Sewers renewal (both sides of King Edward between Dunbar & Quesnel);
- Streets restoration & spot improvements on King Edward;
- Green Rainwater Infrastructure (various locations);
- Intersection improvements at Arbutus (Transportation Design);
- Bus stop upgrades and a relocation at Quesnel & King Edward (Transit Integration & Projects);
- Sewer separation work on W 29th Avenue (Dunbar Street to Collingwood Street) and W 30th Avenue (Collingwood Street to Blenheim Street)
Location: W King Edward Avenue from Arbutus Street to Dunbar Street
W 29th Avenue from Dunbar Street to Collingwood Street
W 30th Avenue from Collingwood Street to Blenheim Street
Schedule: Jul 4, 2022 - Feb 28, 2025; All days; 7:00 AM - 5:00 PMurn:uuid:c78af3b8-857c-4b15-9bf7-7d53b84609122022-06-30T07:00:00ZWest King Edward Avenue Integrated Project 2024-03-27T19:24:12.6522117Z49.24809381472639 -123.167895728248 49.24809412571483 -123.16797263387858 49.249007757915024 -123.16963806804672Integrated project on W King Edward Ave from Arbutus to Dunbar – PM is Petru Roman.
Scope includes;
- Water renewal (north side of King Edward between Arbutus & Quesnel) - completed;
- Sewers renewal (both sides of King Edward between Dunbar & Quesnel);
- Streets restoration & spot improvements on King Edward;
- Green Rainwater Infrastructure (various locations);
- Intersection improvements at Arbutus (Transportation Design);
- Bus stop upgrades and a relocation at Quesnel & King Edward (Transit Integration & Projects);
- Sewer separation work on W 29th Avenue (Dunbar Street to Collingwood Street) and W 30th Avenue (Collingwood Street to Blenheim Street)
Location: W King Edward Avenue from Arbutus Street to Dunbar Street
W 29th Avenue from Dunbar Street to Collingwood Street
W 30th Avenue from Collingwood Street to Blenheim Street
Schedule: Jul 4, 2022 - Feb 28, 2025; All days; 7:00 AM - 5:00 PMurn:uuid:df3db5c9-0cb0-44e1-ab2f-305772e47fe52022-06-30T07:00:00ZWest King Edward Avenue Integrated Project 2024-03-27T19:24:12.6522117Z49.24808390200491 -123.16540754290212 49.24809381472639 -123.167895728248Integrated project on W King Edward Ave from Arbutus to Dunbar – PM is Petru Roman.
Scope includes;
- Water renewal (north side of King Edward between Arbutus & Quesnel) - completed;
- Sewers renewal (both sides of King Edward between Dunbar & Quesnel);
- Streets restoration & spot improvements on King Edward;
- Green Rainwater Infrastructure (various locations);
- Intersection improvements at Arbutus (Transportation Design);
- Bus stop upgrades and a relocation at Quesnel & King Edward (Transit Integration & Projects);
- Sewer separation work on W 29th Avenue (Dunbar Street to Collingwood Street) and W 30th Avenue (Collingwood Street to Blenheim Street)
Location: W King Edward Avenue from Arbutus Street to Dunbar Street
W 29th Avenue from Dunbar Street to Collingwood Street
W 30th Avenue from Collingwood Street to Blenheim Street
Schedule: Jul 4, 2022 - Feb 28, 2025; All days; 7:00 AM - 5:00 PMurn:uuid:9647f873-4bd3-40b4-a77e-12f4bbceeb782022-06-30T07:00:00ZWest King Edward Avenue Integrated Project 2024-03-27T19:24:12.6522117Z49.24808390200491 -123.16540754290212 49.24809381472639 -123.167895728248Integrated project on W King Edward Ave from Arbutus to Dunbar – PM is Petru Roman.
Scope includes;
- Water renewal (north side of King Edward between Arbutus & Quesnel) - completed;
- Sewers renewal (both sides of King Edward between Dunbar & Quesnel);
- Streets restoration & spot improvements on King Edward;
- Green Rainwater Infrastructure (various locations);
- Intersection improvements at Arbutus (Transportation Design);
- Bus stop upgrades and a relocation at Quesnel & King Edward (Transit Integration & Projects);
- Sewer separation work on W 29th Avenue (Dunbar Street to Collingwood Street) and W 30th Avenue (Collingwood Street to Blenheim Street)
Location: W King Edward Avenue from Arbutus Street to Dunbar Street
W 29th Avenue from Dunbar Street to Collingwood Street
W 30th Avenue from Collingwood Street to Blenheim Street
Schedule: Jul 4, 2022 - Feb 28, 2025; All days; 7:00 AM - 5:00 PMurn:uuid:9e7bbeb3-43ca-40c0-9791-9463278954882022-06-30T07:00:00ZWest King Edward Avenue Integrated Project 2024-03-27T19:24:12.6522117Z49.249007757915024 -123.16963806804672 49.24974171251449 -123.17097606270664 49.24975371596247 -123.17099780085184 49.249766202705615 -123.1710211895711 49.249778410084616 -123.17104492085689 49.24979034715548 -123.17106895351776 49.24980201387743 -123.17109331503514 49.24981339230058 -123.1711179778652 49.24982344246368 -123.17114058873595Integrated project on W King Edward Ave from Arbutus to Dunbar – PM is Petru Roman.
Scope includes;
- Water renewal (north side of King Edward between Arbutus & Quesnel) - completed;
- Sewers renewal (both sides of King Edward between Dunbar & Quesnel);
- Streets restoration & spot improvements on King Edward;
- Green Rainwater Infrastructure (various locations);
- Intersection improvements at Arbutus (Transportation Design);
- Bus stop upgrades and a relocation at Quesnel & King Edward (Transit Integration & Projects);
- Sewer separation work on W 29th Avenue (Dunbar Street to Collingwood Street) and W 30th Avenue (Collingwood Street to Blenheim Street)
Location: W King Edward Avenue from Arbutus Street to Dunbar Street
W 29th Avenue from Dunbar Street to Collingwood Street
W 30th Avenue from Collingwood Street to Blenheim Street
Schedule: Jul 4, 2022 - Feb 28, 2025; All days; 7:00 AM - 5:00 PMurn:uuid:db320fd9-3934-4de6-beef-8845b0df75112022-06-30T07:00:00ZWest King Edward Avenue Integrated Project 2024-03-27T19:24:12.6522117Z49.249007757915024 -123.16963806804672 49.24974171251449 -123.17097606270664 49.24975371596247 -123.17099780085184 49.249766202705615 -123.1710211895711 49.249778410084616 -123.17104492085689 49.24979034715548 -123.17106895351776 49.24980201387743 -123.17109331503514 49.24981339230058 -123.1711179778652 49.24982344246368 -123.17114058873595Integrated project on W King Edward Ave from Arbutus to Dunbar – PM is Petru Roman.
Scope includes;
- Water renewal (north side of King Edward between Arbutus & Quesnel) - completed;
- Sewers renewal (both sides of King Edward between Dunbar & Quesnel);
- Streets restoration & spot improvements on King Edward;
- Green Rainwater Infrastructure (various locations);
- Intersection improvements at Arbutus (Transportation Design);
- Bus stop upgrades and a relocation at Quesnel & King Edward (Transit Integration & Projects);
- Sewer separation work on W 29th Avenue (Dunbar Street to Collingwood Street) and W 30th Avenue (Collingwood Street to Blenheim Street)
Location: W King Edward Avenue from Arbutus Street to Dunbar Street
W 29th Avenue from Dunbar Street to Collingwood Street
W 30th Avenue from Collingwood Street to Blenheim Street
Schedule: Jul 4, 2022 - Feb 28, 2025; All days; 7:00 AM - 5:00 PMurn:uuid:25b8d462-59e2-400c-878b-7dbb018ccb972022-06-30T07:00:00ZWest King Edward Avenue Integrated Project 2024-03-27T19:24:12.6522117Z49.25037168555761 -123.15778723971357 49.2497813431159 -123.15930394905813Integrated project on W King Edward Ave from Arbutus to Dunbar – PM is Petru Roman.
Scope includes;
- Water renewal (north side of King Edward between Arbutus & Quesnel) - completed;
- Sewers renewal (both sides of King Edward between Dunbar & Quesnel);
- Streets restoration & spot improvements on King Edward;
- Green Rainwater Infrastructure (various locations);
- Intersection improvements at Arbutus (Transportation Design);
- Bus stop upgrades and a relocation at Quesnel & King Edward (Transit Integration & Projects);
- Sewer separation work on W 29th Avenue (Dunbar Street to Collingwood Street) and W 30th Avenue (Collingwood Street to Blenheim Street)
Location: W King Edward Avenue from Arbutus Street to Dunbar Street
W 29th Avenue from Dunbar Street to Collingwood Street
W 30th Avenue from Collingwood Street to Blenheim Street
Schedule: Jul 4, 2022 - Feb 28, 2025; All days; 7:00 AM - 5:00 PMurn:uuid:9acdf596-f164-4adb-97e4-f61415af60852022-06-30T07:00:00ZWest King Edward Avenue Integrated Project 2024-03-27T19:24:12.6522117Z49.250628011237524 -123.1571289684377 49.25037168555761 -123.15778723971357Integrated project on W King Edward Ave from Arbutus to Dunbar – PM is Petru Roman.
Scope includes;
- Water renewal (north side of King Edward between Arbutus & Quesnel) - completed;
- Sewers renewal (both sides of King Edward between Dunbar & Quesnel);
- Streets restoration & spot improvements on King Edward;
- Green Rainwater Infrastructure (various locations);
- Intersection improvements at Arbutus (Transportation Design);
- Bus stop upgrades and a relocation at Quesnel & King Edward (Transit Integration & Projects);
- Sewer separation work on W 29th Avenue (Dunbar Street to Collingwood Street) and W 30th Avenue (Collingwood Street to Blenheim Street)
Location: W King Edward Avenue from Arbutus Street to Dunbar Street
W 29th Avenue from Dunbar Street to Collingwood Street
W 30th Avenue from Collingwood Street to Blenheim Street
Schedule: Jul 4, 2022 - Feb 28, 2025; All days; 7:00 AM - 5:00 PMurn:uuid:b6d19e5e-adb1-4674-95b8-d040af977fe62022-06-30T07:00:00ZWest King Edward Avenue Integrated Project 2024-03-27T19:24:12.6522117Z49.24618955863741 -123.18523195248837 49.24616745818935 -123.18193961987035Integrated project on W King Edward Ave from Arbutus to Dunbar – PM is Petru Roman.
Scope includes;
- Water renewal (north side of King Edward between Arbutus & Quesnel) - completed;
- Sewers renewal (both sides of King Edward between Dunbar & Quesnel);
- Streets restoration & spot improvements on King Edward;
- Green Rainwater Infrastructure (various locations);
- Intersection improvements at Arbutus (Transportation Design);
- Bus stop upgrades and a relocation at Quesnel & King Edward (Transit Integration & Projects);
- Sewer separation work on W 29th Avenue (Dunbar Street to Collingwood Street) and W 30th Avenue (Collingwood Street to Blenheim Street)
Location: W King Edward Avenue from Arbutus Street to Dunbar Street
W 29th Avenue from Dunbar Street to Collingwood Street
W 30th Avenue from Collingwood Street to Blenheim Street
Schedule: Jul 4, 2022 - Feb 28, 2025; All days; 7:00 AM - 5:00 PMurn:uuid:979e1a11-c434-4091-8fd2-28e4695c1d2b2022-06-30T07:00:00ZWest King Edward Avenue Integrated Project 2024-03-27T19:24:12.6522117Z49.25005330903335 -123.1819011817829 49.25005959403299 -123.18346161783779Integrated project on W King Edward Ave from Arbutus to Dunbar – PM is Petru Roman.
Scope includes;
- Water renewal (north side of King Edward between Arbutus & Quesnel) - completed;
- Sewers renewal (both sides of King Edward between Dunbar & Quesnel);
- Streets restoration & spot improvements on King Edward;
- Green Rainwater Infrastructure (various locations);
- Intersection improvements at Arbutus (Transportation Design);
- Bus stop upgrades and a relocation at Quesnel & King Edward (Transit Integration & Projects);
- Sewer separation work on W 29th Avenue (Dunbar Street to Collingwood Street) and W 30th Avenue (Collingwood Street to Blenheim Street)
Location: W King Edward Avenue from Arbutus Street to Dunbar Street
W 29th Avenue from Dunbar Street to Collingwood Street
W 30th Avenue from Collingwood Street to Blenheim Street
Schedule: Jul 4, 2022 - Feb 28, 2025; All days; 7:00 AM - 5:00 PMurn:uuid:da02dd86-54e8-48dc-84a7-3190787af7912022-06-30T07:00:00ZWest King Edward Avenue Integrated Project 2024-03-27T19:24:12.6522117Z49.25005330903335 -123.1819011817829 49.25005959403299 -123.18346161783779Integrated project on W King Edward Ave from Arbutus to Dunbar – PM is Petru Roman.
Scope includes;
- Water renewal (north side of King Edward between Arbutus & Quesnel) - completed;
- Sewers renewal (both sides of King Edward between Dunbar & Quesnel);
- Streets restoration & spot improvements on King Edward;
- Green Rainwater Infrastructure (various locations);
- Intersection improvements at Arbutus (Transportation Design);
- Bus stop upgrades and a relocation at Quesnel & King Edward (Transit Integration & Projects);
- Sewer separation work on W 29th Avenue (Dunbar Street to Collingwood Street) and W 30th Avenue (Collingwood Street to Blenheim Street)
Location: W King Edward Avenue from Arbutus Street to Dunbar Street
W 29th Avenue from Dunbar Street to Collingwood Street
W 30th Avenue from Collingwood Street to Blenheim Street
Schedule: Jul 4, 2022 - Feb 28, 2025; All days; 7:00 AM - 5:00 PMurn:uuid:c421667a-78d4-471f-850c-cc494535af152022-06-30T07:00:00ZWest King Edward Avenue Integrated Project 2024-03-27T19:24:12.6522117Z49.25005330903335 -123.1819011817829 49.25005959403299 -123.18346161783779Integrated project on W King Edward Ave from Arbutus to Dunbar – PM is Petru Roman.
Scope includes;
- Water renewal (north side of King Edward between Arbutus & Quesnel) - completed;
- Sewers renewal (both sides of King Edward between Dunbar & Quesnel);
- Streets restoration & spot improvements on King Edward;
- Green Rainwater Infrastructure (various locations);
- Intersection improvements at Arbutus (Transportation Design);
- Bus stop upgrades and a relocation at Quesnel & King Edward (Transit Integration & Projects);
- Sewer separation work on W 29th Avenue (Dunbar Street to Collingwood Street) and W 30th Avenue (Collingwood Street to Blenheim Street)
Location: W King Edward Avenue from Arbutus Street to Dunbar Street
W 29th Avenue from Dunbar Street to Collingwood Street
W 30th Avenue from Collingwood Street to Blenheim Street
Schedule: Jul 4, 2022 - Feb 28, 2025; All days; 7:00 AM - 5:00 PMurn:uuid:90ad250d-5d01-4e1a-b804-8896aec8ee0d2022-06-30T07:00:00ZWest King Edward Avenue Integrated Project 2024-03-27T19:24:12.6522117Z49.24520885832604 -123.181930795216 49.24519326006563 -123.17864543281519Integrated project on W King Edward Ave from Arbutus to Dunbar – PM is Petru Roman.
Scope includes;
- Water renewal (north side of King Edward between Arbutus & Quesnel) - completed;
- Sewers renewal (both sides of King Edward between Dunbar & Quesnel);
- Streets restoration & spot improvements on King Edward;
- Green Rainwater Infrastructure (various locations);
- Intersection improvements at Arbutus (Transportation Design);
- Bus stop upgrades and a relocation at Quesnel & King Edward (Transit Integration & Projects);
- Sewer separation work on W 29th Avenue (Dunbar Street to Collingwood Street) and W 30th Avenue (Collingwood Street to Blenheim Street)
Location: W King Edward Avenue from Arbutus Street to Dunbar Street
W 29th Avenue from Dunbar Street to Collingwood Street
W 30th Avenue from Collingwood Street to Blenheim Street
Schedule: Jul 4, 2022 - Feb 28, 2025; All days; 7:00 AM - 5:00 PMurn:uuid:f8a9f089-ca22-4363-bdaa-32372dd2d4882022-06-30T07:00:00ZWest King Edward Avenue Integrated Project 2024-03-27T19:24:12.6522117Z49.250014474638135 -123.17210310885055 49.25001448911698 -123.17211150456285 49.250017321425275 -123.17293755965426Integrated project on W King Edward Ave from Arbutus to Dunbar – PM is Petru Roman.
Scope includes;
- Water renewal (north side of King Edward between Arbutus & Quesnel) - completed;
- Sewers renewal (both sides of King Edward between Dunbar & Quesnel);
- Streets restoration & spot improvements on King Edward;
- Green Rainwater Infrastructure (various locations);
- Intersection improvements at Arbutus (Transportation Design);
- Bus stop upgrades and a relocation at Quesnel & King Edward (Transit Integration & Projects);
- Sewer separation work on W 29th Avenue (Dunbar Street to Collingwood Street) and W 30th Avenue (Collingwood Street to Blenheim Street)
Location: W King Edward Avenue from Arbutus Street to Dunbar Street
W 29th Avenue from Dunbar Street to Collingwood Street
W 30th Avenue from Collingwood Street to Blenheim Street
Schedule: Jul 4, 2022 - Feb 28, 2025; All days; 7:00 AM - 5:00 PMurn:uuid:a9c5c700-ae90-4592-a929-aa818f0e20522022-06-30T07:00:00ZWest King Edward Avenue Integrated Project 2024-03-27T19:24:12.6522117Z49.250014474638135 -123.17210310885055 49.25001448911698 -123.17211150456285 49.250017321425275 -123.17293755965426Integrated project on W King Edward Ave from Arbutus to Dunbar – PM is Petru Roman.
Scope includes;
- Water renewal (north side of King Edward between Arbutus & Quesnel) - completed;
- Sewers renewal (both sides of King Edward between Dunbar & Quesnel);
- Streets restoration & spot improvements on King Edward;
- Green Rainwater Infrastructure (various locations);
- Intersection improvements at Arbutus (Transportation Design);
- Bus stop upgrades and a relocation at Quesnel & King Edward (Transit Integration & Projects);
- Sewer separation work on W 29th Avenue (Dunbar Street to Collingwood Street) and W 30th Avenue (Collingwood Street to Blenheim Street)
Location: W King Edward Avenue from Arbutus Street to Dunbar Street
W 29th Avenue from Dunbar Street to Collingwood Street
W 30th Avenue from Collingwood Street to Blenheim Street
Schedule: Jul 4, 2022 - Feb 28, 2025; All days; 7:00 AM - 5:00 PMurn:uuid:2118cc28-e36b-4d2f-be5a-c598547091692022-06-30T07:00:00ZWest King Edward Avenue Integrated Project 2024-03-27T19:24:12.6522117Z49.24982344246368 -123.17114058873595 49.24982449139941 -123.1711429557795 49.24983531123502 -123.1711682075557 49.249845833796286 -123.17119374687202 49.249856059083186 -123.17121957372818 49.24986598713619 -123.17124566064246 49.249875626950256 -123.1712720076456 49.249884951560176 -123.17129860090316 49.24989397893563 -123.17132545421791 49.24990269112692 -123.17135254004563 49.24991109714932 -123.1713798446763 49.24991919698246 -123.1714073818503 49.24992697267652 -123.17143512402345 49.24993442423133 -123.17146307119528 49.249941569657494 -123.17149120968688 49.24994838198978 -123.17151952566354 49.24995487020277 -123.17154803289675 49.24996103433716 -123.17157670390442 49.24996687439287 -123.17160553868612 49.249972381395 -123.17163452346934 49.24997755536381 -123.17166364451275 49.24998239629923 -123.17169290181585 49.24998689520595 -123.17172229534691 49.24999106114038 -123.17175178391412 49.24999489406156 -123.17178139499862 49.24999838501503 -123.17181110108693 49.250001543016424 -123.17184088846902 49.250004350054866 -123.17187077082252 49.250006824181895 -123.17190070698699 49.25000894738673 -123.17193071064013 49.25001072868491 -123.17196076807174 49.25001216809687 -123.17199086554048 49.2500132656227 -123.1720210030457 49.25001402130309 -123.17205115310519 49.25001442612253 -123.17208132942788 49.250014474638135 -123.17210310885055Integrated project on W King Edward Ave from Arbutus to Dunbar – PM is Petru Roman.
Scope includes;
- Water renewal (north side of King Edward between Arbutus & Quesnel) - completed;
- Sewers renewal (both sides of King Edward between Dunbar & Quesnel);
- Streets restoration & spot improvements on King Edward;
- Green Rainwater Infrastructure (various locations);
- Intersection improvements at Arbutus (Transportation Design);
- Bus stop upgrades and a relocation at Quesnel & King Edward (Transit Integration & Projects);
- Sewer separation work on W 29th Avenue (Dunbar Street to Collingwood Street) and W 30th Avenue (Collingwood Street to Blenheim Street)
Location: W King Edward Avenue from Arbutus Street to Dunbar Street
W 29th Avenue from Dunbar Street to Collingwood Street
W 30th Avenue from Collingwood Street to Blenheim Street
Schedule: Jul 4, 2022 - Feb 28, 2025; All days; 7:00 AM - 5:00 PMurn:uuid:4303e37b-bdda-4d98-addb-5faf3f3532cd2022-06-30T07:00:00ZWest King Edward Avenue Integrated Project 2024-03-27T19:24:12.6522117Z49.24982344246368 -123.17114058873595 49.24982449139941 -123.1711429557795 49.24983531123502 -123.1711682075557 49.249845833796286 -123.17119374687202 49.249856059083186 -123.17121957372818 49.24986598713619 -123.17124566064246 49.249875626950256 -123.1712720076456 49.249884951560176 -123.17129860090316 49.24989397893563 -123.17132545421791 49.24990269112692 -123.17135254004563 49.24991109714932 -123.1713798446763 49.24991919698246 -123.1714073818503 49.24992697267652 -123.17143512402345 49.24993442423133 -123.17146307119528 49.249941569657494 -123.17149120968688 49.24994838198978 -123.17151952566354 49.24995487020277 -123.17154803289675 49.24996103433716 -123.17157670390442 49.24996687439287 -123.17160553868612 49.249972381395 -123.17163452346934 49.24997755536381 -123.17166364451275 49.24998239629923 -123.17169290181585 49.24998689520595 -123.17172229534691 49.24999106114038 -123.17175178391412 49.24999489406156 -123.17178139499862 49.24999838501503 -123.17181110108693 49.250001543016424 -123.17184088846902 49.250004350054866 -123.17187077082252 49.250006824181895 -123.17190070698699 49.25000894738673 -123.17193071064013 49.25001072868491 -123.17196076807174 49.25001216809687 -123.17199086554048 49.2500132656227 -123.1720210030457 49.25001402130309 -123.17205115310519 49.25001442612253 -123.17208132942788 49.250014474638135 -123.17210310885055Integrated project on W King Edward Ave from Arbutus to Dunbar – PM is Petru Roman.
Scope includes;
- Water renewal (north side of King Edward between Arbutus & Quesnel) - completed;
- Sewers renewal (both sides of King Edward between Dunbar & Quesnel);
- Streets restoration & spot improvements on King Edward;
- Green Rainwater Infrastructure (various locations);
- Intersection improvements at Arbutus (Transportation Design);
- Bus stop upgrades and a relocation at Quesnel & King Edward (Transit Integration & Projects);
- Sewer separation work on W 29th Avenue (Dunbar Street to Collingwood Street) and W 30th Avenue (Collingwood Street to Blenheim Street)
Location: W King Edward Avenue from Arbutus Street to Dunbar Street
W 29th Avenue from Dunbar Street to Collingwood Street
W 30th Avenue from Collingwood Street to Blenheim Street
Schedule: Jul 4, 2022 - Feb 28, 2025; All days; 7:00 AM - 5:00 PMurn:uuid:c669f215-00b3-4571-b352-643074b1c2092022-06-30T07:00:00ZWest King Edward Avenue Integrated Project 2024-03-27T19:24:12.6522117Z49.25003470649344 -123.17800321599113 49.25003658161589 -123.17860089522597Integrated project on W King Edward Ave from Arbutus to Dunbar – PM is Petru Roman.
Scope includes;
- Water renewal (north side of King Edward between Arbutus & Quesnel) - completed;
- Sewers renewal (both sides of King Edward between Dunbar & Quesnel);
- Streets restoration & spot improvements on King Edward;
- Green Rainwater Infrastructure (various locations);
- Intersection improvements at Arbutus (Transportation Design);
- Bus stop upgrades and a relocation at Quesnel & King Edward (Transit Integration & Projects);
- Sewer separation work on W 29th Avenue (Dunbar Street to Collingwood Street) and W 30th Avenue (Collingwood Street to Blenheim Street)
Location: W King Edward Avenue from Arbutus Street to Dunbar Street
W 29th Avenue from Dunbar Street to Collingwood Street
W 30th Avenue from Collingwood Street to Blenheim Street
Schedule: Jul 4, 2022 - Feb 28, 2025; All days; 7:00 AM - 5:00 PMurn:uuid:71a85766-4460-4e7b-8f44-7acd0c5d323c2022-06-30T07:00:00ZWest King Edward Avenue Integrated Project 2024-03-27T19:24:12.6522117Z49.250026745540595 -123.17569977982996 49.25003470649344 -123.17800321599113Integrated project on W King Edward Ave from Arbutus to Dunbar – PM is Petru Roman.
Scope includes;
- Water renewal (north side of King Edward between Arbutus & Quesnel) - completed;
- Sewers renewal (both sides of King Edward between Dunbar & Quesnel);
- Streets restoration & spot improvements on King Edward;
- Green Rainwater Infrastructure (various locations);
- Intersection improvements at Arbutus (Transportation Design);
- Bus stop upgrades and a relocation at Quesnel & King Edward (Transit Integration & Projects);
- Sewer separation work on W 29th Avenue (Dunbar Street to Collingwood Street) and W 30th Avenue (Collingwood Street to Blenheim Street)
Location: W King Edward Avenue from Arbutus Street to Dunbar Street
W 29th Avenue from Dunbar Street to Collingwood Street
W 30th Avenue from Collingwood Street to Blenheim Street
Schedule: Jul 4, 2022 - Feb 28, 2025; All days; 7:00 AM - 5:00 PMurn:uuid:5f93e808-5c36-47da-a0fd-6f29e32704be2022-06-30T07:00:00ZWest King Edward Avenue Integrated Project 2024-03-27T19:24:12.6522117Z49.25003658161589 -123.17860089522597 49.25005330903335 -123.1819011817829Integrated project on W King Edward Ave from Arbutus to Dunbar – PM is Petru Roman.
Scope includes;
- Water renewal (north side of King Edward between Arbutus & Quesnel) - completed;
- Sewers renewal (both sides of King Edward between Dunbar & Quesnel);
- Streets restoration & spot improvements on King Edward;
- Green Rainwater Infrastructure (various locations);
- Intersection improvements at Arbutus (Transportation Design);
- Bus stop upgrades and a relocation at Quesnel & King Edward (Transit Integration & Projects);
- Sewer separation work on W 29th Avenue (Dunbar Street to Collingwood Street) and W 30th Avenue (Collingwood Street to Blenheim Street)
Location: W King Edward Avenue from Arbutus Street to Dunbar Street
W 29th Avenue from Dunbar Street to Collingwood Street
W 30th Avenue from Collingwood Street to Blenheim Street
Schedule: Jul 4, 2022 - Feb 28, 2025; All days; 7:00 AM - 5:00 PMurn:uuid:b6c9bcef-4d69-43ad-8775-81c0ed77c84c2022-06-30T07:00:00ZWest King Edward Avenue Integrated Project 2024-03-27T19:24:12.6522117Z49.250026745540595 -123.17569977982996 49.25003470649344 -123.17800321599113Integrated project on W King Edward Ave from Arbutus to Dunbar – PM is Petru Roman.
Scope includes;
- Water renewal (north side of King Edward between Arbutus & Quesnel) - completed;
- Sewers renewal (both sides of King Edward between Dunbar & Quesnel);
- Streets restoration & spot improvements on King Edward;
- Green Rainwater Infrastructure (various locations);
- Intersection improvements at Arbutus (Transportation Design);
- Bus stop upgrades and a relocation at Quesnel & King Edward (Transit Integration & Projects);
- Sewer separation work on W 29th Avenue (Dunbar Street to Collingwood Street) and W 30th Avenue (Collingwood Street to Blenheim Street)
Location: W King Edward Avenue from Arbutus Street to Dunbar Street
W 29th Avenue from Dunbar Street to Collingwood Street
W 30th Avenue from Collingwood Street to Blenheim Street
Schedule: Jul 4, 2022 - Feb 28, 2025; All days; 7:00 AM - 5:00 PMurn:uuid:4162d308-d29b-4928-938c-59bae0717daa2022-06-30T07:00:00ZWest King Edward Avenue Integrated Project 2024-03-27T19:24:12.6522117Z49.250017321425275 -123.17293755965426 49.250026745540595 -123.17569977982996Crews will be on site to conduct Underground Utility Construction on behalf of Metro Vancouver
Traffic Impacts:
24hr Reduced Lanes, Westbound, 4400-4600 Block W 16th Ave from Trimble St to Tolmie St
WO#: PD773438
Extension: Sunday, Mar 31, 2024
Location: 4400-4600 Block W 16th Ave
Schedule: Nov 27, 2023 - Apr 30, 2024; All daysurn:uuid:d0e8379e-e8f0-4f95-bae6-d44d9caacc4d2023-11-22T08:00:00Z[24hr] Metro Vancouver - Underground Utility Construction2024-03-11T18:28:11.5162932Z49.25826091809452 -123.20627666304014 49.25837533321493 -123.2139970471255Crews will be onsite to conduct Overhead maintenance at 3000-3100 blk of Knight St on behalf of BC Hydro
Traffic Impacts: Travel Lane Closure at East side of 3000-3100 blk of Knight St from Lane South of E15th Ave to South PL3024 Knight St
WO: W2401369-01
Location: E/S of 3000-3100 blk of Knight St
Schedule: Mar 30, 2024 - Mar 30, 2024; Sa; 8:00 AM - 5:00 PMurn:uuid:75d56c1c-536d-404a-8872-5b98a918b4502024-03-25T07:00:00Z[WEEKEND] BC Hydro - Overhead Maintenance at 3000-3100 Block of Knight St2024-03-25T22:13:24.7296637Z49.256999499807335 -123.0759424944895 49.256040167247676 -123.07589421472723